GRISWOLD HIGH SCHOOL ROOF REPLACEMENT October 29, 2013

Upload: others

Post on 03-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

GRISWOLD HIGH SCHOOLROOF REPLACEMENT

October 29, 2013

Page 2: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Griswold High School• 111, 930 s.f.

• Stone Ballasted 060 mil EPDM Membrane

• Installed in 1992

Page 3: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

EXTERIOR

EXISTING CONDITIONS

Page 4: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Stone ballasts, removed to locate and repair leaks, do not hold layedmembrane in place

Page 5: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Concrete walk pavers have deteriorated due to prolong exposure to UV rays.

Page 6: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Shrinking of EPDM membrane due to age causes lap seams to split open allowing water infiltration.

Page 7: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Seams have been patched, but continuous maintenance required to keep facility water tight.

Page 8: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted
Page 9: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

INTERIOR

EXISTING CONDITIONS

Page 10: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Water has infiltrated the building in several locations.

GHS Library

Page 11: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

GHS Library

Page 12: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Cafeteria

Page 13: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Janitor’s Closet Science Closet

Page 14: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

PROPOSED SOLUTION

Page 15: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

• 080 mil White PVC Membrane

• Energy Star Certified

• 4” Rigid ISO Insulation Over Vapor Retarder

• Existing Drains Supplemented with New Overflow Drains

• New Fascia Metal, Safety Rail, and Walk Pads

• Replacement of all Skylights

• Fan Replacement and Electrical Reconnections

COMPLETE ROOF REPLACEMENT

Page 16: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Roof Plan PVC MembraneNew Skylights

CourtyardNew Walk Pads

KEY

Drains

Drains

Drains

Drains

Page 17: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Griswold Elementary School Griswold Middle School

Page 18: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

PROJECT COST

Page 19: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

CONSTRUCTION CONTRACT ESTIMATE FOR THE REROOFING OF GRISWOLD HIGH SCHOOL

REIMBURSEMENT*Task Estimated Cost Eligibility Estimate Ineligible EstimateGeneral Conditions:Demolition:New Roof Installation:New Over Flow Drains:New Metal Fascia:MiscellaneousSkylights:

_______________ ______________ ______________Sub-Total $2,545,000 $2,336,500 $ 208,500

Construction Contingency: $ 255,000 $ 0 $ 255,000***Owner’s Soft Costs: $ 150,000 $ 100,000 $ 50,000MEP Allowance: $ 50,000 $ 0 $ 50,000

_____________ _____________ _____________Grand Total $3,000,000 $2,436,500 $ 563,500

$ 150,000$ 112,000$1,997,000$ 42,000$ 63,000$ 10,000$ 171,000

$ 112,500$ 112,000$1,997,000$ 42,000$ 63,000$ 10,000$ 0

$ 37,500$ 0$ 0$ 0$ 0$ 0$ 171,000**

*Griswold 2013-2014 reimbursement rate is 72.14%. **May be eligible for reimbursement in whole or in part***Eligibility to be determined upon designated usage. If the contingency is not used, the amount designated will not be bonded.

Page 20: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Town of Griswold Debt ProjectionsAs of September 30, 2013

Page 21: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

Estimated Tax Impact of Bonding

Page 22: GRISWOLD HIGH SCHOOL ROOF REPLACEMENT...Oct 29, 2013  · The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted

GRISWOLD HIGH SCHOOLROOF REPLACEMENT

Q & A

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

October 29, 2013