R.J. LINO – President Director
PT. PELABUHAN INDONESIA II (PERSERO)
Saatnya Membangun “Mengintip Peluang Pembangunan Infrastuktur Dari Rencana Induk MP3EI” Roundtable Discussion - Jakarta, 12 Oktober 2011
North Kalibaru Terminal Development Plan
CELAH PELUANG DAN TANTANGAN MEMBANGUN INFRASTRUKTUR KELAUTAN MP3EI
The Port of Tanjung Priok as Economic Engine of The Country
![Page 2: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/2.jpg)
THE RULE OF GAME
GOOD ship will come
if and only if Port is GOOD
![Page 3: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/3.jpg)
PORT EFFICIENCY
Why Logistic Cost in Indonesia is High ???
![Page 4: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/4.jpg)
PORT EFFICIENCY
PORT PRODUCTIVITY 1
2
3
![Page 5: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/5.jpg)
PRODUCTIVITY IMPROVEMENT PROGRAM
PROGRAMS
24/7 Operations
Restructure Labour Union
Restructure & Selection of Stevedoring Co.
Reducing Dwelling Time
Information and Communication Technology
Procurement Cargo Handling Equipment
Handling Method Improvement
Replan & Reorganize Existing Port Layout
Increase port capacity with no major investment
Faster port stay time of the vessel increase national
fleet capacity with no investment in building of
new vessel
Significant impact in reducing logistic cost
DIRECT IMPACT
Human Capital Development Program
![Page 6: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/6.jpg)
PROCUREMENT OF EQUIPMENT NEW EQUPMENT – PORT OF TANJUNG PRIOK
Port of Tanjung Priok
![Page 7: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/7.jpg)
Port of Pontianak
Port of Palembang
PROCUREMENT OF EQUIPMENT
Port of Panjang
1) 1 unit QCC Twin Lift 2) 4 units Gantry Jib Crane
1) 2 unit QCC Twin Lift 2) 4 units RMGC 3) 4 units Gantry Jib Crane
1) 2 unit QCC Twin Lift 2) 4 units RMGC 3) 3 units Gantry Jib Crane
![Page 8: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/8.jpg)
Port of Jambi
Port of Teluk Bayur
PROCUREMENT OF EQUIPMENT
1) 7 units Gantry Luffing Crane 2) 3 units RTGC
1) 2 units Fixed Luffing Crane 2) 3 units RMGC
Port of Pangkal Balam 1) 1 unit fix Jib Crane 2) 1 unit platform fix jib crane
![Page 9: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/9.jpg)
KALIBARU TERMINAL DEVELOPMENT PLAN
PRODUCTIVITY IMPROVEMENT PROGRAM
PROCUREMENT OF PORT EQUIPMENT
Procurement of more than 120 units of different type of crane
1 Quay Container Crane 24 Units
2 Luffing Crane 24 Units
3 JIB Crane 16 Units
4 Rubber Tyred Gantry 32 Units
5 Rail Mounted Gantry Crane 21 Units
6 Harbour Mobile Crane 28 Units
Procurement of Tug Boat & Pilot Boat
1 Tug Boat 21 Units
2 Pilot Boat 5 Units
Procurement of Access Channel Radar Monitoring System for Tanjung Priok
Procurement of Bulk Handling Equipment : Tanjung Priok, Ciwadan, Teluk Bayur and Pulau Baai
![Page 10: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/10.jpg)
KALIBARU TERMINAL DEVELOPMENT PLAN
INDONESIA LOGISTICS COMMUNITY SERVICES (I L C S)
ILCS GLOBAL E-LOGISTIK
SIMOPEL
SIMTEK
SIMPERS
SIMKEU
PELINDO II
PELINDO I, III, IV
Another Port
Airport
NSW
SENDER GOVERNMENT
AGENCY BANK
CDC CFS DEPO
TRUCKING ANOTHERCARRIER
ANOTHER LOGISTIC PROVIDER
RECEIVER
DATA SHARING :
• Legal Document/Approval
• Tracking/Tracing
• Cargo Monitoring
• Service/Facility Availability
• Billing
• Information
SMALL MEDIUM BUSINESS
![Page 11: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/11.jpg)
The Port of Tanjung Priok as Economic Engine of The Country
North Kalibaru Terminal Development Plan
![Page 12: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/12.jpg)
KALIBARU TERMINAL DEVELOPMENT PLAN
THE PORT OF TANJUNG PRIOK AS ECONOMIC ENGINE OF THE COUNTRY
![Page 13: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/13.jpg)
THROUGHPUT PETIKEMAS
Domestik = 39%
Internasional = 2.4%
TOTAL = 5.8%
2000
Domestik = 30.1%
Internasional = 22.3%
TOTAL = 24.5 %
2009 2010
237.000
2.257.000
2009
2.731.000
1.068.000
3.340.000
1.390.000
2.731.000
1.068.000
Internasional
Domestik
GROWTH (RATA2 PER TAHUN) GROWTH 2010 - 2009
± 6 Juta Teu’s
2011
Estimasi Container
+ 1 Juta Teu’s
Domestik = 31,7 %
Internasional = 23.4 %
TOTAL = 27.6 %
+ 1.2 Juta Teu’s
GROWTH 2011 - 2010
CONTAINER TRAFFIC 2009 - 2010
![Page 14: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/14.jpg)
PENINGKATAN 2009 ~ 2010 = 1 JUTA TEUS/TAHUN
SIGNIFIKANSI
Setara dengan total throughput TPK Surabaya
3000 TEUS/hari 75 rangkaian KA (@ 40 Gerbong )
PENINGKATAN 2009 ~ 2010 = 1 JUTA TEUS/TAHUN
SIGNIFIKANSI
![Page 15: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/15.jpg)
JICT : 1100 Teu’s/m’/Tahun
TPK KOJA : 900 Teu’s/m’/Tahun
2010
“The Best Asia Container Terminal
dibawah 4 Juta Teu’s”
Tambahan : 1 Juta Teu’s/Tahun Memerlukan tambahan 900 m Dermaga Container baru
PRODUCTIVITY PERFORMANCE
![Page 16: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/16.jpg)
EVOLUSI KAPAL PETIKEMAS
1980 – 1996 60% lbh kapal kontainer berukuran ≤ 3.000 TEU’s
(below Panamax)
Tahun 2007 Kapal ukuran ≤ 3.000 TEU’s ,
PANAMAX dan POST PANAMAX jumlahnya
hampir sama
2012 Kapal dengan ukuran POST PANAMAX atau yang lebih besar, prosentasenya akan
semakin dominan ≤ 3.000 TEU’s Others (≤ 3.000 TEU’s)
Panamax (3.000 – 4.000+TEU’s)
Post Panamax (≥5.000 TEU’s)
![Page 17: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/17.jpg)
Source : David Wignall Associates Tanjung Priok Short Term Development Review (2009)
CONTAINER TRAFFIC FORECAST PORT OF TANJUNG PRIOK (WITH TRANSHIPMENT )
6,0
![Page 18: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/18.jpg)
*Traffic Forecast 2009
DEMAND VS CAPACITY (CONTAINER)
Traffic Forecast
Kapasitas Eksisting
PENATAAN PELABUHAN DAN JICT EXPANSION Menambah Kapasitas 1 Juta Teu’s
750 Meter Dermaga
750 Meter Dermaga
750 Meter Dermaga
6.0
![Page 19: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/19.jpg)
CONTAINER THROUGHPUT TG. PRIOK DIBANDING BEBERAPA PELABUHAN HUB LAINNYA
PORT of Rotterdam – Netherland
PORT of Antwerp - Belgium
PORT of Hamburg – Germany
PORT Klang– Malaysia
PORT Tanjung Pelepas– Malaysia
PORT of Singapore (PSA) – Singapore
11, 14 Juta Teu’s
8, 47 Juta Teu’s
7,91 Juta Teu’s
8,87 Juta Teu’s
6,54 Juta Teu’s
28,43 Juta Teu’s 2010
Tanjung Priok Estimasi ± 6 Juta Teu’s 2011
if • Nearly Zero Waiting Time • Facility and Equipment World Class • Productivity World Class • ICT and Management World Class
Kapal Container Kapasitas > 10.000 Teu’s akan CALL
ke Tanjung Priok
![Page 20: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/20.jpg)
TERMINAL NORTH KALIBARU DEVELOPMENT PORT OF TANJUNG PRIOK (PELINDO II’s PLAN)
PHASE I
-18 MLWS
![Page 21: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/21.jpg)
West Pasific Hub Port Development
![Page 22: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/22.jpg)
SORONG STRATEGIC POSITION IN THE EAST OF INDONESIA
MAKASSAR
BITUNG
SORONG
AMBON
MANOKWARI
MANADO
FAKFAK
MERAUKE
JAYAPURA
TERNATE
BALIKPAPAN
SAMARINDA
NUNUKAN
PANTOLOAN
PAREPARE KENDARI
TOLI TOLI
GORONTALO
BIAK
TUAL
KAIMANA TIMIKA
NABIRE
THROUHGPUT PETIKEMAS (TEUS)
THROUGHPUT AREA INI = 205.061 TEUS
SERUI
THROUGHPUT AREA INI = 394.977 TEUS
![Page 23: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/23.jpg)
SORONG STRATEGIC POSITION IN THE WEST PACIFIC
SYDNEY
DARWIN
CAIRNS
PORT MORESBY
TIMOR LESTE
MAKASSAR
BITUNG
SORONG
NEW CALEDONIA
SOLOMON ISLAND
![Page 24: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/24.jpg)
WEST PASIFIC HUB PORT DEVELOPMENT – SORONG – WEST PAPUA
SORONG PORT
ARAR PORT
PETRO CHINA PORT (KASIM)
PERTAMINA PORT
PULAU TELEME (Rencana West Pacific Hub Port)
SORONG
![Page 25: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/25.jpg)
WEST PASIFIC HUB PORT DEVELOPMENT – SORONG – WEST PAPUA
SHORT TERM DEVELOPMENT 2011- 2013
Dermaga : 500 M
Back Up Area : 30 Ha
![Page 26: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/26.jpg)
INTERNATIONAL HUB PORT
ASIA PORT – BATAM INTERNATIONAL HUB PORT
![Page 27: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/27.jpg)
ASIAN PORT - BATAM
![Page 28: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/28.jpg)
ASIAN PORT - BATAM
1st size for 4,0 Million Teu’s
![Page 29: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/29.jpg)
OPPORTUNITY
PROCUREMENT OF CARGO HANDLING EQUIPMENT IN THE PORT UNDER
PELINDO 1, 3 AND 4
![Page 30: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/30.jpg)
OPPORTUNITY
CONTAINER TERMINAL
New Container Terminal
Developing of Existing Terminal
Sibolga
Pulau Baai
Palembang
Pekanbaru Dumai
Belawan
Bangka
Pontianak
Lhoksemauwe
Batam
Kruing raya
Semarang
Tanjung Priok
Lembar Benoa
Ambon
Sorong
Banjarmasin
Kupang
Fak-Fak
Ternate
Manokwari
Jayapura
Merauke
Kendari
Gorontalo
Pantoloan
Kumai Mamuju
![Page 31: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/31.jpg)
CHALLANGE
Regulation Institution Competency
of Human Resources
![Page 32: IFI 121011 Pelindo](https://reader034.vdocuments.us/reader034/viewer/2022042508/5452de8eaf79591d308b527d/html5/thumbnails/32.jpg)
THANK YO U