IEQ and Building Investigations. Case Study Rowhouse , Trenton NJ. J. Ponessa, Ph.D. 3 Story Brick Rowhome. First Floor. Living room Moderate water damage to ceiling at wall; otherwise in good condition Where was water coming from?. First Floor (cont.). Kitchen - PowerPoint PPT Presentation

TRANSCRIPT

1

IEQ and Building Investigations

Case Study

Rowhouse, Trenton NJ

J. Ponessa, Ph.D.

2

3 Story Brick Rowhome

3

First Floor

Living room

Moderate water damage to ceiling at wall; otherwise in good condition

Where was water coming from?

4

First Floor (cont.)

Kitchen

Stove, sink clean; walls dirty, areas behind stove filthy

5

First Floor (cont.)

Bathroom

Epic mold

6

First Floor (cont.)

Bathroom (cont.)

Rotted sill at back of tub-shower

7

Second Floor–Above Living Room

Bedroom

Severe water damage to wall, ceiling

8

Where is this coming from?

Let’s take a look outside

9

An outside walkaround is always a good idea, especially when there is a

moisture problem

10

More Exterior Clues

11

Recall the Floor Plan

12

Exterior, Side Alley(adjacent to damaged rooms)

13

A Closer Look…

Flashing missing

Mortar erosion in wall, sill missing

14

And BelowBroken concrete, depression (also note missing

mortar)

15

Conclusion

This building is on a serious downward spiral and will soon become uninhabitable if corrective action is not taken soon

16

Other Common Places To Find Moisture Problems

Sink cabinets Behind tub & shower walls