Presented by
22/05/2012
How to Retrofit your BuildingFrom Benchmarking to Commissioning
Dr Paul Bannister
![Page 2: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/2.jpg)
Why retrofit?BenchmarkingIdentifying energy efficiency opportunitiesMaking it happen
Overview
![Page 3: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/3.jpg)
Reasons for retrofitting buildings vary, but key factors include:Services upgradeNABERS upgrade to attract tenantsReposition asset for improved rent/sale value
Why Retrofit?
![Page 4: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/4.jpg)
Services upgradesReplacement of old plantImprovement of service deliveryReduced maintenance costsImproved reliability
Why Retrofit?
![Page 5: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/5.jpg)
NABERS & asset repositioningPCA grade matrix references NABERSGovernment tenants demand 4.5 star rating
Some large corporate tenants, tooCBD lighting may generate similar driversBuilding with 4.5 stars may attract higher rentsBuilding with quality tenants has higher sale value
Why Retrofit?
![Page 6: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/6.jpg)
Rebuild has many disadvantagesHigh capital costsHigh environmental impactsLoss of rent during construction periodFinal result may not be that much better
Why Not Knock Down and Rebuild?
![Page 7: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/7.jpg)
Retrofit timing has to be coordinated carefully:Vacancies (especially for deeper refurbishments)Known replacement horizons for plantSeasonal plant outage coordination
Beware central plant lead times
When to Retrofit?
![Page 8: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/8.jpg)
Use available benchmarks to determine the level of efficiency opportunity in your building:
Offices: Anything less than NABERS 4 stars is fair gameHotels/shopping centres: Anything less than NABERS 3.5 stars is fair game
But.....Almost every building has 10-15% savings availableBenchmarking tells you how much worse it is than that
Benchmarking – How Good is my Building?
![Page 9: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/9.jpg)
With low-hanging fruit measures2.5 star buildings have savings of 15-20%+ available0-1 star buildings have savings in excess of 30% available
With some capital investment2.5 star buildings have savings of 30%+ available0-1 star buildings have savings in 50%+ available
Almost everywhere, gas savings are availableGas is typically wasted more than electricity
Benchmarking – How BAD is my building?
![Page 10: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/10.jpg)
Standard process is an energy audit, which should include as a minimum:
List of specific energy savings measures with costs and benefitsAn energy end-use breakdownA description of the site
Notional standard is AS3598 Level 2
Identifying Energy Savings
![Page 11: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/11.jpg)
Audits cost anywhere between 3% and 20% of annual energy cost depending on site size and complexity
You get what you pay for.Bad audit call-signs:
No end use breakdown How did the auditor estimate energy use?
Non-specific measures“Do something with your HVAC controls”“Replace all the T8 lamps with T5 replacements”
Good and Bad Audits
![Page 12: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/12.jpg)
Work internally to identify wasteResults dependent upon skills and motivation of building staff
Limited domain audits can deliver resultse.g. lighting only, HVAC only
HVAC controls reviews can be very cost-effectiveBe wary of supplier driven equipment upgrades
Solutions offered will be equipment drivenPlenty of bad examples and far fewer good examples
Alternatives to Audits
![Page 13: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/13.jpg)
Retrofit Costs - Office Buildings
![Page 14: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/14.jpg)
Retrofit Costs - Hotels
![Page 15: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/15.jpg)
LightingTurn off when not neededReduce lighting power density/install more complex controls
HVACImprove controlsUpgrade plant
Other equipmentTurn off when not in useRationalise
Areas of Opportunity
![Page 16: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/16.jpg)
LEHR demonstrated that performance improvement is not just about technology. Key factors include:
Management responsibility and authorityHaving a reason to care:
Staff vs contractorsIncentives and disincentivesNABERS declaration
TrainingCulture of continuous improvement
Don’t Forget Building Management
![Page 17: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/17.jpg)
Implementation process must manage:Preservation of design intentTranslation of design intent into designTranslation of design into a working outcomeMinimisation of tenant disruptionDemonstration of outcomeTime and costs
Key Issues in the Implementation Process
![Page 18: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/18.jpg)
Key playersEnergy auditorServices engineerContractor(s)Building ownerBuilding managementProject managerTenants
One party may take several roles
Key Players in the Implementation Process
![Page 19: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/19.jpg)
Design and constructHand audit to contractorContractor designs and implements solutions
Detailed design, build to planHand audit to design consultantDesign works and tenderContractor implements, consultant checks
Energy Performance ContractEPC contractor identifies and implements solutionsEPC contractor guarantees outcome
Procurement and Contracting Options
![Page 20: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/20.jpg)
Not all efficiency upgrades are successfulSpecification issuesControl/commissioning issuesLack of monitoring and verificationProject management
Common Failures
![Page 21: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/21.jpg)
Audits don’t always give much detailA good audit should, thoughEnergy efficiency is often about detail
Normal practice delivers the designs that fail and need upgrade
Delivery of successful retrofits requires specific attention to energy efficiency
Preservation of design intent is important
Specification Issues
![Page 22: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/22.jpg)
Simple questions (not always easy answers)Does it work the way it was intended?Has it been optimised for efficiency?What commissioning tests has it been subject to?Has it been correctly documented (or at all)?
Consider the use of an Independent Commissioning Agent
Controls/Commissioning Issues
![Page 23: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/23.jpg)
Establish a pre-works baselineNABERS easiest where available
Develop monitoring for each measure, preferablySimple before/after measures for simple systemsClimate corrected correlation based benchmarks for HVAC
Build metering into the works to enhance understandingConfirm performance as part of the defects process
Monitoring and Verification
![Page 24: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/24.jpg)
All procurement methods need a good project manager toIntegrate proposed design with design intentManage implementation issues in line with design intentManage multiple conflicting prioritiesManage monitoring and verification process
Project Management
![Page 25: How to Retrofit your Building - City of Melbourne · Paul Bannister 1200 Buildings Retrofitting seminar #1 Final.pptx Author: miclee Created Date: 20120522172243Z](https://reader033.vdocuments.us/reader033/viewer/2022051913/60038cfe773e6a27286cc3e3/html5/thumbnails/25.jpg)
Retrofitting is an attractive option for the repositioning of anassetThe basic process is:
MeasureIdentify savingsImplement savingsMeasure
Procurement and execution of retrofits require care
Conclusions