Download - Estimate

Transcript
Page 1: Estimate

COLLEGE CAMPUS INDICATNG PROPOSED CONSTRUCTION IN RED. ESTIMATED COST OF

CONSTRUCTION Rs. 13,34,96,171/-

Page 2: Estimate
Page 3: Estimate
Page 4: Estimate

4

Estimate

S.No. LIST OF WORKS RATE

1. CIVIL WORK Rs. 9,44,28,766 /-

2. ELECTRICAL WORK Rs. 1,30,21,519/-

3. PLUMBING WORK Rs. 1,11,12,576/-

4. FIRE FIGHTING WORK Rs. 1,03,17,505 /-

5. AIR CONDITIONING WORK Rs. 46,15,805/-

TOTAL Rs. 13,34,96,171/-


Top Related