Page 1: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

ISO 9001: 2008 C: 382

MGMT.SYS CERTIFIED

OHSAS 18001:2007 OHS: 64

MGMT.SYS CERTIFIED

Page 2: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

BUILT IN CONTRACTING and

TRADING w. l. l

C O M P A N Y P R O F I L E

Page 3: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

CONTENTS

1. Company Particulars

2. About Us

- ISO 9001:2008 Quality Management System Certificate

- OHSAS 18001:2007 Occupational Health & Safety Management

Certificate

3. Organizational Chart and CV’s of Key Personnel

4. Equipment List

5. Main Projects Executed in Qatar During the Last 5 Years

6. Work Certificates and Awards

7. Quality and OHS Policy

Page 4: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Company Particulars

Page 5: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Company Particulars

Company Name: Built-in Contracting and Trading W.L.L. Established: 2 0 0 2

Commercial Registration No: 2 4 7 2 2

P.O. Box: 2 2 9 5 0

Office Location: 5th Floor, Al Rufaa Tower Al Meena Street Doha - State of Qatar Maintenance Store: Sylia City

Phone No: (0974) 44 36 3962

Fax No: (0974) 44 36 3963

E- mail: [email protected] Kind of Company: Partnership

Partners: Fuad AL SIDDIQI Jean Pierre SAADE Antoine GHARIOS Ghassan SALIBA Work Force: 188 Employees and Laborers Bank Reference: Doha Bank Laboratory: Qatar Industrial Laboratories Doha Technical Laboratories

Page 6: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 7: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 8: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

About Us

Page 9: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

About Us

Built-In has been established in Qatar since 2002 and in Lebanon since 1987. We

escorted the huge volume of reconstruction work that has started early Nineties

when the Lebanese war was over. And through our years of experience we have

rapidly grown especially in Qatar and developed in the following lines:

a) Road Construction Projects: Asphalt, Sub Base, Utilities, and Special

drilling works.

b) EHV Cabling Work: Kahramaa’s Approved Subcontractor. (as per enclosed letter)

Moreover, we are certified for QUALITY MANAGEMENT SYSTEM: ISO 9001:2008 and OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM: OHSAS 18001:2007 (enclosed certificates)

Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers, Drainage and Asphalt Pavement with Curbstones and Gutters. All through our past performance, we always succeeded in fulfilling our commitment in handing over the projects within the scheduled time. Our maneuverability allows us to shift very quickly to the next work location scoring an exceptional short mobilization time. We can mobilize three fully equipped Asphalt Teams together with the same number of Sub Base Teams and they can be increased to our needs. We are completing Sub Base laying works using our Pavers in Salwa Road Project (Doha Expressway - Package 7 – Salwa Road Phase 2) and the Additional Road beyond CP7 Boundary Site in Qatar Foundation – Education City.

Page 10: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

In many occasions we showed proof of high efficiency especially in heavy traffic areas like NDIA North Extension of Ras Abou Abboud Road where performance, planning and coordination were essential in the construction of diversions which were tied to the existing roads. These diversions were intended to replace Ras Abou Abboud Bridge and bypass the existing round about. Despite the heavy traffic, our Teams where carrying out with great confidence, Asphalt Pavement Works even during day shifts, in the area extending from Sana Round About to NDIA North Entrance. These Asphalt Works started in November 2007 and ended in February 2010. They lasted almost 2 years and amounted QR 28 Millions in two years. In the same period we were working on two other main Asphalt Projects: The first one is in Messaieed (Q–Chem II) amounting QR 32 Millions and consisting of two layers of Asphalt Pavement of 150,000 m2 each. The second one is in RasLaffan (Laffan Refinery) with a value of QR 12 Millions and covering 76,000 m2 of Asphalt for each two layers. These three projects in almost 2 years time totaled QR 72 Millions and were all handed over. Other smaller road projects were in hand in this period in addition to a QR 30 Millions Kahramaa Cable Laying project. Later on we were involved in Road & Car Parking works in NDIA especially at CP14, CP18, and CP60 and in Sub-base works at CP94, CP51 and CP69. In February 2010 we started a fast track project in Ras Laffan for FLUOR – Medgulf. It consists of one layer Sub base and three layers of Asphalt with a cost of QR 8.6 Millions. In less than two months we laid 15,000 Tons of Asphalt in addition to Excavation, Sub base and Road Marking. We were awarded for the fast and safe achievement of this project. Furthermore in 2012 we achieved successfully the Car Parking at School of Business Building Premises in Qatar University having a total area of

Page 11: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

16,000 m2 of Pavement and Soft Landscaping including Piling & Concrete foundations. Actually we are completing in Qatar University another Car Parking at AAB Premises where we are involved in Piling Works for Car Sheds Foundations in addition to Earthworks & Pavement. We almost completed a Kahramaa Project for Cable Laying at Bin Mahmoud and Al Nassr where we found, during excavation, a congested area full of existing underground utilities that have been maintained operational without any damage.

In all our projects our goal is to enhance the satisfaction of our clients. Through the effort of our team that consists of Professional Civil Engineers, Business Managers, Technicians and skillful operators and laborers working together and doing their best to deliver excellence in quality, exceeding Customer expectation, while time frame is fully committed and safe operation maintained.

Page 12: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 13: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 14: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Organizational Chart

And CV’s of Key Personnel

Page 15: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

ORGANIZATIONAL CHART

Managing Partner Ghassan Saliba

Document

Controller Biju Mathew

P.R.O

Emil Karam

Executive

Secretary Naneth Gulde

EHV Projects Manager

LR & DP

Programme

Manager

Procurement

Manager

Maroun Chahine

Accountant

Soni Mathew

HR Manager

Rabih Boutros

Maintenance

Department Chief

Maroun Azar

Chief Surveyor

Azareel Moral

Project Safety

officers

Quantity

Surveyor

Sudin Kumar

Safety Supervisor

Taofeeq Abiodun

Rufai

Planning

Engineer

Ahmad Ziyath

Site Engineers

Surveyors &

Helpers

QA/QC

Engineer

Girirajan N.

Chief Technician Foremans and Gang Leaders

Equipment Operators and Laborers

Project

Manager

Nakhle Moussa

Operations

Manager

Fadi Najm

Secretary/

Receptionist Farah Robiso

Techns. & Helpers

Management

Representative

Fadi Najm

Page 16: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

G H A S S A N E . S A L I B A

WORKING EXPERIENCE

1- BUILT-IN CONTRACTING AND TRADING WLL

(July 2002 to date) - Qatar:

Built-In Subcontracting Activities are distributed as follows:

- Infastructure works featuring earth working, sub base laying, asphalting, hard and soft landscaping, etc.

- EHV and HV Cable Work : Approved Subcontractor from Kahramaa - Building and Villas compounds construction. Position: Managing Partner Duties: - Being the resident partner in Qatar. I established the Company, after conducting a thorough marked study enabling the partners to estimate the potentials. - I am managing the Company’s operation and administration, mainly:

Handling public relations.

Pricing, quoting and leading tendering process including documents and drawings study.

Negotiating and singing contracts.

Negoitiating suppliers.

Interviewing and recruiting staff.

Supervising projects execution and implementing quality standards and time schedules.

Dealing with projects consultants and clients engineers. Built-In Portfolio covers Major Contracting Companies Executing Major Projects in Qatar i.e: Qatar University

Car Parking at School of Business Building Premises

Construction of Car Parking at AAB Premises Daewoo E & C

Q – Chem II Extension - Messaeid

Laffan Refinery – Ras Laffan

Page 17: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Hyundai E & C

QAFCO – 5 – Mesaied

Midmac Company:

NDIA – North/South Extensions to RAAR

Khalifa Stadium ( Olympic Sports Stadium)

Lusail Motorcycle Racetrack

Qatar Foundation Housing Compound

Salwa Road Phase II Siemens and Saudi Cable Company:

EHV and HV Cable Work in Phase VII and GTC/394/2010

Arab Construction Company:

Al Udeid Air Base

Platinum Tower United Engineers Berhad (Malaysian Company):

Salwa International Highway – Phase I. MAN Enterprise:

Twin Towers – Dafna Area Mabani Qatar:

Ras Laffan – Doha Pipe Line

Duheil Roads Reinstatement. 2- BUREAU D’ETUDES ALAIN JOSEPH & ASSOCIES and BUREAU D’ ETUDES GHASSAN SALIBA (July 1987 – May 2002) - Lebanon: Activities of the Two Establishments:

Achitecture and Structure Design

Projects Management

Projects Supervision

Interior Decoration Projects: Design, Supervision, and Management.

Page 18: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Position: Partner in BUREAU D’ETUDES ALAIN JOSEPH & ASSOCIES and owner of BUREAU D’ ETUDES GHASSAN SALIBA

Duties:

Structure Design: Head of the team of Civil Engineers: Our office was among the first offices using IT in design and drawing in Lebanon.

Supervision of Projects Execution: Residential and offices buildings, interior decoration works.

Project Management: monitoring execution quality and time schedule and cost reducing.

Coordination among architects, civil engineers, electro – mechanical engineers, interior architects and landscape designers.

Negotiating and singing contracts. Clients Porfolio Covers: - Indevco Group ( Major Industrial Company) :

Office building design and execution supervision. - First National Bank

Interior decoration works of five branches. - College des Apotres (Major School)

Design and management of new buildings projects. -Humanitarian Institutions

Longue Vie: Old Age Pension design and execution supervision

Maronite Social Fund : Residential Compound for clients having limited income.

Ministry of Post and Telecommunications

Supervision of the main office building reinstatements.

Supervision of Telephone Network Project in Lebanon.

Page 19: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

- Structure Design for many other Architecture Design Offices. - Supervision management of residential compounds, buildings, villas and apartments.

3- SASCO GROUP (July 1982 – June 1987) – Lebanon:

SASCO Activities Cover:

Construction of residential and office buildings for sale to end - users.

Interior decoration works. Position: Project Manager Duties:

Execution of projects

Structure design of the company projects.

Responsible of building materials purchasing.

Follow-up with the buyers of the company flats and offices.

Negotiating, singning contract with the sub-contractors. Main Executed Projects

Assli Residential Building – Horsh Tabet: Luxurious flats building in a high standard area of Beruit.

Assli Residential Building – Brummana : Residential Building including the company owner ( S. Assli) residence.

Interior decoration work of Assli residence.

Banque Trad – Credit Lyonais: Main Branch Offices Building.

Interior decoration work of Trad Villa.

Al Saydeh office building .

Villa Gharghour Construction – El Rabieh.

Surock Residential Building : 450m2 area flats in Beruit.

SASCO Group offices building .

Page 20: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

PERSONAL DATA

Date & Place of Birth: November 8th, 1959 -

Ka-el-Rim, LEBANON Marital Status: Married Nationality: Lebanese Qatar Residency: Company Sponsorship

EDUCATION

1. Universite Saint Joseph, Faculte d’Ingenierie, Ecole

Superieure d’Ingenieurs de Beyrouth, Beirut (July 1982) Diploma of Civil Engineer , Public Work Section (5 years)

2. Beirut Annunciation Orthodox College, Beirut (June 1977)

Lebanese Baccalaureate, Section II, Mathematics ranch.

INTERESTS

Chess, traveling, music and skiing.

TIPS

Computer Skills: Structure Design Program, Auto Cad, Windows, Word, Excel, and Internet. Languages: Fluency in English, French and Arabic (written & spoken).

Al Rufaa Tower 5th Floor, Al Meena St. Near Sana Signal - DOHA - QATAR P .O.BO X 22950 Doha E- MAIL: bui l t in@q atar .n et . qa

Page 21: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

CURRICULUM VITAE

Name : Fadi Said NAJM

Mother’s name : Antoinette WEHBE

Date of Birth : Rechmaya 6 March 1960

Nationality : Lebanese

Marital Status : Married

Telephone (Mob) : +974 5587 6871

Languages : Arabic, French and English (written and spoken)

School education : College du Sacré Coeur — Gemmayzeh

And College Mont La Salle — AinSaadeh(BaccII, Math)

University Degree : From 1978 to 1983

Civil Eng. /Structure 1983 ESIB -USJ

Member of the Lebanese Order of Engineers and Architects (OAE) Beirut, since 1983.

Experience Summary

I started my career, as Site Engineer, with all works related to infrastructure networks such as:

Drainage, Sewerage, Water Supply, Telephone Ducts, MediumVoltage BuriedCables,Street Lighting & Sidewalks. In addition to Pavement & Concrete Structures such as Retaining Walls, Box Culverts

& small Bridges; with all relevant Excavation Works, Topographic Survey & Shop Drawings.

Then I was assigned to Quantity Survey, Coordination with consultant, Payments & I was involved in pricing of many tenders.

The Second part of my experience as a Project Manager was essentially Planning, Management & Procurement together with the Checking of Shop Drawings to be submitted to the Consultant, Payments, Claims& Pricing.

As a Structural Engineer, I made or shared the Design of several Buildings in Lebanon. My

Computer skills include the Following: Excel, Word, and Microsoft Project & with some ability inAutoCAD.

Major of my Experience was in Road Construction & Infrastructure, but I was appointed as Project

Manager for many Building Projects such as:

a) Saint Rita Church in HorshTabet- Sin El Fil- Lebanon

b) Roumieh Barracks for the Lebanese Army Roumieh – Lebanon c) Rachaya Technical School for CDR - Ministry of Education Rachaya - Lebanon

These projects comprised:Planning, Shop Drawings, Excavation, Setting out, Concrete Works, Mechanical & Electrical Works, Finishing Works & Pavement in addition to Procurement, Quantity

Survey & payments.

Page 22: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

WORK EXPERIENCE

In QATAR

Company : Built In Contracting & Trading - Qatar

Position : Operations Manager

January 2012 till present

1. Car Parking at AAB Premises - Qatar University

- Excavation, Fill for parking, Drainage and Asphalt.

2. CP 7 - Qatar Foundation

- Roadwork Excavation, Drainage, Sewerage

3. GTC/394/2010

Establishment of 66KV and 132KV Urgent Cable Lines

Doha Super to Al MergabMall.

- Cable Work: Trench Excavation, 66KV Cable Laying,Filling, Reinstatement - Kahramaa – EPE

- Main Contractor: Saudi Cable Company

- Value: QR 14,400,540 QR

4. EPIC for the Phase 1 of the Expansion of Waste Water Treatment Plant – Messaieed

- Roadwork: Excavation, Fill, Sub base, Asphalt, Drainage, Palisade Fence, Side Walks, Car Shades

- Qatar Petroleum – KEO

- Main Contractor: Hyosung-Ebara

- Value: QR 3,900,000 QR

July 2011 to December 2011

1. Passenger Terminal Complex: CP 18 – NDIA

- Roadwork: Excavation, Filling, Sub-base, Asphalt Pavement, Marking & Signing.

- NDIA – OBI (Bechtel)

- Main Contractor: Sky Oryx (Taisei-TAV)

- Value: 6,400,000 QR

2. Central Utility Plants: CUP 2,3 & 4 – NDIA

- Road work: Excavation, Backfilling, Sub-base, Asphalt Pavement, Marking & Signing. - NDIA – OBI (Bechtel)

- Main Contractor: CAT International

- Value: 2,100,000 QR

3. Helium 2 HeXu – RasLaffan

- Road Work: Sub-base, Asphalt Pavement & Marking

- RAS GAS - Main Contractor: Medgulf

- Value: 898,700 QR

Page 23: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

January 2011 to June 2011

1. Zikreet Office Building - RasLaffan

- Road Work: Sub base, Asphalt Pavement - RAS GAS

- Main Contractor: Medgulf

- Value 1,900,000 QR

2. QAFCO 5 – Fertilization Complex – Messaieed

- Road Work: Asphalt Pavement , Guard Rails, Marking

- QAFCO – SAIPEM - Main Contractor: Hyundai E & C

- Value: 9,800,000 QR

3. EPIC for Electrical & Telecom Utilities for Support Service Area, Phase 1 & 2 – RasLaffan

- Road Work: Excavation, Sub-base, Kerbs, Asphalt Pavement, Marking & Signing

- Qatar Petroleum

- Main Contractor: Larsen & Toubro - Value: 2,150,860 QR

March 2010 – December 2010

1. Berth 6-Common Lean LNG Loading Facilities-RasLaffan

- Road work: Excavation, Sub base, Asphalt Pavement

- Qatar Gas

- Main Contractor:Medgulf Company - Value: 8.4 Million QR

2. Epic of Gas Supply to Station V and Facility C Pipeline - RasLaffan. - Road Work: Sub base, Pavement

- Qatar Petroleum

- Main Contractor: Larsen & Toubro - Value: 3.1 Million QR.

3. School of Foreign Service (Georgetown University)

- Road work: Subbase, Pavement - Qatar Foundation / QP

- Main Contractor:Midmac Company

- Value: 1.5 Million QR

September 2008 to February 2010

1. North South Extension toRas Abu Abboud Road

- Road Work: Excavation, Fill,Subbase, Asphalt Pavement - NDIA

- Main Contractor: Midmac- Yuksel

- Value: 26 Million QR 2. Q-Chem II

- Road Work: Excavation, Subgrade, Gutters, Subbase, AsphaltGuard rails, Road Marking.

- For Q-Chem II-Messaieed

- Daewoo Engineering & Construction - Technimont - Value: 33,000,000 QR

Page 24: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

3. Qatar Transmission System Expansion Phase 8 - Contract No.: GTC-142B/2006=(AWS to Ray)

- HV Cable Work: Excavation & Laying of 66kv Cable

- For Kahramaa- ETA Star Company

- Value: 3.6 Million QR.

January 2007 to August 2008

1. Qatar Transmission system expansion Phase VI, Contract no: GTC/5/2004,

- Cable Work: High voltage 66 kV cable circuit: New Doha J to Lagoon Plaza Substation;

Wakrah to Wakrah central substation; Old airport to Old airport north 11kV outgoing cables for 16 substations

- For Kahrama – Siemens Consortium

- Value: 6,689,880 QR

2. Qatar Transmission system expansion Phase VII, Contract no: GTC/124/2006/D,

- Cable Work: High voltage 66 kV cable circuit:

- Old Airport East to Mosseimeer - For Kahramaa – Saudi Cable Company

- Value: 29,726,043 QR

3 Road & Asphalt works for the following projects:

- RLPB Roads for Larsen & Toubro / Siemens – RasLaffan

- Roads for (GS-Daewoo) – Laffan Refinery Project and Tank Farm

- Asphalt for Bilfinger - (Diversions) - Road Works for – MidmacYuksel – NDIA Road- North Extension(Diversions)

- Road works for Gamuda-Dukhan Highway

- Bitumen Sand (Tank Foundation) for Descon& CCC - Pearl GTL Project– RasLaffan

Company : MAN ENTERPRISE - Qatar

Position : Construction Manager Year 2006 :Infrastructure for Science and Technology Park.

Education City — Qatar Foundation - (QP)

Consultant: K E O

Sewerage & Storm Networks, Roads, Landscaping

Value (158, 000, 000 QR)

Company : Office HAMID KEYROUZ — Lebanon

Position : Project Manager

Years 03 —05 :Rehabilitation of Jeita- AintouraRoad: Road &Infrastructure value (2,970,000 $) Client:CDR --- Consultant: Team International Sin el Fil Roads Rehabilitation & Infrastructure (400,000$) - World Bank

Rachaya Technical School: Building (1,200,000 $) Client: CDR. Consultant: AbdelwahedChehab

Pricing & Bidding for over 6 Projects.

Page 25: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Years 02— 03 :Rehabilitation of Roads & Infrastructure of BorjHammoud Municipality. World Bank (1,500,000 $)

Beirut City Sidewalks Upgrading: Achrafieh (700,000 $) Client: CDR. Consultant: Dar Al Handasah (Taleb)

Years 00—01:Bsharry Road, Lebanon: Mainly Infrastructure &Pavement (3,900,000$) Client: MPW --- Consultant: Dar Al Handasah (Taleb)

Pricing &Bidding for more than 25 Projects mainly infrastructure.

Years 99—00:Army Barracks - Roumieh, Lebanon.

Construction of an army Barracks at Roumieh (840,000$)

Client: 1SF & Army

Consultant: 1SF Building Department.

Years 98—99:Contract “ABC - Area II” Road Construction and Rehabilitation of infrastructure utilities at BourjHammoud& Beirut Northern Suburbs (4,680,000$)

Roads & Infrastructure.

Client: CDR ---- Consultant: Dar Al Handasah (Shair& Partners)

Company:HABIB HAKIM & FILS SAL - Lebanon

Position: Project Manager

Years 97 - 98:Mkalles- Mansourieh road - Road Construction (Excavation & Pavement)

(1, 600,000 $)

Client: MPW ---- Consultant: ACE

Years 94 - 96:Upgrading of Beirut Northern Suburbs (10,600,000$)Nahr el Mott Dekwaneh- Urgent Works - (Road F & Road D) (1 ,200,000$)

Jal el Dib - Dora Dora- KarantinaRoad works & Infrastructure : Box Culvert &

Utilities. Client: CDR ---- Consultant: Dar Al Handasah (Shair& Partners)

- Pricing & Bidding for more than 6 Projects mainly infrastructure.

Company:HABIB HAKIM & FILS SAL - Lebanon Position: Site Engineer

Years 93: Prequalification, Pricing & Bidding for over 20 contracts mainly infrastructure

&road construction. Client: CDR

Years 91-92: Asphalt works in Beirut -Client: CDR – 1,200,000 $

- Asphalt works in Metn Client: MPW – 2,800,000 $

Years 88 -90: Saint Rita Church - HorshTabet- Sin El Fil

- Reinforced concrete structure (1,100,000$) Client: Maronite Archdiocese ---- Consultant: Said BITAR

Page 26: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Years 83 - 87: Rehabilitation of Roads network

- Jbeil- Madfoun Road - 3,200,000 $

-Nahr el Mott - Hazmieh road -3,800,000 $

-Nahr Beirut - Bickfaya road – 2,400,000 $

Mainly Infrastructure & Pavement Client: CDR ---- Consultant: Dar Al Handasah (Taleb)

Page 27: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

CURRICULUM VITAE

Name : Nakhle

First Name : Moussa

Father’s Name : Amine

Mother’s Name : Najibee

Nationality : Lebanese

Place of Birth : Rechmaya

Date of Birth : January 23, 1961

Status : Married

Mobile No.: : 00974 – 5589 4960

Education : B. S. Civil Engineering – 1987

Language Spoken : Arabic, English and French

Work Experience : 2007 to date – Built - In Contracting & Trading (Qatar) Site Manager

Project - Car Parking at AAB Premises Excavation, Sub Base Asphalt, Street Lighting, Hard & Soft Landscaping (2013)

Project - Car Parking at School of Business Building Premises Excavation, Sub Base Asphalt, Street Lighting, Hard & Soft Landscaping (2011-2012)

Project – Sky Oryx - NDIA – CP 18 Excavation, Asphalt Pavement, Road Marking & Traffic Signs (2011-2012)

Project – QAFCO 5 – Messaieed Asphalt and Guard Rails (2010 – 2011)

Project - Medgulf Construction Co. – Ras Laffan Excavation and Road Work (2009 – 2010)

Project - Midmac Yuksel – N. D. I. A. Naval Base Parking and New Doha Diversion (2008–Present)

Page 28: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Project– Midmac Yuksel - New Doha International Airport Excavation and Road Work (2007 – 2008)

Project – Saudi Cable Co. - KAHRAMAA 66 kV Cable Work including Asphalt and Reinstatement (2008- 2009)

Project – Daewoo E & C – Q Chem – Mesaeeid Excavation and Road Work (2008 – 2009)

2005 – 2007 - Moussa for Trading and Contracting (Lebanon) Specialized in Waterproofing System, Renovation, Concrete Repair and Infrastructures. 2003 – 2004 - Al Nakoura Water Line Project and Electric Station at the UNIFIL Subcontractor of Water Tech Company.

2000 – 2002 - P. S. T. N. Subcontractor of Al Mabani and Al Zakhem and C. E. T.

1988 – 1999 - Al Mabani Company General Contracting (Saudi Arabia) Site Manager Earthwork, Bridges and Infrastructure

Project – ABHA Airport Trumpet Interchange

Project – Haiil Aiport

Reasphalting the Runway, Taxiway, Building New Box Culvert and Renew the Old Batiment.

Project – Éclair 2- King Fahed Airport

Shelter for the Helicopter Super Puma and Road around the Airport.

Project – BAHRA Strategy Tank for Gasoline and Road Around.

Project - Network Telecom with Libancell

Towers and Building in Bekaa Area

Project – Al Mzaar 2000 – Parking Chalet of Five Star Hotel Responsible for Steel and Wood Yard, Batch Plain Formwork pouring Concrete.

Page 29: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

References :

Engr. Toni Sayegh Al Mabani Company 00961-3600030 Engr. Jean Gebran C. E. T. Company 00961-3275099 Engr. Charbel Yazbeck Water Tech Company 00961-3576757

Engr. Farouk Ghaziri Freyssinet Company (Al Riad) 00966-4767248

Page 30: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

CURRICULUM VITAE

Azareel Lamela Moral P.O. Box 22950 Doha, Qatar

Mobile # 5557 5283

Email: [email protected]

WORK EXPERIENCE

BUILT-IN CONTRACTING

Doha, Qatar

June 2006 to Present

Planning Engineer. In-charge of planning and monitoring progress of works. Tasked to

maintain high level of tracking in project execution. Closely coordinate with the project

manager to review possible changes and identify additional cost or potential savings in the

future. Also monitor, adjust and update the cost plan and consolidate results in weekly

reports.

Some of Major Road Work Projects:

Construction of Car Park at AAB Premises - Qatar University; Car Parking at

School of Business Building Premises - Qatar University; Passenger Terminal

Complex – NDIA CP 18; QAFCO 5 - Messaieed; GTC/394/2010 Establishment of

66KV and 132 KV Urgent Cable Lines; GSVC – Ras Laffan; Electrical &

Telecom Utilities –Ras Laffan; Q –Chem II – Messaieed; Laffan Refinery - Ras

Laffan; Extension to RAAR – NDIA.

SAMAMA PRECAST CO.

Riyadh, Kingdom of Saudi Arabia

June 2003 to December 2005

Planner. Assigned for different projects in Southern area of The Kingdom of Saudi Arabia

for the school projects of the Ministry of Education. Primary task is to set a feasible schedule

for buildings, underground structures, roads and utilities. Establish milestones for every

structure. Prepare site development plan phasing and interface drawing using AutoCAD.

Coordinate with the consultant to maintain realistic time frame for all site works. All

undertakings were closely coordinated and reported directly to the project manager.

Page 31: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

HUY HOANG CONSTRUCTION CO.

Ho Chi Minh City, Vietnam.

2002 to 2003

Planning Engineer. Perform various works in construction planning. Also responsible for

subdivision plan preparation, phasing and scheme drawing, using primavera software to set

resources and equipment histograms together with cash flow diagrams.

FIL-ESTATE GOLF AND CONSTRUCTION MANAGEMENT

Manila, Philippines.

1996 to 2002

Planning Assistant. Duties included automated mapping with geographic information system.

Preparation of Official Community Plans, technical report writing, bylaw preparation,

development control activities including subdivision processing and development permit

processing .

EDUCATIONAL BACKGROUND

UNIVERSITY OF MINDANAO

Davao City, Philippines

Bachelor of Science in Civil Engineering

1988-1993

OTHER SKILLS

In addition to planning skills, I have a very good command of AutoCAD. And my main

computer proficiencies are Primavera, MS Office, Advanced Software Autodesk, Photoshop,

and Windows Movie Maker.

INTERESTS

Scuba diving, photography, internet browsing, shopping

Page 32: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

CURRICULUM VITAE NAME: N.GIRIRAJAN E-mail :[email protected], [email protected]

Phone : 00974-5557 3139, 0091-9943723303,

QA/QC ENGINEER

OBJECTIVE:

To be a QA/QC – ENGINEER in a professional organization offering clear and exciting growth path for performing candidates and an opportunity to work in a highly stimulating

innovating and challenging environment.

ACADEMIC PROFILE: Education : DIPLOMA IN CIVIL ENGINEERING, B. Tech Civil Engineering Class obtained : First class With Honors Duration of course : 1995 – 1998

Institution : Bhaktavachalam Polytechnic, Kanchipuram Tamilnadu, India.

EXPERIENCE IN QATAR

EMPLOYER : BUILT IN Contracting & Trading

(August 2008 to date) Position : QA / QC Engineer PROJECT : Car Parking at School of Business Building Premises POSITION : QA/QC Engineer

PERIOD : October 2011 to April 2012 Owner : Qatar University Main Contractor : Built In Contracting & Trading Value : QR 6,400,000 Duration : 7 months

Page 33: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

PROJECT : Ras Gas Helium 2HeXU and Utilities – Ras Laffan POSITION : QA/QC Engineer PERIOD : Dec. 2011 – January 2012 Owner : Ras Gas

Main Contractor : Medgulf Construction Co. Value : QR 898,700 Duration : 2 Months PROJECT : Berth 6–Common Lean LNG Loading Facilities

–Ras Laffan POSITION : QC Engineer

PERIOD : February 2010 – May 2010 Owner : Qatar Gas – Fluor Main Contractor : Medgulf Construction Co. Value : QR 8,500,000/- Duration : 4 Months

PROJECT : North / South Extensions to Ras Abu Abboud Road. POSITION : QC Engineer PERIOD : September 2008 – July 2009 Owner : NDIA Consultant : SALVO Main Constructor : Midmac - Yuksel Value : QR 13,485,000 Duration : 11 Months PROJECT : Measaeid A 2000 CC PP Project. POSITION : QC - Civil PERIOD : Aug 2009 – Jan 2010 CONTRACTOR : Butec contracting co. CONSULTANT : Eberdrola ltd.

EXPERIENCE IN KUWAIT EMPLOYER : FLUOR DANIEL CONSULTANT B.V, KUWAIT. PROJECT : Olefins 2 Kuwait. POSITION : Senior QA/QC – Engineer

PERIOD : July 2006 –August 2008 OWNER : Equate, Dow, Petrochemical Industries Co. PROJECT VALUE : 2 Billion USD. PROJECT DURATION : 2 Years

EMPLOYER : AHMADIAH CONTRACTING AND TRADING COMPANY,

KUWAIT. POSITION : QA / QC Engineer PERIOD : November 2004 –July 2006. PROJECT : Al – Khiran Pearl City Kuwait. OWNER : La – Allah Al Kuwait.

PROJECT VALUE : 60 Million USD. PROJECT DURATION : 2 Years.

PROJECT DETAILS : Infrastructure Work in AL-KHIRAN PEARL CITY in Kuwait.

Page 34: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

EMPLOYER : COMBINED GROUP CONTRACTING AND TRADING COMPANY, KUWAIT POSITION : QA /QC Engineer PERIOD : October 2002 –November 2004.

PROJECT : SE-52, Kuwait sewerage and Renovation Project Kuwait OWNER : Ministry of public works. Kuwait. PROJECT DURATION : 2 Years. PROJECT DETAILS : Storm water and Sanitary Work in Kuwait.

RESPONSIBILITY AND EXPERIENCE:

Follow up and supervise the drawing for site preparation, review engineering drawings.

Set QA/QC plan: Implement ITP plan.

Prepare materials submittals.

Managing the QA / QC Team.

Inspection of work to be executed.

Conduct and record all testing.

Preparing detailed records and reports for all inspections conducted at site and maintain the quality control documents.

Prepare and issue non-conformance reports, field trouble reports.

Implementing Corrective Measures for Clearing of Non-Conformances

Ensure using copies of latest revision drawings, specification and scope of work

Receive AFI (application for inspection) forward to client, conduct joint inspections & coordinate with client QA/ QC representatives and get approval.

Review and assurance to implement issued approved drawings and technical specifications; design changes notifications and field change requests. To prepare

any Discrepancy Notice if deviations were observed and issue Non Conformance report if say so

Responsible to notify or submit "REQUEST FOR INFORMATION” for client.

Prepare hold points on form work , rebar , line and grade , embedment , concrete and foundation structures dimensions and prior to release of concrete placement request

Conduct leak test, maintain records and get approval from client. Check survey report given by the surveyor such coordinates (northing &easting) and elevation (top & bottom level of structures) as per drawing.

All projects involve infrastructure works. My duty was to implements all instructions given in the specification. Including electric cable, telephone, Fresh water, Back water, Storm water, sanitary manhole, house connection, Gully and Curbstone.

Sub-Grading and asphalt work.

PREVIOUS EMPLOYMENT IN INDIA:

EMPLOYER : CONSOLIDATED CONSTRUCITON CONSTORIUM Ltd, (An ISO 9001-2000 Certified Company), INDIA

POSITION : QA/QC ENGINEER.

PEROID : MAY 2000 – September 2002 PROJECT : Construction of hospital building (G+3) at Lakdikupul, Hyderabad. PROJECT VALUE : 64 Cr INR. PROJECT DURATION : 2 YEARS PROJECT DETAILS : Construction of Multistory hospital building.

Page 35: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

PREVIOUS EMPLOYMENT IN INDIA: POSITION : SITE ENGINEER PERIOD : MAY 1998 - MAY 2000

EMPLOYER : CEEBROS PROPERTY DEVELOPMENT PVT. LTD, Chennai – 28, INDIA

PROJECT DONE: Construction of commercial complex (G+4) at Nungambakam, Chennai.

Foundation : Driven Cast in – situ Pile foundation Area : 80,000 sq. ft.

Constructions of Multistory residential flats (G+7), of six blocks (384 flats) at Virugambakkam, Chennai.

Foundation : Driven Cast in-situ Pile foundation Area : 4,838.40 sq. ft.

Construction of commercial complex (G+4) at Nugambakkam, Chennai Foundation : Isolated footing (framed structure) Area : 42,000 sq. ft. Construction of Multistory residential flats (G+3) at Egmore, Chennai Foundation : Driven Cast in-situ Pile foundation

KEY QUALIFICATIONS & COMPUTER KNOWLEDGE:

Over 12 + Years Experience in the field of Civil construction and Quality assurance and

quality control. Principally responsible for conducting quality survey and investigations

for Road improvement projects involving:

1. BS, ASTM & ASSTHO requirements

2 QCS requirements in Qatar

PERSONEL INFORMATION:

Father Name : NATARAJAN

Age & Date of Birth : 35 years, 30th May 1978.

Language Known : English, Arabic, Hindi, Tamil & Malayalam

Gender : Male

Nationality : Indian

Martial Status : Married

Passport Details : G 3437909 valid up to July 2017

Permanent Address : 3/27 K.K.P Street,

Alangudi (post),

Valangaiman (taluk),

Thiruvarur (Dist),

Tamilnadu, India. Pin – 612801

Phone: 0091- 4374269444

Page 36: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 1 of 8

CURRICULUM VITAE CHAMINDA PERERA

Site Engineer -------------------------------------------------------------------------------------------------------------------------------

EDUCATION National Certificate in Technology

Civil Engineering Technical College of Ratmalana

Sri Lanka.

ADDITIONAL QUALIFICATIONS Safety & Environment Certificates

Confined space Awareness

Basic First Aid

Basic Fire Fighting

-------------------------------------------------

E-MAIL ADDRESS [email protected]

-------------------------------------------------

CONTACT ADDRESS P.O. Box 12693, Doha Qatar

-------------------------------------------------

TELEPHONE NO.

+974-55721811 Qatar

+974-44167992

-------------------------------------------------

NATIONALITY Sri Lanka -------------------------------------------------

PASSPORT No.

N1384613

-------------------------------------------------

SRI LANKA ADDRESS No: 1AZ New Town

Kundasale, Sri Lanka

-------------------------------------------------

DATE OF BIRTH 07- Dec - 1973

EMPLOYMENT HISTORY

YEAR COMPANY 2010 February to present BUILT – IN Contracting & Trading

SITE ENGINEER

2007 June to January 2010 IBERDROLA ENGINEERING & CONSTRUCTION

S.A. Middle East Branch Doha –Qatar.

March 2004 –May 2007 UNITED ENGINEERS MALAYSIA (BHD) Middle East

Branch Doha Qatar.

October 2001 to March 2004 KBAS Contracting Trading and Industrial Co.

Doha Qatar. January 1997 to September 2001 International Construction Consortium Ldt. Sri Lanka.

Page 37: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 2 of 8

EXPERIENCE PROFILE:

Scope of overall employment background for more than 15 years of diversified experience in

supervision, engineering & project management which includes execution of civil works for

infrastructure projects such as, power plant, industrial, residential buildings, concrete and asphalt

roads, drainage system and other major projects. Perform detailed and sensitive assignments with

dependability and function within a trouble shooting environment, imaginative in seeking new

approaches to do things better, faster, more economically and can work well under stress. Has

developed a good vocational training system with supervision by application in all technological

methods.

Execution of utilities & Highway projects

Monitoring Manpower at Site More than 200 Pupils

Monitoring Machinating Distributing and Site Organizing

Daily Reports Coordinating with Consultation , Road Department , Utilities and M&E Departments

Coordinating with Sub Contracts , Materials Plants

Work According to QA-QC Plan (Follow up Inspection with Construction Check list ) Project Safety & Environment inspection , flow up during working time

Power plant all bared Utilities Structures work

In side Power Plant Fire Protection Ring Network.

Summary of my major assignment include:

SITE ENGINEER

Construction of 2000 MV Gas Turbine Power Plant, Mesaieed Qatar.

Construction of Salwa International Highway project Doha to Saudi Arabia Border

Qatar.

Road Construction Projects and Utilities Work Doha Qatar.

Road Construction Projects & Bridge Construction in Sri Lanka

COMPUTER LITERATE:

MS Excel

Auto cad

MS Word

PROJECT EXPERIENCES:

BUILT IN CONTRACTING & TRADING

2010 February to present (SITE ENGINEER)

1. DWTP – Mesaied

(September 2012 till present)

Road Works, Drainage and Sidewalks.

Page 38: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 3 of 8

2. NDIA Packages: CP 10, CP 94, CP 51, CP 69, CP 60.

(October 2011 to August 2012)

Road Work, Sub Base and Asphalt

3. Zikreet Office Building - Ras Laffan

(March 2011 to August 2011)

Sub base, Asphalt (3Layers)

Value: 1,900,000 QR

4. Epic of Gas Supply to Station V and Facility C – Ras Laffan

(February 2010 to March 2010)

Sub base, Asphalt and Kerbstone

Value : 4,900,000 QR

5. EPIC of Electrical and Telecom Utilities for Support Service Area – Ras Laffan

(September 2010 to February 2010)

Sub base, Asphalt (2Layers) and Kerbstone

Value: 1,600,000 QR

6. Salwa Highway Maintenance

(April 2010 to August 2010)

Asphalt Wearing Course

Value: 4,800,000 QR

IBERDROLA ENGINEERING & CONSTRUCTION S.A.

June 2007 to January 2010

2000 Megawatts Combined Cycle Power Plant, Mesaieed,

Doha, Qatar

Project Cost: USD 1.75 Bn

Client : Qatar Petroleum (Mesaieed Industrials City)

Consultant : Parsons Brinckerhq International

Q.S. Engineer

Turbine Building Foundations

Earthworks and Roadwork

Storm Water Drains

Bored Piling

Earth Retention System (Sheet

Piling, Diaphragm Walls)

Buried Utilities (Fire Protection

System, Oil and non oily drainage,

Electrical Cable duct banks and

raceways)

Circulating Water Cooling Buried

pipe line (Ø 1200 mm – Ø 2600

Glass Reinforced Pipes

My job Responsibility and Activities.

Rain water pits and gully pot with

Road Crossing.

Duct Banks with Manhole.

Per-cast yard work handling

Major Backfilling work.

CCTV Network all civil work.

Oil pit Manhole re-bar and concrete

work.

Page 39: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 4 of 8

Finishing work at all blocks.

Row water GRP pipe line backfilling

work.

Per-cast slab installation and

removing work.

Fire pipe system valves pits re-bar

work and casting work.

Deep Excavation & Dewatering

system

Cable gallery and 400KV pits.

Project Role:

Excavation and construction of sub-structure (foundation)

Collect information in accordance with appropriate codes of practices and specifications in all

quantity calculation, materials and workmanship for the bored piling, sheet piling, diaphragm wall,

jacking pit and other deep excavation activities.

Prepare and compiles basic records of each activities for daily measurement.

Inspect and sign quantified inspection request made by the sub-contractor.

Underground Network Quantities

Onshore/Offshore GRP pipe laying for Cooling Water System (Intake and Discharge pipes).

Laying and backfilling of pipes (GRP, Oil Pipes, Storm Drainage System and Fire Fighting network).

Stretches with pipe encasement

Manholes and duct banks.

Laying of the Electrical Grounding Cable Network.

Earthworks/Urbanization

Road construction, trenches and fencing of the project area.

Earthworks quantities.

Record machineries and materials allocation as per requirement such as laying of sub-grade, granular

sub base and bituminous concrete.

Monitor field activities pertaining to the assigned task to meet the project build of quantities.

-------------------------------------------------------------------------------------------------------------------------------

UNITED ENGINEERS MALAYSIA (BHD)

March 2004 –May 2007

Salwa International Highway

Phase 1- Doha, Qatar Project Cost: QR 1250 M

Client : Roads Department, Ministry of Municipal and Agriculture Affairs

Consultant : Parsons International Limited

Site Engineer (Utility Works)

Page 40: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 5 of 8

Gas pipeline associated projects, Multi-

Barrel Box Culverts for Qatar Petroleum

Roads and Bridge Construction (11 units

Pre-stressed Concrete Box Girder)

Storm Water Drainage

Project Role: Civil work Q.S

Salwa Road – Phase 1 extends from just south of the Industrial Area Roundabout

At the junction of Salwa and A1 Furousiya roads to 90 Kilometers in advance of the Saudi Arabia Border at Abu Samara Bound and includes some 81 kms of the

Salwa Road.

The works comprise upgrading of Salwa Road to dual carriageways to full modern freeway

standards, including access control, embankment works, construction of asphaltic pavement,

11 interchanges /bridges, 3 camel crossing, major utilities works: QP Culverts, water main

pipe lines, sewerage system, electrical and telephone cable and ducts, intelligent traffic

systems, cross drains, street lighting Net work systems.

UTILITIES WORKS Water Main Net Work System Construction, from 1200mm dia to all DI pipe: Excavation

work , pipe laying and pressure testing with ,Hydraulic Swabbing , Sterilizing and Water Construction of water chamber and chamber Fittings Insulation work.

Construction of Underground Sewerage System excavation, pipe laying work, manhole Construction work.

Storm water drainage soakaway and gullies Construction.

Construction of Underground Telephone Net Work System, excavation works pipe laying and

Chamber Construction (JRC 14, JRC 12 & MR-09, and MR 08).

Electrical work 132kv, 66kv, 11kv cable laying joint bay, link box construction in door, out door

substation and earth resisting testing work. Street lighting cable laying package sub station, feeder

pillar installation construction of 30m Street lighting high mast foundation cast insitu and post installation 14m Street lighting foundation pre-cast installation. Pre-cast yard Quantity control.

------------------------------------------------------------------------------------------------------------------------------------

KBAS Contracting Trading and Industrial Co. Doha, Qatar

October 2001 to March 2004

Road Construction and Utilities Work

Client : Roads Department, Ministry of Municipal and Agriculture Affairs

Consultant : Arabic Engineering Consulting

Coast : QR. 45 millions

Quantity Engineer

Duties include The Project scope included renovation of existing roads at zone 52

internal roads construction with all infrastructural works like Water mains varying dia

from 100mm to 400m dia, dry legs and ducts crossing excavation and pipe laying,

construction of water mains chamber etc, and its related pressure testing swabbing,

chlorination shutdown and commissioning works. Drainage works included storm water

Page 41: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 6 of 8

drainage soak away, gullies and its connections, boreholes. The scope in Electrical works

included, division of the existing cables and realign, lays new cables and arranging its

commissioning. Streetlight works along the center median on the main C/W and on the

services roads like 12 m high columns installations and its arrangements for

commissioning. Hard land scalping works like earthworks sub base works and Asphalt

works and its necessary procurement

-------------------------------------------------------------------------------------------------------------------------------

International Construction Consortium Ld Sri Lanka

April 2000 – September 2001

Akurassa Sri Lanka Road Project Client : Road Department Authority

Consultant : Kardino & Davets International

Cost : SRL. 35 millions

Construction Supervision

Earthwork

Equipment Planning

Fabrication

Project Role: Earthwork Heavy Equipment Supervisor

Disseminate work items for earthwork equipments in reference to project equipment plan

Maintain equipment schedule. Monitor and schedule equipment preventive maintenance. Supervise

equipment repair, adjustments and parts fabrication

Implement and supervise fabrication activities and see to it that details are conforming to the

requirements on the plans and shop drawings

Canvass and procure equipment parts and ascertain that these items are in compliance to the

manufacturer’s specifications

Monitor equipment fuel consumption and performance

-------------------------------------------------------------------------------------------------------------------------------

International Construction Consortium Ld Sri Lanka

September 1998 – March 2000

Ambalangoda Sri Lanka Double Span Bridge

Client : Road Department Authority

Consultant : RD & DC Cost : USD 4Mn

Construction Supervision

Duties include: Embankment Filling work & Compaction

Quality control of Earth work on Earth Dam Construction

Quality control of pre cast yard and Pers testing work

bridge structures work

bridge Formworks

Concreting work and curing system

Concrete Hand Rails Fixing

Quality control for Asphalt work and Road Markings work

Page 42: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 7 of 8

January 1998 – August 1998

Civil Inspector for International Construction Consortium Ld Sri Lanka

Gall Road Project.

Client : Road Department Authority

Consultant : RD & DC

Cost : SR. 25 millions

Duties include:

5 Km dual carriageway new construction with Asphalt base course and wearing (AC-BC

and AC-WC) course.

Underground Sewerage System

Waste Water System

Water Main System Network

Kerbs fixing & furnishing work

January 1997 – December 1997

Technical Inspector, International Construction Consortium Ld Sri Lanka

Sangaraja Mawathain Sri Lanka Improvement Project

Client : Road Department Authority

Consultant : W/S Atkins International Ltd.

Cost : SR. 70 millions

Duties include:

Underground Sewerage System

Waste Water System

Water Main System Network

Kerbs fixing & furnishing work

Asphalt Including ACBC and ACWC

Street Light Network

My Contact Details : Mobile - (+974) 5721811

Tel - (+974) 4167992

E-mail - [email protected]

PERSONNEL REFERENCES

Mr. Mohamed Badawi Mr. Tang Weng Yin

Page 43: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 8 of 8

Resident Engineer (Utility and M&E) QA-QC Manager

Parsons International Limited (U.S.A.) United Engineers (Malaysia) Qatar Brach

P.O. Box 2091 P.O. Box 23181

Doha - State of Qatar Doha - State of Qatar

Tel Office: 0974 4821979 Tel Office: 0974 4820311

Mobile : 0974 5569376 Mobile : 0974 5546067

Page 44: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

CURRICULUM VITAE

SUDIN KUMAR K. S. P.O. Box 22950 Doha, Qatar

Mobile # 0974 5536 0102

Email: [email protected]

OBJECTIVES

Accomplish seasoned Surveyor with a solid more than 14 years experience in Middle East (Abu

Dhabi (U.A.E), Kuwait and Qatar) in field of construction especially in Quantity Survey in Roads and

Bridges.

Summary of Qualification

Quantity Surveyor of major construction company Maximum attention for cost reduction and wastage control for optimum productivity.

Outstanding training, leadership and communication skills

Hard working, able to multi-task effectively.

Activities

Preliminary Surveyor for collecting all details from the specifications and drawings for the

preparation of complete quantity take off.

Quantity Survey Engineer in the field of roads, minor bridges, pipe rack foundation, pipe

sleeper, equipment foundation. Coordination between site and office with the help of surveyor and supervisors in order to

monitor progress of work.

Conducting all necessary surveys and witnessing different field measurements in order to keep track of the work progress and quantity for payment preparation.

Instruments Used

Familiar with all survey equipment like Total Station, Auto Level, etc.

BUILT IN Contracting & Trading – (Qatar) (Oct. 2008 to present)

Designation : Quantity Survey Projects : Car Parking at AAB Premises

Consultant : Qatar University

Designation : Quantity Survey

Projects : NDIA CP -18 Passenger Terminal Complex

Consultant : NDIA

Designation : Quantity Survey

Projects : Car Parking at School of Business Building Premises

Consultant : Qatar University

Page 45: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Designation : Quantity Survey

Projects : Doha Expressway Package 7 – Phase II

Consultant : Ashghal

Designation : Quantity Survey

Projects : Q-Chem II – Ethylene Derivatives

Consultant : Q Chem.

Designation : Quantity Survey

Projects : QAFCO – 5 Messaieed

Consultant : QAFCO

Ghantoot Transport & Gen. Cont. - (Abu Dhabi. U. A. E.) (May2007 to Aug. 2008)

Designation : Survey Engineer

Project : Internal Roads in Mohammed Bin Zayed City

Consultant : ITAL Consultant

S. B. C. Gen. Contracting – (Kuwait) (May 2006 to April 2007)

Designation : Survey Engineer

Project : Kuwait Oil Company, Facility upgrade and relocation of

Underground processing pipe for gathering centre.

Consultant : AMEC

Al Jaber Establishment – (Abu Dhabi, U. A. E.) (May 2000 to April 2006) Designation : Survey Engineer

Project : Maintenance, additions and minor projects for Road and

Bridges in U. A. E. Consultant : Hyder Consulting Middle East

Project : Construction of internal roads in Khalifa City B

Consultant : Consult, Engineer and Project Managers

EDUCATIONAL Qualification

CIVIL Engineering from board of Higher Education, Kerela in April 1999. Diploma in Automobile Engineering from Board of Technical Education, Kerela in

April 1997

Computer Knowledge

AutoCAD and Microsoft Office

Page 46: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Personal Profile

Sex : Male

Date of Birth : 24th May 1979

Marital Status : Married Nationality : Indian

Permanent Address : Koduvakkatiil

Kallickad, Arattupuzha P.O. Alappuzha (Dist.) Kerela, India – 690565

Tel. No.: 00914-7924-88750

Language known : English, Arabic, Hindi and Malayalam

Passport No. : G 2590567 Validity : 8

th March 2017

Place of Issue : Cochin

Declaration

I do hereby declare that, the particular given above are true and correct to the best of my knowledge

and belief.

Doha – Qatar

Date : ______________

SUDIN KUMAR K. S.

Page 47: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 1 of 4

Taofeeq Abiodun Rufai

17, Shuban Street, Abu Harmour,

Doha, Qatar.

Mobile: +974 70519531

Email ID: [email protected]

SAFETY SUPERVISOR WITH SIX YEARS EXPERIENCE

OBJECTIVE

Seeking assignments with a reputable organization where safety of lives and property

as well as sustainability of the environment is paramount.

JOB HISTORY

February till Date: Built-In Trading and Contracting W.L.L

Position: HSE Officer

Project: Domestic Waste Water Treatment Plant, Mesaieed

Scope: All road-works including excavation, gullies, chain fencing re-

instatement works-asphalt laying, kerb works, etc

Duties:

Liaise with contractors’ Construction Managers and Safety Managers to improve

safety provisions

Closing out of Non-Conformances raised by Project Consultant/Client

Carry out inductions for Built-In site staff.

Report any accident/near misses on site immediately to Company’s Line

Manager

Daily patrolling of the site to ensure and monitor employees’ compliance to

Client’s HSE standards

Coordinate for procurement and general management of PPE on site

Issues permit for permit-required activities on the site as per standard and

Clients requirements

Reinforcing hazard communication to workers through Daily Toolbox talks

Keeping of Site Safety records for equipments, permits, incidents and statistical

records

Ensuring effectiveness of employees emergency preparedness

Page 48: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 2 of 4

April 2010- June 2012: Green Line Engineering W.L.L.

Position: QHSE Supervisor

Project: Construction of Doha North sewerage treatment chambers

from Pumping Mains to Pumping Station (PS70)

Project Scope:

This involved a horizontal construction in which large concrete chambers were

constructed across large GRP pipes of about 1.5metres diameter. A very deep

excavation was done along 23km road from Pumping Mains leading to the

pumping station. The chambers are draw-pit, air valve or wash -out connection

chamber, depending on the type of pipe inside the chamber cast.

The construction activities included excavation, earth works, rafts, wall casting,

post –finish screeding and so on. It was a project that ran for 2 years.

Duties:

Spotting/identifying hazards and suggesting control measures

Closing out of Non-Conformances raised by Project Consultant/Client

Represent company in construction and progress meeting with Consultant and

Clients

Review and approve JSA/ Risk Assessments

Keeping and maintaining site safety records like incident records, induction

records, equipment records, etc

Ensuring safe and effective storage of materials pending their usage on site and

prevention of wastes

Compiling of Performance indicators for onward submission of Monthly report

to Client

Performing quality checks on task using Client/Consultant approved formats &

checklists

Ensure that all incoming materials are conforming to the clients specs and that

required test reports attached

September 2008- March 2010: Reynold Construction Company (RCC)

Lagos, Nigeria

Position: Safety Officer

Project: Construction of Splicing Pit for Underground Transmission

cable from Federal secretariat to National Stadium substation, Lagos

Project Scope:

The project involved construction of splicing pit (SP) in which underground high

voltage cable were laid and spliced. The SP were precast made of reinforced concrete

in form of U-shape which was about 2metres high and about 15metres long in

dimension and spread from one electrical substation to another. It served as repair pit

for cables during testing, splicing and repairing. There were at least two SP in every

1Km length of road and about 32 splicing pits covering 16km road length.

The construction activities included excavation, blinding, screeding, base slab and wall

reinforcement as well as concreting. Curing and others were done as per later civil

activities.

Page 49: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 3 of 4

Duties:

Computing of risk assessment/JSA for risk prone activities using method

statements

Monitoring the quantity and quality of PPE provided for employees and ensure

compliance to its use as per standard.

Carrying out Safety walkthrough with Project consultant and ensuring that all

issues raised are closed-out

Conducting of safety induction course for new employee and TBT before

kicking off any risk prone tasks

Involved in the filing and investigation of incident to ensure that surface or root

causes are detected for subsequent accident prevention

Assessing and evaluating subcontractors’ safety records for review/approval.

Advising management on other issues related to safety/welfare of workforce.

Involved in conduction of emergency mock drill wherever advised by

Client/Consultant

Conducting Site Inspection Programme (SIP) along with other project

authorities

July 2001- March 2003: Constain West Africa

Position: Safety Inspector

Project: Construction of Government Secretariat Complex,

Wuse Zone III, Abuja, Nigeria

Scope: Surveying, excavation, piling, backfilling, concrete

pouring for structures, landscaping, interiors,

ON JOB TRAINING/ACHIEVEMENTS

Achieved 1,000,000 (One Million Safe Man Hours without LTI)

OTHER TRAININGS RECEIVED

Introduction to Ergonomics

Hazard Communication programme

Personal Protective Equipment

Energy Control Programme: LOTO

Fall Protection Programme

Emergency Action Plan

Electrical safety Basic

Effective Accident Investigation

HSE QUALIFICATIONS

NEBOSH IGC IN OCCUPATIONAL SAFETY&HEALTH:

OSHA 44 Hour Safety Specialist Certificate: OSHA (U.S)

Diploma in Construction Safety: Nigerian Institute of Safety Professional

Government Certificate in Road Safety-Federal Road Safety Corporation of Nigeria.

Page 50: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Page 4 of 4

EDUCATIONAL QUALIFICATION

Bachelor of Economics (2007) : Olabisi Onanbanjo University, Nigeria

Diploma in Accountancy (2000) : Osun State Polytechnic, Iree, Nigeria

West African Examination Certificate: Akolu, Oyo State, Nigeria

COMPUTER PROFICIENCY.

MS Office, Dbase management (Access).

SPSS Packages.

QuickBooks Pro

PERSONAL DETAILS

Date of Birth : 2nd

November, 1978

Marital Status : Married

Nationality : Nigerian

English Language Proficiency : Excellent

Visa Status : Work visa

Page 51: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Equipment List

Page 52: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Equipment List

Serial

No. Description Quantity

1. EXCAVATOR

a. Hitachi ZAXIS 210 H - 2008 equipped with 1.8 T Jack Hammer

2

b. Hyundai 170 W – 7 - 2008 4

c. Komatsu 240 - 2002 equipped with 1.8 T Jack Hammer 1

d. Samsung 280 - 1997 equipped with 2T Jack Hammer 1

e. Caterpillar 225L - 1995 equipped with 1.8T Jack Hammer 2

f. Caterpillar 320 C - 2004 equipped with 1.8 T Jack Hammer 2

g. JCB – 4 CX - 2008 2

2 TRENCHER

a. Vermeer Commander T1055 Track Trencher - 2008 1

3 ASPHALT PAVER

a. Dynapac F 141 – C - 2008 1

b. Blaw Knox SB 91 – 1998 1

b. Marini 251 – 1991 1

4 STEEL ROLLER COMPACTOR

a. Bomag BW 202 – 2007 – 11 T 1

b. Ingersoll Rand DD – 90 – 2006 - 10T 2

c. Dynapac CC20 – 1990 1

d. Benford 2T 1

5 TYRE ROLLER COMPACTOR

a. Dynapac CP 271 - 2008 1

Page 53: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

b. Hamm GRW 18 - 2008 2

c. Dynapac WP15 - 1993 2

d. Dynapac WP902 -1993 1

6 VIBRATING ROLLER

a. Dynapac CA 250 10 T 2008 3

b. Dynapac 10 T 1995 2

7 GRADER

a. Caterpillar 140 H - 1993 2

b. Volvo G 970 - 2008 1

8 SHOVEL

a. Cat 950 – 1998 3

b. Caterpillar 216 B - 2008 3

9 CABLE LAYING EQUIPMENT

a. Cable Pulling Winch Type – KW 5010 – 5 Ton with all accessories.

1

10 Pole Drill Ingersol Rand 2003 1

11 Telescopic Crane 16T Coles 1981 1

12 Survey Equipment Total Station IC 403 - Leica 4

13 PRIMER Sprayer

a. 3.5 Ton Capacity 2

14 TRUCKS

a. ACTROS and HINO 19 m3 and 30 m3 Capacity 19

Note: Equipment Maintenance & Repair. We have a Workshop in Siliya Area for the maintenance of our Equipment & Vehicles . Our highly qualified mechanic team is performing periodical maintenance program along with all needed repairs. Our Maintenance Department Manager and his team are conducting necessary testing & keeping all relevant records in order to maintain the Equipment in proper condition

Page 54: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Main Projects Executed in Qatar During the Last 5 Years

Page 55: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Project Name ClientStarting

Date

Completion

DateWork Description

Value

(QR)Status

Main

ContractorReference

1GC12108900 - Dukhan

FieldsQP May. 2013 Dec. 2013

Grading, Sub-Base, Asphalt,

Aggregate Surfacing &

Drainage.

7,298,903 Ongoing Petroserv Lt

Eng. Sasa

Isakovic -

6696 1348

2

Labour City Pumping

Station and Rising Main –

Industrial Area

Ashghal July. 2013 Dec. 2013

Trench Excavation and

Backfilling, Valve Chambers

for Sewerage,

6,465,000 Ongoing NASS Group

Mr.Raed

Rustom -

5554 3279

3

Car Parking at School of

Business Building Premises

– ID 37/2011

Qatar

UniversityOct. 2011 April. 2012

Excavation, Asphalt

Pavement, Street Lighting,

Landscape, Piles: Drilling &

Reinforced Concrete

6,400,000 Completed Built In Co.

Eng.

Abdallah -

5550 9095

4Car Parking at AAB

Premises – ID 30/2012/2013

Qatar

UniversityJan. 2013 April. 2013

Excavation, Asphalt

Pavement, Street Lighting,

Hard Landscaping

3,000,000 Completed Built In Co.

Eng. David

Nathakumar -

5582 7310

5Passenger Terminal

Complex – NDIA – CP 18NDIA Jul. 2011 May. 2012

Excavation, Roads Sub base

and Asphalt Pavement, Road

Marking and Traffic Signs.

6,000,000 Completed Sky Oryx

Eng. Chadi

Fadel -

5552 0935

6 QAFCO – 5 - Mesaieed QAFCO Nov. 2010 May. 2012Asphalt Pavement, Guard

Rails, Road Marking8,990,000 Completed Hyundai

Eng. C.H.

Kim - 5576

3664

7

Q – Chem II Ethylene

Derivatives Complex

– Mesaieed Industrial City

Q - Chem Apr. 2009 Feb. 2010

Sub base and Asphalt

Pavement, Storm Water

Channels, Guard Rails.

32,120,000 Completed Daewoo Mr. Ishaq -

5588 9265

8

GTC / 394 /2010 – Urgent

66 KV Cable Line Circuit

Between Doha Super S/S –

Al Mergab Mall S/S Doha

Expressway

Kahramaa Dec. 2012 Sept. 2013

Trenches, Joint Bays, Road

Crossing, Cable Laying and

Road Reinstatement

14,400,540 On goingSaudi Cable

Co.

Mr.

Mohamed

Riaz -

5571 4466

Main Projects Executed in Qatar during the Last 5 Years

Page 56: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Project Name ClientStarting

Date

Completion

DateWork Description

Value

(QR)Status

Main

ContractorReference

9BP# 1G-6A1 South Campus

Central Plant CP7

Qatar

FoundationMar.2013 Nov.2013

Foul Drainage Netwok,

Subbase and Asphalt

Pavement

2,000,000 On going

Bemco &

Almabani

(Unicorp)

Eng. Georges

Gharzouzi -

5557 3754

10Package 7

- Salwa Road - Phase 2Ashghal Mar. 2011 Aug. 2013

Road Sub Base and Asphalt

Pavement 18,000,000 Completed

Yuksel -

Midmac

Eng. Mark

Mussel - 5551

4767

11

Cycle Path Asphalt Work –

Doha Expressway Package

7 Salwa Road - Phase 2

Ashghal Jan. 2013 Jul. 2013

Asphalt Work, 12mm

Aggregate Mix Design –

1.35m width

2,000,000 CompletedYuksel-

Midmac

Eng. Hamdi

Gunes - 5527

4387

12

GTC-124 -2006–D–Phase VII

– Old Airport East to

Moseimeer S/S and Al Sadd

North to QRE S/S.

Kahramaa Mar. 2008 Dec. 2009

Trenches, Joint Bays, Road

Crossing, Cable, Interlock

Curbstone and

Reinstatement, Soft

Landscaping

29,726,043 CompletedSaudi Cable

Co.

Mr.

Mohamed

Riaz -

5571 4466

13

NDIA – CP – 14 - Airside,

Landside Roadways and

Parking

NDIA Mar. 2011 Sept. 2011

Sub Base, Asphalt Pavement,

Curbstone, Interlock, Guard

Rail, Telephone Ducts and

Manholes

3,006,000 CompletedMidmac

Contracting

Eng. Mark

Mussel - 5551

4767

14

Common Lean LNG

Loading Facilities – Berth #6

– Ras Laffan

Qatar Gas Feb. 2010 May. 2010

Excavation, Roads Sub Base

and Asphalt Pavement,

Road Marking

8,381,579 Completed

Medgulf

Construction

Co.

Mr. Ivan

Morgan -

5550 5042

15Ras Gas Helium 2 HeXU

and Utilities Project Ras Gas Dec. 2011 Jan. 2012

Sub Base, Asphalt Pavement

3 Layers and Marking898,700 Completed

Medgulf

Construction

Mr. Ivan

Morgan -

5550 5042

Page 57: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Project Name ClientStarting

Date

Completion

DateWork Description

Value

(QR)Status

Main

ContractorReference

16

EPIC for the Phase I of the

Expansion of Wastewater

Treatment Plant – Mesaieed

QP Jan. 2013 Sept. 2013

Road Sub base, Asphalt

Pavement, Fence and Civil

Work

6,000,000 On going

Hyosung

Ebara

Engineering

Co.

Mr. Kim Sang

- 6602 2876

17

Epic for Electrical and

Telecom Utilities for

Support Service Area –

Phase 1 & 2

Qatar

Petroleum Nov. 2010 Feb. 2011

Excavation, Sub Base ,

Kerbstone, Asphalt

Pavement, Marking and

Signing

2,150,860 CompletedLarsen &

Toubro

Mr. Chayan

6607 5263

18Central Utility Plants

– NDIA – CP - 60NDIA Jun. 2011 Dec. 2011

Road Sub base, Asphalt

Pavement and Road Marking2,000,000 Completed

C.A.T.

International

Eng. Elie

Nseir - 5599

5547

19Zikreet Office Building

(XK – 50) – Ras LaffanRas Gas Feb. 2011 Jun. 2011

Road Sub Base, Asphalt

Pavement 1,700,000 Completed

Medgulf

Construction

Mr. Ivan

Morgan -

5550 5042

20

Salwa Highway

Maintenance Between Sta.

25 + 000 to Sta. 92 + 380.

Ashghal Apr. 2010 Aug. 2010Asphalt Wearing Course

Reinstatement4,800,000 Completed UEM

Eng. Raja Rao

- 5585 1923

21

New Doha International

Airport – North South

Extensions to Ras

Abu Abboud Road. Ref. :

526/SC - 32 B/07 – Rev. - 1

N.D.I.A. Oct. 2007 Mar. 2008Excavation, Roads Sub base

and Asphalt Pavement9,239,999 Completed

Midmac

Yuksel JV

Eng. Mark

Mussel - 5551

4767

22Laffan Refinery – Ras

Laffan

Laffan

RefineryMar. 2008 Jul. 2009

Excavation, Roads Sub base

and Asphalt Pavement,

Interlock, Curbstone

12,198,743 CompletedDaewoo E &

C

Mr. Ishaq -

5588 9265

23 GTC – 5 – 2004– Phase VI Kahramaa Aug. 2006 Oct. 2007Trenches, Joint Bays, Road

Crossing and Reinstatement6,689,888 Completed Siemens

Eng.

Kajendran -

3318 7434

Page 58: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Project Name ClientStarting

Date

Completion

DateWork Description

Value

(QR)Status

Main

ContractorReference

24

EPIC of Gas Supply to

Station V and Facility C

Pipeline – Ras

Laffan

QP Jan. 2010 Dec.2010

Road Sub base and Asphalt

Pavement, Interlock,

Curbstone

4,900,000 CompletedLarsen &

Toubro

Mr. Chayan

6607 5263

25

New Doha International

Airport – North South

Extensions to Ras Abu

Abboud Road. Ref. : 526/SC

- 35 /08 – Rev. - 3

N.D.I.A. Jul. 2008 Oct. 2008

Parking Sub Base and

Asphalt Pavement,

Excavation

3,243,355 CompletedMidmac

Yuksel JV

Eng. Mark

Mussel - 5551

4767

26

New Doha International

Airport – North South

Extensions to Ras Abu

Abboud Road. Ref. : 526/SC

- 35 A/08– Rev. – 3

N.D.I.A. Sept. 2008 Jun. 2009Excavation Roads Sub Base

and Asphalt Pavement4,975,385 Completed

Midmac

Yuksel JV

Eng. Mark

Mussel - 5551

4767

27

New Doha International

Airport – North South

Extensions to Ras Abu

Abboud Road. Ref. : 526/SC

-32 A1/09– Rev.- 1

N.D.I.A. Nov. 2008 Oct. 2009Road Sub Base and Asphalt

Pavement3,632,478 Completed

Midmac

Yuksel JV

Eng. Mark

Mussel - 5551

4767

28

New Doha International

Airport – North South

Extensions to Ras Abu

Abboud Road. Ref. : 526/SC

- 32 G/09 –Rev.- 1

N.D.I.A. Aug. 2009 Feb. 2010 Roads Asphalt Pavement 4,875,000 CompletedMidmac

Yuksel JV

Eng. Mark

Mussel - 5551

4767

Page 59: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Work Certificates

And Awards

Page 60: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 61: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 62: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 63: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 64: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 65: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 66: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 67: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 68: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 69: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 70: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

What are YOU doing to CREATE a ZERO HARM Day?

4

Bugle

M

Berth 6 HSE Newsletter April - May 2010 Issue # 23

Mr. Chandra Takore, a Kaefer employee was a laborer,

when he first came to Berth 6 Project. He was

nominated as BBB and then his performance,

commitment towards his roles and responsibilities, and

his dedication to safety secured him promotion as a

foreman. Mr. Chandra Takores’ inspirational story and

dedication to the safety of all Berth 6 Project personnel -

summarizes the impact of the BBB Program.

The program has proved that “any matter can be

resolved on site”, if there are good relationships and

open communication “between the supervisors and

workers”. This experience has shown that motivation of

accepting successful practices and adopting adequate

safe behavior is higher, when coming from “peers” and

not only through the "authority".

HSSE professionals have continuously stated that the

BBB’s have been ‘SMART’ identifying the hazards,

‘CONFIDENT’ allowing them to “stop a job” when it is

unsafe and possessing the initiative to provide an

explanation upon rectifying the unsafe condition and/or

act.

The success of the BBB Program has highlighted that the

Berth 6 Project number one value as safety, by

reinforcing our commitment to “Together Everyone

Achieves More” and “Everyone Goes Home Safe”.

Ozay Ciplak, QG Berth 6 Technical Construction Specialist

Road Construction

Road Construction Team safely and successfully

completed 4971 meters of main Berth 6 road and 1150

meters service road around SS-ITR Building. There was a

lot of preparation that went into road building. A great

deal of planning was put into developing Safe Work

Methods and a comprehensive Traffic Management

Plan for this task before work commenced. 3 layers of

asphalt were laid to complete the job. Almost 15000 tons

of asphalt was poured and 2430 numbers of guardrail

posts and 10096 linear meters of guard rails were

installed.

Built-In was the prime contractor and supported by Fluor,

QG and Medgulf Berth6 Project personnel.

Well done to all involved in safe completion of the Road

Works.

Pictured is the Road Construction Team with their Recognition

Certificate. (from left to right – T.Coble (QG), Abdul Aziz

Ibrahim (Built-In), Nakhle Moussa (Built-In), Fadi Nijam (Built-

In), V. Gunasekaran (MG), Mohammad Shafique (MG), Ajit

Singh (MG), Rathore (MG), Lawrence O’Brien (QG), Z.Orhon

(Fluor), P.Caughey (Fluor), B.Boudier (QG)

HSE Team Focus

Name: Glenn Mascarenas

Nationality: Filipino

Preferred Name: Glenn

Position: HSE Supervisor

Favourite Sport(s): Basketball, Table

Tennis

Past Time/Hobbies: Watching TV, Playing Video Games

Favourite Holiday: Boracay Island

Favourite Aspect of the Job: Saving Lives Everyday

Safety Advice: The Safer, the Better

Page 71: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 72: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 73: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 74: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 75: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 76: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 77: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 78: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 79: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 80: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 81: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 82: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 83: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 84: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 85: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 86: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 87: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 88: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 89: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 90: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 91: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 92: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 93: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 94: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 95: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 96: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 97: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 98: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,
Page 99: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,

Quality and OHS Policy

Page 100: ISO 9001: 2008 C: 382 OHSAS 18001:2007 OHS: 64 ...SYSTEM: OHSAS 18001:2007 (enclosed certificates) Road Construction Projects included: Road Excavation, Backfilling, Aggregate Layers,