IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY ETIV - EMAS Technical Implementation and Verification 1 IPIMAR – JANUARY 2005 CARLOS CARDOSO MARIA LEONOR NUNES

Upload: vuongdung

Post on 15-Aug-2019

216 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

1ETIV - EMAS Technical Implementation and Verification 1

IPIMAR – JANUARY 2005

CARLOS CARDOSO MARIA LEONOR NUNES

Page 2: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

2ETIV - EMAS Technical Implementation and Verification 2

This project has been funded with support from the European

Commission. This publication reflects the views only of the

author, and the Commission cannot be held responsible for any

use which may be made of the information contained therein.

Page 3: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

3ETIV - EMAS Technical Implementation and Verification 3

WHAT IS EMAS?

EMAS means EcoManagement and Audit Scheme

EMAS aims to promote continuous evaluation and improvement in the environmental performance of participating organizations

EMAS does not replace Community or national environmental legislation

EMAS is an environmental management scheme for organizations operating in the European Union and

European Economic Area

EMAS brings together environmental protection and economic development

+

INTRODUCTION

Page 4: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

4ETIV - EMAS Technical Implementation and Verification 4

DIFFERENCES BETWEEN EMAS AND ISO 14001

�EMAS REQUIRES A PRELIMINARY ENVIRONMENTAL REVIEW

�EMAS REQUIRES A GREATER CONTROL OVER SUPPLIERS AND CONTRACTORS

�EMAS ESTABLISHES THE AUDITS’ FREQUENCY AND METHODOLOGY

�EMAS DEMANDS COMPANIES TO PUBLISH AN ENVIRONMENTAL

STATEMENT

�EMAS PROVIDES FOR A CERTIFICATION SYSTEM WITH INDEPENDENT

ENVIRONMENTAL VERIFIERS AND REGISTRATION BODIES

INTRODUCTION

Page 5: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

5ETIV - EMAS Technical Implementation and Verification 5

THE MAIN STEPS FOR IMPLEMENTATION OF EMAS

PLANNING

ENVIRONMENTAL POLICY

ENVIRONMENTAL REVIEW

ENVIRONMETAL LEGAL REQUIREMENTS

ENVIRONMENTAL OBJECTIVES AND TARGETS

ENVIRONMENTAL PROGRAMME

OPERATION

MONITORING AND MEASUREMENT

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

ENVIRONMENTAL RECORDS

INTERNAL AUDITS

ENVIRONMENTAL MANAGEMENT

SYSTEM VERIFICATION

MANAGEMENT REVIEW

PUBLIC COMMUNICATION

VALIDATION, VERIFICATION AND RECORDS

INTRODUCTION

ORGANIZATION AND

PERSONNEL

RESPONSIBILITIES

TRAINING

COMMUNICATION

DOCUMENTATION

DOCUMENTATION CONTROL

OPERATIONAL CONTROL

PREVENTION AND EMERGENCY PREPAREDNESS

PLANNING

ENVIRONMENTAL POLICY

ENVIRONMENTAL REVIEW

ENVIRONMETAL LEGAL REQUIREMENTS

ENVIRONMENTAL OBJECTIVES AND TARGETS

ENVIRONMENTAL PROGRAMME

OPERATION

MONITORING AND MEASUREMENT

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

ENVIRONMENTAL RECORDS

INTERNAL AUDITS

ENVIRONMENTAL MANAGEMENT

SYSTEM VERIFICATION

MANAGEMENT REVIEW

PUBLIC COMMUNICATION

VALIDATION, VERIFICATION AND RECORDS

ORGANIZATION AND

PERSONNEL

RESPONSIBILITIES

TRAINING

COMMUNICATION

DOCUMENTATION

DOCUMENTATION CONTROL

OPERATIONAL CONTROL

PREVENTION AND EMERGENCY PREPAREDNESS

Page 6: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

6ETIV - EMAS Technical Implementation and Verification 6

PLANNING: CONDITIONS NEEDED FOR EMAS APPLICATION

ENVIRONMENTAL POLICYConsists of:

Aims

Principles of Action

ENVIRONMENTAL REVIEW

Involves:

Thorough examination of all env ironmental aspects

Identification of the aspects with a significant impact

FIRST OF ALL:

THE REAL SITUATION:

ENVIRONMENTAL PROGRAMME

Consists of:

All measures required for achieving the objectives and targets

Definition of responsibilities

Detailed and scheduled plan for the measures application

REQUIRE

ENVIRONMENTAL LEGAL

REQUIREMENTS

ENVIRONMENTAL

OBJECTIVES AND TARGETS

Are set considering:

Legal and regulatory requirements

Env ironmental aspects with significant impact

All available technological options

Financial and operational requirements

ENABLES

ENABLE

INTRODUCTION

ENVIRONMENTAL POLICYConsists of:

Aims

Principles of Action

ENVIRONMENTAL REVIEW

Involves:

Thorough examination of all env ironmental aspects

Identification of the aspects with a significant impact

ENVIRONMENTAL PROGRAMME

Consists of:

All measures required for achieving the objectives and targets

Definition of responsibilities

Detailed and scheduled plan for the measures application

REQUIRE

ENVIRONMENTAL LEGAL

REQUIREMENTS

ENVIRONMENTAL

OBJECTIVES AND TARGETS

Are set considering:

Legal and regulatory requirements

Env ironmental aspects with significant impact

All available technological options

Financial and operational requirements

ENABLES

ENABLE

Page 7: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

7ETIV - EMAS Technical Implementation and Verification 7

ORGANIZATION AND PERSONNEL: COMPONENTS OF EMAS STRUCTURE

RESPONSIBILITIESInvolve:

Definition of section responsibilities

Constitution of the EMS team

TRAINING

Raising env ironmental awareness

Training employees connected with significant env ironmental impacts

Internal EMS courses

COMMUNICATIONRequires:

Procedures for internal and external communication

DOCUMENTATION

Includes:

System manual

System and Operational procedures

Records, external documents and others

DOCUMENTATION CONTROLEncompasses:

Localization, periodic analysis and removal

OPERATIONAL CONTROLComprises:

Operations and activ ities

Goods and serv ices

PREVENTION AND EMERGENCY PREPAREDNESS

Entails:

Identification of accidents and emergencies

Development of plans for emergency response

INTRODUCTION

RESPONSIBILITIESInvolve:

Definition of section responsibilities

Constitution of the EMS team

TRAINING

Raising env ironmental awareness

Training employees connected with significant env ironmental impacts

Internal EMS courses

COMMUNICATIONRequires:

Procedures for internal and external communication

DOCUMENTATION

Includes:

System manual

System and Operational procedures

Records, external documents and others

DOCUMENTATION CONTROLEncompasses:

Localization, periodic analysis and removal

OPERATIONAL CONTROLComprises:

Operations and activ ities

Goods and serv ices

PREVENTION AND EMERGENCY PREPAREDNESS

Entails:

Identification of accidents and emergencies

Development of plans for emergency response

Page 8: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

8ETIV - EMAS Technical Implementation and Verification 8

OPERATION: CONTROL OF EMAS APPLICATION

MONITORING AND MEASUREMENT

Enables:

To monitor the performance of the relevant operational controls

To verify conformance with env ironmental objectives and goals

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

Detection of non-conformances:

From emergencies, audits and monitoring & measurement actions

Definition of the required corrective and preventive actions

ENVIRONMENTAL RECORDS

The records prove the application of all EMAS requirements

Therefore, must be:

Legible, identified, connected with the respective activity and adequately kept

INTERNAL AUDITSVerify compliance with:

Regulations

Env ironmental goals

INTRODUCTION

MONITORING AND MEASUREMENT

Enables:

To monitor the performance of the relevant operational controls

To verify conformance with env ironmental objectives and goals

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

Detection of non-conformances:

From emergencies, audits and monitoring & measurement actions

Definition of the required corrective and preventive actions

ENVIRONMENTAL RECORDS

The records prove the application of all EMAS requirements

Therefore, must be:

Legible, identified, connected with the respective activity and adequately kept

INTERNAL AUDITSVerify compliance with:

Regulations

Env ironmental goals

Page 9: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

9ETIV - EMAS Technical Implementation and Verification 9

VALIDATION AND VERIFICATION OF EMAS BY EXTERNAL ENTITIES

MANAGEMENT REVIEWInvolves:

Thorough analysis of the internal audit’s results

Guidelines for the improvement of EMS in the company

PUBLIC

COMMUNICATION

EMAS requires:

Presentation of an env ironmental statement

VALIDATION, VERIFICATION

AND RECORDS

Encompasses:

Commissioning an independent env ironmental verifier

Validation by the verifier (only if there is full compliance with all EMAS requirements)

Application for registration under EMAS

After a positive evaluation of the EMAS implementation:

Registration is granted

ORGANIZATION

REGISTERED UNDER EMAS

INTRODUCTION

MANAGEMENT REVIEWInvolves:

Thorough analysis of the internal audit’s results

Guidelines for the improvement of EMS in the company

PUBLIC

COMMUNICATION

EMAS requires:

Presentation of an env ironmental statement

VALIDATION, VERIFICATION

AND RECORDS

Encompasses:

Commissioning an independent env ironmental verifier

Validation by the verifier (only if there is full compliance with all EMAS requirements)

Application for registration under EMAS

After a positive evaluation of the EMAS implementation:

Registration is granted

Page 10: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

10ETIV - EMAS Technical Implementation and Verification 10

APPLICABLE LEGISLATION (PORTUGUESE LAW)

WATER - Law Nº 236/98

Emission Limits (COD, BOD5, SST, etc.)

Requisites for an Emission License

Company’s Control Records

Infraction Penalties

GENERAL ASPECTS- Law Nº 11/87

Quality of natural resources (air, water, soil, etc.)

Pollution prohibition

Attribution of responsibilities to the organizationthat produced the pollutant agent(s)

AIR- Law Nº 286/93- Law Nº 78/2004

Emission Limits (for SO2, NO2, CO and others)

Prohibition of the substances that Deplete the

Ozone Layer (CFCs, Halons, MBr and Others)

Infraction Penalties

Rules for prevention and control of atmosphericpollutants

INTRODUCTION

Page 11: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

11ETIV - EMAS Technical Implementation and Verification 11

NOISE- Law Nº 292/2000

- Law Nº 259/2002

Temporary and permanent noise

Sensible and mixed zones

Establishment of quantified limits for the twozones and distinction between day and night time

Infraction Penalties

Attribution of special noise licenses

APPLICABLE LEGISLATION (PORTUGUESE LAW)

WASTE- Law Nº 239/97

- Law Nº 335/97

- Law Nº 366-A/97

- Law Nº 209/2004

Rules concerning storage, treatment andelimination of waste

Waste Classification and Separation

Waste Transport Regulation

Special Treatment of the Dangerous Waste

Infraction Penalties

INTRODUCTION

Page 12: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

12ETIV - EMAS Technical Implementation and Verification 12

ADVANTAGES OF AN ENVIRONMENTAL MANAGEMENT SYSTEM

COST REDUCTION:Improved operational efficiency (lower consumption of energy and raw materials)

RISK REDUCTION:Reduced likelihood of serious and costly accidents

COMPETITIVE BENEFITS:Improvement of the company’s image with consumers, regulatory authorities and

general public

ACTIVE ORGANIZATIONAL STRUCTURE:Advantageous for other purposes (for instance, implementation of quality

management systems)

INTRODUCTION

Page 13: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

13ETIV - EMAS Technical Implementation and Verification 13

�LARGE NUMBER OF SPECIES CONSUMED IN MANY DIFFERENT FORMS (FRESH, FROZEN, SMOKED, CANNED, ETC.)

�120 MILLION TONNES WORLD PRODUCTION OF FISH IN YEAR 1998

�OVER 80 % OF THE FISH PRODUCTION IS FOR HUMAN FOOD

�ABOUT 60 MILLION TONNES ARE INDUSTRIALLY PROCESSED (FREEZING/THAWING,

CUTTING, FILLETING, COOKING, ETC.)

�A THIRD OF THE PROCESSED QUANTITY ENDS UP AS INDUSTRIAL WASTE

FISH PRODUCTION - 120 M.T.

OTHER USES

17%

HUMAN

CONSUMPTION

FRESH

33%

HUMAN

CONSUMPTION

PROCESSED

50%

INDUSTRIAL WASTE

20 M.T.

Non-food

uses

GENERAL ASPECTS

FISH PROCESSING INDUSTRY

Page 14: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

14ETIV - EMAS Technical Implementation and Verification 14

ENVIRONMENTAL BALANCE OF THE FROZEN FISH INDUSTRY

FROZEN FISH

INDUSTRY

WATER

ENERGY

CHEMICALS

FRESH

OR

FROZEN FISH

FROZEN FILLETS NOISE

ODOUR

WASTEWATER

SOLID WASTE

REFRIGERANT LOSSES

FISH PROCESSING INDUSTRY

Page 15: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

15ETIV - EMAS Technical Implementation and Verification 15

ENVIRONMENTAL BALANCE OF THE CANNING INDUSTRY

DAMAGED

CANS

WASTEWATER

SOLID WASTE

ODOUR

NOISE

REFRIGERANT

LOSSES

CANS

WATER

ENERGY

CHEMICALS

PACKING

MEDIA

CANNING INDUSTRY

FRESH

FISH

CANNED FISH

FISH PROCESSING INDUSTRY

Page 16: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

16ETIV - EMAS Technical Implementation and Verification 16

DESCRIPTION OF THE FROZEN FISH FACTORY (XPTO)

PRODUCES FROZEN FILLETS FROM FROZEN FISH

PROCESSES 10 TO 12 TONS OF FISH PER DAY AND OPERATES 5 DAYS PER WEEK ALL YEAR ROUND

PORTUGUESE FACTORY, LOCATED NEAR LISBON

LISBON

XPTO

PROCESSED SPECIES: HAKE TUNA MACKEREL AND MANY MORE

CHOSEN PRODUCTION LINE:PRODUCTION OF HAKE FILLETS(850 TONS OF HAKE PROCESSED PER YEAR)

FISH PROCESSING INDUSTRY

Page 17: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

17ETIV - EMAS Technical Implementation and Verification 17

RECEPTION AND

SELECTION

CUTTING AND

TRIMMING

RAW FISH STORAGE

DESAGGREGATION OF FROZEN BLOCKS

FREEZINGTUNNEL

RAW FISH

GLAZINGCALIBRATION

AND WEIGHING

PACKAGINGFINAL PRODUCT

STORAGE

DISTRIBUTION

FINAL PRODUCT

IN RETAILER

PROCESS DIAGRAM OF THE FROZEN FISH FACTORY (XPTO)

FISH PROCESSING INDUSTRY

Page 18: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

18ETIV - EMAS Technical Implementation and Verification 18

RECEPTION

AND

SELECTION

CUTTING

AND

TRIMMING

GLAZING

RAW FISH

STORAGE

DESAGGREGATION

OF FROZEN BLOCKS

FREEZING

TUNNEL

CALIBRATION

AND

WEIGHING

PACKAGINGFINAL PRODUCT

STORAGE

RAW FISH

DISTRIBUTION

FINAL PRODUCT

IN RETAILER

SOLID WASTE

(FISH)

REFRIGERANT LOSSES (AMMONIA)

WATER

WASTEWATERSOLID WASTE

(CARDBOARD, PLASTIC)

LIQUID

NITROGEN

GASEOUS

NITROGEN

ELECTRICAL

ENERGY

XPTO’S PROCESS DIAGRAM & ASSOCIATED ENVIRONMENTAL ASPECTS

FISH PROCESSING INDUSTRY

Page 19: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

19ETIV - EMAS Technical Implementation and Verification 19

DESCRIPTION OF THE CANNED FISH FACTORY (CCC)

PROCESSES 20 TONSOF FISH PER DAY AND OPERATES 220 DAYS A YEAR

PORTUGUESE FACTORY, LOCATED IN NORTH PORTUGALCCC

PROCESSED SPECIES: SARDINE, TUNA, MACKEREL, OCTOPUS AND SQUID

PACKING MEDIA USED: TOMATO SAUCE, VEGETABLE OIL, OLIVE OIL, BRINE AND HOT PEPPER SAUCE

CHOSEN PRODUCTION LINE:PRODUCTION OF CANNED SARDINES(1500 TONS OF SARDINE PROCESSED PER YEAR)

FISH PROCESSING INDUSTRY

Page 20: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

20ETIV - EMAS Technical Implementation and Verification 20

PROCESS DIAGRAM OF THE CANNED FISH FACTORY (CCC)

FRESH SARDINE FREEZING WASHING

GLAZING

STORAGETHAWINGBRINING

HEADING, EVISCERATING,

WASHING AND CANNING

WASHING

COOKING COOLINGTOMATO SAUCE ADDITION

AND CAN SEAMING

CAN WASHINGSTERILIZATION

COOLINGFINAL PRODUCT

STORAGE

DISTRIBUTION

CANNED SARDINE IN RETAILER

BRINE

PRODUCTION

STEAM

PRODUCTION

TOMATO SAUCE PREPARATION

CHLORINATED WATER

PREPARATION

FRESH SARDINE FREEZING WASHING

GLAZING

STORAGETHAWINGBRINING

HEADING, EVISCERATING,

WASHING AND CANNING

WASHING

COOKING COOLINGTOMATO SAUCE ADDITION

AND CAN SEAMING

CAN WASHINGSTERILIZATION

COOLINGFINAL PRODUCT

STORAGE

DISTRIBUTION

CANNED SARDINE IN RETAILER

BRINE

PRODUCTION

STEAM

PRODUCTION

TOMATO SAUCE PREPARATION

CHLORINATED WATER

PREPARATION

FRESH SARDINE FREEZING WASHING

GLAZING

STORAGESTORAGETHAWINGBRINING

HEADING, EVISCERATING,

WASHING AND CANNING

WASHING

COOKING COOLINGTOMATO SAUCE ADDITION

AND CAN SEAMING

CAN WASHINGSTERILIZATION

COOLINGFINAL PRODUCT

STORAGE

FINAL PRODUCT

STORAGE

DISTRIBUTION

CANNED SARDINE IN RETAILER

BRINE

PRODUCTION

BRINE

PRODUCTION

STEAM

PRODUCTION

STEAM

PRODUCTION

TOMATO SAUCE PREPARATION

TOMATO SAUCE PREPARATION

CHLORINATED WATER

PREPARATION

CHLORINATED WATER

PREPARATION

FISH PROCESSING INDUSTRY

Page 21: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

21ETIV - EMAS Technical Implementation and Verification 21

CCC’S PROCESS DIAGRAM & ASSOCIATED ENVIRONMENTAL ASPECTS

BRINE

PRODUCTION

STEAM

PRODUCTION

CHLORINATED WATER

PREPARATION

TOMATO SAUCE

PREPARATION

FRESH SARDINE FREEZING WASHING GLAZING STORAGE

THAWING

BRINING

HEADING, EVISCERATING,

WASHING AND CANNINGWASHINGCOOKINGCOOLING

TOMATO SAUCE ADDITION

AND CAN SEAMING

CAN WASHING

STERILIZATION

COOLING

FINAL PRODUCT

STORAGE

DISTRIBUTIONCANNED SARDINE

IN RETAILER

REFRIGERANT LOSSES

(AMMONIA)

SOLID WASTE

FUEL OIL

PACKING MEDIA

ELECTRICAL

ENERGY

CANS

DAMAGED CANS

WASTEWATER

WATER

FISH PROCESSING INDUSTRY

Page 22: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

22ETIV - EMAS Technical Implementation and Verification 22

IMPLEMENTATION OF CLEANER PRODUCTION (CP)

THERE ARE IMPORTANT CLEANER PRODUCTION OPPORTUNITIES FOR THE FISHPROCESSING INDUSTRY THAT ONLY REQUIRE MINOR CHANGES IN THE PROCESS:

♣ TRAIN STAFF IN GOOD CLEANING PRACTICES

♣ REGULAR MAINTENANCE TO AVOID INEFFICIENCIES

♣ KEEP WORK AREAS TIDY AND UNCLUTTERED TO AVOID ACCIDENTS

♣ INSTALL DRIP PANS OR TRAYS TO COLLECT DRIPS AND SPILLS

♣ SEGREGATE WASTE FOR REUSE AND RECYCLING

♣ IDENTIFY AND MARK ALL VALVES TO PREVENT ANY INCORRECT SETTING

FISH PROCESSING INDUSTRY

Page 23: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

23ETIV - EMAS Technical Implementation and Verification 23

IMPLEMENTATION OF CLEANER PRODUCTION (CP)

SIMPLE WAYS TO SAVE WATER:

USE OFFAL TRANSPORT SYSTEMS THAT AVOID OR MINIMISE THE USE OF

WATER

INSTALL DEVICES THAT CONTROL WATER FLOW FOR MANUAL CLEANING

USE HIGH PRESSURE WATER TO CLEAN SURFACES

PRE-SOAK FLOORS AND EQUIPMENT TO LOOSEN DIRT BEFORE THE FINAL

CLEANING

REUSE WASTEWATERS (EX.: THAWING WASTEWATERS FOR INITIAL

CLEANING STEPS)

FISH PROCESSING INDUSTRY

Page 24: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

24ETIV - EMAS Technical Implementation and Verification 24

AFTER CP PRACTICES

PRE-SOAKAGE

SCRAPING

FINAL WASHING

DIRTY SURFACEWATER DETERGENTS

CLEAN SURFACE

BEFORE CP PRACTICES

MULTIPLE WASHING

OPERATIONS

WATER DIRTY SURFACE DETERGENTS

CLEAN SURFACE

WATER SAVING

IMPLEMENTATION OF CLEANER PRODUCTION (CP)

FISH PROCESSING INDUSTRY

Page 25: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

25ETIV - EMAS Technical Implementation and Verification 25

IMPLEMENTATION OF CLEANER PRODUCTION (CP)

THERE ARE ALSO SIMPLE AND EFFECTIVE WAYS TO REDUCE THE EFFLUENTLOADS:

SWEEP UP SOLID WASTE FOR USE AS A BY-PRODUCT

COLLECT OFFAL AND BLOOD IN A SPECIAL BIN

CLEAN FISH WITH VACUUM HOSES

USE DRY CLEANING TECHNIQUES (EX.: SCRAPING FLOOR BEFORE

CLEANING)

FIT DRAINS WITH SCREENS TO REDUCE THE AMOUNT OF SOLID WASTE IN

THE EFFLUENT

FISH PROCESSING INDUSTRY

Page 26: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

26ETIV - EMAS Technical Implementation and Verification 26

SOME EASY WAYS TO SAVE ENERGY:

IMPLEMENTATION OF CLEANER PRODUCTION (CP)

REGULAR MAINTENANCE TO AVOID ENERGY INEFFICIENCIES

IMPROVE INSULATION ON COOLING/HEATING SYSTEMS

ELIMINATE STEAM LEAKS

TRAIN STAFF TO SWITCH OFF EQUIPMENT WHEN NOT IN USE

OTHERWISE USE SENSORS TO TURN OFF LIGHTS AND EQUIPMENT

FISH PROCESSING INDUSTRY

Page 27: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

27ETIV - EMAS Technical Implementation and Verification 27

IMPLEMENTATION OF EMAS

PLANNING

Conditions needed for a successful accomplishment of EMAS

ORGANIZATION AND

PERSONNEL Components essential to build up all EMAS structure

OPERATION Control & guarantees of an effective EMAS application

ENVIRONMENTAL MANAGEMENT

SYSTEM VERIFICATION

Validation & verification of the implemented system by

external entities

EMAS APPLICATION

PLANNING

Conditions needed for a successful accomplishment of EMAS

ORGANIZATION AND

PERSONNEL Components essential to build up all EMAS structure

OPERATION Control & guarantees of an effective EMAS application

Page 28: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

28ETIV - EMAS Technical Implementation and Verification 28

ENVIRONMENTAL POLICY

ENVIRONMENTAL PROGRAMME

DIFFICULTIES:

Discussion for the assignment of responsibilities

Much intense work in order to construct a detailed plan

ENVIRONMENTAL REVIEW

DIFFICULTIES:

Identification of the aspects with an environmental impact

Quantification and selection of the aspects with a significant impact

ENVIRONMENTAL LEGAL

REQUIREMENTS

ENVIRONMENTAL

OBJECTIVES AND TARGETS

PLANNING: CONDITIONS NEEDED FOR EMAS APPLICATION

EMAS APPLICATION

ENVIRONMENTAL POLICY

ENVIRONMENTAL REVIEW

DIFFICULTIES:

Identification of the aspects with an environmental impact

Quantification and selection of the aspects with a significant impact

ENVIRONMENTAL LEGAL

REQUIREMENTS

ENVIRONMENTAL

OBJECTIVES AND TARGETS

Page 29: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

29ETIV - EMAS Technical Implementation and Verification 29

ENVIRONMENTAL POLICY (CCC AND XPTO)

ENVIRONMENTAL PROTECTION IS THE MAIN KEY TO THE COMPANY’S DEVELOPMENT

THE COMPANY’S PREMISES MUST ADOPT WASTE MANAGEMENT POLICIES

ALL WORKING STAFF MUST ACCOMPLISH THE FOLLOWING:

�RESPECT THE ENVIRONMENT

�FOLLOW ALL APPLICABLE LEGISLATION

�SEARCH PERMANENTLY FOR INDUSTRIAL OPTIMIZATION

�REDUCE RAW MATERIALS AND ENERGY CONSUMPTION

�REGISTER AND INVESTIGATE ALL ACCIDENTS AND COMPLAINTS

�ADEQUATE TRAINING FOR ALL WORKERS AND PEOPLE INVOLVED

�GOOD RELATIONSHIP WITH ALL NEIGHBOURS

�COOPERATE WITH ORGANIZATIONS COMMITED TO A HIGHER ENVIRONMENTAL

PROTECTION

EMAS APPLICATION

Page 30: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

30ETIV - EMAS Technical Implementation and Verification 30

ENVIRONMENTAL REVIEW: ASSESSMENT METHODOLOGY

Factory

WASTEWATER

• SST

• COD

• BOD5

•Oil content

• pH

• N/P content

SOLID WASTE

• Fish offcuts

• Cardboard

• Plastic

WATER

TOTAL AND DETAILED CONSUMPTION

500 l

ELECTRICAL ENERGY

• TOTAL CONSUMPTION

• EQUIPMENT CONSUMPTION

9 9 9

EMAS APPLICATION

Page 31: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

31ETIV - EMAS Technical Implementation and Verification 31

ENVIRONMENTAL REVIEW (XPTO)

Glazing wastewater parametersGlazing wastewater parametersGlazing wastewater parametersGlazing wastewater parameters ValueValueValueValue

Volume (m3/year) 120

Volume (m3/ton of processed hake) 0.14

COD (mg O2/l) 752 BOD5 (mg O2/l) 200

Nitrogen (mg N/l) 8.78

THE GLAZING WASTEWATER PROBLEM

Environmental aspectEnvironmental aspectEnvironmental aspectEnvironmental aspect Value per yearValue per yearValue per yearValue per year Value per ton of Value per ton of Value per ton of Value per ton of

processed hakeprocessed hakeprocessed hakeprocessed hake

Water consumption (m3) 3240 3.8

Energy consumption (kWh) 709000 834

Detergents consumption (l) 1670 2

Ammonia release (l) 60 0.07 Nitrogen release (l) 170000 200

Fish waste production (ton) 25.4 0.030

Common garbage production (m3) 257 0.30

Plastic production (ton) 11.6 0.014

Cardboard production (ton) 23.6 0.028 Wastewater discharge (m

3) 3240 3.8

QUANTIFIED ENVIRONMENTAL IMPACTS

MAXIMUM VALUES(Portuguese Legislation)

COD 150 mg O2/l

BOD5 40 mg O2/l

EMAS APPLICATION

Page 32: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

32ETIV - EMAS Technical Implementation and Verification 32

XPTO

3.8 m3

WATER

834 kWh

ENERGY

1 TON

FROZEN HAKE

0.97 TON

FROZEN HAKE

FILLETS

3.8 m3

TOTAL WASTEWATER

0.3 m3

COMMON

GARBAGE

GLAZING WASTEWATER

(4 % OF TOTAL)

COD: 752 mg O2/l

BOD5: 200 mg O2/l

ENVIRONMENTAL ASPECTS WITH A SIGNIFICANT IMPACT (XPTO)

EMAS APPLICATION

Page 33: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

33ETIV - EMAS Technical Implementation and Verification 33

ENVIRONMENTAL REVIEW (CCC)

QUANTIFIED ENVIRONMENTAL IMPACTS

Environmental aspect Value per year Value per ton of

processed sardine

Water consumption (m3) 6300 4.2

Electricity consumption (kWh) 110000 74

Fuel oil consumption (ton) 75 0.05

Fish waste production (ton) 600 0.4

Wastewater discharge (m3) 6300 4.2

Parameter Value

Volume (m3/year) 6300

Volume (m3/ton of processed sardine) 4.2

COD (mg O2/l) 7700

BOD5 (mg O2/ l) 3500

Nitrogen (mg N/l) 200

Phosphorous (mg P/l) 27

THE WASTEWATER IMPACTMAXIMUM VALUES(Portuguese Legislation)

COD 150 mg O2/l

BOD5 40 mg O2/l

Nitrogen 15 mg N/l

Phosphorous 10 mg P/l

EMAS APPLICATION

Page 34: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

34ETIV - EMAS Technical Implementation and Verification 34

CCC

1 TON

FRESH SARDINE

≈≈≈≈ 0.5 TON

CANNED FISH

4.2 m3

WASTEWATER

COD: 32 kg

BOD5: 15 kg

Nitrogen: 1 kg

Phosphorous: 0.1 kg

0.4 TON

FISH WASTE

4.2 m3

WATER

74 kWh

ELECTRICITY

0.05 TON

FUEL

ENVIRONMENTAL ASPECTS WITH A SIGNIFICANT IMPACT (CCC)

EMAS APPLICATION

Page 35: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

35ETIV - EMAS Technical Implementation and Verification 35

ENVIRONMENTAL LEGAL REQUIREMENTS (CCC AND XPTO)

THE COMPANY HAS TO ESTABLISH AND MAINTAIN A PROCEDURE

ENABLING:

ACCESS TO ALL LEGAL REQUIREMENTS AND OTHERS

http://dre.pt/

SELECTION OF APPLICABLE LEGAL REQUIREMENTS AMONG LEGISLATION

AN UPDATED KNOWLEDGE OF THE WHOLE LEGAL FRAME

NEW LAWS OLD LAWS

EMAS APPLICATION

Page 36: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

36ETIV - EMAS Technical Implementation and Verification 36

ENVIRONMENTAL OBJECTIVES AND TARGETS (XPTO)

OBJECTIVES:

�REDUCTION OF WATER CONSUMPTION

�REDUCTION OF ELECTRICAL ENERGY CONSUMPTION

�REGULAR MONITORING OF WATER AND ENERGY CONSUMPTIONS

�REDUCTION OF COD AND BOD5 LEVELS IN THE GLAZING WASTEWATER

�REDUCTION OF COMMON GARBAGE PRODUCTION

BUT, HOW MUCH? AND WHEN?

TARGETS:

�3 m3 OF WATER CONSUMPTION PER TON OF PROCESSED HAKE (END 2005)

�750 kWh OF ELECTRICAL ENERGY CONSUMPTION PER TON OF PROCESSED HAKE (END 2005)

�REGULAR REGISTER OF WATER AND ELECTRICAL ENERGY CONSUMPTIONS (END 2005)

�COD < 380 mg O2/l AND BOD5 < 100 mg O2/l IN THE GLAZING WASTEWATER (END 2005)

�0.20 m3 OF COMMON GARBAGE PRODUCTION PER TON OF PROCESSED HAKE (END 2005)

1

2

3

4

5

EMAS APPLICATION

Page 37: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

37ETIV - EMAS Technical Implementation and Verification 37

ENVIRONMENTAL OBJECTIVES AND TARGETS (CCC)

OBJECTIVES:

�REDUCTION OF WATER CONSUMPTION

�REDUCTION OF ELECTRICAL ENERGY CONSUMPTION

�REGULAR MONITORING OF WATER AND ENERGY CONSUMPTIONS

�UTILIZATION OF NATURAL GAS INSTEAD OF FUEL OIL

�REDUCTION OF COD, BOD5, N AND P LEVELS IN THE WASTEWATER

�UTILIZATION OF FISH WASTE FOR FISH MEAL PRODUCTION

ONCE MORE, HOW MUCH? AND WHEN?

TARGETS:

�3.4 m3 OF WATER CONSUMPTION PER TON OF PROCESSED SARDINE (END 2005)

�65 kWhOF ELECTRICAL ENERGY CONSUMPTION PER TON OF PROCESSED SARDINE (END 2005)

�REGULAR REGISTER OF WATER AND ELECTRICAL ENERGY CONSUMPTIONS (END 2005)

�EXCLUSIVE UTILIZATION OF NATURAL GAS IN THE BOILER (2006)

�WASTEWATER (END 2005): COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, 100 mg N/l AND 15 mg P/l

�SELLING ALL SARDINE WASTE TO A FISH MEAL PLANT (END 2005)

1

2

3

4

5

6

EMAS APPLICATION

Page 38: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

38ETIV - EMAS Technical Implementation and Verification 38

ENVIRONMENTAL PROGRAMME FOR XPTO - EP XPTO-AA

EP XPTO-AA ESTABLISHES WHICH MEASURES MUST BE TAKEN IN ORDER TO MEET XPTO’S TARGETS:

3 Regular Register

�WATER METERS INSTALLATION

�REGISTER ELECTRICITY CONSUMPTION FOR MAIN EQUIPMENTS

5 0.2 m3 Garbage/ton�SCREENING OF ALL COMMON GARBAGE

1 3 m3 Water/ton�HIGH PRESSURE CLEANING SYSTEMS

�EFFICIENT CLEANING PRACTICES

�PRE-SOAK FLOORS AND EQUIPMENT

�VACUUM HOSES FOR FISH CLEANING

�REPORT AND FIX LEAKS PROMPTLY

4 380 mg O2/l & 100 mg O2/l

�DRAINS WITH SCREENS AND TRAPS

2 750 kWh/ton

�INSULATION IMPROVEMENT

�REGULAR EQUIPMENT MAINTENANCE

�ELECTRICITY-SAVING SENSORS

EMAS APPLICATION

Page 39: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

39ETIV - EMAS Technical Implementation and Verification 39

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 1: 3 m3 of water consumption per ton of processed hake until the end of 2005

Acquisition of high pressure cleaning sys tems EMS coordinator Day 15

Training workers in efficient c leaning prac tices

Preparation of work instruction for pre-soakage c leaning

Instal lation of vacuum hoses for fish cleaning

Preparation of operational procedure for finding

and fixing leaks

EMS coordinator

EMS coordinator

EMS coordinator

EMS coordinator

Day 15

Day 31

Day 15

Day 30

Target 2: Electricity consumption lower than 750 kWh per ton of processed hake until the end of 2005

Commission better insulation of freezing rooms EMS coordinator Day 28

Assuring regular equipment maintenance

Instal lation of energy sav ing sensors

Production & Maintenance

EMS coordinator

Day 15

Day 15

Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005

Instal lation of meters on high water consumption equipment

Preparation of operational procedure for r egistration of electrici ty consumption

EMS coordinator

EMS coordinator

Day 31

Day 31

Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively

Instal lation of sc reens and traps in the glazing tank drain

EMS coordinator Day 31

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 1: 3 m3 of water consumption per ton of processed hake until the end of 2005

Acquisition of high pressure cleaning sys tems EMS coordinator Day 15

Training workers in efficient c leaning prac tices

Preparation of work instruction for pre-soakage c leaning

Instal lation of vacuum hoses for fish cleaning

Preparation of operational procedure for finding

and fixing leaks

EMS coordinator

EMS coordinator

EMS coordinator

EMS coordinator

Day 15

Day 31

Day 15

Day 30

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 1: 3 m3 of water consumption per ton of processed hake until the end of 2005

Acquisition of high pressure cleaning sys tems EMS coordinator Day 15

Training workers in efficient c leaning prac tices

Preparation of work instruction for pre-soakage c leaning

Instal lation of vacuum hoses for fish cleaning

Preparation of operational procedure for finding

and fixing leaks

EMS coordinator

EMS coordinator

EMS coordinator

EMS coordinator

Day 15

Day 31

Day 15

Day 30

Target 2: Electricity consumption lower than 750 kWh per ton of processed hake until the end of 2005

Commission better insulation of freezing rooms EMS coordinator Day 28

Assuring regular equipment maintenance

Instal lation of energy sav ing sensors

Production & Maintenance

EMS coordinator

Day 15

Day 15

Target 2: Electricity consumption lower than 750 kWh per ton of processed hake until the end of 2005

Commission better insulation of freezing rooms EMS coordinator Day 28

Assuring regular equipment maintenance

Instal lation of energy sav ing sensors

Production & Maintenance

EMS coordinator

Day 15

Day 15

Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005

Instal lation of meters on high water consumption equipment

Preparation of operational procedure for r egistration of electrici ty consumption

EMS coordinator

EMS coordinator

Day 31

Day 31

Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005

Instal lation of meters on high water consumption equipment

Preparation of operational procedure for r egistration of electrici ty consumption

EMS coordinator

EMS coordinator

Day 31

Day 31

Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively

Instal lation of sc reens and traps in the glazing tank drain

EMS coordinator Day 31

Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively

Instal lation of sc reens and traps in the glazing tank drain

EMS coordinator Day 31

CHRONOGRAM FOR THE IMPLEMENTATION OF EP XPTO-AA

EMAS APPLICATION

Page 40: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

40ETIV - EMAS Technical Implementation and Verification 40

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively

Preparation of wo rk instruction for removal of thesolid waste retained in the glazing tank drain

EMS coordinator Day 31

Target 5: Common garbage production lower than 0.20 m3 per ton of processed hake until the end of 2005

Preparation of operational procedure for screening all common garbage produced

EMS coordinator Day 30

Training workers in separating all garbage produced

Ra ising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 31

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively

Preparation of wo rk instruction for removal of thesolid waste retained in the glazing tank drain

EMS coordinator Day 31

Target 4: Until the end of 2005, COD and BOD5 in the glazing wastewater lower than 380 mg O2/l and 100 mg O2/l, respectively

Preparation of wo rk instruction for removal of thesolid waste retained in the glazing tank drain

EMS coordinator Day 31

Target 5: Common garbage production lower than 0.20 m3 per ton of processed hake until the end of 2005

Preparation of operational procedure for screening all common garbage produced

EMS coordinator Day 30

Training workers in separating all garbage produced

Ra ising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 31

Target 5: Common garbage production lower than 0.20 m3 per ton of processed hake until the end of 2005

Preparation of operational procedure for screening all common garbage produced

EMS coordinator Day 30

Training workers in separating all garbage produced

Ra ising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 31

CHRONOGRAM FOR THE IMPLEMENTATION OF EP XPTO-AA

EMAS APPLICATION

Page 41: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

41ETIV - EMAS Technical Implementation and Verification 41

ENVIRONMENTAL PROGRAMME FOR CCC - EP CCC-AA

EP CCC-AA ESTABLISHES WHICH MEASURES MUST BE TAKEN IN ORDER TO MEET CCC’S TARGETS:

�INSULATION IMPROVEMENT

�REGULAR EQUIPMENT MAINTENANCE

�ELECTRICITY-SAVING SENSORS

65 kWh/ton2

�WATER METERS INSTALLATION

�REGISTER ELECTRICITY CONSUMPTION FOR MAIN EQUIPMENTS

Regular Register3

Natural gas4

�INSTALLATION OF A NATURAL GAS BOILER

�DRAINS WITH SCREENS AND TRAPS

�OFFAL COLLECTION IN

SEPARATE CONTAINERS

3800 mg O2/l & 1700 mg O2/l5

�SOLID WASTE SEPARATION ON THE FISH PREPARATION TABLES

Sell sardine waste6

�HIGH PRESSURE CLEANING SYSTEMS

�EFFICIENT CLEANING PRACTICES

�PRE-SOAK FLOORS AND EQUIPMENT

�FIXTURES FOR WATER CONTROL

�VACUUM HOSES FOR FISH CLEANING

�REPORT AND FIX LEAKS PROMPTLY

�REUSE THAWING WASTEWATERS

3.4 m3 Water/ton1

EMAS APPLICATION

Page 42: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

42ETIV - EMAS Technical Implementation and Verification 42

CHRONOGRAM FOR THE IMPLEMENTATION OF EP CCC-AA

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 1: 3.4 m3 of water consumption per ton of processed sardine until the end of 2005

Acquisition of high pressure cleaning sys tems EMS coordinator Day 15

Training workers in efficient c leaning prac tices

Preparation of work instruction for pre-soakage c leaning

Instal lation of fixtures for water flow control

Instal lation of vacuum hoses for fish cleaning

EMS coordinator

EMS coordinator

EMS coordinator

EMS coordinator

Day 31

Day 31

Day 15

Day 30

EMS coordinator

Preparation of operational procedure for finding

and fixing leaks

EMS coordinator Day 30

Preparation of work instruc tion for collecting thawing was tewaters and use them in cleaning

Day 31

Target 2: Electricity consumption of about 65 kWh per ton of processed sardine until the end of 2005

Commission better insulation of freezing rooms

Assuring regular equipment maintenance

Instal lation of energy sav ing sensors

Production & Maintenance

EMS coordinator

Day 15

Day 28

EMS coordinator

Day 15

Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005

Ins tallation of meters on high water consumption equipment

Preparation of operational procedure for registration of elec tr ici ty consumption

EMS coordinator Day 31

EMS coordinator Day 31

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 1: 3.4 m3 of water consumption per ton of processed sardine until the end of 2005

Acquisition of high pressure cleaning sys tems EMS coordinator Day 15

Training workers in efficient c leaning prac tices

Preparation of work instruction for pre-soakage c leaning

Instal lation of fixtures for water flow control

Instal lation of vacuum hoses for fish cleaning

EMS coordinator

EMS coordinator

EMS coordinator

EMS coordinator

Day 31

Day 31

Day 15

Day 30

EMS coordinator

Preparation of operational procedure for finding

and fixing leaks

EMS coordinator Day 30

Preparation of work instruc tion for collecting thawing was tewaters and use them in cleaning

Day 31

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 1: 3.4 m3 of water consumption per ton of processed sardine until the end of 2005

Acquisition of high pressure cleaning sys tems EMS coordinator Day 15

Training workers in efficient c leaning prac tices

Preparation of work instruction for pre-soakage c leaning

Instal lation of fixtures for water flow control

Instal lation of vacuum hoses for fish cleaning

EMS coordinator

EMS coordinator

EMS coordinator

EMS coordinator

Day 31

Day 31

Day 15

Day 30

EMS coordinator

Preparation of operational procedure for finding

and fixing leaks

EMS coordinator Day 30

Preparation of work instruc tion for collecting thawing was tewaters and use them in cleaning

Day 31

Target 2: Electricity consumption of about 65 kWh per ton of processed sardine until the end of 2005

Commission better insulation of freezing rooms

Assuring regular equipment maintenance

Instal lation of energy sav ing sensors

Production & Maintenance

EMS coordinator

Day 15

Day 28

EMS coordinator

Day 15

Target 2: Electricity consumption of about 65 kWh per ton of processed sardine until the end of 2005Target 2: Electricity consumption of about 65 kWh per ton of processed sardine until the end of 2005

Commission better insulation of freezing rooms

Assuring regular equipment maintenance

Instal lation of energy sav ing sensors

Production & Maintenance

EMS coordinator

Day 15

Day 28

EMS coordinator

Day 15

Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005

Ins tallation of meters on high water consumption equipment

Preparation of operational procedure for registration of elec tr ici ty consumption

EMS coordinator Day 31

EMS coordinator Day 31

Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005Target 3: Beginning to register water and electricity consumptions for main equipments until the end of 2005

Ins tallation of meters on high water consumption equipment

Preparation of operational procedure for registration of elec tr ici ty consumption

EMS coordinator Day 31

EMS coordinator Day 31

EMAS APPLICATION

Page 43: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

43ETIV - EMAS Technical Implementation and Verification 43

CHRONOGRAM FOR THE IMPLEMENTATION OF EP CCC-AA

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 4: Exclusive utilization of natural gas in the boiler from 2006 onwards

Acquisition of a natural gas boiler Production & Maintenance

Ins tallation of a natural gas line

Day 31

Day 30Production & Maintenance

Preparation of work instruction for removal of thesolid waste retained in the drains

EMS coordinator Day 31Instal lation of sc reens and traps in the drains

Target 5: Until the end of 2005, achieving: COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, Nit. - 100 mg N/l and Phosp. - 15 mg P/l

EMS coordinator

Day 31

Acquisition of specific containers for blood and offal col lection

Preparation of work instruction for col lecting blood and offal

EMS coordinator

EMS coordinator

Day 15

Day 15

Target 6: Selling all sardine waste to a fish meal plant from 2005 onwards

Preparation of operational procedure for separating waste on the fish preparation tables

EMS coordinator

Day 28

Making a deal with a company that produces fish meal from fish waste

Raising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 28

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

TASK RESPONS.PERFORMANCE PERIOD (MONTHS)

Set Oct Nov Dec Jan Feb Mar Apr May Jun

Target 4: Exclusive utilization of natural gas in the boiler from 2006 onwards

Acquisition of a natural gas boiler Production & Maintenance

Ins tallation of a natural gas line

Day 31

Day 30Production & Maintenance

Target 4: Exclusive utilization of natural gas in the boiler from 2006 onwards

Acquisition of a natural gas boiler Production & Maintenance

Ins tallation of a natural gas line

Day 31

Day 30Production & Maintenance

Preparation of work instruction for removal of thesolid waste retained in the drains

EMS coordinator Day 31Instal lation of sc reens and traps in the drains

Target 5: Until the end of 2005, achieving: COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, Nit. - 100 mg N/l and Phosp. - 15 mg P/l

EMS coordinator

Day 31

Acquisition of specific containers for blood and offal col lection

Preparation of work instruction for col lecting blood and offal

EMS coordinator

EMS coordinator

Day 15

Day 15

Target 6: Selling all sardine waste to a fish meal plant from 2005 onwards

Preparation of operational procedure for separating waste on the fish preparation tables

EMS coordinator

Day 28

Making a deal with a company that produces fish meal from fish waste

Raising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 28

Preparation of work instruction for removal of thesolid waste retained in the drains

EMS coordinator Day 31Instal lation of sc reens and traps in the drains

Target 5: Until the end of 2005, achieving: COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, Nit. - 100 mg N/l and Phosp. - 15 mg P/lTarget 5: Until the end of 2005, achieving: COD - 3800 mg O2/l, BOD5 - 1700 mg O2/l, Nit. - 100 mg N/l and Phosp. - 15 mg P/l

EMS coordinator

Day 31

Acquisition of specific containers for blood and offal col lection

Preparation of work instruction for col lecting blood and offal

EMS coordinator

EMS coordinator

Day 15

Day 15

Target 6: Selling all sardine waste to a fish meal plant from 2005 onwards

Preparation of operational procedure for separating waste on the fish preparation tables

EMS coordinator

Day 28

Making a deal with a company that produces fish meal from fish waste

Raising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 28

Target 6: Selling all sardine waste to a fish meal plant from 2005 onwardsTarget 6: Selling all sardine waste to a fish meal plant from 2005 onwards

Preparation of operational procedure for separating waste on the fish preparation tables

EMS coordinator

Day 28

Making a deal with a company that produces fish meal from fish waste

Raising workers awareness for environmental issues

EMS coordinator

All EMS team

Day 28

EMAS APPLICATION

Page 44: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

44ETIV - EMAS Technical Implementation and Verification 44

ORGANIZATION AND PERSONNEL: ESSENTIAL COMPONENTS OF EMAS

RESPONSIBILITIESDIFFICULTIES:

Discussion for the assignment of responsibilities

TRAINING

DIFFICULTIES:

Changing old practices that are deleterious for the environment

Raising environmental awareness

COMMUNICATION

DOCUMENTATION

DIFFICULTIES:

Organization of the documentation structure

Writing down every detail of the operational procedures

DOCUMENTATION CONTROL

OPERATIONAL CONTROL

DIFFICULTIES:

Identification of operational controls for every target

Convincing suppliers and contractors to comply with all environmental requirements

PREVENTION AND EMERGENCY PREPAREDNESS

DIFFICULTIES:

Testing the plans for emergency response

EMAS APPLICATION

RESPONSIBILITIESDIFFICULTIES:

Discussion for the assignment of responsibilities

TRAINING

DIFFICULTIES:

Changing old practices that are deleterious for the environment

Raising environmental awareness

COMMUNICATION

DOCUMENTATION

DIFFICULTIES:

Organization of the documentation structure

Writing down every detail of the operational procedures

DOCUMENTATION CONTROL

OPERATIONAL CONTROL

DIFFICULTIES:

Identification of operational controls for every target

Convincing suppliers and contractors to comply with all environmental requirements

PREVENTION AND EMERGENCY PREPAREDNESS

DIFFICULTIES:

Testing the plans for emergency response

Page 45: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

45ETIV - EMAS Technical Implementation and Verification 45

ADMINISTRATION

Mr. A

QUALITY CONTROL

Mr. B

ADMINISTRATIVE SERVICES

FINANCIAL DEPARTMENT

Mr. C

WAREHOUSE

Mr. D

PRODUCTION AND MAINTENANCE

Mr. E

RESPONSIBILITIES - ORGANIZATIONAL STRUCTURE CONCERNING EMS

EMAS APPLICATION

Page 46: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

46ETIV - EMAS Technical Implementation and Verification 46

SECTION RESPONSIBILITIES IN THE EMAS IMPLEMENTATION

Sections EMS Requirements

Adm. Adm./Fin. P & M Warehouse QC

1- Policy R C C C S

2- Environmental aspects R

3- Environmental legislation S C R

4- Objectives and targets S C C C R

5- Environmental programme S C C C R

6- Responsibilities R C C C S

7- Training S C R

8- Communication R C

9- EMS documentation R

10- Document control R

11- Operational control C R C S

12- Emergency plan R C S

13- Monitoring C R C S

14- Non-conformances S R

15- Registers C C C R

16- EMS audits S C C C R

17- EMS review R C

TABLE KEY:Adm. – AdministrationFin. – Finance

P & M – Production and MaintenanceQC – Quality Control

R - ResponsibleC - CooperationS - Supervision

EMAS APPLICATION

Page 47: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

47ETIV - EMAS Technical Implementation and Verification 47

PRODUCTION AND MAINTENANCE

WAREHOUSEADMINISTRATIVE SERVICES

QUALITY CONTROL

Mr. B

Mr. C

Mr. E

Mr. D

RESPONSIBILITIES - COMPOSITION OF THE EMS TEAM

EMAS APPLICATION

Page 48: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

48ETIV - EMAS Technical Implementation and Verification 48

ALL EMPLOYEESRAISING ENVIRONMENTAL

AWARENESS

TRAINING

EMPLOYEES RESPONSIBLE

FOR A SIGNIFICANT ENVIRONMENTAL IMPACT

SPECIALIST ENVIRONMENTAL TRAINING

EMPLOYEES RESPONSIBLE

FOR SOME PART OF THE EMS

EMS COURSE

EMAS APPLICATION

Page 49: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

49ETIV - EMAS Technical Implementation and Verification 49

COMMUNICATION

INTERNAL COMMUNICATION

MANAGEMENT

ALL EMPLOYEES

ENVIRONMENTAL POLICY,

OBJECTIVES AND TARGETS

INFO

RM

S FE

ED

BA

CK

COMPLAINTS

EXTERNAL COMMUNICATION

DIRECT CONTACTS

PHONE CALLS

VISITS

SPECIFIC FORM

RNW# - Non-Written

Communication

WRITTEN

REPLY

WRITTEN

REPLY

SPECIAL RECORDRCOMP# - Complaints

ANALYSIS OF THE COMPLAINTS

WRITTEN

ANSWER

EMAS APPLICATION

Page 50: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

50ETIV - EMAS Technical Implementation and Verification 50

SYSTEM MANUAL

SYSTEM PROCEDURES

OPERATIONAL PROCEDURES

RECORDS OTHER DOCUMENTSEXTERNAL

DOCUMENTS

HIERARCHICAL DOCUMENTATION STRUCTURE OF EMS

THE MOST IMPORTANT DOCUMENT FOR EMS:EMS AND ALL PROCEDURES ARE PRESENTED

ACTIVITIES THAT MUST BE CARRIED OUT FOR

A THOROUGH IMPLEMENTATION OF EMS

SET OPERATIONAL CRITERIA THAT

ENABLE AN EFFICIENT CONTROL

EFFECTIVE EMS

IMPLEMENTATION

FOR INSTANCE:

RTRAIN#, RNW#

or RCOMP#

EMAS APPLICATION

Page 51: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

51ETIV - EMAS Technical Implementation and Verification 51

DOCUMENTATION – SYSTEM PROCEDURES (XPTO AND CCC)

THE SYSTEM PROCEDURES ANSWER TO VARIOUS PROBLEMS:

�Operational control of the most meaningful aspects

�Requirements concerning measurement and monitoring of all operational controls

�Evaluation of conformance with legislation and relevant norms

Procedure Objective

SP 00 – Procedures Preparation Preparation of procedures SP 01 – Environmental Aspects Identification and evaluation of environmental aspects SP 02 – Legislation and other Requirements Identification and access to legislation and other

requirements SP 03 – Training and Knowledge Identification and execution of training and knowledge

actions SP 04 – Internal and External

Communication

Internal and external documentation

SP 05 – Documentation Control Control of documents SP 06 – Operational Control – Operations

and Activities

Identification and control of all operations and activities

with environmental impact SP 07 – Operational Control – Goods and

Services

Identification and control of goods and services with

environmental impact SP 08 – Emergency Preparedness and Response

Identification and preparation of response procedures for accidents and emergencies

SP 09 – Monitoring and Measurement Identification and control of monitoring and measurement operations

SP 10 – Non-Conformances and Corrective and Preventive Actions

Non-conformances record and response

SP 11 - Records Control of records

SP 12 – EMS Audits Execution and calendar of internal audits

EMAS APPLICATION

Page 52: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

52ETIV - EMAS Technical Implementation and Verification 52

DOCUMENTATION CONTROL

OBJECTIVES

LATEST

VERSION

AVAILABILITY OF ALL RELEVANT

DOCUMENTS IN THE CRITICAL POINTS

OBSOLETE

IMMEDIATE REMOVAL OF THE OBSOLETE DOCUMENTS FROM ALL UTILIZATION POINTS

IDENTIFICATION OF ALL OBSOLETE DOCUMENTS

OBSOLETE

LOCALIZATION

Opera

ANALYSIS, REVIEWIF NECESSARY, APPROVAL BY

AUTHORIZED PERSONNEL

EMAS APPLICATION

Page 53: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

53ETIV - EMAS Technical Implementation and Verification 53

OPERATIONAL CONTROL

OPERATIONAL CONTROL ENCOMPASSES THE WAY XPTO (CCC) CONTROLS ITS

OPERATIONS IN ORDER TO ASSURE:

�THE SYSTEMATIC ACCOMPLISHMENT OF THE ENVIRONMENTAL OBJECTIVES AND

TARGETS

�THE ADEQUATE MONITORING OF ALL ENVIRONMENTAL ASPECTS

ADDITIONALLY, OPERATIONAL CONTROL MUST FOLLOW SOME RULES:

�IDENTIFY, AT LEAST, ONE OPERATIONAL CONTROL FOR EACH OBJECTIVE AND TARGET

�CONTROL ALL OPERATIONS CONNECTED WITH THE ENVIRONMENTAL ASPECTS

�ESTABLISH PROCEDURES FOR ALL CRITICAL POINTS

�COMMUNICATE THE RELEVANT PROCEDURES TO SUPPLIERS AND CONTRACTORS

EMAS APPLICATION

Page 54: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

54ETIV - EMAS Technical Implementation and Verification 54

IMPLEMENTED OPERATIONAL CONTROLS FOR EACH TARGET (XPTO)

2 750 kWh/ton�VERIFY MONTHLY ELECTRICITY CONSUMPTION AND CALCULATE THE AMOUNT OF HAKE PROCESSED EACH MONTH

1 3 m3 Water/ton�VERIFY MONTHLY WATER CONSUMPTION AND CALCULATE THE AMOUNT OF HAKE PROCESSED EACH MONTH

3 Regular Register �MANAGEMENT REVIEW EACH TRIMESTER

4 380 mg O2/l & 100 mg O2/l�PERFORM MONTHLY CHEMICAL ANALYSIS OF THE GLAZING WASTEWATER

5 0.2 m3 Garbage/ton�ESTIMATE MONTHLY PRODUCTION OF COMMON GARBAGE AND CALCULATE THE AMOUNT OF HAKE PROCESSED EACH MONTH

EMAS APPLICATION

Page 55: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

55ETIV - EMAS Technical Implementation and Verification 55

Number of dumpsters filled each month

Amount of hake processed each month

Garbage production per ton of processed hake

OPERATIONAL CONTROL CONCERNING XPTO’S TARGET 5

EMAS APPLICATION

Page 56: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

56ETIV - EMAS Technical Implementation and Verification 56

IMPLEMENTED OPERATIONAL CONTROLS FOR EACH TARGET (CCC)

�VERIFY MONTHLY ELECTRICITY CONSUMPTION AND CALCULATE THE AMOUNT OF SARDINE PROCESSED EACH MONTH

65 kWh/ton2

�MANAGEMENT REVIEW EACH TRIMESTERRegular Register3

Natural gas4 �MANAGEMENT REVIEW EACH TRIMESTER

�MONTHLY CHEMICAL ANALYSIS OF THE WASTEWATER GENERATED IN THE PLANT

3800 mg O2/l & 1700 mg O2/l5

�ESTIMATE MONTHLY AMOUNT OF SEPARATED FISH WASTE AND CALCULATE THE AMOUNT OF SARDINE PROCESSED EACH MONTH

�MANAGEMENT REVIEW EACH TRIMESTER

Sell sardine waste6

�VERIFY MONTHLY WATER CONSUMPTION AND CALCULATE THE AMOUNT OF SARDINE PROCESSED EACH MONTH

3.4 m3 Water/ton1

EMAS APPLICATION

Page 57: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

57ETIV - EMAS Technical Implementation and Verification 57

OPERATIONAL CONTROL CONCERNING CCC’S TARGET 6

Quantity of fish waste separated on the heading and eviscerating tables

Amount of sardine processed each month

Separated sardine waste per ton of processed sardine

Total sardine waste per ton of processed sardine

0.4 ton/ton of processed sardine

COMPARISON

X ton/ton of processed sardine

EMAS APPLICATION

Page 58: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

58ETIV - EMAS Technical Implementation and Verification 58

PREVENTION AND EMERGENCY PREPAREDNESS

THE COMPANY MUST:

�ESTABLISH AND KEEP PROCEDURES ENABLING THE IDENTIFICATION OF POSSIBLE

ACCIDENTS AND EMERGENCY SITUATIONS

EX.: FIRES, ACCIDENTAL RELEASES, SPILLS, ETC.

FOR EACH IDENTIFIED SITUATION MUST BE DEVELOPED A PLAN FOR

EMERGENCY RESPONSE (PER# - TYPE OF SITUATION) REFERRING:

�IMMEDIATE RESPONSE ACTIONS

�WHO TO CALL

�WHICH AUTHORITIES MUST BE INFORMED

•BE PREPARED TO PREVENT AND REDUCE ALL CONNECTED ENVIRONMENTAL IMPACTS

EMAS APPLICATION

Page 59: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

59ETIV - EMAS Technical Implementation and Verification 59

OPERATION: CONTROL AND GUARANTEES OF EMAS APPLICATION

MONITORING AND MEASUREMENT

DIFFICULTIES:

Identification of monitoring and measurement actions

Training employees to carry out these actions

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

DIFFICULTIES:

Detection of non-conformances

Discussion of the corrective and preventive actions

ENVIRONMENTAL RECORDS

INTERNAL AUDITS

DIFFICULTIES:

Finding external professional consultants to perform the audits

Collecting meaningful data

Preparation of the audit’s report

EMAS APPLICATION

MONITORING AND MEASUREMENT

DIFFICULTIES:

Identification of monitoring and measurement actions

Training employees to carry out these actions

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

DIFFICULTIES:

Detection of non-conformances

Discussion of the corrective and preventive actions

ENVIRONMENTAL RECORDS

INTERNAL AUDITS

DIFFICULTIES:

Finding external professional consultants to perform the audits

Collecting meaningful data

Preparation of the audit’s report

Page 60: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

60ETIV - EMAS Technical Implementation and Verification 60

MONITORING AND MEASUREMENT (M&M)

ADEQUATE DOCUMENTATION IS CRUCIAL:

�SYSTEM PROCEDURE, SP 09 –Monitoring and Measurement

�LISTS OF OPERATIONS AND MEASUREMENT EQUIPMENTS

�DOCUMENTS RECORDING ALL MAINTENANCE AND CALIBRATION OPERATIONS PERFORMED IN THE EQUIPMENTS

MONITORING AND MEASUREMENT ACTIONS TYPICALLY INVOLVE:

�CALIBRATION OF THE MEASUREMENT DEVICES

�RECORDING THE VALUES ATTAINED IN EVERY OPERATIONAL CONTROL

�COMPARISON WITH ESTABLISHED TARGETS

MONITORING AND MEASUREMENT ACTIONS ARE ESSENTIAL FOR AN

ADEQUATE CONTROL OF ALL CRITICAL POINTS

EMAS APPLICATION

Page 61: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

61ETIV - EMAS Technical Implementation and Verification 61

M&M ACTIONS FOR EACH OPERATIONAL CONTROL (XPTO)

Operational control M & M action

- Verify monthly water consumption and

calculate the amount of hake processed each month (Target 1)

- Calibrat ion of water meter s and sca les - Record monthly value of water consumpt ion

per ton of proc essed hake

- Comparison with established target

- Verify monthly electricity consumption

and calculate the amount of hake processed each month (Target 2)

- Calibrat ion of electricity meter s and sc ales - Record monthly value of electrical energy

consumpt ion per ton of proces sed hake

- Comparison with established target

- Management review each trimester

(Target 3)

- Record phase of the project

- Record del ays to the schedule (chronogram) - Repor t to the management board

- Perform chemical analysis of the glazing wastewater every month (Target 4)

- Record monthly values of COD and BOD5 in

the gla zing wastewater

- Comparison with established targets

- Estimate monthly production of common

garbage and calculate the amount of hake processed each month (Target 5)

- Moni toring common garbage disposal and calibra ting scales

- Record monthly value of common garbage

product ion per ton of processed hake - Comparison with established target

EMAS APPLICATION

Page 62: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

62ETIV - EMAS Technical Implementation and Verification 62

MONITORING AND MEASUREMENT ACTIONS (XPTO’S TARGET 5)

RECORD MONTHLY VALUE

OF COMMON GARBAGE

PRODUCTION PER TON OF

PROCESSED HAKE

COMPARISON WITH

ESTABLISHED TARGET

MONITORING COMMON GARBAGE DISPOSAL

Measurement of the

volumetric capacity

Work instruction for

determining the number of dumpsters

filled each month

CALIBRATION OF THE SCALES

1 kg 0.5 kg2 kg

ENABLES

ENABLESENABLES

EMAS APPLICATION

Page 63: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

63ETIV - EMAS Technical Implementation and Verification 63

M&M ACTIONS FOR EACH OPERATIONAL CONTROL (CCC)

Operational control M & M action

- Verify monthly water consumption and

calculate the amount of sardine processed each month (Target 1)

- Calibrat ion of water meter s and sca les - Record monthly value of water consumpt ion

per ton of proc essed sardine

- Comparison with established target

- Verify monthly electricity consumption and calculate the amount of sardine processed

each month (Target 2)

- Calibrat ion of electricity meter s and sc ales

- Record monthly value of electrical energy

consumpt ion per ton of proces sed s ardine - Comparison with established target

- Management review each trimester

(Target 3)

- Record phase of the project

- Record del ays to the schedule (chronogram) - Repor t to the management board

- Management review each trimester

(Target 4)

- Record phase of the project

- Record del ays to the schedule (chronogram) - Repor t to the management board

- Monthly chemical analysis of the

wastewater generated in the plant (Target 5)

- Record monthly values of COD, BOD5 ,

Nit roge n and Phosphorous in the wa stewater - Comparison with established targets

- Estimate monthly amount of fish waste

separated on the fish preparation tables and

calculate the quantity of sardine processed each month (Target 6)

- Calibrat ion of scales

- Record monthly value of separated f ish waste per ton of proces sed s ardine

- Comparison with established target

- Management review each trimester (Target 6)

- Record phase of the project

- Record del ays to the schedule (chronogram)

- Repor t to the management board

EMAS APPLICATION

Page 64: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

64ETIV - EMAS Technical Implementation and Verification 64

MONITORING AND MEASUREMENT ACTIONS (CCC’S TARGET 6)

RECORD MONTHLY VALUE OF

SEPARATED FISH WASTE PER

TON OF PROCESSED SARDINE

COMPARISON WITH

ESTABLISHED TARGET

CALIBRATION OF THE SCALES

1 kg 0.5 kg2 kg

ENABLES

For instance, the

second task of target 6

RECORD DELAYS

TO THE SCHEDULE

REPORT TO THE MANAGEMENT BOARD

RECORD PHASE

OF THE PROJECT

ENABLES

CCCFISH MEAL

PLANT

Fish Waste

Negotiations

€ €€

EMAS APPLICATION

Page 65: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

65ETIV - EMAS Technical Implementation and Verification 65

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

FOR EVERY DETECTED NON-CONFORMANCE A SPECIFIC DOCUMENT MUST BE FILLED OUT RNC# - NON-CONFORMANCES AND MUST CONTAIN THE FOLLOWING INFORMATION:

�SECTION WHERE THE NON-CONFORMANCE OCCURRED

�REQUIREMENT OF THE NORM THAT WAS DISRESPECTED

�DESCRIPTION OF THE NON-CONFORMANCE

�CORRECTIVE AND PREVENTIVE ACTIONS PERFORMED

�ALTERED DOCUMENTS

IN XPTO AND CCC, THE DETECTION OF NON-CONFORMANCES RESULTED FROM COMPLAINTS, EMERGENCY SITUATIONS, AUDITS AND ALL M&M ACTIONS

WHAT IS A NON-CONFORMANCE?

WHAT IS A CORRECTIVE ACTION?

WHAT IS A PREVENTIVE ACTION?

ASPECT OF EMAS IMPLEMENTATION STANDING BEYOND THE ACCEPTANCE CRITERIA

ACTION THAT AIMS AT REESTABLISHING THE CONCERNED ASPECT WITHIN LIMITS

ACTION THAT AIMS TO AVOID ANY SERIOUS DEVIATION IN SOME ASPECT OF EMAS IMPLEMENTATION

EMAS APPLICATION

Page 66: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

66ETIV - EMAS Technical Implementation and Verification 66

NON-CONFORMANCES CORRECTIVE ACTIONPREVENTIVE ACTION

NON-CONFORMANCES/CORRECTIVE & PREVENTIVE ACTIONS (XPTO)

NO SPECIALIST ENVIRONMENTAL

TRAINING PROVIDED FOR THOSE

WORKERS WHOSE ACTIVITY HAD A

SIGNIFICANT ENVIRONMENTAL IMPACT

Put a specific person in charge of all training actions

Commission external environmental experts

TWO LISTS (LINTC AND LEXTC) WERE

NOT FILLED OUTFill out the lists with the missing information

Explain to workers the documents importance

DELAY IN THE INSTALLATION OF

VACUUM HOSES

Report any serious problem in the installation of new equipments to EMS team

Ask advice from other experts

COD AND BOD5 LEVELS DID NOT DECREASE

Teach workers to remove the solid waste retained in the drain of the glazing tank

Reinstall the drain’s screen

INCREASE IN THE PRODUCTION OF

COMMON GARBAGE PER TON OF

PROCESSED HAKE

Improve workers training for common garbage separation

Appointment of a person for workers supervision in screening the garbage

EMAS APPLICATION

Page 67: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

67ETIV - EMAS Technical Implementation and Verification 67

NON-CONFORMANCES/CORRECTIVE & PREVENTIVE ACTIONS (CCC)

NON-CONFORMANCES CORRECTIVE ACTIONPREVENTIVE ACTION

NO SPECIALIST ENVIRONMENTAL

TRAINING PROVIDED FOR THOSE

WORKERS WHOSE ACTIVITY HAD A

SIGNIFICANT ENVIRONMENTAL IMPACT

Put a specific person in charge of all training actions

Commission external environmental experts

ABSENCE OF THE OPERATIONAL PROCEDURE FOR SEPARATING SOLID

WASTE

Regular EMAS meetings for analysis of all operational procedures

Special EMAS meeting for preparing the procedure

THE ORGANIC LOAD IN THE

WASTEWATER DID NOT DECREASE

Appointment of a person for supervising workers when they collect offal

Reinforce workers training for collecting offal

EMAS APPLICATION

Page 68: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

68ETIV - EMAS Technical Implementation and Verification 68

SYSTEM OF ENVIRONMENTAL RECORDS APPLIED TO XPTO AND CCC

ESTABLISHED FOLDERS:RECORDS: ELIMINATION:

AFTER:

TRAINING RECORDS

AUDITS RESULTS

REVIEW RESULTS

DEFINITION OF OBJECTIVES & TARGETS

ENVIRONMENTAL PLAN (chronograms)

DEFINITION OF RESPONSIBILITIES

COMMUNICATION LISTS AND RECORDS

LISTS OF DOC. REMOVED, MODIFIED, etc.

LISTS OF WORK INSTRUCTIONS

EMERGENCY PLANS AND RECORDS

LISTS, MAINT. & CALIB. RECORDS

NON-CONFORMANCES RECORDS

REVIEW RESULTS

ENVIRONMENTAL STATEMENTS

ENVIRONMENTAL REVIEW

OBJECTIVES AND TARGETS

ENVIRONMENTAL PROGRAMME

RESPONSIBILITIES

TRAINING

COMMUNICATION

DOCUMENTATION CONTROL

OPERATIONAL CONTROL

PREVENTION AND EMERGENCY PREPAREDNESS

MONITORING AND MEASUREMENT

NON-CONFORMANCES AND CORRECTIVE AND PREVENTIVE ACTIONS

INTERNAL AUDITS

MANAGEMENT REVIEWS

ENVIRONMENTAL STATEMENTS

2 YEARS

3 YEARS

5 YEARS

5 YEARS

5 YEARS

5 YEARS

3 YEARS

3 YEARS

3 YEARS

TO BE DEFINED

TO BE DEFINED

TO BE DEFINED

TO BE DEFINED

TO BE DEFINED

EMAS APPLICATION

Page 69: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

69ETIV - EMAS Technical Implementation and Verification 69

INTERNAL AUDITS (IA)

WHY INTERNAL AUDITS HAVE TO BE PERFORMED?

�TO OBSERVE WHETHER EMS AGREES WITH THE ENVIRONMENTAL PROGRAMME

�TO VERIFY A CORRECT IMPLEMENTATION OF THE SYSTEM

�TO PROVIDE INFORMATION FOR THE MANAGEMENT REVIEW

PROGRAMME – SPECIFIES WHICH ACTIVITIES MUST BE AUDITED

PROCEDURES – SPECIFY THE AUDITS SCOPE AND FREQUENCY, THE MANAGEMENT

RESPONSIBILITIES AND ALSO THE METHODOLOGICAL ISSUES

THE EXECUTION OF AN INTERNAL AUDIT REQUIRES:

XPTO

(CCC)

INTERNAL AUDIT

EACH INTERNAL AUDITSIMULTANEOUSLY ENCOMPASSES

ALL RELEVANT ACTIVITIES

IA IA

AUDIT CYCLE

TIME

1 YEAR

EMAS APPLICATION

Page 70: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

70ETIV - EMAS Technical Implementation and Verification 70

INTERNAL AUDITS

THE PREPARATION OF THE INTERNAL AUDITS REQUIRED AN AUDIT’S PLAN:

Issue Content

Objectives Verification of compliance with EMAS norm and the

environmental objectives and targets

Criteria EMAS requirements

Application areas Production & Quality Control, Warehouse & Offices, Auxil iary Operations, Canteen, Env. Records and EMS documents

Calendar Preparation – two months Inspection – six months

Report preparation and presentation – four months

Functions and responsibilities Specific tasks assigned to the members of the audit’s team

Resources localization Where to find the main documents and devices required for measurements and other inspection activities in the critical

areas

Company’s representatives EMS team members

Report’s issues Audit’s objectives; application areas; company's name; audited processes; client’s identification; audit’s team

identification; dates and places of the audits activities; criteria; audit’s results and conclusions

Logistics The planning of all visits and inspection tasks

Confidential issues List of the company’s areas that must receive special care

regarding divulgation

Future audit’s actions Issues that raised some doubts or problems must be followed in the future

EMAS APPLICATION

Page 71: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

71ETIV - EMAS Technical Implementation and Verification 71

SUMMARY OF THE AUDIT’S RESULTS FOR XPTO

THE PRODUCTION OF COMMON GARBAGE PER TON OF PROCESSED HAKE DID NOT DECREASE

BESIDES THE GLAZING WASTEWATER, THERE ARE OTHER OPERATIONS THAT GENERATE WASTEWATER WHICH MUST BE ANALYZED

THE MAINTENANCE AND CALIBRATION ACTIVITIES ARE NOT CORRECTLY REGISTERED

Error

THE RESPONSIBILITIES STRUCTURE IS UNBALANCED (EXCESSIVE NUMBER OF TASKS ASSIGNED TO EMS COORDINATOR)

ABSENCE OF ADEQUATE ENVIRONMENTAL TRAINING FOR ALL WORKERS

?

EMAS APPLICATION

Page 72: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

72ETIV - EMAS Technical Implementation and Verification 72

SUMMARY OF THE AUDIT’S RESULTS FOR CCC

ABSENCE OF ADEQUATE ENVIRONMENTAL TRAINING FOR ALL WORKERS

?

THE ORGANIC LOAD IN THE WASTEWATER DID NOT DECREASE

COD

BOD5

THE MONITORING OF THE FISH WASTE SEPARATION DOES NOT COMPRISE OTHER PROCESS OPERATIONS BESIDES HEADING

AND EVISCERATING

!!!!!

THE LIST OF MODIFIED DOCUMENTS IS MISSING

LMD?

THE RESPONSIBILITIES STRUCTURE IS UNBALANCED (EXCESSIVE NUMBER OF TASKS ASSIGNED TO EMS COORDINATOR)

EMAS APPLICATION

Page 73: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

73ETIV - EMAS Technical Implementation and Verification 73

VALIDATION AND VERIFICATION OF EMAS BY EXTERNAL ENTITIES

MANAGEMENT REVIEW

DIFFICULTIES:

Time availability

Reaching conclusions

PUBLIC

COMMUNICATION

DIFFICULTIES:

Preparation of an accurate and clear environmental statement

VALIDATION, VERIFICATION

AND RECORDS

DIFFICULTIES:

Finding an independent environmental verifier

Financial costs

Application for registration under EMAS

ORGANIZATION

REGISTERED UNDER EMAS

EMAS APPLICATION

MANAGEMENT REVIEW

DIFFICULTIES:

Time availability

Reaching conclusions

PUBLIC

COMMUNICATION

DIFFICULTIES:

Preparation of an accurate and clear environmental statement

VALIDATION, VERIFICATION

AND RECORDS

DIFFICULTIES:

Finding an independent environmental verifier

Financial costs

Application for registration under EMAS

ORGANIZATION

REGISTERED UNDER EMAS

Page 74: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

74ETIV - EMAS Technical Implementation and Verification 74

MANAGEMENT REVIEW

FURTHERMORE, THE MANAGEMENT REVIEW HAS TO CONSIDER:

POSSIBLE ALTERATIONS OF ENVIRONMENTAL POLICY, OBJECTIVES AND

TARGETS (AS A RESULT OF MODIFIED CIRCUMSTANCES)

A THOROUGH ANALYSIS OF THE INTERNAL AUDIT’S RESULTS

FOR XPTO AND CCC, THE REVIEW IS PERFORMED IN A MEETING THAT IS HELD

EVERY YEAR

THE MANAGEMENT MUST REVIEW THE IMPLEMENTED EMS, THUS, ENSURING

THAT IT REMAINS ADEQUATE, SUFFICIENT AND EFFECTIVE

WHAT IS IT?

ALL DISCUSSED ISSUES ARE RECORDED IN THE REVIEW MINUTES

EMAS APPLICATION

Page 75: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

75ETIV - EMAS Technical Implementation and Verification 75

CONCLUSIONS OF THE FIRST MANAGEMENT REVIEW MADE BY XPTO

ALL GENERATED WASTEWATERS SHOULD BE REGULARLY ANALYZED

COD

BOD5

Jan Feb Mar

Apr May Jun

Jul Aug Sep

Oct Nov Dec

THE COMPANY SHOULD SEARCH FOR NEW CLEAN TECHNOLOGIES (FOR INSTANCE FIXTURES THAT RESTRICT WATER FLOW FOR CLEANING)

A COMPLETE AND DETAILED TRAINING PROGRAMME SHOULD BE DEVELOPED

EMS TEAM MEMBERS SHOULD ENTER EMS COURSES

RESPONSIBILITIES FOR EMS SHOULD BE SPLIT MORE EVENLY AMONG EMS TEAM MEMBERS

EMAS APPLICATION

Page 76: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

76ETIV - EMAS Technical Implementation and Verification 76

CONCLUSIONS OF THE FIRST MANAGEMENT REVIEW MADE BY CCC

THE COMPANY SHOULD SEARCH FOR NEW CLEAN TECHNOLOGIES (FOR INSTANCE FIXTURES THAT RESTRICT WATER FLOW FOR CLEANING)

A COMPLETE AND DETAILED TRAINING PROGRAMME SHOULD BE DEVELOPED

GAS EMISSIONS FROM BOILER SHOULD BE MONITORED ON REGULAR BASIS

7 5 3

EMS TEAM MEMBERS SHOULD ENTER EMS COURSES

RESPONSIBILITIES FOR EMS SHOULD BE SPLIT MORE EVENLY AMONG EMS TEAM MEMBERS

EMAS APPLICATION

Page 77: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

77ETIV - EMAS Technical Implementation and Verification 77

PUBLIC COMMUNICATION

EMAS REQUIRES THE PRESENTATION OF AN ENVIRONMENTAL STATEMENT

SUMMARY OF THE ENVIRONMENTAL STATEMENTS PREPARED BY XPTO AND CCC:

§§§§ Ton of processed hake¶ Ton of processed sardine

XPTO CCC

Company’s description Company’s description

Environmental policy Environmental policy Environmental aspects Environmental aspects

Objectives and targets Objectives and targets

Env. Performance indicators (October 2004): Env. Performance indicators (October 2004):

Water consumption – 3.5 m3/ton§ Water consumption – 4.0 m3/ton¶

Electricity consumption - 790 kWh/ton§ Electricity consumption – 73 kWh/ton

Common garbage production – 0.3 m3/ton§ Fuel oil consumption – 0.05 ton/ton¶

Wastewater discharge – 3.5 m3/ton

§ Fish waste production – 0.4 ton/ton

COD (glazing wastewater) – 400 mg O2/l Wastewater discharge – 4.0 m3/ton

BOD5 (glazing wastewater) – 100 mg O2/l COD (wastewater) – 7700 mg O2/l

Environmental verifier: BOD5 (wastewater) – 3500 mg O2/l

Name - VVV Nitrogen (wastewater) – 200 mg N/l

Accreditation number - ##### Phosphorous (wastewater) - 27 mg P/l

Validation date - ##/##/## Environmental verifier:

Name - VVV

Accreditation number - ##### Validation date - ##/##/##

EMAS APPLICATION

Page 78: ETIV - EMAS Technical Implementation and Verification 1libvolume4.xyz/foodtechnology/bsc/semester5/technologyofdairyand...IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY 1 ETIV

IMPLEMENTATION OF EMAS IN A FISH PROCESSING INDUSTRY

78ETIV - EMAS Technical Implementation and Verification 78

VALIDATION, VERIFICATION AND RECORDS

HOW TO ATTAIN REGISTRATION UNDER EMAS?

SEVERAL STEPS HAD TO BE TAKEN BY XPTO AND CCC:

�COMMISSION AN INDEPENDENT ENVIRONMENTAL VERIFIER (WHICH MUST UNDERTAKE A CAREFUL

EXAMINATION OF THE EMAS IMPLEMENTATION)

�AS XPTO AND CCC FULLY COMPLIED WITH ALL EMAS REQUIREMENTS:

VALIDATION WAS CONFERRED BY THE ENVIRONMENTAL VERIFIER

SUBMISSION TO THE COMPETENT ORGANISM (INSTITUTO DO AMBIENTE) OF THE VALIDATED ENVIRONMENTAL

STATEMENT AND A SPECIFIC FORM DULY FILLED IN

PAYMENT OF A REGISTRATION FEE

�XPTO AND CCC REQUESTED REGISTRATION UNDER EMAS

�AFTER EVALUATION OF REQUEST, THE INSTITUTO DE AMBIENTE GRANTED REGISTRATION

AS A RESULT OF THE REGISTRATION, XPTO AND CCC WERE ALLOWED TO USE THE EMAS LOGOTYPE (VERSION 1)

EMAS APPLICATION