BELMONT HIGH SCHOOLEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
AGENDAExisting Conditions Summary
01 / Civil
02 / Landscape
03 / Architectural
04 / Structural
05 / Mechanical & Electrical
06 / Plumbing
07 / Fire Protection
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
01/ CIVIL ENGINEERINGEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
01/ CIVIL ENGINEERING: ANALYSIS / TOPOGRAPHYBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
01/ CIVIL ENGINEERING: ANALYSIS / WETLAND RESOURCE AREASBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
01/ CIVIL ENGINEERING: ANALYSIS / STORM DRAINAGEBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
01/ CIVIL ENGINEERING: ANALYSIS / SEWER SERVICEBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
01/ CIVIL ENGINEERING: ANALYSIS / WATER, GAS, AND ELECTRIC SERVICESBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
02/ LANDSCAPEEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
02/ LANDSCAPE: SITE ANALYSIS/ CONTEXTBelmont High School
CONTEXTBHS SITE
N
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
02/ LANDSCAPE: SITE ANALYSIS/ REGULATORY CONSTRAINTSBelmont High School
REGULATORY CONSTRAINTSBHS SITE
N
GENERAL BUSINESS ZONE
GENERAL RESIDENCE ZONE
ZoNiNg SummaryGeneral Residential General Business
SetbacksFront 20' 5'Side 10' 20' or height of building
(whichever is higher)Rear 12' 20' or height of building
(whichever is higher)Max. Building Height 33' 36'Max. Stories 2.5 NA
REGULATORY CONSTRAINTSBHS SITE
N
GENERAL BUSINESS ZONE
GENERAL RESIDENCE ZONE
ZoNiNg SummaryGeneral Residential General Business
SetbacksFront 20' 5'Side 10' 20' or height of building
(whichever is higher)Rear 12' 20' or height of building
(whichever is higher)Max. Building Height 33' 36'Max. Stories 2.5 NA
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
ENVIRONMENTAL ASSETS
SOILS
BHS SITE
udortheNtS, wet SubStratum
urbaN laNd, wet SubStratum udortheNtS, wet SubStratum
Newport urbaN laNd complex, 3-15%
urbaN laNd
merrimac-urbaN laNd complex, 0-8%NScio urbaN laNd complex, 0-8%
Scio very fiNe SaNdy loam, 3-8%
ENVIRONMENTAL ASSETS
SOILS
BHS SITE
udortheNtS, wet SubStratum
urbaN laNd, wet SubStratum udortheNtS, wet SubStratum
Newport urbaN laNd complex, 3-15%
urbaN laNd
merrimac-urbaN laNd complex, 0-8%NScio urbaN laNd complex, 0-8%
Scio very fiNe SaNdy loam, 3-8%
02/ LANDSCAPE: SITE ANALYSIS/ SOIL ASSESSMENTBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
02/ LANDSCAPE: SITE ANALYSIS/ ENVIRONMENTAL ASSETSBelmont High School
ENVIRONMENTAL ASSETS
SOILS
BHS SITE
udortheNtS, wet SubStratum
urbaN laNd, wet SubStratum udortheNtS, wet SubStratum
Newport urbaN laNd complex, 3-15%
urbaN laNd
merrimac-urbaN laNd complex, 0-8%NScio urbaN laNd complex, 0-8%
Scio very fiNe SaNdy loam, 3-8%
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
CIRCULATION + PARKINGBHS SITE
MBTA BUS STOP
VEHICULAR CIRCULATION
CAR PARKING SPACES
EXISTING SITE ACCESS POINTS
SERVICE AREAS
PEDESTRIAN CIRCULATION20
PARKING SUMMARYCar Spaces 343Bus Spaces 15
N
CIRCULATION + PARKINGBHS SITE
MBTA BUS STOP
VEHICULAR CIRCULATION
CAR PARKING SPACES
EXISTING SITE ACCESS POINTS
SERVICE AREAS
PEDESTRIAN CIRCULATION20
PARKING SUMMARYCar Spaces 343Bus Spaces 15
N
02/ LANDSCAPE: SITE ANALYSIS/ CIRCULATION + PARKINGBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
02/ LANDSCAPE: SITE ANALYSIS/ EXISTING PROGRAMBelmont High School
EXISTING PROGRAMBHS SITE
N
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
02/ LANDSCAPE: SITE ANALYSIS/ BUILDABLE AREASBelmont High School
BUILDABLE AREASBHS SITE
N
BUILDABLE AREAS
BUILDABLE AREASBHS SITE
N
BUILDABLE AREAS
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
03/ ARCHITECTUREEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
DN
UP
UP
UP
UP
EXISTING HIGH SCHOOL LEGEND
ADMINISTRATION & GUIDANCE
ART & MUSIC
CIRCULATION
CORE ACADEMIC
COURTYARD
CUSTODIAL & MAINTENANCE
DINING & FOOD SERVICE
DISTRICT OFFICES
HEALTH & PHYSICAL EDUCATION
MEDIA CENTER
SPECIAL EDUCATION
VOCATIONS & TECHNOLOGY
865.01 SFCOMPUTER LAB
1010.49 SFCLASSROOM
1119.63 SFCLASSROOM
1010.49 SFCLASSROOM
1119.63 SFCLASSROOM
950.63 SFCLASSROOM
27533.04 SFFIELDHOUSE
3736.25 SFCOURTYARD
4351.12 SFLIBRARY
754.17 SFCLASSROOM
760.16 SFCLASSROOM
738.90 SFCLASSROOM
391.35 SFCLASSROOM
391.35 SFCLASSROOM
738.56 SFCLASSROOM
748.36 SFCLASSROOM
749.05 SFCLASSROOM
749.98 SFCLASSROOM
723.44 SFCLASSROOM
779.63 SFCLASSROOM
417.77 SFCLASSROOM
412.95 SFCLASSROOM
781.50 SFCLASSROOM
712.33 SFCLASSROOM
759.55 SFCLASSROOM
7193.32 SFCAFETERIA
7180.01 SFAUDITORIUM
1259.48 SFSERVING
1898.94 SF
BOYS LOCKER
ROOM
1566.60 SFBOILER ROOM
227.91 SFTRAINING
554.77 SFEQUIP DRYING
362.67 SF
ATHLETIC
STORAGE
314.67 SF
EXTERIOR
STORAGE
195.24 SFOFFICE
71.39 SFWC
145.47 SFWC
149.00 SFWC
435.75 SF
CAMPUS PROGRAM
CLASSROOM
2100.00 SFLECTURE HALL
814.02 SFLABBB
1021.58 SF
COMPUTER LAB
PHYSICS
224.43 SFWC
151.29 SFWC
194.50 SFWC
216.80 SFWC 297.94 SF
METCO
87.37 SFOFFICE
117.44 SFOFFICE
87.41 SFOFFICE
117.76 SFOFFICE
1631.85 SFWEIGHT ROOM
1080.49 SF
GIRLS LOCKER
ROOM
159.33 SFSTORAGE
495.90 SF
BOYS LOCKER
ROOM
690.24 SFCAMPUS PROGRAM
118.46 SFWC
165.47 SFWC
737.96 SF
SOCIAL STUDIES
OFFICE
769.72 SFELL
35
2.0
2 S
FC
OLLAB
OR
ATIO
N
88
2.7
1 S
F
EN
GLIS
H W
RIT
ING
LAB
35
9.3
4 S
FC
OLLAB
OR
ATIO
N
667.59 SFENGLISH OFFICE
53.09 SFWC
53.24 SFWC
262.96 SFOFFICE
203.71 SF
ATHLETIC
DIRECTOR
423.26 SF
LEX. CHINESE
STORAGE
47.99 SFWC
48.13 SFWC 131.08 SF
CONF RM
945.18 SFADMIN
113.27 SFVAULT
163.27 SFRECORDS
100.31 SFSTORAGE
779.93 SFGUIDANCE
134.94 SFOFFICE
146.71 SFOFFICE
135.45 SFMAILROOM
135.46 SFOFFICE
132.39 SFOFFICE
145.75 SFOFFICE
357.48 SFCONF RM
269.89 SFPRINCIPAL
147.99 SFVP
69
5.4
6 S
FC
USTO
DIA
L O
FFIC
E
314.13 SFDISHWASHING
739.76 SFSTAFF DINING
11
3.1
7 S
FS
TO
RAG
E
99.78 SFOFFICE
422.01 SFSTORAGE
234.00 SFFREEZER
138.00 SFRECEIVING
182.58 SFSTORAGE
111.16 SFLOCKER RM
1263.82 SFKITCHEN
384.62 SFSTORAGE
374.69 SFDRESSING
394.43 SFSTORAGE
1909.56 SFBAND ROOM
102.33 SFSTORAGE
188.75 SFOFFICE360.68 SF
MUSIC
CLASSROOM
13
5.6
4 S
FP
RAC
TIC
E
321.92 SFSTORAGE51.00 SF
STORAGE
1732.67 SF
INSTRUMENTAL
ROOM1756.41 SFWOOD SHOP
78.57 SFSTORAGE
110.28 SFSTORAGE
54.99 SFSTORAGE
124.86 SFOFFICE
108.31 SFSTORAGE
68.50 SFFIRE CONTROL
1329.71 SF
SPECIAL
EDUCATION
40
5.6
0 S
F
LEAD
GU
IDAN
CE
CO
UN
SELO
R
152.21 SFWC
122.93 SFWC
143.84 SFWC
150.47 SFWC
724.68 SF
SPECIAL
EDUCATION
188.24 SFELEC
289.49 SFSTORAGE
176.92 SFMECH
35.29 SFJANITOR
71.30 SFOFFICE
391.98 SF
SWITCHBOARD
ROOM
855.85 SFSHOWERS
569.12 SFSHOWERS
21
1.6
8 S
FS
TO
RAG
E3
79
.94
SF
EQ
UIP
STO
RAG
E
117.47 SFSTORAGE
104.30 SFSTORAGE
72.14 SFCOACH
266.49 SFOFFICE
140.56 SFWAITING RM
493.50 SFEXAM
176.36 SFOFFICE
63.74 SFOFFICE
N
543.38 SF
ATHLETIC
STORAGE
6946.82 SFPOOL
136.67 SFBEA OFFICE
128.33 SFBEA OFFICE
204.76 SFPROJECT ROOM
203.46 SFPROJECT ROOM
505.30 SF
SPECIAL
EDUCATION
2761.96 SFSTAGE
156.25 SFCOPY 44.10 SF
STORAGE
53.71 SFSTORAGE
80.04 SFOFFICE
106.50 SFOFFICE
162.16 SFWC
118.19 SFWC 26.58 SF
ELEC
89.01 SFOFFICE
436.78 SF
CAMPUS PROGRAM
CLASSROOM
615.61 SF
ONE STUDENT
CLASSROOM
824.37 SFCLASSROOM
832.86 SFCLASSROOM
787.32 SFCLASSROOM
728.88 SFCLASSROOM
800.70 SFCLASSROOM
792.51 SFCLASSROOM
267.34 SF
TOWN MAINT
OFFICE
218.86 SFMECH
124.88 SFWC
113.63 SFWC
134.12 SFWC
144.62 SFSTORAGE
189.70 SFBREAK
196.33 SFBELMONT OFFICE
106.30 SFSTORAGE
03/ ARCHITECTURE: LEVEL 01 FLOOR PLANBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
UP
UP
UP
UP
UP
EXISTING HIGH SCHOOL LEGEND
ADMINISTRATION & GUIDANCE
ART & MUSIC
CIRCULATION
CORE ACADEMIC
CUSTODIAL & MAINTENANCE
HEALTH & PHYSICAL
EDUCATION
MEDIA CENTER
VOCATIONS & TECHNOLOGY
533.33 SFSTORAGE
5703.53 SFGYM
413.34 SFSTORAGE
440.54 SFTEAM ROOM
2649.86 SFBLEACHERS
159.33 SFSTORAGE
221.35 SFSTORAGE
3948.07 SF
GIRLS LOCKER
ROOM
159.96 SFOFFICE
825.24 SFWELLNESS ROOM
1344.19 SFLAB
202.00 SFPREP
1354.88 SFLAB
505.57 SFLAB
285.08 SFPREP
79.75 SFJANITOR
1444.64 SFLAB
1222.85 SFLAB
133.28 SFANIMAL
172.29 SFGROWING
92.65 SFPREP
1194.47 SFLAB
1172.25 SFLAB
895.57 SFLAB
1000.88 SFLAB
268.81 SFPREP
138.53 SFPREP
114.13 SFPREP
172.16 SFWC
173.41 SFWC
375.29 SFBREAK/COPY
204.13 SFSTORAGE
700.24 SFSCIENCE OFFICE
105.21 SFOFFICE
75.75 SFWC
75.75 SFWC
116.80 SFSTORAGE 146.65 SF
STORAGE
74.30 SFMECH
61.17 SFELEC
754.56 SFCLASSROOM
750.96 SFCLASSROOM
804.16 SFCLASSROOM
746.88 SFCLASSROOM
752.04 SFCLASSROOM
552.08 SFCOMPUTER LAB
440.97 SFPROJECT ROOM
600.14 SFMATH OFFICE
362.48 SFCOLLABORATION
869.33 SF
LANGUAGE
COMPUTER LAB
370.30 SFCOLLABORATION
595.76 SFLANGUAGE OFFICE
750.08 SFCLASSROOM
742.19 SFCLASSROOM
392.03 SFCLASSROOM
395.66 SFCLASSROOM
737.78 SFCLASSROOM
745.77 SFCLASSROOM
111.27 SFWC
166.49 SFWC
120.91 SFWC
23.67 SFELEC
169.63 SFWC
43.81 SFWC
43.81 SFWC
54.18 SFJANITOR
740.12 SFCLASSROOM
392.03 SFCLASSROOM
392.03 SFCLASSROOM
741.85 SFCLASSROOM
744.39 SFCLASSROOM
30
3.2
5 S
F
TECH
DIR
EC
TO
R
OFFIC
E
416.49 SFSERVER
106.14 SFSTORAGE
175.81 SFVP OFFICE
215.20 SFCOMPUTER RM
1478.01 SFART ROOM
974.75 SFCLASSROOM
1805.56 SFART ROOM
1260.12 SFART ROOM
478.89 SFFINE ARTS OFFICE
1745.93 SFART ROOM
847.47 SFMECH
1163.62 SFCLASSROOM
457.59 SF
GENERAL
STORAGE88.08 SF
ELEV MECH
50.91 SFJANITOR
43.81 SFWC
47.26 SFWC
218.58 SFART STORAGE
N
457.06 SFCOMP LAB
1150.57 SFLIBRARY
483.33 SFTECH OFFICES
429.77 SFTECH OFFICES
327.37 SFTECH OFFICES
234.76 SFCONF RM
139.17 SFVP OFFICE
369.20 SFCONF ROOM
247.34 SFDARK RM
826.94 SFWELLNESS ROOM
03/ ARCHITECTURE: LEVEL 02 FLOOR PLANBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
03/ ARCHITECTURE: ROOF LEVEL FLOOR PLANBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
03/ ARCHITECTURE: PROGRAM BREAKDOWN
ADMINISTRATION & GUIDANCE 16,159 SQFT (6.6%)
ART & MUSIC 24,030 SQFT (9.8%)
CIRCULATION 42,468 SQFT (17.3%)
CORE ACADEMIC 59,135 SQFT (24.1%)
COURTYARD (EXTERIOR) 3,736 SQFT (1.5%)
CUSTODIAL & MAINTENANCE 11,530 SQFT (4.7%)
DINING & FOOD SERVICE 12,282 SQFT (5.0%)
HEALTH & PHYSICAL EDUCATION 60,445 SQFT (24.6%)
MEDIA CENTER 6,301 SQFT (2.6%)
DISTRICT OFFICES 875 SQFT (3.0%)
VOCATIONS & TECHNOLOGY 2,472 SQFT (1.0%)
SPECIAL EDUCATION 5,980 SQFT ( 2.4%)
TOTAL 245,413 SQFT
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
04/ STRUCTUREEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
TYPICAL ROOF: Poured gypsum over form deck supported on steel bulb tees, steel joists and beams.
TYPICAL FLOOR: 2 1/2” thick concrete slab-on-form deck supported on steel bar joists and wide flange steel girders.
FIRST FLOOR: Mix of reinforced concrete structural slab and concrete slab-on-grade
UTILITY TUNNELS: Below first floor corridor
04/ STRUCTURE: EXISTING CONDITIONSBelmont High School
FIELDHOUSE ROOF: is typical rood construction supported on structural steel bents
FOUNDATIONS: Concrete filled steel piles and pile caps supporting the building columns, walls and first floor slab at the majority of the footprint
LATERAL LOAD: No explicit lateral load resisting system (shear walls, braced frames, etc.) for resisting seismic and wind loads
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
LEVEL 01
LEVEL 02
WIDE FLANGE BEAMS
STRUCTURAL STEEL COLUMNS
BAR JOISTS
04/ STRUCTURE: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
04/ STRUCTURE: EXISTING CONDITIONSBelmont High School
EXISTING STRUCTURE
The existing structure is performing well
Signs of past water leaks were observed
Minor cracks in the interior masonry walls and masonry facade were observed
No undue vibration from footfall was perceived at supported slabs
No signs of foundation settlement were observed
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
04/ STRUCTURE: FEASIBILITY OF RENOV. AND EXPANSIONBelmont High School
Compliance with International Existing Building Code
Compliance Method: Work Area Compliance Method
Work area will be greater than 50%; thus, Level 3 Alterations
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
SEISMIC CLIPPING: of all existing masonry walls will be required
DEMISING WALLS: Majority of walls do not appear to be structural in nature
RENOVATIONS: Proposed renovations will trigger an analysis of the existing building and will require the addition of shear walls or braced frames, which will probably require addition of piles within the building
SLAB ON GRADE AREAS: Addition of tie beams connecting pile caps at slab-on-grade areas.
04/ STRUCTURE: FEASIBILITY OF RENOVATION AND EXPANSION Belmont High School
GRADE BEAMS AND PILES: will be required for phased and partial demolition to support the new exterior walls.
RENOVATIONS: will require trenching of existing slabs:
- Not easy to trench under supported structural slabs, will need to maintain continuity of reinforcement of the slab
- Have to be careful in trenching through Fieldhouse floor due to tension cables
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
Proposed additions should be horizontal additions, separated from the existing structure by expansion joints.
Vertical additions may not be feasible, due to limited capacity of foundations and columns. The existing roof structure will not have capacity to support floor loads.
04/ STRUCTURE: FEASIBILITY OF RENOV. AND EXPANSION Belmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
05/ MECHANICAL + ELECTRICALEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
LARGE SPACES LIGHTING: Cafeteria lighting is typical for the library/Media Center as well as other large spaces throughout the building.
ORIGINAL FIXTURES: Similar to many spaces throughout the building, the fixtures are original to the building, utilizing fluorescent lamps and inefficient vs. higher efficient LED fixtures.
CONTROLS: local line voltage switches vs. low voltage employing dimming, vacancy sensors and day lighting controls.
05/ ELECTRICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
UTILITY TRANSFORMER AND BACKUP GENERATOR: Existing (see photo).
TRANSFORMER: With any projected upgrades/additions or rebuild the transformer size and/location will need to be addressed.
GENERATOR: The generator size offers limited opportunity to add equipment. The existing distribution does not meet todays code required separation of systems.
05/ ELECTRICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
For new or renovated designs all electrical equipment would be in dedicated electric closets. No equipment in storage closets or other non dedicated areas.
05/ ELECTRICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
MAIN ELECTRIC ROOM: Space Limitations
05/ ELECTRICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
SCIENCE ROOMS
FLUORESCENT LIGHTING: is typical for most of the classrooms throughout the building. The fixtures are original to the building with fluorescent lamps vs. todays LED fixtures offering higher efficiencies.
CONTROLS: are original to the building consisting of local line voltage switching vs. todays low voltage dimming, vacancy sensors and day lighting controls
05/ ELECTRICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
STEAM BOILERS: 47+ year old steam boilers.
DUEL FUEL: burners can burn gas or fuel oil.
BOILERS: have been partially or completely re-tubed several times.
STEAM SYSTEM: requires maintenance of steam traps, condensate pumps, receiver tanks, control valves, anti-corrosion chemicals.
05/ MECHANICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
ROOF TOP UNITS
Casings are in good condition. Corrosion around the unit base.
There are two vintages of units. Same manufacturer, but with differences in technology. Five units have web interfaces.
All have steam heating coils.
Some have DX cooling.
05/ MECHANICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
UNIT VENTILATORS
Provides heating with hot water and outdoor air ventilation through an exterior louver.
Heavy gauge casings are in good condition, but some with dents and deformations. Chipped paint typical.
Pneumatically controlled dampers and valves require a high level of maintenance.
05/ MECHANICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
PNEUMATIC TEMPERATURE CONTROLS
Master control panel and pressure control actuators (see photo)
Original copper tubing with soldered fittings with some plastic tubing.
Repairing of leaks is difficult. Some tubing is covered with fire proofing.
Little to no monitoring capability.
Pneumatic technicians harder to find.
05/ MECHANICAL: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
06/ PLUMBINGEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
06/ PLUMBING: EXISTING CONDITIONSBelmont High School
PLUMBING FIXTURES
MODELS: Most are older models and not compliant with current codes.
ADA: Not all fixture configurations or mounting heights meet current ADA requirements.
COLD WATER SYSTEM: More than adequate to meet existing / future demands
HOT WATER SYSTEM: Combination of steam-fired and electric water heaters. A more centralized approach should produce energy savings in future.
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
06/ PLUMBING: EXISTING CONDITIONSBelmont High School
SANITARY SYSTEM: Piping system is visibly in fair condition, but piping serving science lab is not acid-resistant per code.
STORM SYSTEM: Existing roof drains and visible piping systems appear in good condition.
NATURAL GAS SYSTEM: Existing gas service is mor than adequate to meet current needs of school and visible piping systems appear to be in good condition.
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
KITCHEN
Currently, all electric equipment/ no gas connections.
No dish washing on site at this time/ all disposable plates and utensils.
Three-compartment sink and associated grease trap not used.
No exterior grease trap on site.
06/ PLUMBING: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
SCIENCE WING
No gas connections to countertop turrets.
Main gas shut-off valve to wing is in ceiling and not code compliant.
Lab sink waste piping is on its own system, but does not have acid resistant piping and treated before connecting to the building’s main waste system.
Water service to the lab is from the main domestic system.
Lab water should be its own protected system.
06/ PLUMBING: EXISTING CONDITIONSBelmont High School
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
06/ PLUMBING: EXISTING CONDITIONSBelmont High School
POOL LOCKERS + SHOWERS
Existing locker rooms and shower rooms in fair condition.
Single floor drain in shower areas.
Water from one shower should not drain into other shower areas.
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
07/ FIRE PROTECTIONEXISTING CONDITIONS SUMMARY
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017
BUILDING COMMITTEE MEETING / SEPTEMBER 14, 2017