  • 7/31/2019 Global PM Method Logy

    1/12

    Multi site and source systems deploymentFramework and Methodology

    Frank Pataky

  • 7/31/2019 Global PM Method Logy

    2/12

    About the Deployment MethodologyDeployment Methodology is a globally consistent framework for implementing Projects. It

    provides guidance, a road map and templates to help sites successfully plan and manage ERP

    deployment where multiple sites and multiple source system conversions are need.

    Why a standardmethodology?

    Focused effort,less rework,

    increasedefficiency

    Access to righttools

    and templatesspeeds up

    deployment

    Standardapproach

    = reduced time= reduced cost

    Consistentapproachto tracking

    benefits

    Right first timeimplementation

  • 7/31/2019 Global PM Method Logy

    3/12

    The 17 Deployment Methodology stages

    The deployment methodology has been divided into 17 key stages which can at times overlap or run in parallel

    Risked Based Project Management (RBPM) stages are also shown to illustrate the alignment of the Framework

    with the quality assurance requirements as outlined by RBPM methodology

    Objectives, high level milestones, outputs and deliverables are detailed within each stage

    R B P M

    1. Initiation 2. Requirements &Analysis 3. Design 4. Build 5. Test 6. Transition

    7. PostImplementation

    S t a g e s

    1. DeploymentSite

    Evaluation

    2. DeploymentProject

    Initiation

    3. Impact

    Analysis4. Inbound &

    Outbound DataSourcingAnalysis

    5. DataMappingAnalysis

    6. Technical

    Design

    7. ProcessDesign

    8. Build / Unit

    Test

    9. Functional

    Rules Testing

    10. TechnicalTesting

    11. UAT

    12. Finance/ITOperations

    Setup

    13. Parallel Run& Initial Process

    Changes

    14. Book ofRecord

    17. PostImplementation

    Project Review& Closure

    15. SourceSystem

    Tranches16. ProcessChange &Benefits

    Realization

  • 7/31/2019 Global PM Method Logy

    4/12

    Deployment Methodology: Stages 1-2

    Knowledge = predictability

    The more we know upfront, the more accurate theestimates for time and effort required to do the job

    No assumptions on site readiness

    Evaluation identifies if site is not ready or timing isntright

    Site onboarding and expectation management

    Allows us to work with the site to identify scope andbenefits of deployment, and gain buy-in from keystakeholders

    A standard approach = smoother project kick-off and lifecycle

    Budget approved and locked in, adequate resourcingagreed at these earlier stages

    R B P M

    1. Initiation

    S t a g e s

    1. Deployment SiteEvaluation

    2. DeploymentProject Initiation

  • 7/31/2019 Global PM Method Logy

    5/12

    Deployment Methodology: Stages 3-5

    Local requirements identified, analysed and agreed

    Confirm the fit of the standard deployment components Target, Gold, Group Systems and standard feeds for the site

    Legacy to target data mapping is done

    Needs skills and experience but also standard tools and

    templates to make the process easier and more predictable

    R B P M

    2. Requirements &Analysis

    S t a g e s

    3. Impact Analysis

    4. Inbound &Outbound Data

    Sourcing Analysis

    5. Data MappingAnalysis

  • 7/31/2019 Global PM Method Logy

    6/12

    FTP Deployment Methodology: Stages 6-11

    A stage dedicated to process design

    Functional Rules Testing (TURF)Included as a particular form oftesting required for platformdeployment

    Central environments

    = standardised projects andreduced cost and deliverydependencies

    R B P M

    3. Design 4. Build 5. Test

    F T P S

    t a g e s

    6. Technical

    Design

    7. ProcessDesign

    8. Build / Unit

    Test

    9. Functional

    Rules Testing

    10. TechnicalTesting

    11. UAT

  • 7/31/2019 Global PM Method Logy

    7/12

    Deployment Methodology: Stages 12-16

    Transition stage is one of the most complex

    Consistent operations set up, not reinventing the wheel

    Leverage the significant amount of work already done tosupport the current deployments

    Adaptable methodology: Supports parallel run

    Standard approach to Book of Record

    Leverage and standardise tranche experiences

    Its here where benefits and process changes are realised themethodology will give us a standard approach and tools for this

    R B P M

    6. Transition

    S t a g e s

    12. Finance/ITOperations Setup

    13. Parallel Run & InitialProcess Changes

    14. Book of Record

    15. Source SystemTranches

    16. Process Change &Benefits Realization

  • 7/31/2019 Global PM Method Logy

    8/12

    FTP Deployment Methodology: Stage 17

    Often the forgotten stage in projectsbut value shouldnot be underestimated

    Review and closure, gathering of lessons learnedand improvements will be critical to improving themethodology if we are to reduce the time tomarket and the cost of deployment

    Continuous improvement

    We will gather improvements and makeadjustments at each stage to fine tune themethodology not waiting 18 months to improvethings

    R B P M

    7. PostImplementation

    F T P

    S t a g e s

    17. PostImplementation

    Project Review &

    Closure

  • 7/31/2019 Global PM Method Logy

    9/12

    Implement using a structured and repeatable framework to:

    Minimise cost

    Maximise standardisation

    Reduce duration of implementation projects

    Use Standard Deployment Methodology

    Start at a sigle site

    Develop Future sites target: plan and plan per site

    Drive deployment to sites from regional team using Subject Matter Expert (SME)resource

    Develop a sprate roll-out plan for each sites

    Our approach

  • 7/31/2019 Global PM Method Logy

    10/12

    The how

    Testing

    Processes &Functionality

    DataManagement

    InformationManagement& Reporting

    BUILD

    Communications & Engagement

    Support

    Operations

    Implementation& Transition

    DEPLOY

    Project Governance & Co-ordination

    Technology Infrastructure

    Business Change and Benefits Realisation

    Nine work-streams sharing both Finance and IT resources

  • 7/31/2019 Global PM Method Logy

    11/12

    Resources

    Build a region-centric team to run multiple site deployments in tandem

    Build a global team of SME to be travel to site implementations as required

    Provide Subject Matter Expert (SME) regional team resources to support site teams

    Follow the standard work stream organisation both in region and site teams

    Functiuonal Users and IT to work closely together, ideally physically co-located

    Avoid the need for building substantial implementation teams in each site but develop lasting skills and experience in the site teams

    Develop a partnership between local teams to deliver to other regional sites

    Target team composition 20 % from previous sites 80% from local sites

    Recruit and develop the global teams

  • 7/31/2019 Global PM Method Logy

    12/12

    One Team

    Mix of roles, skills and

    grades across countries

    Excellent cross-site

    communications

    Building a One Team environment

    Joint recruitment approach

    Flexible working

    practises

    Team mobility

    Career progression and

    succession planning

    Comprehensive on-boarding

    and team development plan

    Joint Business and IT teamwork Local and region teams

    working in unison