FACILITIES MANAGEMENT Facilities Planning and Construction Department Date: July 3, 2017 CONSTRUCTION PROJECT STATUS REPORT Report No.9 Gooch Dillard Renovation Phase III: Dillard Current Status: landscape package has extended contract completion Start: June 1, 2016 Finish: August 4, 2017 % complete Buildings 94% Landscape 75% Current Activities: Punch list and lock up bldgs. 386, 387 (final) Commission locks. Commission MEP systems. Crawl space install vapor barrier and ballast. Crawl space install access ladders. Phase I replace lights, patch and paint. Study and Lounge install cabinetry and structural glass. All-weather traffic coating on exterior stairs ongoing. Cut and fill for new central lawn. Grade and sub grade for new fire lane, old fire lane is removed. Install new biofilter, cover for final fill at end. Field measure for new handrails. Add more bike parking to Alderman Pedestrian Path (the bridge) Future Activities Flooring in study. Furniture Delivery in July. Graphics in Lounge and Study. Complete Landscape improvements. Please contact Kate Meyer, UVA Senior Project Manager, at [email protected] or (434) 982-5748 with any questions or comments. Charles Durrer is the UVA Senior Construction Manager, and can be reached at [email protected] or (434) 962- 4087. New Atlantic Contracting is the Construction Manager at Risk. VMDO is the Architect.

Upload: buithien

Post on 11-Feb-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gooch Dillard Renovation Phase III: Dillard · Runk Han U RSITY RGINIA 575 Alderman Rd • P.O. Box 400726 • Charlottesville, VA 22904-4726 • 434-982-5880 • FAX 434-982-5894

FACILITIES MANAGEMENT Facilities Planning and Construction Department

Date: July 3, 2017 CONSTRUCTION PROJECT STATUS REPORT Report No.9 Gooch Dillard Renovation

Phase III: Dillard

Current Status: landscape package has extended contract completion Start: June 1, 2016

Finish: August 4, 2017 % complete Buildings 94% Landscape 75%

Current Activities: Punch list and lock up bldgs. 386, 387 (final) Commission locks. Commission MEP systems. Crawl space install vapor barrier and ballast. Crawl space install access ladders. Phase I replace lights, patch and paint. Study and Lounge install cabinetry and structural glass. All-weather traffic coating on exterior stairs ongoing. Cut and fill for new central lawn. Grade and sub grade for new fire lane, old fire lane is removed. Install new biofilter, cover for final fill at end. Field measure for new handrails. Add more bike parking to Alderman Pedestrian Path (the bridge)

Future Activities Flooring in study. Furniture Delivery in July. Graphics in Lounge and Study. Complete Landscape improvements.

Please contact Kate Meyer, UVA Senior Project Manager, at [email protected] or (434) 982-5748 with any questions or comments. Charles Durrer is the UVA Senior Construction Manager, and can be reached at [email protected] or (434) 962-4087. New Atlantic Contracting is the Construction Manager at Risk. VMDO is the Architect.

Page 2: Gooch Dillard Renovation Phase III: Dillard · Runk Han U RSITY RGINIA 575 Alderman Rd • P.O. Box 400726 • Charlottesville, VA 22904-4726 • 434-982-5880 • FAX 434-982-5894

2

Page 3: Gooch Dillard Renovation Phase III: Dillard · Runk Han U RSITY RGINIA 575 Alderman Rd • P.O. Box 400726 • Charlottesville, VA 22904-4726 • 434-982-5880 • FAX 434-982-5894

3