ever vail brochure
DESCRIPTION
Ever Vail, LLC, an affiliate of Vail Resorts Development Company (VRDC), has updated its plans and application materials for the Ever Vail re-development project. The revised plans reduce commercial space by more than 30 percent, and also include revisions to the Red Sandstone Creek corridor creating a larger open park-like area through the middle of the nearly 12-acre site.TRANSCRIPT
-
November 15, 2010 Revision 1 - December 28, 2010EVER VAIL | Comprehensive Project Overview
-
EVER VAILComprehensive Project Overview | November 15, 2010
1AERIAL SITE PLAN - EXISTING
N
EVER VAILEVER VAIL
RITZRITZCARLTONCARLTON
VAIL SPAVAIL SPA
GORE CREEK GORE CREEK PLACEPLACE
GORE CREEK GORE CREEK R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
I-70
I-70
I-70
I-70
S. FRONTA
GE ROAD
S. FRONTA
GE ROAD
ARRABELLEARRABELLE
CASCADECASCADEVILLAGEVILLAGE
LIONSHEAD VILLAGELIONSHEAD VILLAGE
-
EVER VAILComprehensive Project Overview | November 15, 2010
2EXISTING | ZONING
INDICATES AREA INDICATES AREA CURRENTLY ZONED SDD#4CURRENTLY ZONED SDD#4
INDICATES AREA CURRENTLY INDICATES AREA CURRENTLY ZONED ARTERIAL BUSINESS ZONED ARTERIAL BUSINESS DISTRICTDISTRICT
INDICATES AREA CURRENTLY INDICATES AREA CURRENTLY ZONED LIONSHEAD MIXED-USE 2ZONED LIONSHEAD MIXED-USE 2
C.D.O.T. RIGHT-OF-WAYC.D.O.T. RIGHT-OF-WAYCURRENTLY UNZONEDCURRENTLY UNZONED
-
EVER VAILComprehensive Project Overview | November 15, 2010
3PROPOSED | ZONING
INDICATES AREA PROPOSED INDICATES AREA PROPOSED LIONSHEAD MIXED-USE 2LIONSHEAD MIXED-USE 2
-
Revision 1 - Dec 28, 2010
EVER VAILComprehensive Project Overview | November 15, 2010
4PRELIMINARY PLAT
-
EVER VAILComprehensive Project Overview | November 15, 2010
5BUILDABLE AREA
-
EVER VAILComprehensive Project Overview | November 15, 2010
6TOPOGRAPHIC SURVEY
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
7AERIAL SITE PLAN - PROPOSED
N
EVER VAILEVER VAIL
RITZRITZCARLTONCARLTON
VAIL SPAVAIL SPA
GORE CREEK GORE CREEK PLACEPLACE
GORE CREEK GORE CREEK R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
I-70
I-70
I-70
I-70
S. FR
ONTA
GE RO
AD
S. FR
ONTA
GE RO
AD
ARRABELLEARRABELLE
CASCADECASCADEVILLAGEVILLAGE
LIONSHEAD VILLAGELIONSHEAD VILLAGE
-
EVER VAILComprehensive Project Overview | November 15, 2010
8ILLUSTRATIVE PLAN
25 50 100 2000
N
PROPOSED FRONTAGE PROPOSED FRONTAGE ROAD BRIDGEROAD BRIDGE
PEDESTRIAN BRIDGEPEDESTRIAN BRIDGE
CLIMBING WALL TOWERCLIMBING WALL TOWER
RESIDENTIAL GARAGE RESIDENTIAL GARAGE ENTRANCEENTRANCE
PROPOSED SNOWPROPOSED SNOWSTORAGESTORAGE
GAS REGULATORGAS REGULATOR
PED./BIKEPED./BIKEPATHPATH
POOLPOOL
TRANSIT CENTERTRANSIT CENTERENTRANCEENTRANCE
PROPOSED PROPOSED ROUND ABOUTROUND ABOUT
PED. CONNECTIONPED. CONNECTIONTO LIONSHEADTO LIONSHEAD
WESTWESTLIONSHEAD LIONSHEAD
CIRCLECIRCLE
GORE CREEK GORE CREEK PLACE TOWN HOMESPLACE TOWN HOMES
VAIL SPA VAIL SPA CONDOSCONDOS
ERWSDERWSDTREATMENT TREATMENT PLANTPLANT
GARAGE ENTRYGARAGE ENTRY
LOADING/LOADING/SERVICE SERVICE ENTRANCEENTRANCE
THE RITZ CARLTONTHE RITZ CARLTONRESIDENCESRESIDENCES
NORT
H FRO
NTAG
E ROA
D
NORT
H FRO
NTAG
E ROA
D
I-70I-70
I-70I-70
SOUT
H FRO
NTAGE
ROAD
SOUT
H FRO
NTAGE
ROAD
FORE
ST R
OAD
FORE
ST R
OAD
HOTEL PLAZAHOTEL PLAZA
FOR
ES
T RO
AD
FOR
ES
T RO
AD
GORE CREE
KGORE
CREEK
GORE CREEK
GORE CREEK
CENTRAL CENTRAL PLAZAPLAZA
PARKPARK
HOTELHOTEL
GONDOLAGONDOLA
GORE C
REEK
GORE C
REEK
RE
D S
AN
DS
TON
E C
RE
EK
RE
D S
AN
DS
TON
E C
RE
EK
WEST SIDE WEST SIDE AUTO COURTAUTO COURT
MIXED USE MIXED USE PARKING ENTRANCEPARKING ENTRANCE
-
EVER VAILComprehensive Project Overview | November 15, 2010
9PEDESTRIAN | CIRCULATION DIAGRAM
25 50 100 2000
N
LEGEND:PEDESTRIAN ONLY
MULTI-USE PATH
RITZCARLTON
CASCADEVILLAGE
LIONSHEADPARKING GARAGE
LIONSHEADVILLAGE
EVER VAIL
-
EVER VAILComprehensive Project Overview | November 15, 2010
10VEHICULAR | CIRCULATION DIAGRAM
25 50 100 2000
N
EVER VAILTRANSIT CENTER
AREA STUDIED FOR FUTURE STOPS:- ECO TRANSIT EASTBOUND- WEST VAIL EASTBOUND- TOV IN-TOWN SHUTTLE
RITZCARLTON
CASCADEVILLAGE
LIONSHEADPARKING GARAGE
LIONSHEADVILLAGE
EVER VAIL
ECO TRANSIT - EASTBOUNDROUTE & STOPS
LEGEND:
TOV WEST VAIL - EASTBOUNDROUTE & STOPS
TOV WEST VAIL - WESTBOUNDROUTE & STOPS
TOV IN-TOWN SHUTTLEROUTE & STOPS
STOP UNDER STUDY FORFUTURE IMPLEMENTATION
-
EVER VAILComprehensive Project Overview | November 15, 2010
11SITE CIRCULATION DIAGRAM
25 50 100 2000
N
RITZCARLTONS
. FRON
TAGE R
OAD
FOR
EST
RO
AD
GORE CREEKR
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
TRANSIT
LEGEND:
PASSENGER CAR
PEDESTRIAN ONLY
MULTI-USE PATH
COVERED BICYCLE RACKS
DROP-OFF AREA
HOTEL SHUTTLE
PARKING ENTRANCE
TRANS
IT CEN
TER
HOTEL
GONDOLA
E-7
E-EEEEEEEEEEEEEEE 5 E-6
E-3
E-2
E-2
E-1E-E-EEE-E-EEEEEEEEEEE 4444444444444444
W-2
WWWWWWW-WWWWWW 2
W-W--111W-3
W-3
-
EVER VAILComprehensive Project Overview | November 15, 2010
12PEDESTRIAN CONNECTION TO CASCADE
CASCADECASCADE
EVER VAILEVER VAIL
15 30 60 1200
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
13PEDESTRIAN CONNECTION TO LIONSHEAD
EVER VAILEVER VAIL
LIONSHEADLIONSHEAD
-
EVER VAILComprehensive Project Overview | November 15, 2010
14OVERALL EXISTING | GONDOLA WALKING DISTANCE
125 250 500 10000
N
LIONSHEADLIONSHEAD
I-70I-70
I-70I-70
I-70I-70
VAIL VILLAGEVAIL VILLAGE
GOLDEN PEAKGOLDEN PEAK
500 FT1000 F
T1500 F
T
500 FT
1000 FT
1500 FT
PP
PP
PP
LEGEND
PARKING GARAGE
500 FT
1,000 FT
1,500 FT
CASCADECASCADEVILLAGEVILLAGE
-
EVER VAILComprehensive Project Overview | November 15, 2010
15OVERALL WITH EVER VAIL | GONDOLA WALKING DISTANCE
125 250 500 10000
N
LIONSHEADLIONSHEAD
I-70I-70
I-70I-70
I-70I-70
VAIL VILLAGEVAIL VILLAGE
GOLDEN PEAKGOLDEN PEAK
500 FT
1000 FT
1500 FT
500 FT1000 F
T1500 F
T
500 FT
1000 FT
1500 FT
PP
PPPP
PP
EVER VAILEVER VAIL
CASCADECASCADEVILLAGEVILLAGE
TRANSIT TRANSIT CENTERCENTER
EXTENT OF BELOW GRADE EXTENT OF BELOW GRADE PARKINGPARKING
PP
LEGEND
PARKING GARAGE
500 FT
1,000 FT
1,500 FT
-
EVER VAILComprehensive Project Overview | November 15, 2010
16EVER VAIL | GONDOLA WALKING DISTANCE
PP
PP
50 100 200 4000
N
EVER VAILEVER VAIL
LIONSHEADLIONSHEADI-70I-70
500 FT
1000 FT
1500 FT
TRANSIT TRANSIT CENTERCENTER
EXTENT OF BELOW EXTENT OF BELOW GRADE PARKINGGRADE PARKING
PP
LEGEND
PARKING GARAGE
500 FT
1,000 FT
1,500 FT
-
EVER VAILComprehensive Project Overview | November 15, 2010
17CORE AREA PARKING MAP
125 250 500 10000
N
EVER VAILEVER VAIL
PP
PPPP
PP
LIONSHEADLIONSHEADI-70I-70
I-70I-70
I-70I-70
VAIL VILLAGEVAIL VILLAGEEXTENT OF BELOW GRADE EXTENT OF BELOW GRADE PARKINGPARKING
PP
LEGEND
COMMERCIAL CORE AREA
PROPOSED COMMERCIAL CORE AREA
PARKING GARAGE
-
EVER VAILComprehensive Project Overview | November 15, 2010
18PROPOSED GRADING PLAN
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
19FRONTAGE ROAD RELOCATION | PHASING
25 50 100 2000
N
GLOB
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
RITZ CARLTONTONTONTONTONTONTONONNONNONNONTONNTONNONONOOORESIDENCEEEEEEEEEEEEEEEEEEEEEEEEESSSSSSSSSSSSSS
GORGORRGORGORGORGORGORGORRGORRGORGOGORG RRRRRGORE CCCE CE CCE CE CE CE CE CCCE CE CREEEEEEEEEEEEEEEEEEEEKKKKKKKKKKKKKKKKKKKKKKKKKTOWOWOWOWOWOWOWOWOWOWWWWWWWNHONHONHONHONHONHONHONHONHONHONHONHONHONHONHONHONHONHOONHOOONHONHONHONNHOHOON OMMMMMMMMESMMMMMMMMMMMM
ERWERWRWERWERWRWERWRWRWRWWRWWSDSDSDSDSDSDSDDSDSDSDDSDSD
VAIL SPA
SURFACE PARKING306 SPACES
OUTLINE OF EXISTING BUILDINGS
FRON
TAGE R
OAD
FORE
ST R
OAD
-
EVER VAILComprehensive Project Overview | November 15, 2010
20END OF PHASE 1 CONDITION | PHASING
25 50 100 2000
N
E-7
E-66
E-33-33-3333
E-2
GLOB
E-5E-5
E-1
E-4E-4E-4E-4E-4E-4E-4E-4E-4E-4E-4E-4E-4-4EEE-4E-4EEEEE
TRAN
SIT CE
NTER
SKIER
DROP
-OFF
FRON
TAGE R
OAD
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
BUS STOP
RITZ CARLTONTONTONTONTONONNTONTONONONONNNNNONNTONNNONNNRESIDENCEEEEEEEEEEEEEEEEEEEEESSSSSSSS
GORGORGORGORGORGORGORGORGORRGORRGORGORGORORGORG RRE CCCE CE CE CCE CE CCE CCEEE CCREEEEEEEEEEEEEEEEEEEEKKKKKKKKKKKKKKKKKKKKKKKKTOWOWOWOWOWOWOWOWOOOOWWOWWWOWNHONHONHONHONHONHONHONHONHONHONHONHONHONHONHONHOHONHONNNHOHOHONNHOHOHOMMMMMMMESMMMMMMMMMM
ERWRWRWRWRWRWRWRWWRWWWWSDSDSDSDSDSDSDSDSDSDSDSD
VAIL SPA
SURFACE PARKING306 SPACES
MARKET
HOTEL
HOTELPORTE COCHERE
FORE
ST R
OAD
-
EVER VAILComprehensive Project Overview | November 15, 2010
21FIRE DEPARTMENT ACCESS DIAGRAM
RITZ CARLTONRESIDENCES
GORE CREEKPLACE
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
FIRE ACCESS LANE
ERWSDPLANT
S. FRO
NTAGE
ROAD
S. FRO
NTAGE
ROAD
FORE
ST R
OAD
25 50 100 2000
N
FIRE APPARATUS ACCESS
LEGEND:
FIRE FIGHTER ACCESS, MAX 150 LENGTH
AREA BEYOND 150 FIRE FIGHTER ACCESS
HOTEL
TRANSIT CENTER
E-7
E-5
E-6
E-3
E-2
E-2
E-1
W-2
WWWWWWWWW-WWWWWW 2W-1
W-3
W-3
GONDOLAE-E-EE-E-E-E-EEEEEEEEEEE-EEE 444444444444444444
MARK
ET S
T.
-
EVER VAILComprehensive Project Overview | November 15, 2010
22OVERALL SITE AREA
CREEK SETBACKS
10 BUILDING SETBACK
PROPERTY LINE
SITE AREA:WEST 230,634 SFEAST 318,940 SFTOTAL 549,574 SF 12.617 ACRES
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
23ABOVE GRADE | SITE COVERAGE
SITE COVERAGE:WEST 91,463 SFEAST 160,745 SFTOTAL 252,208 45.89%(RESIDENTIALBRIDGES INCLUDED)
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
24BELOW GRADE | SITE COVERAGE
SITE COVERAGE:WEST 118,712 SFEAST 244,299 SFTOTAL 363,011 SF 66.05%(BELOW GRADE GARAGEEXTENTS INCLUDED)
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
25COMBINED ABOVE AND BELOW GRADE | SITE COVERAGE
SITE COVERAGE:WEST 126,102 SFEAST 258,521 SFTOTAL 384,623 SF 69.98%(ALL ABOVE GRADE ANDGARAGE EXTENTS INCLUDED)
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
26EXISTING/PROPOSED TREE PLAN
-
EVER VAILComprehensive Project Overview | November 15, 2010
27LANDSCAPE CALCULATIONS PLAN
-
EVER VAILComprehensive Project Overview | November 15, 2010
28GROUND LEVEL | FLOOR PLANS
20 40 80 1600
N
SKIER
DROP
-OFF
MARKET
MARKET LOADING
VAIL PARKSAND RECREATION
GAS REGULATOR
CENTRAL PLANT
MIXED USE PARKING ENTRANCE
RESIDENTIALLOADING AND WASTE
RESIDENTIAL PARKINGENTRANCE
CENTRALCHECK-IN
RESIDENTIALAMENITY
HOTEL SHUTTLEDROP-OFF
DROP-OFF
OFFICELOBBY
RES.LOBBY
RES.LOBBY
RES.LOBBY
RES.LOBBY
RES.LOBBY
NIGHTCLUB ENTRANCE
MARKETENTRANCE
RES.LOBBY
RES.LOBBY
W
SKI VALET
W
M
M
HOTEL PORTECOCHERE
HOTELMEETINGROOMS
CENTRAL LOADINGDOCK BELOW E-3
PARKINGGARAGEENTRY
HOTEL RESTAURANT
ELEVATOR AND ESCALATORFROM MIXED USE PARKING
PUBLIC ELEVATOR ANDESCALATOR FROM/TO PLAZA CREEK SIDE
GONDOLA
CREEK CENTERLINE
30 CREEK SETBACK
50 CREEK SETBACK
GORE CREEKCENTERLINE
HOTELPLAZA
WEST SIDEAUTO COURT
RE
D S
AN
DS
TON
E C
RE
EK
GORE CREEK
ERWSDPLANT
RITZCARLTON
WESTLIONSHEAD
CIRCLE
CENTRALPLAZA
S. FRO
NTAGE
ROAD
TRANS
IT CEN
TER
FORE
ST R
OAD
HOTEL
E-7-7E
EE-5E-55EE
E-6-6-6E 6
E-3EE 3E
E-2E 2E 2E-
E-1-
W-2W 2WW 2
W-22WW
W-1W 1W 1
W 3W-3333W 33333W-3W-333
3W-33WW 3W 3WWWWW 333
W-3W-3WW 3
3W-333WW 33333333
W-33W-3
ESCALATOR/ ELEVATORFROM MIXED USE PARKING
ESCALATOR/ ELEVATORFROM MIXED USE PARKING
PARK AREA
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
29LEVEL 1a | FLOOR PLANS
E-66E-6
5E-555EE-E-55
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
30LEVEL 2 | FLOOR PLANS
20 40 80 1600
N
POOL TERRACE
E-E-E-E-7777777777777
E-E-E-E-E-E-E-E-E-E-E-E-E-E-E-E-E-E 6666666666666666
EEEEE-EEEEEEEEEE 3
E----2222
W-WWWWWWWWWWWWWWWWWWWWW 222
W-W-W-W-W 1111W-WW 333
W-W-W-333
WWWWWWWWWWWWWWWWW-WWWWWWW 333333333333333333333WWW-W-WWW-WWWWWWWWWWWWWWWWWW 3333333333333333333333333
E-E-E-E-5555
W-W-W-222
E--1
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
31LEVEL 3 | FLOOR PLANS
20 40 80 1600
N
E-E-E-E-5555E-E-E-E-E-E-E-E-E-E-EE-E-E-EEE-E-66666666666666666
E-E-E-E-7777
E-EEE 2222
E--111
W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-2222222222222222222222
W-W-W-W-1111
W-WWWWWWW-WWWWWWW-WWWWWWWWWWW 3333333333333333333333
W-W-W-333333333333333333333W-W-W-WWWWWWWWWWWWWWWWWWW 3
E-333
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
32LEVEL 4 | FLOOR PLANS
20 40 80 1600
N
E-E-E-E-5555 E-EEEEE-E-E-EEEEEEEEEEEEE 6666
E-EE 333
W-W-W-W-W-W--W-W-W-W-W-W-W-W-W-W-W-2222222222222222222
W-W-W-W-1111
EEEEE-E-E-EEEEE-777
E-E 11
E------EEE-2222222
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
33LEVEL 5 | FLOOR PLANS
20 40 80 1600
N
E-E-E-E-666666666666666666666666666
E-7777777777777777777777777777
W-W-W-W-W-W-W-W-W-W-W-W-WW-W-W-W-W-222222222222222222
E-EEEEEEEEEEEEEEEE 2 E-333
E-EE-E-5
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
34LEVEL 6 | FLOOR PLANS
20 40 80 1600
N
W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W-W 22222222222222222
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
35ROOF PLAN
20 40 80 1600
N4:12
4:12
4:12
4:12
4:12
4:12
4:124:12
4:12
4:124:12
4:12
4:12
4:12
4:12
4:12
4:12
2:12
2:12
2:12
2:12
2:12
2:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6
:
1
2
6
:
1
2
6
:
1
2
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
3:12
6:12
6:12
6:12
6:12
6:12
6:12
6
:
1
2
2
:
1
2
2
:
1
2
2
:
1
2
2:12
2:12
2:12
2:12
2:12
6:12
6:12
6
:
1
2
6
:
1
2
6
:
1
2
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
3:12
6:12
6:12
6:12
6:12
6:12
6:12
6
:
1
2
2
:
1
2
2
:
1
2
2
:
1
2
6:12
2:12
2:12
5:12
5:12
3:12
5:12
5:12
3:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
6:126:12
6:12
6:12
6:12
6:12
6:12
6:12
6:12
SOLAR READY ROOF AREAS
LEGEND:
SNOW MANAGEMENT STRATEGY:
Roof lines will be designed to not deposit snow on parking areas, trash storage areas, stairways, deck or balconies or entryways.
Secondary roofs, snow clips and snow guards will be utilized in areas as necessary to protect plaza areas from roof snow shedding.
All structures will have a Class A roof assembly or have a Class A roof covering.
Roofs will be designed as a cold roof
Venting will be made via roof pergolas at peaks of roof forms and eave venting at soffi ts.
-
EVER VAILComprehensive Project Overview | November 15, 2010
36P1 PARKING | FLOOR PLANS
20 40 80 1600
N
RESIDENTIAL BY-PASS LANE
COMMERCIAL ENTRANCE LANES
PARKING ENTRANCE
SEE ZONING ANALYSIS FOR PARKING REQUIREMENTS AND SUMMARY
VAIL PARKS &RECREATIONLOWER LEVEL OUTDOOR
SPACE
OPEN TOBELOW
LOADINGDOCK
BELOW
NIGHT CLUB
COMM
ERCIA
L PAR
KING
COMM
ERCIA
L PAR
KING
RESIDENTIA
L PARKING
RESIDENTIA
L PARKING
RES.LOBBY
RESIDENTIALAMENITY
RES.LOBBY
PARK AREA
RES.LOBBY
E-2-
W-33333WWWWW-3W-3WWW
W 33W-333W 3WW 33WWW-3W
E-1EE 1-1
MIXED USED PARKINGENTRY RAMP PASSES THROUGH
RESIDENTIAL ENTRY RAMP
RAMP TO P2 COMMERCIALPARKING
MOUNTAINOPERATIONS
BELOW
MOUN
TAIN
OPERA
TIONS
PARKIN
G
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
CROSSOVER30 DIMENSION COMPLIANCE
SCALE 1:20
-
EVER VAILComprehensive Project Overview | November 15, 2010
37P2 PARKING | FLOOR PLANS
20 40 80 1600
N
CENTRAL LOADINGDOCK - SEE DIAGRAMS FOR TRUCK MOVEMENTS
MIXED USE PARKINGRAMP AND TICKETING GATES
ELEVATOR/ESCALATORTO DEVO/VRD SPACE
ELEVATOR/ESCALATORTO DEVO/VRD SPACE
SPEED RAMP TO LEVEL P3
SKI LOCKERS
PUBLIC ELEVATOR TO GONDOLA PLAZA
MIXED
USE
PARK
ING
MIXED USE
PARKING
PUBLIC ELEVATOR/ESCALATORTO SURFACE
COMMERCIAL RAMPTO LEVEL P3
COMMERCIAL RAMPTO LEVEL P1
PUBLIC ELEVATOR/ ESCALATOR TO SURFACE
MOUNTAIN OPERATIONSLOADING DOCK - SEE DIAGRAMSFOR TRUCK MOVEMENTS
MIXED USE ELEVATOR/ESCALATOR TO GROUND LEVELW-3-3
3W-3WW-3333
E-2EEEE--
E-1E-1E-11111
SEE ZONING ANALYSIS FOR PARKING REQUIREMENTS AND SUMMARY
MOUNTAINOPERATIONS
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS P2 DEVODROP-OFF CONFIGURATION
SCALE 1:20
-
EVER VAILComprehensive Project Overview | November 15, 2010
38P3/P4 PARKING | FLOOR PLANS
P3 PARKING
20 40 80 1600
N
HOTELBACK OF HOUSE
CENTRAL PLANT
MOUNTAIN OPERATIONSLOWER LEVEL
RESID
ENTIA
L PAR
KING.
RES.LOBBY
RES.LOBBY
RES.LOBBY
RES.LOBBY
RES.LOBBY
RES.LOBBY
SEE ZONING ANALYSIS FOR PARKING REQUIREMENTS AND SUMMARY
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
MIXED
USE P
ARKIN
G
MIXED
USE P
ARKIN
G
MIXED USE P
ARKING
PUBLIC ELEVATOR/ ESCALATOR TO SURFACE
PUBLIC ELEVATORSTO SURFACE
PUBLIC ELEVATOR/ ESCALATOR TO SURFACE
COMMERCIAL RAMPTO LEVEL P2
COMMERCIAL RAMPTO LEVEL P4
P4 PARKING
-
EVER VAILComprehensive Project Overview | November 15, 2010
39GROUND LEVEL USE DIAGRAMS
LEVEL 1 PLAN
E-1E-1E-1E-1E-1E-1
E-1 E-1
E-1E-1E-1E-1-1E-1E-1
E-2E-2E-2E-2E-2E-2
EEEE-2E-2E-2E-2E-2E-2E-2-22EE-2EEEEEEEE
W-2W-2W-2W-2W-2W-2
W-2W-2W-2W-2W-2W-2W-2W-2W-2WW-2WW
W-2W-2W-2W-2W-2W-2
E-3E-3E-3E-3E-3E-3E-3EEEEE
E-6E-6E-6E-6E-6E-6
E-7E-7E-7E-7E-7E-7
E-5E-5E-5E-5E-5E-5
40 80 160 3200
N
W-1W-1W-1W-1W-1W-1
W-3W-3W-3W-3W-3W-3W-3W-3W-3W-33
W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-33333WW
W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-33
W-3W-3W-3W-3W-3W-W-3W-3W-3-3W-3W-33-3W-3-3-3-3W
W-3W-3W-3W-3W-3W-3W-3W-3WW-3
W-3W-3W-3W-3W-3W-3W-33W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W-W-WW 3W 3W 3WW 3WWWW-3W-3W-3W-3W-3W-3W-3W-333W 3W-3W 3W 33WWWW 3W-W-3W-WW-3WW 3W 3WWWW 3WWW-3W-3W-3W-3W-3W-3W-3W-3W-3W-3W- W-3W-3W-3W-3W-3W-3W-3W-3W-3W
W-3W-3W-3W-3W-3W-3W-3W-3W-3W-W-3 W-3W-3W-3W
B
B
B
C
C C
C
D
D D
D
D
D D
D
E
E
C
C C
C
A A
A A
B
B
B
P2 LEVEL PLAN P3 LEVEL PLAN40 80 160 3200
N
40 80 160 3200
N
P1 LEVEL PLAN40 80 160 3200
N
LEGEND
LEVEL 1
GARDEN
BASEMENT
-
EVER VAILComprehensive Project Overview | November 15, 2010
40GROUND LEVEL USE DIAGRAMS
15 30 60 1200 15 30 60 1200
15 30 60 1200 15 30 60 1200
15 30 60 1200
SECTION A-A SECTION D-D
SECTION B-B SECTION E-E
SECTION C-C
LEGEND
LEVEL 1
GARDEN
BASEMENT
W-3
W-1
W-3
E-3HOTEL
E-5
W-2
E-2
E-1
E-7E-5
GORE CREEK
RED SANDSTONE CREEK
RED SANDSTONE CREEK
-
EVER VAILComprehensive Project Overview | November 15, 2010
41TYPICAL UNIT PLANS
2 4 8 160
N
TYPICAL 1 BEDROOM/1 BATH - 856 SF
TYPICAL EHU - 1,200 SF
TYPICAL 2 BEDROOM/2 BATH - 1,304 SF
TYPICAL HOTEL GUEST ROOM - 448 SF
LIVING/DINING
14-0x22-0
LIVING/DINING
14-0x22-0
BR12-6x15-10
BR12-6x15-10
MASTER BR13-7x20-0
BATH
BATHBATHBATH
LIVING LIVINGAREA
14-0x17-0
KITCHEN
DININGBR #1
BR #2 BR #3
BR #4
BATH MASTER BATH
KITCHEN KITCHEN
A
C
B
D
-
EVER VAILComprehensive Project Overview | November 15, 2010
42AUTO COURTS | TURNING MOVEMENTS
-
EVER VAILComprehensive Project Overview | November 15, 2010
43TRANSIT CENTER | TURNING MOVEMENTS
-
EVER VAILComprehensive Project Overview | November 15, 2010
44TRANSIT CENTER/LOADING DOCK | TURNING MOVEMENTS
-
EVER VAILComprehensive Project Overview | November 15, 2010
45LOADING DOCK | TURNING MOVEMENTS
-
EVER VAILComprehensive Project Overview | November 15, 2010
46SITE SECTIONS
10 20 40 800
PARKING LEVEL 1
PARKING LEVEL 1
PARKING LEVEL 2PARKING LEVEL 3
PARKING LEVEL 2
GORE CREEK
GORE CREEK
SCALE 1=20
W-1
W-2
W-3
W-3
MIXED USE PARKINGMIXED USE PARKING
RES. AMENITYRES.RES. RES.RES. RES.RES. RES.RES. RES.
RES.RES.
RES.EHU.RES.
RESIDENTIAL PARKING
MIXED USE PARKING
RES.
RES.RES.
EHUEHU
FRONTAGE ROAD
FRONTAGE ROAD
PARKING ENTRY RAMP
RES. RES.
RES.RES.
RES.
KEY PLAN
SECTION THROUGH W-1 & W-3 LOOKING EAST
SECTION THROUGH W-2 & W-3 LOOKING EAST
A
B
A
A
B
B
PEDESTRIANPORTAL TOCREEKSIDE
EHU
RES.
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
RESIDENTIAL PARKINGVAIL. PARKS & REC
-
EVER VAILComprehensive Project Overview | November 15, 2010
47SITE SECTIONS
10 20 40 800SCALE 1=20
SECTION THROUGH CREEKSIDE
SECTION THROUGH RED SANDSTONE CREEK
C
DC
C
DD
FRONTAGE RDBRIDGE BEYOND
RED SANDSTONE CREEK
P-1 LEVEL
PARK
RED SANDSTONE CREEK
VAIL PARKS & REC. BEYOND
RES.
OFFICE
MECH.
RETAILRESIDENTIAL
AMENITY
RESIDENTIALAMENITY
RES.RES.RES.RES.
RES.
RES.RES.RES.
RES.RES.RES. RES.
RES.RES.RES. RES.RES.RES.RES. RES.
W-3 W-3
W-2
E-3
E-1
RES.RES.RES.RES.RES.RES.
RES.
RES.
RES.
RES.
RES.RES. RES.
P-1 RESIDENTIAL PARKING
P-2 MIXED USE PARKINGP-3 MIXED USE PARKING
MOUNTAIN OPS YARD
P-2 MIXED USE PARKING
P-3 MIXED USE PARKING
RES. RES.RES. RES.RES. RES.RES. RES.
RES. RETAIL
MTG. MTG.MTN OPS YARD
RES.
HOTELRESTAURANT
GST. RMS.
HOTEL B.O.H.
SERVICE/LOADING
GST. RMS.
RES. RES.
RES.
E-2
MTN. OPSMECH.
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
48SITE SECTIONS
10 20 40 800SCALE 1=20
SECTION THROUGH HOTEL PLAZAE
FRONTAGE RD.
RES. RES.
E
E
SECTION THROUGH EAST SIDE RESIDENTIALF
E-5
RES. RES.
OFFICE
RES. RES.
RES.
F&BTRANSITCENTER
P-1 MIXED USE PKG
P-2 MIXED USE PKG
P-3 MIXED USE & RESID. PKG HOTEL BACK OF HOUSE
LOADING DOCK
POOL TERRACE
RES. RES.
RES.
RES. RES.
E-3
HOTEL PORTE COCHERE
E-6E-5
RES. RES.RES. RES.
RES. RES.RES.
RES. RES.RES. RES.
RES.
RES. RES.RES.RES.RES.TRANSIT CENTER
OFFICE
P-2 MIXED USE PKG
P-4 MIXED USE PKG
P-1 MIXED USE PKG
P-3 MIXED USE & RESID. PKG
F
F
HOTEL LOBBY
GST. RMS.
GST. RMS. GST. RMS.
FRONTAGE RD. FOREST RD.
GST. RMS. GST. RMS.
GST. RMS. GST. RMS. KEY PLAN
RETAIL
HOTEL
LEGEND:
FOOD/BEVERAGE
MEETING
MARKET RESIDENTIAL
OFFICE
EMPLOYEE HOUSING
PUBLIC
PARKING
SERVICE/MECHANICAL
MOUNTAIN OPERATIONS
-
EVER VAILComprehensive Project Overview | November 15, 2010
49LANDSCAPE PLAN
25 50 100 2000
N
-
EVER VAILComprehensive Project Overview | November 15, 2010
50WEST SIDE | ENLARGED SITE PLANS
-
EVER VAILComprehensive Project Overview | November 15, 2010
51EAST SIDE | ENLARGED SITE PLANS
-
EVER VAILComprehensive Project Overview | November 15, 2010
52CREEKSIDE | ENLARGED SITE PLANS
-
20 40 80 1600
N
EVER VAILComprehensive Project Overview | November 15, 2010
53INTERPOLATED TOPO PLAN | BUILDING HEIGHTS
-
EVER VAILComprehensive Project Overview | November 15, 2010
54MAXIMUM HEIGHT PLANE | BUILDING HEIGHTS
MAX. HT. = 60.5MAX. HT. = 60.5
MAX. HT. = 71.5MAX. HT. = 71.5
MAX. HT. = 24MAX. HT. = 24
MAX. HT. = 37MAX. HT. = 37
MAX. HT. = 42MAX. HT. = 42
MAX. HT. = 47MAX. HT. = 47
MAX. HT. = 56MAX. HT. = 56
MAX. HT. = 82.5MAX. HT. = 82.5
-
EVER VAILComprehensive Project Overview | November 15, 2010
55MAXIMUM AVG HEIGHT PLANE | BUILDING HEIGHTS
MAX.AVG. HT. = 49MAX.AVG. HT. = 49
MAX.AVG. HT. = 60MAX.AVG. HT. = 60
MAX.AVG. HT. = 71MAX.AVG. HT. = 71
-
EVER VAILComprehensive Project Overview | November 15, 2010
56RIDGE ELEVATIONS | BUILDING HEIGHTS
20 40 80 1600
N
24 MAX.HT.
37 MAX.HT.
42 MAX.HT.
47 MAX.HT.
56 MAX.HT.
60.5
MAX
. HT.
49 M
AX. A
VG. H
T.
71.5 M
AX. H
T.
60 MA
X. AV
G. HT
.
82.5 M
AX. H
T.
71 MA
X. AV
G. HT.
F1
J1
J2
J3
J4
J7 J8J5
J6
J13
J9
J17
J14
J10
J18
J15
J11
J19
J16
J12
J20
J29
J30
J23
J24
J27
J28
J25
J26
J31 J33J35
J34J36
J37
J38
J39
J40
J47
J48J45
J46J43
J44
J42
J41 J49J50
K1
K2K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
K14K15
K16
M24
M25
M28M29
M22
M23
M1
M2
M3
M4
M7M8M9
M10M5
M6M11
M12
M13
M14
M15M26
M27
M16
M17
M18
N1
N2
N3
N4
N5
N6
N7 N8
N9
N10
N11 N12
N13
N25
N24
N21
N20N19
N18
N17
N16N14
N15
N22
N23N26
N27
N35
N36
N28
N29
N32
N33N34
N30N31
N37
N39
N40
N41N42
N38
M19M20
M21
J32
J21 J22
F2
F3F4F5F6F7F8
F11 F12
F9 F10
F13
H1
H2
G1
G2
G3G4
G5
G32 G6
G11G12
G17
G18G19
G20
G21G22
G23 G24
G29G30
G33G7
G8
G35 G36
G25 G26
G27 G28
G34
G13G14
G15G16
G31
G9
G10
A1
D1
D2
D3
D4
D5D6
D7 D8
D9
D11D12
D10
D13
D14
D15 D16
D17
D18
D19D20
D21D22
E1E2
E3
E4
E5E6
E7 E8
E9
E10
E11
E12
E13E14
E15
E16A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13A14A15
B11
B12
B10 B13
B14
B9
B3B2
B4
B1
B5
B6
B7
B8
B15
B16
B17
B18C13
C14 C17
C15 C16
C18
C19
C11
C12
C9
C10
C7
C8
C5
C6
C3
C4
C1
C2
C20
ERWSDPLANT
CENTRALPLAZA
GORE CREEK
GONDOLAPARK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
WEST SIDEAUTO COURT
MARKET STREETPLAZA
RITZCARLTON
S. FRO
NTAGE
ROAD
I-70
WWWWWWW-----22222222
EEEEEEEEEEEEEEEEE-----222222
EEE-3333
EE 55E 5E----5EEEEEEEEEEEEEEEEEEE--------------666666666666666666666
EEEEEEEEEEEEEE-7777777777777777777
E-1
EEEEEEEEEEEEEEEE-----4444444444444444444
WWWWWWWWWWWWWWWWWWWWWW-------------11111111111111111111
WW-333333333
-
HEIGHTS MEASURED TO INTERPOLATED/FINISHED GRADES
RIDGE ELEV. HEIGHT AVERAGE LENGTH LENGTH * AVERAGE
W-1 A1 8159.0 57.00A2 8159.0 57.00 57.00 17.50 997.50 FT
A3 8162.0 60.50A4 8162.0 60.50 60.50 57.50 3478.75 FT
A5 8164.5 60.50A6 8164.5 60.50 60.50 50.00 3025.00 FT
A6 8164.5 60.50A7 8164.5 60.50 60.50 44.00 2662.00 FT
A8 8165.0 60.50A9 8165.0 60.50 60.50 64.00 3872.00 FT
A9 8165.0 60.50A10 8165.0 60.50 60.50 38.00 2299.00 FT
A11 8162.5 59.50A12 8162.5 59.50 59.50 20.50 1219.75 FT
A12 8162.5 59.50A13 8162.5 59.50 59.50 72.00 4284.00 FT
A14 8129.0 26.00A15 8129.0 26.00 26.00 14.00 364.00 FT
W-3 D1 8121.0 21.50D2 8121.0 19.50 20.50 44.50 912.25 FT
D3 8126.5 23.50D4 8126.5 21.00 22.25 80.50 1791.13 FT
D5 8111.5 17.00D6 8118.0 21.50 19.25 25.00 481.25 FT
D7 8124.0 19.50D8 8129.0 23.50 28.00 56.00 1568.00 FT
D9 8133.0 27.00D10 8133.0 34.50 30.75 56.00 1722.00 FT
D11 8131.0 27.00D12 8131.0 28.50 27.75 41.50 1151.63 FT
D13 8124.0 23.50D14 8126.0 30.00 26.75 13.50 361.13 FT
D15 8136.0 31.50D16 8140.5 33.50 32.50 28.00 910.00 FT
D17 8142.0 36.00D18 8142.0 41.50 38.75 49.00 1898.75 FT
D19 8142.0 36.00D20 8142.0 35.50 35.75 19.00 679.25 FT
D21 8128.5 20.00D22 8128.5 19.50 19.75 35.00 691.25 FT
825.50 34368.63
AVERAGE HEIGHT 41.63
MAX AVERAGE HT 49.00 FT-7.37
HEIGHTS MEASURED TO INTERPOLATED/FINISHED GRADES
RIDGE ELEV. HEIGHT AVERAGE LENGTH LENGTH * AVERAGE
W-1 B1 8160.0 53.00B2 8160.0 52.00 52.50 49.00 2572.50 FT
B3 8164.0 54.00B4 8164.0 56.00 55.00 28.00 1540.00 FT
B5 8173.0 65.00B6 8173.0 65.00 65.00 49.00 3185.00 FT
B7 8162.5 56.50B8 8162.5 56.50 56.50 29.00 1638.50 FT
B9 8172.0 64.00B10 8172.0 64.00 64.00 80.50 5152.00 FT
B11 8162.5 59.50B12 8162.5 59.50 59.50 17.50 1041.25 FT
B13 8152.0 48.00B14 8152.0 48.00 48.00 13.00 624.00 FT
B15 8162.5 58.50B16 8162.5 58.50 58.50 42.00 2457.00 FT
B17 8137.0 32.00B18 8137.0 32.00 32.00 56.00 1792.00 FT
W-2 C1 8177.0 63.50C2 8177.0 71.00 67.25 70.00 4707.50 FT
C3 8182.0 68.00C4 8182.0 71.00 69.50 87.50 6081.25 FT
C5 8178.5 66.50C6 8178.5 66.50 66.50 38.50 2560.25 FT
C7 8181.0 71.00C8 8181.0 71.00 71.00 84.00 5964.00 FT
C9 8180.0 71.00C10 8180.0 71.00 71.00 77.00 5467.00 FT
C11 8172.0 66.00C12 8172.0 66.00 66.00 59.00 3894.00 FT
C13 8136.5 30.50C14 8136.5 30.50 30.50 41.50 1265.75 FT
C15 8161.5 55.50C16 8161.5 55.50 55.50 11.00 610.50 FT
C17 8176.5 71.50C18 8176.5 71.50 71.50 80.50 5755.75 FT
C19 8150.5 45.50C20 8150.5 45.50 45.50 13.50 614.25 FT
W-3 E1 8139.0 34.00E2 8143.5 38.00 36.00 28.00 1008.00 FT
E3 8145.5 38.50E4 8145.5 46.00 42.25 45.50 1922.38 FT
E5 8145.0 39.00E6 8145.0 38.00 38.50 31.00 1193.50 FT
E7 8130.5 22.00E8 8130.5 23.00 22.50 38.50 866.25 FT
E9 8130.0 27.00E10 8132.5 34.50 30.75 15.50 476.63 FT
E11 8149.5 43.50E12 8149.5 52.00 47.75 56.00 2674.00 FT
E13 8130.5 23.50E14 8130.5 23.00 23.25 37.00 860.25 FT
E15 8130.5 28.50E16 8132.5 33.00 30.75 11.50 353.63 FT
1189.50 66277.13
AVERAGE HEIGHT 55.72
MAX AVERAGE HT 60.00 FT-4.28
HEIGHTS MEASURED TO INTERPOLATED/FINISHED GRADES
RIDGE ELEV. HEIGHT AVERAGE LENGTH LENGTH * AVERAGE
E-1 F1 8189.5 75.00F2 8189.5 81.00 78.00 122.50 9555.00 FT
F3 8172.5 64.50F4 8172.5 65.50 65.00 25.00 1625.00 FT
F5 8139.5 55.00F6 8139.5 56.00 55.50 11.00 610.50 FT
F7 8121.5 33.50F8 8121.5 36.00 34.75 7.50 260.63 FT
F9 8140.5 34.00F10 8140.5 36.50 35.25 7.00 246.75 FT
F11 8180.0 73.50F12 8189.5 79.50 76.50 40.00 3060.00 FT
F12 8189.5 79.50F13 8180.0 68.00 73.75 40.00 2950.00 FT
E-2 G1 8195.0 75.00G2 8195.0 74.00 74.50 42.00 3129.00 FT
G3 8188.5 68.00G4 8188.5 68.00 68.00 21.00 1428.00 FT
G4 8188.5 68.00G5 8188.5 71.00 69.50 103.00 7158.50 FT
G5 8188.5 71.00G6 8188.5 72.00 71.50 77.50 5541.25 FT
G7 8195.0 78.00G8 8195.0 79.00 78.50 66.50 5220.25 FT
G9 8195.5 72.50G10 8195.5 74.00 73.25 38.50 2820.13 FT
G11 8185.0 64.00G12 8188.5 38.00 51.00 31.00 1581.00 FT
G13 8189.5 75.00G14 8185.0 71.00 73.00 51.00 3723.00 FT
G15 8191.0 67.00G16 8191.0 69.50 68.25 31.00 2115.75 FT
G17 8191.0 70.00G18 8191.0 70.00 70.00 21.00 1470.00 FT
G19 8185.0 76.50G20 8188.5 74.00 75.25 42.00 3160.50 FT
G21 8192.5 70.50G22 8192.5 68.50 69.50 35.00 2432.50 FT
G23 8191.0 71.00G24 8191.0 65.00 68.00 33.50 2278.00 FT
G25 8142.0 27.50G26 8142.0 26.00 26.75 13.00 347.75 FT
G27 8185.0 66.00G28 8188.5 71.00 68.50 32.00 2192.00 FT
G29 8187.5 22.50G30 8185.0 26.00 24.25 11.00 266.75 FT
G31 8191.5 45.00G32 8191.5 43.00 44.00 7.00 308.00 FT
G33 8191.5 78.00G34 8191.5 75.00 76.50 39.50 3021.75 FT
G35 8158.0 74.50G36 8158.0 74.00 74.25 38.50 2858.63 FT
E-3 J1 8200.0 78.00J2 8200.0 79.00 78.50 52.50 4121.25 FT
J3 8178.5 57.00J7 8184.5 63.50 60.25 36.00 2169.00 FT
J5 8198.5 78.50J6 8198.5 82.00 80.25 134.50 10793.63 FT
J7 8197.5 78.00J8 8197.5 77.50 77.75 42.00 3265.50 FT
J9 8189.5 71.00J10 8195.5 77.00 74.00 37.50 2775.00 FT
J11 8195.5 76.50J12 8189.5 70.50 73.50 36.00 2646.00 FT
J13 8197.5 80.00J14 8197.5 79.50 79.75 42.50 3389.38 FT
J15 8197.5 79.50J16 8197.5 79.00 79.25 43.00 3407.75 FT
J17 8189.5 72.00J18 8195.5 78.00 75.00 36.00 2700.00 FT
J19 8195.5 78.00J20 8189.5 72.00 75.00 36.00 2700.00 FT
J21 8200.0 80.00J22 8200.0 80.00 80.00 26.00 2080.00 FT
J23 8189.5 68.00J24 8194.0 73.00 70.50 47.00 3313.50 FT
J25 8193.0 71.00J26 8200.0 80.00 75.50 26.00 1963.00 FT
J27 8189.5 77.50J28 8194.0 72.00 74.75 196.50 14688.38 FT
J29 8194.5 74.00J30 8189.5 70.00 72.00 31.50 2268.00 FT
J31 8198.5 77.50J32 8191.5 72.00 74.75 45.00 3363.75 FT
J33 8194.0 73.50J34 8189.5 70.00 71.75 27.00 1937.25 FT
J35 8199.0 78.00J36 8199.0 79.50 78.75 39.50 3110.63 FT
J37 8189.5 66.50J38 8192.0 69.50 68.00 10.00 680.00 FT
J39 8198.5 76.00J40 8198.5 80.50 78.25 147.00 11502.75 FT
J41 8197.5 75.50J42 8197.5 75.50 75.50 43.00 3246.50 FT
J43 8196.0 74.50J44 8189.5 68.00 71.25 39.00 2778.75 FT
J45 8197.5 77.00J46 8197.5 76.50 76.75 43.00 3300.25 FT
J47 8195.5 75.50J48 8189.5 69.50 72.50 37.00 2682.50 FT
J49 8168.0 46.00J50 8167.0 45.50 45.75 42.50 1944.38 FT
E-4 J1 8140.5 30.00J2 8154.5 70.00 50.00 111.00 5550.00 FT
E-5 N1 8196.5 71.50N2 8196.5 71.00 71.25 29.50 2101.88 FT
N3 8204.5 78.00N4 8204.5 80.00 79.00 70.00 5530.00 FT
N4 8204.5 80.00N5 8204.5 80.50 80.25 29.50 2367.38 FT
N6 8193.5 66.50N7 8193.5 67.50 67.00 47.00 3149.00 FT
N7 8193.5 67.50N8 8193.5 67.50 67.50 40.50 2733.75 FT
N9 8204.5 77.00N10 8204.5 80.00 78.50 98.00 7693.00 FT
N11 8199.5 73.00N12 8199.5 72.50 72.75 37.50 2728.13 FT
N12 8199.5 72.50N13 8199.5 72.00 72.25 39.50 2853.88 FT
N14 8142.0 13.00N15 8148.5 20.00 16.50 14.50 239.25 FT
N16 8180.5 52.00N17 8180.5 52.00 52.00 21.00 1092.00 FT
N18 8179.0 50.00N19 8179.0 50.50 50.25 53.50 2688.38 FT
N20 8170.0 41.50N21 8170.0 42.50 42.00 53.50 2247.00 FT
N22 8206.5 78.50N23 8206.5 80.50 79.50 84.00 6678.00 FT
N24 8200.0 74.00N25 8200.0 74.00 74.00 7.00 518.00 FT
N26 8197.0 71.00N27 8197.0 70.00 70.50 30.50 2150.25 FT
N28 8196.0 68.00N29 8196.0 67.50 67.75 46.00 3116.50 FT
N30 8191.0 61.50N31 8198.0 68.50 65.00 22.50 1462.50 FT
N32 8197.5 67.50N33 8197.5 67.50 67.50 7.00 472.50 FT
N34 8206.5 77.00N35 8206.5 78.00 77.50 68.50 5308.75 FT
N35 8206.5 78.00N36 8206.5 78.50 78.25 38.00 2973.50 FT
N37 8200.0 72.50N38 8200.0 72.50 72.50 7.00 507.50 FT
N39 8197.0 67.50N40 8197.0 67.00 67.25 36.50 2454.63 FT
N41 8190.0 61.00N42 8190.0 61.00 61.00 13.00 793.00 FT
E-6 K1 8196.5 74.00K2 8196.5 73.50 73.75 99.00 7301.25 FT
K3 8188.5 65.00K4 8192.5 70.00 67.50 27.00 1822.50 FT
K5 8192.0 69.50K6 8192.0 72.00 70.75 38.00 2688.50 FT
K7 8200.0 75.00K8 8200.0 78.00 76.50 73.50 5622.75 FT
K9 8195.5 71.50K10 8195.5 70.50 71.00 30.00 2130.00 FT
K11 8198.0 72.00K12 8198.0 75.50 73.75 87.50 6453.13 FT
K13 8196.0 71.00K14 8196.0 70.00 70.50 39.50 2784.75 FT
K15 8170.5 44.00K16 8170.5 44.00 44.00 12.00 528.00 FT
E-7 M1 8202.0 70.00M2 8202.0 70.00 70.00 43.00 3010.00 FT
M3 8203.5 72.00M4 8203.5 72.50 72.25 77.00 5563.25 FT
M5 8202.0 70.00M6 8202.0 71.00 70.50 65.50 4617.75 FT
M7 8165.0 33.50M8 8169.5 38.00 35.75 9.00 321.75 FT
M9 8191.0 60.00M10 8194.0 63.50 61.75 14.50 895.38 FT
M11 8195.0 63.50M12 8191.0 60.00 61.75 15.00 926.25 FT
M13 8103.5 72.50M14 8103.5 73.00 72.75 88.00 6402.00 FT
M14 8103.5 73.00M15 8103.5 75.50 74.25 78.00 5791.50 FT
M16 8186.0 56.50M17 8195.5 65.00 60.75 34.00 2065.50 FT
M18 8196.5 66.00M19 8196.5 66.00 66.00 42.00 2772.00 FT
M20 8202.0 71.00M21 8202.0 71.00 71.00 24.00 1704.00 FT
M22 8193.5 64.00M23 8193.5 65.00 64.50 37.00 2386.50 FT
M24 8195.0 67.00M25 8195.0 65.50 66.25 49.00 3246.25 FT
M26 8192.5 62.50M27 8190.5 60.00 61.25 9.00 551.25 FT
M28 8192.0 63.00M29 8186.0 58.50 60.75 23.00 1397.25 FT
4302.50 304578.00 FT
AVERAGE HEIGHT 70.79 FT
MAX AVERAGE HEIGHT 71.00 FT-0.21
EVER VAILComprehensive Project Overview | November 15, 2010
57OVERALL AVERAGE HEIGHT CALCULATION | BUILDING HEIGHTS
WEST - 49FT MAX AVG. HEIGHT WEST - 60FT MAX AVG. HEIGHT EAST - 71FT MAX AVG. HEIGHT
CONTD
CONTDBUILDING HEIGHTS MEASURED FROM THE EXISTING, FINISHED OR INTERPOLATED GRADE - WHICHEVER IS MORE RESTRICTIVE- TO THE RIDGE OF THE PRIMARY ROOF FORM.
-
W1
W3W3
W3W3
EVER VAILComprehensive Project Overview | November 15, 2010
58BUILDING ELEVATIONS
8 16 32 640
B
A
W-1 NORTH ELEVATION - FRONTAGE ROAD
W-3 SOUTH ELEVATION - GORE CREEK
A
B
PANEL SYSTEM
STONE CLAD PLANTERSSTONE CLAD WALLS
STONE CLAD WALLS
STONE CLAD CHIMNEYS RESIDENTIAL ENTRIESAT STAIR LANDINGS
RESIDENTIALTOWN HOUSE
MIXED-USE PARKINGENTRY/ EXIT
LEVEL 4
LEVEL 2 LEVEL 2 LEVEL 2
LEVEL 3 LEVEL 3
LEVEL 3
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1
LEVEL 1
LEVEL P2
LEVEL 2
LEVEL P1 LEVEL P1
LEVEL P2
LEVEL P1 LEVEL P1
-
W2
W2
E2
E2
E1
EVER VAILComprehensive Project Overview | November 15, 2010
59BUILDING ELEVATIONS
A
B
C
8 16 32 640
W-2 WEST ELEVATION - WEST AUTO COURT
E-2 WEST ELEVATION - CREEKSIDE E-1 WEST ELEVATION - CREEKSIDE
A
B C
STONE CLADWALLS AND
BASE
STONE CLADBASE
STONE CLADBASE
STUCCO STUCCO STONE CLADCHIMNEYS
STONE CLADCHIMNEYS
STAIRS/ESCALATORTO CENTRAL PLAZA
PEDESTRIANPASSAGE TO
CREEKSIDE
STONE CLAD CHIMNEYS
GLASS AND PANEL WALL
SYSTEM
PANEL SYSTEM VAIL REC. DISTRICT
RESIDENTIALAMENITY
LEVEL 3
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 2
LEVEL 1
LEVEL P1
LEVEL P2
LEVEL P3
LEVEL 1
LEVEL P1
LEVEL 4
LEVEL 4
LEVEL 5
LEVEL 5
LEVEL 6
LEVEL 3
LEVEL 3
LEVEL 1
LEVEL 1
LEVEL 2
LEVEL 2
-
E3
E6
E7
EVER VAILComprehensive Project Overview | November 15, 2010
60BUILDING ELEVATIONS
8 16 32 640
E-3 HOTEL - NORTH ELEVATION
E-6 SOUTH ELEVATION - FOREST ROAD E-7 SOUTH ELEVATION - FOREST ROAD
A
B C
AB
C
STONE CLAD BASE AND CHIMNEYS
STUCCO W/PUNCHED
OPENINGS
RESIDENTIAL TOWN HOMES
W/ ON STREET ACCESS
STONE CLAD BASE AND CHIMNEYS
STONE CLAD BASE AND CHIMNEYS
GLASS AND FRAME EXPRESSION
MARKETENTRANCE
NIGHT CLUBENTRANCE
HOTELENTRANCE
GLASS AND FRAME SYSTEM
STUCCO W/ PUNCHED
OPENINGS
HOTEL ENTRY W/ PORTE COCHERE
GLASS AND FRAME EXPRESSION
LEVEL 4
LEVEL 4
LEVEL 5
LEVEL 5
LEVEL 3
LEVEL 3
LEVEL 1
LEVEL 1
LEVEL 2
LEVEL 2
LEVEL 4
LEVEL 5
LEVEL 3
LEVEL 1
LEVEL 2
-
EVER VAILComprehensive Project Overview | November 15, 2010
61SUN/SHADE ANALYSIS
MAR 20/SEPT 22 9AM
MAR 20/SEPT 22 12 NOON
MAR 20/SEPT 22 3PM
EQUINOX
JUN 21 9AM
JUN 21 12 NOON
JUN 21 3PM
SUMMER SOLSTICE
DEC 21 9AM
DEC 21 12 NOON
DEC 21 3PM
WINTER SOLSTICE
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
RITZCARLTON
S. FRON
TAGE RO
AD
W-1W-1
W-3W-3
W-3W-3
W-2W-2
E-2E-2
E-1E-1
E-3E-3
E-5E-5
E-4E-4
E-7E-7
E-6E-6
GORE CREEK
R
E
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
-
EVER VAILComprehensive Project Overview | November 15, 2010
62WIDTH-TO-HEIGHT | ZONING
VIEW A - COMPRESSION
1W:1 1/2H
E-2 RESIDENTIAL
SKIER STAIRS / ESCALATORS
E-1 RESIDENTIAL
CENTRAL PLAZA BEYOND
VIEW B - COMPRESSION
VIEW D - COMPRESSION
E-3 HOTEL
E-2 RESIDENTIAL
CENTRAL PLAZA BEYOND
1W:1H
1W:1H
1W:1H
1W:1/2HE-2 RESIDENTIAL
E-3 HOTEL
E-1 RESIDENTIAL
E-6 RESIDENTIAL
E-7 RESIDENTIAL
E-5 RESIDENTIAL
KEY PLAN
A B
CE
D
VIEW E - RELEASE
1W:1H
E-3 HOTEL
E-6 RESIDENTIAL
1H:1W
1 1/2W:1H
EAST RESIDENTIAL STREET
MARKET STREET BEYOND
VIEW C - RELEASE
-
EVER VAILComprehensive Project Overview | November 15, 2010
63BUILDING STEP BACKS | ZONING
25 50 100 2000
N
11
22334455
66
77
-
EVER VAILComprehensive Project Overview | November 15, 2010
64BUILDING STEP BACKS | ZONING
1 2
3 4
E-6
E-3 E-5 E-3 E-5
E-5E-6 E-5
60
1W:1/2H
1W:1/2H
1W:1/2H
1W:1/2H
1W:1/4H
1W:1/2H
1W:1H1W:1H
70107
120.5106
61.5
80 86.5
5
4
4
7
.
5
5
5
2
4
.
5
6
6
6
3
.
5
2
3
6
6
2
4
.
5
4
5
.
5
7
3
6
7
6
9
.
5
3
2
4
6
.
5
4
5
.
5
-
EVER VAILComprehensive Project Overview | November 15, 2010
65BUILDING STEP BACKS | ZONING
5 6
7
6
2
.
5
2
6
.
5
6
6
.
5
83
1W:1H
1W:1/2H
1W:1H
74
48.5
75
50
846
4
.
5
2
7
2
0
6
4
2
6
5
6
.
5
2
0
6
1
.
5
1W:1/2H
1W:1H
1W:1H
1W:1/2H
E-5 E-2 E-3
E-3 E-2
E-2
-
EVER VAILComprehensive Project Overview | November 15, 2010
66OVERALL SITE AERIAL | 3D MASSING VIEWS
-
EVER VAILComprehensive Project Overview | November 15, 2010
673D MASSING VIEWS
OVERALL AERIAL ALONG FRONTAGE ROAD
WEST SIDE AERIAL ALONG FRONTAGE ROAD
EAST SIDE AERIAL ALONG FRONTAGE ROAD
EAST SIDE AERIAL ALONG FOREST ROAD
-
EVER VAILComprehensive Project Overview | November 15, 2010
683D MASSING VIEWS
CREEKSIDE AERIAL LOOKING SOUTH DOWN RED SANDSTONE CREEK
VIEW FROM W-2 LOOKING TOWARDS MOUNTAIN
WEST SIDE AERIAL ALONG GORE CREEK
VIEW FROM ACROSS GORE CREEK
-
EVER VAILComprehensive Project Overview | November 15, 2010
693D MASSING VIEWS
HOTEL PLAZA AERIAL
VIEW FROM CENTRAL PLAZA LOOKING NORTHWEST
CENTRAL PLAZA AERIAL
VIEW TOWARDS CENTRAL PLAZA AND MOUNTAIN
-
EVER VAILComprehensive Project Overview | November 15, 2010
70KEY PLAN | RENDERING VIEWS
20 40 80 1600
N
W-3
W-3W-3
W-3
W-3
W-1W-2
W-2
E-2
E-1E-EEEEEEEEE 4444444444444444444
E-3
E-5
E-6
E-7
A
B
D
C
FG
H
I
JE
CENTRALPLAZA
HOTEL PLAZA
MARKET
GONDOLA
WEST SIDEAUTO COURT
CREEKSIDE
CREEKSIDEPARK
RITZCARLTON
S. FRO
NTAGE
ROAD
GORE CREEKRE
D
S
A
N
D
S
T
O
N
E
C
R
E
E
K
ERWSDPLANT
HOTEL
TRANSIT CENTER
-
EVER VAILComprehensive Project Overview | November 15, 2010
71WEST SIDE | VIEW A
-
EVER VAILComprehensive Project Overview | November 15, 2010
72CREEKSIDE ARRIVAL | VIEW B
-
EVER VAILComprehensive Project Overview | November 15, 2010
73CREEKSIDE | VIEW C
-
EVER VAILComprehensive Project Overview | November 15, 2010
74CREEKSIDE PATH | VIEW D
-
EVER VAILComprehensive Project Overview | November 15, 2010
75CENTRAL PLAZA | VIEW E
-
EVER VAILComprehensive Project Overview | November 15, 2010
76HOTEL PLAZA | VIEW F
-
EVER VAILComprehensive Project Overview | November 15, 2010
77EAST SIDE RESIDENTIAL | VIEW G
-
EVER VAILComprehensive Project Overview | November 15, 2010
78WEST LIONSHEAD CIRCLE | VIEW H
-
EVER VAILComprehensive Project Overview | November 15, 2010
79HOTEL LOBBY | VIEW I
-
EVER VAILComprehensive Project Overview | November 15, 2010
80POOL TERRACE | VIEW J