ibs training module

58
ADA ADA Cellw Cellw o o rks rks IBS TRAINING PREPARED BY: JAYAN.Y ADA CELLWORKS,PUNE

Upload: pubudu-jayasinghe

Post on 09-Mar-2015

1.237 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: IBS Training Module

ADAADA CellwCellwoorksrks

IBS TRAININGIBS TRAINING

PREPARED BY:

JAYAN.YADA CELLWORKS,PUNE

Page 2: IBS Training Module

ADAADA CellwCellwoorksrks

IBS SURVEYIBS SURVEY LINK BUDGET CALCULATIONLINK BUDGET CALCULATION IMPLEMENTATION IMPLEMENTATION QUALITY CHECKLISTQUALITY CHECKLIST VENDOR HANDLING TIPSVENDOR HANDLING TIPS REPEATERREPEATER BASIC OF LOS SURVEYBASIC OF LOS SURVEY BASIC OF RF SURVEYBASIC OF RF SURVEY

CONTENTSCONTENTS

Page 3: IBS Training Module

ADAADA CellwCellwoorksrks

What is IBS/DAS ?

1.In-building Solution (IBS) / Distributed Antenna System (DAS)

2.Small Cell Coverage within building premises

3.Signal is restricted inside the building

4.Antenna installed inside the building

5.Low Transmit Power of Antenna

6.Smaller Antenna size

Page 4: IBS Training Module

ADAADA CellwCellwoorksrks

What drives the need for IBS ?

1. Demand of Continuous coverage

2. Indoor Activities generating high traffic

3. Poor indoor coverage of outdoor sites

4. Offloading outdoor cells with high utilization

5. Improvement of Network Performance.

Page 5: IBS Training Module

ADAADA CellwCellwoorksrks

IBS Project

1.Site Survey (IBS and LOS)

2.Design report preparation of the survey

3.Implementation work

4.Frequency planning and database preparation

5.Walk test

6.Optimization and site handover

Page 6: IBS Training Module

ADAADA CellwCellwoorksrks

PLANNING PROCESS

Survey, IBS Planning

Page 7: IBS Training Module

ADAADA CellwCellwoorksrks

IBS Planning Process Flow Chart

SITE ACQUISITION

Customer request

1. With target buildings -> Preliminary site survey

2. Without target buildings -> Area survey to locate possible target buildings

-> Approval: customer accepts target buildings

Page 8: IBS Training Module

ADAADA CellwCellwoorksrks

PRELIMINARY SITE SURVEY/PRE- PLANNING

1. Building Information.2. Surrounding Network Information.3. Draft Solution Design.4. Budgetary Cost Estimation.

Page 9: IBS Training Module

ADAADA CellwCellwoorksrks

SITE SURVEY

1. Propagation Measurement.2. Final BTS & Antenna location.3. Final Cable routing.4. Photos of Antenna Location, BTS Location, Microwave

Pole location.

Page 10: IBS Training Module

ADAADA CellwCellwoorksrks

DETAIL DESIGN REPORT

1. System Diagram (Trunking Diagram).2. Power Budget Calculation.3. Solution Description Template.4. TSSR (Technical Site Survey Report) for BTS &

Microwave details.

Page 11: IBS Training Module

ADAADA CellwCellwoorksrks

TYPES OF TYPICAL BUILDINGS COVERED IN IBS1.Office Complex2.Shopping Malls.3.Hotels & Restaurants.4.Hospitals.5.VIP Guest House.6.Exhibition Centre.7.Government Buildings.8.Airports.9.Railway Stations.10.Corporate Residential Complex.11.Factories & Industries

Page 12: IBS Training Module

ADAADA CellwCellwoorksrks

IBS SURVEY & PRE-PLANNING

Page 13: IBS Training Module

ADAADA CellwCellwoorksrks

TOOLS REQUIRED FOR IBS SURVEY1. GPS2. Digital Camera.3. Magnetic Compass.4. Binoculars.5. Measuring Tape.6. Net Monitor Phone.7. Floor Plan of that Particular Site

Page 14: IBS Training Module

ADAADA CellwCellwoorksrks

STEPS IN IBS SURVEY1. Study the building architecture, with the help of floor plans & guidance from Building authorities2. Understand the requirements need in terms of Coverage, Capacity, future Subscriber growth etc.3. Identify the duct for the cable routing & component location.4. Survey on each floor using net monitor and floor plan.5. Mark the present signal level and the antenna location to be installed in the floor plan.6. Note down all the present serving cell information like CELL ID, BCCH, Rx. Level, etc.7. Identify the BTS location, antenna locations and mark on the floor plan.8. Also not down the type of ceiling, whether pop cutting is required or not and availability of cable tray.9. Identify if any future planning is required or not in case of under construction buildings.

Page 15: IBS Training Module

LOS SURVEY

TAKE LAT – LONG BY GPS

ASK FOR FAR END TO SURVEY CO ORDINATOR

DECIDE TOWER HEIGHT( e. g POLE,RTT, GBT )REQUIREMENT( ALSO CONSIDER CUSTOMER SPECIFICATION , NOT MENDATORY )

CHECK POSSIBILITY OF CABLE ROUTING UPTO BTS LOCATION

IF PCM CABLE OR A-BTS IS REQUIRED FOR TX ,THEN MAKE NOTE THAT PCM CABLE LENGTHIS NOT EXCEEDING BY THAT OF GIVEN SPECIFICATION( UPTO 250 M).( DO NOT COMPROMISE WITH BTS LOCATION IT AFFECTS POWER CALCUTAION )

MAKE TERRACE LAY OUT

ADAADA CellwCellwoorksrks

Page 16: IBS Training Module

ADAADA CellwCellwoorksrks

INDOOR PROPOGATION Indoor channels are different from traditional mobile radio channels in two different ways

• The distances covered are much smaller • The variability of the environment is much greater for a

much smaller range of Tx-Rx separation distances.

The propagation inside a building is influenced by• Layout of the building • Construction materials

Typical building type• Sports arena, residential home, factory,...

Indoor propagation is dominated by the same mechanisms as outdoor

• reflection, scattering, diffraction.

Page 17: IBS Training Module

ADAADA CellwCellwoorksrks

However, conditions are much more variable • Doors/windows open or not

The mounting place of antenna• On the wall, ceiling, etc. • The level of floors

In building path loss factors • Partition losses (same floor) • Partition losses between floors

Page 18: IBS Training Module

ADAADA CellwCellwoorksrks

PARTITION LOSSES There are two kind of partition at the same floor:

• Hard partitions: the walls of the rooms • Soft partitions: moveable partitions that does not

span to the ceiling • The path loss depends on the type of the partitions

PARTITION LOSSES BETWEEN FLOORS The losses between floors of a building are determined by

• External dimensions and materials of the building • Type of construction used to create floors • External surroundings • Number of windows • Presence of tinting on windows

Page 19: IBS Training Module

ADAADA

CellwCellwoorksrks

o Antenna System used in IBS Integrated Antenna System

An Indoor area covered by one location e.g., open premises like sports

arena, railway station where BTS is mounted on the wall connected to the Integrated antenna system

Antennas Distributed Via Coax Feeder NetworkThis is the most simplified method used in IBS. It has some

advantage like low cost, flexibility in theDesign when shaping the coverage area, robust and well proven

technique Leaky Cable

This type is mainly used in Train tunnels, where it is tough to install with Coax feeder network. It also has flexible design but it is costly

Antennas Distributed Via Fibre Optic NetworkLow attenuation is the key factor for the deploying IBS thro fibre optic network. Even though it has some advantages like low attenuation, easy installation, it has disadvantages like very expensive, poor design flexibility and power supply needed for antenna units

Page 20: IBS Training Module

15MAN5F004

06M

J

J

24M

9M

14M

10dB

10M

17M

11M

6M

25M

3M

14M

08M

06M

11M

23M

20M

09M

15M

03M

14M

7dB 07M

08M

10M

15M

15M

10M

7dB

AN5F003

AN5F002

AN5F001

AN5F005

AN5F006

AN5F007

AN5F008

AN5F009

AN5F010

AN5F011

AN5F012

AN5F021

AN5F013

AN5F014

AN5F025

AN5F022

AN5F023

AN5F017

AN5F018

AN5F019

AN5F020

12MA 5M

J

30M

19M

21M

AN5F025

7dB J

13M

04M

AN5F015

AN5F016

09M

08MSP2W5F01

SP2W5F02

SP3W5F01

SP2W5F03

SP3W5F02

SP3W5F03AN6F001

SP2W5F04

SP2W5F05

SP2W5F06

SP4W5F01

SP4W5F02

SP4W5F03

CP7dB5F01 CP7dB5F02

CP7dB5F03

CP10dB5F01

27M

10M

ADAADA

CellwCellwoorksrks

Page 21: IBS Training Module

DUCT – 1( ELECTRICAL)

J

JJ

10d

B

7dB

7dB

8M

24M

15M

10M

6M14M

14M10M

30M

7M10M

11M17M

8M8M

3M

25M

09M

23M23M

13M

20M

18M5M

13M 23M

11M

08M

08M

19M

3M 4M

AN5F006

AN5F001

AN5F002

AN5F004

AN5F009

AN5F003

AN5F010 AN5F011

AN5F012

AN5F008

AN5F007AN5F014

AN5F013

AN5F017

AN5F018 AN5F019

AN5F016

AN5F020

AN5F022

AN5F023

AN5F021

AN5F015

AN5F005

21M

J7dB

09M

14M

14M

AN5F0139

AN5F140

SP2W5F02

SP2W5F01

SP3W5F02

CP10dB5F01

SP4W5F01

CP7dB5F01

SP2W5F03

SP4W5F02

SP2W5F04

CP7dB5F02

SP4W5F03

SP2W5F06

SP2W5F05

CP7dB5F03

SP3W5F01

SP3W5F03

Cable goes to the sixth floor

ADAADA

CellwCellwoorksrks

Page 22: IBS Training Module

LINK BUDGET CALCULATION

IT IS BASICALLY FOR POWER THAT REQUIRED AT ANTENNA END.IT DEPENDS ON THE COMPONENTSTHAT HAS BEEN USED FROM BTS TO ANTENNA THAT IS ERP( EFFECTIVE RADIATED POWER ).

LIST OF COMPONENTS WITH LOSSES ARE AS FOLLOWS::

EIRP( Effective Isotropic Radiated Power )= ERP( Effective Radiated Power ) + Gain of that component

We generally deal with EIRP ( Effective Isotropic Radiated Power ),which is defined below.

1) SPLITTERS2) COUPLERS3) CABLES4) ANTENNAS5) COMBINER6) JUMPER CABLE

ADAADA CellwCellwoorksrks

Page 23: IBS Training Module

1) SPLITTERS::

2 WAY2 WAY -3.25 -3.25

3 WAY3 WAY -5.05 -5.05

4 WAY4 WAY -6.25 -6.25

TYPE LOSS (dB)

Generally 3 types of splitters are used in IBS which are as follows.

ADAADA CellwCellwoorksrks

Page 24: IBS Training Module

1) SPLITTERS ( Continue )::

2 WAY 3 WAY 4 WAY

ADAADA CellwCellwoorksrks

Page 25: IBS Training Module

2) COUPLERS::

7 dB7 dB -7 -7 -1.5-1.510 dB10 dB -10 -10 -0.5-0.515 dB15 dB -15 -15 -0.3-0.3

TYPE LOSS AT COUPLE PORT (dB)

LOSS AT THROUGH PORT (dB)

NOTE: Ideally there should be 0 dB loss at through port. But there is always some loss, which is mentioned in table.

ADAADA CellwCellwoorksrks

Page 26: IBS Training Module

2) COUPLERS ( Continue )::

INPUT

COUPLED PORT

THROUGH PORT

ADAADA CellwCellwoorksrks

Page 27: IBS Training Module

3) CABLES::

½ ‘’( LDF4-50 A)½ ‘’( LDF4-50 A) -0.11-0.117/8 ‘’( LDF5-50 A )7/8 ‘’( LDF5-50 A ) -0.06 -0.06 1-5/8’’ ( LDF7-50 A )1-5/8’’ ( LDF7-50 A ) -0.03 -0.03

TYPE LOSS (dB per meter)

ADAADA CellwCellwoorksrks

Page 28: IBS Training Module

3) CABLES ( Continue )::

ADAADA CellwCellwoorksrks

Page 29: IBS Training Module

4) ANTENNAS::

Generally 3 types of antenna are used in IBS, which are as follows.

OMNI ANTENNAOMNI ANTENNA 2 2 PANEL ANTENNAPANEL ANTENNA 7 7 FLAT PATCH OMNI FLAT PATCH OMNI ANTENNAANTENNA 5 5

TYPE Gain (dBi )

ADAADA CellwCellwoorksrks

Page 30: IBS Training Module

4) ANTENNAS ( Continue )::

OMNI ANTENNA

ADAADA CellwCellwoorksrks

Page 31: IBS Training Module

4) ANTENNAS ( Continue )::

PANEL ANTENNA

ADAADA CellwCellwoorksrks

Page 32: IBS Training Module

FLAT PATCH OMNI ANTENNA ( Vendor : Kaweri )

4) ANTENNAS ( Continue )::

12 cm

12 cm

ADAADA CellwCellwoorksrks

Page 33: IBS Training Module

5) COMBINER::

A combiner is the device that enables several transmitters to transmitter from the same antenna.

HYBRID COMBINER( 2 I/P,1 HYBRID COMBINER( 2 I/P,1 O/P )O/P ) 3 dB3 dB

TYPE LOSS

ANTENNA

TX 1

TX 2

e. g TRX

ADAADA CellwCellwoorksrks

Page 34: IBS Training Module

6) LINK BUDGET CALCULATION :: Example with Trunking Diagram:

ADAADA CellwCellwoorksrks

Page 35: IBS Training Module

NOTE:BTS POWER IS MENTIONED AS 37 CONSIDERING 3dB COMBINER LOSS.

ADAADA CellwCellwoorksrks

Page 36: IBS Training Module

6) DIFFERENT CONNECTOR USED IN IMPLEMENTATION:

( 1 ) ½ N MALE CONNECTOR( L4PNM-RC )

To connect female port of other component like our antennas and splitter.

Connect with ½ cable

Connect with antenna port Or splitter port.

ADAADA CellwCellwoorksrks

Page 37: IBS Training Module

( 2 ) ½ N FEMALE CONNECTOR( L4PNF-RC )

Connect with ½ cable

Connect with male port like 7/8 to ½ inch connectorOr Kaveri combiner

To connect male port of other component like 7/8 to ½ connector.

ADAADA CellwCellwoorksrks

Page 38: IBS Training Module

( 3 ) 7/8 to ½ inch CONNECTOR( L5PNM-RC )

Connect with 7/8 cable( LDF 5-50A )

Connect with female port like Our antannas and splitter

To connect female port of 7/8 cable at one side and female port of ½ cable or splitter

ADAADA CellwCellwoorksrks

Page 39: IBS Training Module

To connect female port of 7/8 cable at one side and BTS port or jumper cable

( 4 ) DIN Male for LDF5-50 A 7/8 inch Cable( L5PDM-RPC )

Connect with 7/8 cable( LDF 5-50A )

Connect with female port ofjumper cable or directly to Port of BTS which isGenerally at the top of Ultra BTS

ADAADA CellwCellwoorksrks

Page 40: IBS Training Module

( 5 ) EXTERNAL COMBINER(AVANTEL)

Female PortFemale Port

Female Port

ADAADA CellwCellwoorksrks

Page 41: IBS Training Module

( 6 ) EXTERNAL COMBINER(KAVERI)

Female PortFemale Port

Female Port

( 6 ) EXTERNAL COMBINER(KAVERI) ADAADA CellwCellwoorksrks

Page 42: IBS Training Module

( 7 ) EXTERNAL JUMPER CABLE

AT BTS END

AT COMBIER END

THIS PORT HAS SIZE SAME AS 7/8 CABLE

ADAADA CellwCellwoorksrks

Page 43: IBS Training Module

7) BTS Types:

Generally 3 types of BTS Available.

1) Ultra BTS

Cabinet Max. power Demand:1.8KVVAC / 1.5KVADCNominal Voltage:230AC/-48VDC

Configuration: 4+4+4Power: 43 dBm

ADAADA CellwCellwoorksrks

Page 44: IBS Training Module

2) METRO BTS

85cm

35cm

25cm

Configuration: 2+2Power: 40 dBm

ADAADA CellwCellwoorksrks

Page 45: IBS Training Module

SECTOR’S JUMPER CABLE

MW CABLE FOR CONNECTIVITY

ADAADA CellwCellwoorksrks

Page 46: IBS Training Module

3) ULTRA MINI BTS

It looks same as Ultra BTS.Configuration: 2+2Power: 43 dBm

ADAADA CellwCellwoorksrks

Page 47: IBS Training Module

ADAADA CellwCellwoorksrks

DETAILED DESIGN REPORT1. Building Information: Co-ordinates, No. of Floors, Basements,

Lobbies.2. BTS Information: BTS Type, BTS O/P power, TRX Configuration,

Sectorization.3. TSSR Form – Transmission & RF details if planned with outdoor

sectors also)4. Trunking Diagram - Schematic Presentation of Antenna to BTS

connection via different components like, splitters, combiners & couplers.

5. Link Budget Calculations – EIRP calculation at all antenna ports, considering all the losses.

6. Planned Antenna Location with coverage area.7. Bill of Quantity - Material Requirement for the Implementation of

DAS.

Page 48: IBS Training Module

REPEATER :

Generally used where capacity required is low.

It amplifies and converts weak signal into stronger signal by adding some gain to it.

There are 2 types of repeaters.

1) BAND SELECTIVE:

It amplifies and boost frequency of particular BAND

2) FREQUENCY SELECTIVE:

It amplifies and boost particular frequencies only (Generally 2 / 3 frequency.

ADAADA CellwCellwoorksrks

Page 49: IBS Training Module

ADAADA CellwCellwoorksrks

TYPICAL REPEATER INSTALLATION

Page 50: IBS Training Module

PICK UP ANTENNA(HIGHLY DIRECTIONAL )

NEARER SITE

ADAADA CellwCellwoorksrks

Page 51: IBS Training Module

INDOOR REPEATERCONNECTED TO PEAK UP ANTENNA

CONNECTED TO ANTENNA

POWER: 2W GENERALLY.( 33 dBm )

BAND SELECTIVE

ADAADA CellwCellwoorksrks

Page 52: IBS Training Module

ADAADA CellwCellwoorksrks

IBS IMPLEMENTATION

Page 53: IBS Training Module

ADAADA CellwCellwoorksrks

TYPICAL IBS INSTALLATION

Page 54: IBS Training Module

ADAADA CellwCellwoorksrksGENERAL IMPLEMENTATION ISSUE IN IBS OPEN CONNECTION

Antenna, splitter, coupler port is open

COUPLERCouple port/through port is reversedInput port/through port is reversed

LABELINGAll the splitters and couplers should be labeled for easy identification

ANTENNA PLACEMENT OR ORIENTATIONS IS NOT AS PER PLANShift in antennas if any due to route / customer problem.

THERE IS NO PROPER SADDLING, TYING OF CABLESNo Saddling/tying done on site, typical requirement is as followsi.e., every 1mtr or 1.5mtr cable is to be tied

REQUIREMENT OF EXTRA MATERIALClamps FOR Antennas/cable

Page 55: IBS Training Module

ADAADA CellwCellwoorksrks

VENDOR HANDLING1. Handover site to vendor with all details like work permission,

material storage space, proper cable routing. 2. Generate MRF for delivery of material to this site.3. Ask vendor for daily update.4. Must visit site 2-3 day in week.5. Ask all details after completion of full site.6. Get the material details from the vendor7. Get the BOM (Bill of Material) from the vendor and generate cam

Form for the site after reconciling the material

Page 56: IBS Training Module

ADAADA CellwCellwoorksrks

IMPLIMENTATION AUDITVisit site daily if possible otherwise 2-3 day in weekCheck installation is as par plan or changeDecide any changes in antenna location (if require according to

aesthetic, permission, cable routing etc..)

Page 57: IBS Training Module

ADAADA CellwCellwoorksrks

IBS IMPLEMENTATION QUALITY STANDARDS.1. No Extra Cable is left rolled near the BTS Equipment.2. Feeder Cable and components have to be independently & properly

clamped (saddling) to the wall or laid over the cable tray .

3. Combiner is clamped and the various cables to and from the combiner are secured properly on the Cable tray or Wall mount.

4. Feeder Installation for all the sectors should have appropriate bending radius for both 1/2” & 7/8”.

5. Connector have to be weather proofed6. Feeders & components should be anchored at fixed intervals by

saddling/cable tie7. Aesthetic rectification should be completed with cleanliness

Page 58: IBS Training Module

THANK YOU…