GRISWOLD HIGH SCHOOLROOF REPLACEMENT
October 29, 2013
Griswold High School• 111, 930 s.f.
• Stone Ballasted 060 mil EPDM Membrane
• Installed in 1992
EXTERIOR
EXISTING CONDITIONS
Stone ballasts, removed to locate and repair leaks, do not hold layedmembrane in place
Concrete walk pavers have deteriorated due to prolong exposure to UV rays.
Shrinking of EPDM membrane due to age causes lap seams to split open allowing water infiltration.
Seams have been patched, but continuous maintenance required to keep facility water tight.
INTERIOR
EXISTING CONDITIONS
Water has infiltrated the building in several locations.
GHS Library
GHS Library
Cafeteria
Janitor’s Closet Science Closet
PROPOSED SOLUTION
• 080 mil White PVC Membrane
• Energy Star Certified
• 4” Rigid ISO Insulation Over Vapor Retarder
• Existing Drains Supplemented with New Overflow Drains
• New Fascia Metal, Safety Rail, and Walk Pads
• Replacement of all Skylights
• Fan Replacement and Electrical Reconnections
COMPLETE ROOF REPLACEMENT
Roof Plan PVC MembraneNew Skylights
CourtyardNew Walk Pads
KEY
Drains
Drains
Drains
Drains
Griswold Elementary School Griswold Middle School
PROJECT COST
CONSTRUCTION CONTRACT ESTIMATE FOR THE REROOFING OF GRISWOLD HIGH SCHOOL
REIMBURSEMENT*Task Estimated Cost Eligibility Estimate Ineligible EstimateGeneral Conditions:Demolition:New Roof Installation:New Over Flow Drains:New Metal Fascia:MiscellaneousSkylights:
_______________ ______________ ______________Sub-Total $2,545,000 $2,336,500 $ 208,500
Construction Contingency: $ 255,000 $ 0 $ 255,000***Owner’s Soft Costs: $ 150,000 $ 100,000 $ 50,000MEP Allowance: $ 50,000 $ 0 $ 50,000
_____________ _____________ _____________Grand Total $3,000,000 $2,436,500 $ 563,500
$ 150,000$ 112,000$1,997,000$ 42,000$ 63,000$ 10,000$ 171,000
$ 112,500$ 112,000$1,997,000$ 42,000$ 63,000$ 10,000$ 0
$ 37,500$ 0$ 0$ 0$ 0$ 0$ 171,000**
*Griswold 2013-2014 reimbursement rate is 72.14%. **May be eligible for reimbursement in whole or in part***Eligibility to be determined upon designated usage. If the contingency is not used, the amount designated will not be bonded.
Town of Griswold Debt ProjectionsAs of September 30, 2013
Estimated Tax Impact of Bonding
GRISWOLD HIGH SCHOOLROOF REPLACEMENT
Q & A