engineering estimate

Upload: detrutami

Post on 05-Jul-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/15/2019 Engineering Estimate

    1/310

    R E K A P I T U L A S I

    D A F T A R K U A N T I T A S D A N H A R G A ( D K

    Proyek : Pembangunan Backacker Lo!geLoka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

    A' PEKERAAN PERSIAPAN

    B' PEKERAAN STRUKTUR

    ' PEKERAAN ARSITEKTUR

    D' PEKERAAN INSTALASI *EKANIKAL !an ELEKTRIKAL

    T&TAL

    T&TAL K&NSTRUKSI FISIK + PPN ,-.

    PE*BULATAN

    Terbilang : Empat Miliar Lima Ratus Delapan Puluh Satu Juta Tujuh Ratus Lima puluh Sembilan Puluh Ribu Rup

  • 8/15/2019 Engineering Estimate

    2/310

  • 8/15/2019 Engineering Estimate

    3/310

    H )

     U*LAH HARGA

    R' /0,%1-2%3-2'4,

    R' ,%5,3%,5,%20/'20

    R' /%254%465%-51'1/

    R' /2,%//5%531'--

    R' 4%131%4--%-/0'/6

    R' 1%-42%64-%-/3'6/

    R' 1%-42%64-%---'--

    iah

  • 8/15/2019 Engineering Estimate

    4/310

  • 8/15/2019 Engineering Estimate

    5/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    ,' Da7$ar Harga Sa$uan Ua8 Tenaga Ker9a :aangan (TKL)

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Upah TKL

    No Uraian Upah1 Tenaga / Pekerja Rp 67,550.00

    2 Tukang Batu Rp 94,500.00

    3 Tukang Kayu Rp 94,500.00

    4 Tukang Besi Rp 94,500.00

    5 Tuang P!itur Rp 94,500.00

    6 "an#!r Rp 105,000.00

    7 "asinis / $perat!r Rp 16,%00.00

    % Kernet Rp 67,550.00

    9 Penye&pr!t Rp 40,000.0010 Penjaga "aa& Rp 94,500.00

    11 Kepaa Tukang Batu Rp 105,000.00

    12 Kepaa Tukang Kayu Rp 105,000.00

    13 Kepaa Tukang Besi Rp 105,000.00

    14 Kepaa Tukang Peitur Rp 105,000.00

    15 Kepaa Tukang 'istrik Rp 110,000.00

    16 Tukang 'istrik Rp 70,000.00

    17 instaat!r Rp 130,000.00

    1% pe&(antu instaat!r Rp 70,000.00

  • 8/15/2019 Engineering Estimate

    6/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan1 )ir &3

    2 )kses!ris jen#ea *ri+ti!n tay 12- set

    3 )&pas (r

    4 )ntena *,10 ee&ent (

    5 )ntena *,10 ee&ent (

    6 Baja Ringan in+au&e &2

    7 Batu Bata "era (

    % B 50 &&2 "1

    9 Be aar& (10 Besi Bet!n kg

    11 Besi iku uk. 40403 && kg

    12 Besi trip kg

    13 B! Pane (

    14 B! pane anger unit

    15 B! Teep!n unit

    16 Buis (et!n 1/2 #ia.30 +& (

    17 at auapr!! kg

    1% at (esi kg19 at #asar kg

    20 at &eni (esi kg

    21 at penutup 2 kai kg

  • 8/15/2019 Engineering Estimate

    7/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan22 at te&(!k setara inie kg

    23 !&p!un# gypsu& kg

    24 u (ar e,japan unit

    25 8!ken Kayu aa& #ia %:10 +&, p; 3& (tg

    26 8!&e a&era P/T/

  • 8/15/2019 Engineering Estimate

    8/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan52 Een#ea nak! p!!s F rangka &2

    53 Ka(e !aia 5:2 &@

    54 Ka(e !aia 7:2 &@

    55 Ka(e *R 0,6/1 K 32,5 &&2 &@

    56 Ka(e *R 0,6/1 K 44 &&2 &@

    57 Ka(e *R 0,6/1 K 46 &&2 &@

    5% Ka(e DT 40,6 &&2 &@

    59 Ka(e GH) 1000 !t 10 && &@

    60 Ka(e GH) 1000 !t 16 && &@61 Ka(e GH) 1000 !t 4 && &@

    62 Ka(e GH) 1000 !t 6 && &@

    63 Ka(e GH) 1000 !t 95 && &@

    64 Ka(e GH) 1000 !t 1,5 && &@

    65 Ka(e GH) 1000 !t 2,5 && &@

    66 Ka(e GH) 1000 !t 201,5 && &@

    67 Ka(e GH) 1000 !t 21,5 && &@

    6% Ka(e GH) 1000 !t 31,5 && &@

    69 Ka(e GH) 1000 !t 61,5 && &@70 Ka(e GH*BH 0,6/1 K 32,5 &&2 &@

    71 Ka(e GH*BH 0,6/1 K 4240 &&2 &@

    72 Ka(e GH" 300/750 !t 32,5 &&2 &@

    73 Ka(e GH" 300/750 !t 34 &&2 &2

    74 Ka(e GHH 0,6/1 K 32,5 &&2 &@

    75 Ka(e GHH 0,6/1 K 416 &&2 &@

    76 Ka(e GHH 0,6/1 K 41%5 &&2 &2

    77 Ka(e GHH 0,6/1 K 42,5 &&2 &@

    7% Ka(e GHH 0,6/1 K 4240 &&2 &@79 Ka(e GHH 0,6/1 K 44 &&2 &@

    %0 Ka(e GHH 0,6/1 K 46 &&2 &@

    %1 Ka(e GHH 0,6/1 K 70 &&2 &@

  • 8/15/2019 Engineering Estimate

    9/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan%2 Kasi(!ar# 4&& F !! &eni ijau &2

    %3 Karpet apisan &2

    %4 Ka>at Bet!n Kg

    %5 Kayu 5/7 4& Kayu Kruing &3

    %6 Kayu Bani! &3

    %7 (tg

    %% Kayu Keas DD &3

    %9 Kayu Keas DDD &3

    90 Kayu &eranti &391 Kayu Papan 3/20 Kruing &3

    92 Kera&ik 2020 (

    93 Kera&ik 2025 (

    94 Kera&ik 3030 (

    95 Keriki &aks 30 &&C &3

    96 K!ra Bet!n &3

    97 Kun+i Tana& (

    9% Kusen )u&uniu& &@

    99 Kusen Besi &@100 K>/1pase 8igita unit

    101 K>/3 pase/63 ) 8igita unit

    102 'a##er T==

  • 8/15/2019 Engineering Estimate

    10/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan112 'a&pu T' 1 20 > (

    113 'a&pu T' 1 40 > (

    114 'a&pu T' Bak 11% >att (

    115 'a&pu T' Bak 11% >att F (atteray (

    116 'a&pu T' Bak 136 >att (

    117 'as 8!! (

    11% 'e& kayu kg

    119 "anua pus (utt!n (

    120 "aster )&piJer (121 "B,1p/6/10/16/25 a&per unit

    122 "B,3P, 300 ) (

    123 "*):10 !ne (

    124 "8*:*) 10 !ne C (

    125 "inyak Bekisting tr

    126 G!k (erpasir p+s

    127 Paku Biasa 2- : 5 - kg

    12% Paku skrup kg

    129 Paku skrup 1+&:2,5+& (130 Pane 8B Penge!a (

    131 Pane 8B nit t 1 (

    132 Pane 8B nit t 2,3,4,5 (

    133 Pane Ke(akaran (

    134 Pane "8P (

    135 Pane P!&pa )ir Bersi (

    136 Pane nit (

    137 Pasang istrik /

  • 8/15/2019 Engineering Estimate

    11/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan142 Pintu 8!u(e tripek apis !r&ika (

    143 Pipa Ba+k tee 1- &@

    144 Pipa Ba+k tee 2 1/2- &@

    145 Pipa ip #ia.100 && &@

    146 Pipa K!n#uit D 2 #ia.32 && &@

    147 Pipa K!n#uit D #ia.20 && &@

    14% Pipa K!n#uit D #ia.32 && &@

    149 Pa&ir kg

    150 Pint Kera&ik uk. 1020 (151 Pint Kera&ik uk. 1030 (

    152 Py>!!# 4 && &3

    153 Py>!!# 9&& &3

    154 P!rtan# e&en kg

    156 Pr!J au&uniu& &@

    157 Pr!J ka+a 6&& (

    15% Re#user

  • 8/15/2019 Engineering Estimate

    12/310

    HARGA SATUAN *ATERIAL DAN UPAH

    TAHUN /-,0

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    /' Da7$ar Harga Sa$uan A:a$ !an Ba8an

    Pro;#n"# Suma$era Bara$ Ta8un /-,0

    Daftar Harga Satuan Material

    No Uraian Satuan173 krup Jer (

    174 &!ke #ete+t!r (

    175 pitter 6 p!rt (

    176 teger >erk 's

    177 t!p K!ntak (

    17% t!p K!ntak:T='=P$G (

    179 t!p K!ntak:T (

    1%0 T #!s P (

    1%1 T==

  • 8/15/2019 Engineering Estimate

    13/310

  • 8/15/2019 Engineering Estimate

    14/310

     Harga SatuanRp 1%,000.00

    Rp 11%,400.00

    Rp 5,700.00

    Rp 67%,720.00

    Rp 7%1,5%9.00

    Rp 157,0%0.00

    Rp %00.00

    Rp 103,717.00

    Rp 116,655.00Rp 10,100.00

    Rp 12,100.00

    Rp 12,100.00

    Rp 1,01%,224.00

    Rp 90,673.00

    Rp 41%,%9%.00

    Rp 75,%00.00

    Rp 39,270.00

    Rp 52,400.00Rp 26,400.00

    Rp 73,900.00

    Rp 21,500.00

  • 8/15/2019 Engineering Estimate

    15/310

     Harga SatuanRp 21,500.00

    Rp 4,300.00

    Rp 520,150.00

    Rp 55,400.00

    Rp 11,443,000.00

    Rp %36,900.00

    Rp 197,%00.00

    Rp 241,350.00

    Rp 10,600.00Rp 16,400.00

    Rp 20,400.00

    Rp 11,135.00

    Rp 107,%79,110.00

    Rp 7%,166.00

    Rp 20,000.00

    Rp 41,400.00

    Rp 450,000.00

    Rp 335,724.00Rp 71,%00.00

    Rp 601,000.00

    Rp 1,211,500.00

    Rp 162,700.00

    Rp 46,%14,000.00

    Rp 67,500.00

    Rp 40,350.00

    Rp 21,300.00

    Rp 76,350.00Rp 21,300.00

    Rp 6,363.00

    Rp 19,616.00

  • 8/15/2019 Engineering Estimate

    16/310

     Harga SatuanRp 132,%00.00

    Rp 10,605.00

    Rp 15,90%.00

    Rp %4,900.00

    Rp 150,750.00

    Rp 200,435.00

    Rp 3,749.00

    Rp 17,900.00

    Rp 27,632.00Rp 7,147.00

    Rp 10,699.00

    Rp 154,%50.00

    Rp 2,%3%.00

    Rp 4,492.00

    Rp 73,093.00

    Rp 5,676.00

    Rp 17,02%.00

    Rp 9,545.00Rp 25,105.00

    Rp 1,2%3,500.00

    Rp 14,254.00

    Rp 19,250.00

    Rp 11,930.00

    Rp %4,%93.00

    Rp 697,522.00

    Rp 23,040.00

    Rp 954,450.00Rp 34,723.00

    Rp 4%,3%4.00

    Rp 101,116.00

  • 8/15/2019 Engineering Estimate

    17/310

     Harga SatuanRp 6%,700.00

    Rp 15,000.00

    Rp 16,400.00

    Rp 7,420,000.00

    Rp 3,946,700.00

    Rp 55,400.00

    Rp 3,03%,500.00

    Rp 1,%9%,100.00

    Rp 2,444,300.00Rp 7,950,000.00

    Rp 6,900.00

    Rp 5,600.00

    Rp 15,600.00

    Rp 232,599.00

    Rp 232,599.00

    Rp 32,000.00

    Rp 13%,305.40

    Rp 2%,300.00Rp 775,000.00

    Rp 1,500,000.00

    Rp 159,075.00

    Rp 123,01%.00

    Rp 227,500.00

    Rp 727,500.00

    Rp 3,591,593.00

    Rp 69,%%7.00

    Rp 17,49%.00Rp 10,075.00

    Rp 326,500.00

    Rp 41,995.00

  • 8/15/2019 Engineering Estimate

    18/310

     Harga SatuanRp 64,160.00

    Rp %7,491.00

    Rp 70,200.00

    Rp %20,200.00

    Rp 101,400.00

    Rp 2,545.00

    Rp 16,%00.00

    Rp 155,000.00

    Rp 46%,741.00Rp 50,395.00

    Rp 3,953,140.00

    Rp 5,670,000.00

    Rp 371,175.00

    Rp 10,%00.00

    Rp 30,%55.00

    Rp 16,700.00

    Rp 17,500.00

    Rp 20,600.00Rp 10,047,600.00

    Rp 13,%61,200.00

    Rp 12,444,000.00

    Rp 5,756,400.00

    Rp 59,233,200.00

    Rp 10,363,200.00

    Rp 499,%00.00

    Rp 60,600.00

    Rp 155,100.00Rp 155,100.00

    Rp 105,200.00

    Rp 57,267.00

  • 8/15/2019 Engineering Estimate

    19/310

     Harga SatuanRp 524,900.00

    Rp 11,000.00

    Rp 2%,%00.00

    Rp 226,1%4.00

    Rp 16,96%.00

    Rp 2,125.00

    Rp 12,120.00

    Rp 16,000.00

    Rp 6,000.00Rp 12,%00.00

    Rp %0,700.00

    Rp 117,%00.00

    Rp 1,226.00

    Rp 110,000.00

    Rp 179,000.00

    Rp 169,569.00

    Rp 109,450.00

    Rp 10,300.00Rp 10,300.00

    Rp 50,10%.00

    Rp 25,000.00

    Rp 36,000.00

    Rp %4,62%.00

    Rp 120,%97.00

    Rp 171,%01.00

    Rp 62,574.00

    Rp 57,217.00Rp %,000.00

    Rp 55,200.00

    Rp 4%,%00.00

  • 8/15/2019 Engineering Estimate

    20/310

     Harga SatuanRp 7,500.00

    Rp 345,000.00

    Rp 124,%36.00

    Rp 550,000.00

    Rp 2%,125.00

    Rp 31,%15.00

    Rp 53,025.00

    Rp 4,666.00

    Rp 220,5%4.00Rp 263,196.00

    Rp 23%,613.00

    Rp 250,350.00

    Rp 17,300.00

    Rp 132,563.00

    Rp 1%%,%14.00

    Rp 247,591.00

    Rp 406,757.00

  • 8/15/2019 Engineering Estimate

    21/310

  • 8/15/2019 Engineering Estimate

    22/310

  • 8/15/2019 Engineering Estimate

    23/310

  • 8/15/2019 Engineering Estimate

    24/310

  • 8/15/2019 Engineering Estimate

    25/310

  • 8/15/2019 Engineering Estimate

    26/310

  • 8/15/2019 Engineering Estimate

    27/310

  • 8/15/2019 Engineering Estimate

    28/310

  • 8/15/2019 Engineering Estimate

    29/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN PERSIAPAN

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    30/310

     

    12,00* 10,0+,*0000

    1-,-0 1),002,00000

    1-,-0 2,311,+0000

    1,)99,*2+ *0,9*,-1**0

    1,322,-*3 23,09,**310

    1,)90,*+ 33,11,)--00

    +++,931 +++,9312*

    292,*00 --,*0000

    20,000,000 20,000,00000

    20,000,000 20,000,00000

    *1*,3*3 2,+*),*2)*)

    R' /0,%1-2%3-2'4,

    HARGA SATUAN( R' )

     U*LAH HARGA( R' )

  • 8/15/2019 Engineering Estimate

    31/310

    ANALISA HARGA SATUAN PE

    PEKERAAN PERSIAPAN

    Proyek :

    Loka"# :

    NO KOEF SAT

    1 1 m2

    A

    0.1 $

    0.05 $

    B

    C

    D

    E

    E

    2 1 m2

    A

    0.1 $

    0.1 $

    0.01 $

    0.005 $

    B

    C

    D

    E

    E

    3 1 m2

    A

    0.1 $

    0.1 $0.01 $

    0.005 $

    B

    0.012 &3

    0.02 kg

    0.007 &3

    C

    D

    E

    E4 1 m2

    A

    2 $

  • 8/15/2019 Engineering Estimate

    32/310

    ANALISA HARGA SATUAN PE

    PEKERAAN PERSIAPAN

    Proyek :

    Loka"# :

    NO KOEF SAT

    2 $

    1 $

    0.3 $

    0.05 $

    B

    1.25 (tg

    0.1% &3

    0.%5 kg

    1.1 kg

    35 kg

    0.15 &3

    0.1 &3

    0.15 &3

    30 (ua

    0.25 &@

    2 (ua0.0% &2

    0.15 (ua

    0.3 (ua

    0.06 (r

    C

    D

    E

    E

    5 1 m2

    A1 $

    2 $

    0.2 $

    0.05 $

    B

    1.7 (tg

    0.21 &3

    0.3 kg

    10.5 kg

    0.03 &30.05 &3

    1.5 (r

    C

  • 8/15/2019 Engineering Estimate

    33/310

    ANALISA HARGA SATUAN PE

    PEKERAAN PERSIAPAN

    Proyek :

    Loka"# :

    NO KOEF SAT

    D

    E

    E

    6 1 m2

    A

    2 $

    2 $

    1 $

    0.3 $

    0.05 $

    B

    1.25 (tg

    0.1% &3

    0.%5 kg

    1.1 kg

    35 kg0.15 &3

    0.1 &3

    0.15 &3

    30 (ua

    0.25 (r

    2 (ua

    0.0% &2

    0.15 (ua

    0.3 (ua

    0.06 (rC

    D

    E

    E

    7 1 m2

    A

    0.2 $

    0.4 $

    0.02 $

    0.02 $B

    1.25 (tg

    2.5 kg

  • 8/15/2019 Engineering Estimate

    34/310

    ANALISA HARGA SATUAN PE

    PEKERAAN PERSIAPAN

    Proyek :

    Loka"# :

    NO KOEF SAT

    1.2 (r

    0.005 &3

    0.009 &3

    0.072 &3

    0.06 kg

    0.45 kg

    C

    D

    E

    E

    3 1 bh

    A

    1 $

    1 $

    0.0175 $

    1 $0.1 $

    B

    0.035 &3

    1 &2

    0.6 kg

    16.% kg

    0.027 &3

    0.0405 &3

    C

    DE

    E

  • 8/15/2019 Engineering Estimate

    35/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Membersihkan Lapangan

    Tenaga

    Pekerja Rp 67,550.00

    "an#!r Rp 105,000.00

    Baan

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

    Pengukuran

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

    Pemasangan Boplank 

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu 5/7 4& Kayu Kruing Rp 7,420,000.00

    Paku Biasa 2- : 5 - Rp 16,700.00

    Kayu Papan 3/20 Kruing Rp 7,950,000.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aanPembuatan Kantor Sementara !engan Lantai Plesteran

    Tenaga

    Pekerja Rp 67,550.00

  • 8/15/2019 Engineering Estimate

    36/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

     Tukang Kayu Rp 94,500.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

     Rp 55,400.00

    Kayu Rp 3,946,700.00

    Paku Biasa 2- : 5 - Rp 16,700.00

    Besi trip Rp 12,100.00

    P!rtan# e&en Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    Pasir Bet!n Rp 155,100.00

    K!ra Bet!n Rp 232,599.00

    Batu Bata "era Rp %00.00

    eng Pat Rp 4%,%00.00

     Een#ea Ga+! Rp 132,%00.00Ka+a P!!s Rp 72,700.00

    Kun+i Tana& Rp 32,000.00

    =ngse Rp 10,600.00

    Py>!!# 4 && Rp %0,700.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

    Pembuatan "u!ang Semen !an Peralatan

    TenagaPekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

     Rp 55,400.00

    Kayu Rp 3,946,700.00

    Paku Biasa 2- : 5 - Rp 16,700.00

    P!rtan# e&en Rp 1,226.00

    Pasir Bet!n Rp 155,100.00K!ra Bet!n Rp 232,599.00

    eng e!&(ang BE' 32 Rp 55,200.00

    Pe!a"a#an

    Kayu 8!ken I % : 10 / 4 &

    Kayu 8!ken I % : 10 / 4 &

  • 8/15/2019 Engineering Estimate

    37/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

    Pembuatan Be!eng Peker#a

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

     Rp 55,400.00

    Kayu Rp 3,946,700.00

    Paku Biasa 2- : 5 - Rp 16,700.00

    Besi trip Rp 12,100.00

    P!rtan# e&en Rp 1,226.00Pasir Pasang Rp 95,500.00

    Pasir Bet!n Rp 155,100.00

    K!ra Bet!n Rp 232,599.00

    Batu Bata "era Rp %00.00

    eng Pat Rp 4%,%00.00

     Een#ea Ga+! Rp 132,%00.00

    Ka+a P!!s Rp 72,700.00

    Kun+i Tana& Rp 32,000.00

    =ngse Rp 10,600.00

    Py>!!# 4 && Rp %0,700.00Pe!a"a#an

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

    Pagar Sementara !ari Seng gelombang Tinggi 2$%% m

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00Baan

     Rp 55,400.00

    P!rtan# e&en Rp 1,226.00

    Kayu 8!ken I % : 10 / 4 &

    Kayu 8!ken I % : 10 / 4 &

  • 8/15/2019 Engineering Estimate

    38/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    eng e!&(ang 3- : 5- Rp 55,200.00

    Pasir (et!n Rp 155,100.00

    K!ra Bet!n Rp 232,599.00

    Kayu 5/7 4& Kayu Kruing Rp 3,946,700.00

    Paku Biasa 2- : 5- Rp 16,700.00

    "eni Besi Rp 73,900.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

    Pembuatan papan nama pro&ek 

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

     Tukang Batu Rp 94,500.00

     Tukang +at Rp 94,500.00"an#!r Rp 105,000.00

    Baan

    Kayu &eranti Rp 2,444,300.00

    Print !ut#!!r Lei Rp 50,000.00

    Paku Rp 16,700.00

    P Rp 1,226.00

    Pasir (et!n Rp 155,100.00

    Keriki (et!n Rp 145,000.00

    Pe!a"a#an

    J$%"a A&B&CO'e!ea(& P!)*+# & C)n#+ngen,- .20

    Ha!ga Sa#$an Pee!aan

  • 8/15/2019 Engineering Estimate

    39/310

     JUAH

    Daftar Harga Satuan Upah Sum

    Rp 12,005.00 G! raian

     Rp 6,755.00 1 Tenaga / Pekerja

     Rp 5,250.00 2 Tukang Batu

    3 Tukang Kayu

    4 Tukang Besi

     Rp 12,005.00 5 Tuang P!itur

    6 "an#!r

     'p 12$%%()%% 7 "asinis / $perat!r

    % Kernet

     Rp 17,7%0.00 9 Penye&pr!t

     Rp 6,755.00 10 Penjaga "aa&

     Rp 9,450.00 11 Kepaa Tukang Batu

     Rp 1,050.00 12 Kepaa Tukang Kayu

     Rp 525.00 13 Kepaa Tukang Besi

    14 Kepaa Tukang Peitur

     Rp 17,7%0.00 Daftar Harga Satuan B

    G! raian

     'p 1*$*+%)%% 1 Kayu 5/7 4& Kayu Kruing

    2 Paku Biasa 2- : 5 -

     Rp 17,7%0.00 3 Kayu Papan 3/20 Kruing

     Rp 6,755.00 4

     Rp 9,450.00 5 Kayu Bani! Rp 1,050.00 6 Besi trip

     Rp 525.00 7 P!rtan# e&en

    % Pasir Pasang

     Rp %9,040.00 9 Pasir Bet!n

     Rp 334.00 10 K!ra Bet!n

     Rp 55,650.00 11 Batu Bata "era

    12 eng Pat

     Rp 17,7%0.00 13 Een#ea Ga+! F rangka

    14 Ka+a P!!s

     'p 1*$*+%)%% 15 Kun+i Tana&16 =ngse

     Rp 455,350.00 17 Py>!!# 4 &&

     Rp 135,100.00 1% eng e!&(ang BE' 32

    Kayu 8!ken I % : 10 / 3 &

  • 8/15/2019 Engineering Estimate

    40/310

     JUAH

    Rp 1%9,000.00 19 "eni Besi

     Rp 94,500.00 20 Kayu &eranti

     Rp 31,500.00 21 Print !ut#!!r Lei

     Rp 5,250.00 22 Keriki (et!n

     Rp 1,244,173.%5

    Rp 69,250.00

    Rp 710,406.00

    Rp 14,195.00

    Rp 13,310.00

    Rp 42,910.00

    Rp 23,265.00

    Rp 15,510.00

    Rp 34,%%9.%5

    Rp 24,000.00

    Rp 12,200.00

    Rp 265,600.00Rp 5,%16.00

    Rp 4,%00.00

    Rp 3,1%0.00

    Rp 4,%42.00

    Rp 1,699,523.%5

    'p 1$,--$(2.)+(

    Rp 2%2,%00.00Rp 67,550.00

    Rp 1%9,000.00

    Rp 21,000.00

    Rp 5,250.00

    Rp 1,039,952.95

    Rp 94,1%0.00

    Rp %2%,%07.00

    Rp 5,010.00

    Rp 12,%73.00

    Rp 4,653.00Rp 11,629.95

    Rp %2,%00.00

  • 8/15/2019 Engineering Estimate

    41/310

     JUAH

    Rp 1,322,752.95

    'p 1$.22$*(2)-(

    Rp 455,350.00

    Rp 135,100.00

    Rp 1%9,000.00

    Rp 94,500.00

    Rp 31,500.00

    Rp 5,250.00

    Rp 1,235,233.%5

    Rp 69,250.00

    Rp 710,406.00

    Rp 14,195.00

    Rp 13,310.00

    Rp 42,910.00Rp 14,325.00

    Rp 15,510.00

    Rp 34,%%9.%5

    Rp 24,000.00

    Rp 12,200.00

    Rp 265,600.00

    Rp 5,%16.00

    Rp 4,%00.00

    Rp 3,1%0.00

    Rp 4,%42.00

    Rp 1,690,5%3.%5

    'p 1$,-%$(+.)+(

    Rp 55,510.00

    Rp 13,510.00

    Rp 37,%00.00

    Rp 2,100.00

    Rp 2,100.00Rp 459,%43.29

    Rp 69,250.00

    Rp 3,065.00

  • 8/15/2019 Engineering Estimate

    42/310

     JUAH

    Rp 66,240.00

    Rp 775.50

    Rp 2,093.39

    Rp 2%4,162.40

    Rp 1,002.00

    Rp 33,255.00

    Rp 515,353.29

    'p (1($.(.)2-

    Rp 67,550.00

    Rp 94,500.00

    Rp 1,653.75

    Rp 94,500.00Rp 10,500.00

    Rp %5,550.50

    Rp 50,000.00

    Rp 10,020.00

    Rp 20,596.%0

    Rp 4,1%7.70

    Rp 5,%72.50

    Rp 444,931.25

    'p ///$-.1)2(

  • 8/15/2019 Engineering Estimate

    43/310

    tera Barat

    pa

     Rp 67,550.00

    Rp 94,500.00

    MMM

     Rp 94,500.00

    MMM

     Rp 105,000.00

    Rp 16,%00.00

    Rp 67,550.00

    Rp 40,000.00

    Rp 94,500.00

    Rp 105,000.00

    MMM

     Rp 105,000.00

    MMM

    han Sumatera Barat

    at arga

    &3 Rp 7,420,000.00

    kg Rp 16,700.00

    &3 Rp 7,950,000.00

    (tg Rp 55,400.00

    &3 Rp 3,946,700.00kg Rp 12,100.00

    kg Rp 1,226.00

    &3 Rp 155,100.00

    &3 Rp 155,100.00

    &3 Rp 232,599.00

    ( Rp %00.00

    &@ Rp 4%,%00.00

    ( Rp 132,%00.00

    &2 Rp 72,700.00

    ( Rp 32,000.00( Rp 10,600.00

    &3 Rp %0,700.00

    (r Rp 55,200.00

  • 8/15/2019 Engineering Estimate

    44/310

    kg Rp 73,900.00

    &3 Rp 2,444,300.00

    &2 Rp 50,000.00

    &3 Rp 145,000.00

  • 8/15/2019 Engineering Estimate

    45/310

  • 8/15/2019 Engineering Estimate

    46/310

  • 8/15/2019 Engineering Estimate

    47/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    48/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    49/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    50/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    51/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    52/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN =

    . Beton K.2*0

    angga   2+*

    ulangan )+1) kg

    m3

    m2

    m3

    m2

    m3

    m2

    m3

    m2

    m3

    m2

    m3

  • 8/15/2019 Engineering Estimate

    53/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN =

    . Beton K.2*0

    Balok BB   023

    ulangan   )+0) kg

    Bekisting   1*)

    Tangga !arura$ >=

    . Beton K.2*0

    angga   +10

    ulangan 1,09+- kg

    Bekisting 1-00

    . Beton K.2*0

    Bordes   2+

    ulangan   +3*1 kg

    Bekisting   1)*2

    . Beton K.2*0

    Balok B   0*1

    ulangan   11322 kg

    Bekisting   )0

    . Beton K.2*0

    m2

    m3

    m2

    m3

    m2

    m3

    m2

    m3

    m2

    m3

    m2

    m3

    m2

  • 8/15/2019 Engineering Estimate

    54/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    55/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN =

    . Beton K.2*0

    angga   +00 m3

    ulangan 1,030)) kg

    Bekisting 1))0 m2

    . Beton K.2*0

    Bordes   2+

    ulangan +3*1 kg

    Bekisting 1)*2

    . Beton K.2*0

    Balok B   01-

    ulangan +910 kg

    Bekisting 203

    m2

    m3

    m2

    m3

    m2

  • 8/15/2019 Engineering Estimate

    56/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN =

    . Beton K.2*0

    Balok BB   01) m3

    ulangan *21) kg

    Bekisting 10 m2

    Balok lubang shat pelat4 1* 2*

    . Beton K.2*0

    Balok lubang shat   0+*

    ulangan balok shat --* kg

    Bekisting lubang shat ))0

    PEKERAAN STRUKTUR LANTAI /

      4 PEKERAAN STRUKTUR LANTAI ATAP

    Kolom KP4 20 204 / bh

    . Beton K.2*0

    Kolom   113

    ulangan   23)0- kg

    Bekisting   22*3

    Balok B*4 20 3*, '/ ariant4 2 bh

    . Beton K.2*0

    Balok 31)

    ulangan 1,2***) kg

    Bekisting +*32

    Pelat lantai (.24 13 6m, atap tangga

    . Beton K.2*0Pelat   -39 m3

    ulangan   3*+ kg

    Bekisting   )1)0 m2

    m3

    m2

    m3

    m

    2

    m3

    m2

  • 8/15/2019 Engineering Estimate

    57/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN sopi.sopi

    . Beton K.2*0

    Kolom, balok dan balok miring sopi.sopi   19* m3

    ulangan   +*11 kg

    Bekisting   393 m2

    PEKERAAN STRUKTUR LANTAI ATAP

    REKAPITULASI

    , PEKERAAN P&NDASI DAN LANTAI DASAR

    / PEKERAAN STRUKTUR LANTAI ,

    2 PEKERAAN STRUKTUR LANTAI /

    4 PEKERAAN STRUKTUR LANTAI ATAP

  • 8/15/2019 Engineering Estimate

    58/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN STRUKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    59/310

     ;p -),31110 ;p 10,3--,1)002

    2*,*)3*0 3+,19*,*23**

    1+-,1-000 -,2*2,*3-)0

    -),31110 *,90*,+0)3

    2*,*)3*0 23,+21,0-+03

    1+-,1-000 3,*-9,1-++0

    -),31110 -+-,31*0-

    2*,*)3*0 1,01,1*19

    1+-,1-000 )*9,321)0

    -),31110 2*9,309

    2*,*)3*0 2,1)3,3**+)

    1*),))0*0 +)3,-1*0

    -),31110 1,13*,)9919

    2*,*)3*0 9,+32,120+91*),))0*0 2,030,3200

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

  • 8/15/2019 Engineering Estimate

    60/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 ++1,))0-9

    2*,*)3*0 3,)-+,3*02

    1*),))0*0 -9,*)92

    -),31110 ),01+,99939

    2*,*)3*0 +9,)2,+)-)

    1*),))0*0 10,-*3,1-)-2

    -),31110 3,+1-,)1329

    2*,*)3*0 2,23,32+

    1*),))0*0 ),109,-*9*0

    -),31110 *,030,02*-1

    2*,*)3*0 3),0)0,-)-++

    1*),))0*0 ,992,312-0

    *3,2-*0 3,++),)3**0

    *3,2-*0 2,30,+1+*0

    *3,2-*0 313,330*0

    *3,2-*0 1,1--,202-

    *3,2-*0 +9-,0391)

    1+-,***00 --9,9019*

  • 8/15/2019 Engineering Estimate

    61/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    1+-,***00 +2),13+

    1+-,***00 -0,9001

    1+-,***00 +-+,3933

    1+-,***00 1)9,3931+

    -),31110 2,31*,-11)

    -),31110 1,2)*,39323

    -),31110 210,*33-+

  • 8/15/2019 Engineering Estimate

    62/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 1,+0,)-009

    -),31110 *03,002*-

    39,02*00 3,1,*+3*

    -),31110 1-,*-,00)-

    39,02*00 ),2)1,9*1*0

    1+-,***00 ,-,3+3*

    0*,20310 3-,1-9,*0*+

    2*,*)3*0 -,32+,)+-+

    +2*,2)9*0 -,31+,)3*+0

    R' 440%04,%1,,'55

    -),31110 201,20103

    2*,*)3*0 1,-3+,+9*+

    311,2)9*0 1,+29,3+9*+

  • 8/15/2019 Engineering Estimate

    63/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 3,9+0,113-

    2*,*)3*0 +*,)**,-9339

    311,2)9*0 22,392,-2-3

    -),31110 2,0)3,1)*

    2*,*)3*0 1-,30,1*010

    311,2)9*0 9,--1,3-21+

    -),31110 +1),+2303

    2*,*)3*0 2,+9,-1**

    320,3*00 +,+29,0022+

    -),31110 2+2,913++

    2*,*)3*0 1,+*-,*+09

    320,3*00 2,*3,*+)+

    -),31110 2,2**,)2+--

    2*,*)3*0 13,*3+,-093

    320,3*00 23,190,-+-+

    -),31110 +,0-+,3203

    2*,*)3*0 1,03-,+922)

    320,3*00 1*,++-,)31)

  • 8/15/2019 Engineering Estimate

    64/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 13+,9*191

    2*,*)3*0 +-,9+-)

    320,3*00 -1-,))2+0

    -),31110 1,*0,-)90+

    2*,*)3*0 11,)29,011*2

    320,3*00 9,+2,22-20

    -),31110 1)0,90-2

    2*,*)3*0 9-0,3)9-

    320,3*00 -1-,))2+0

    -),31110 13,3919)

    2*,*)3*0 +,90,1202*

    320,3*00 +,-23,11*)-

    -),31110 3+,93+,*01)

    2*,*)3*0 120,)0+,21)*3

    +2*,2)9*0 13,03,22-01

    -),31110 2,1+),9)220

    2*,*)3*0 1),+0,1+-*2

  • 8/15/2019 Engineering Estimate

    65/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    291,-+*0 2,9-,-*219

    -),31110 1,0-),*+19

    2*,*)3*0 *,**-,3)29

    291,-+*0 2,39,+2022

    -),31110 )39,-0-10

    2*,*)3*0 3,0-,1*1-

    291,-+*0 2,*)1,**13

    -),31110 201,**1**

    2*,*)3*0 1,)3-,*9-1

    291,-+*0 +**,12-))

    -),31110 3,*92,-**1

    2*,*)3*0 2-,*0,*93+2

    291,-+*0 +,9*9,-2+*0

    -),31110 2,1-1,+991

    2*,*)3*0 11,209,--0)3

    291,-+*0 +,19,)*22

    -),31110 ++),91))

    2*,*)3*0 2,9+,299+-

    291,-+*0 1,--3,30

  • 8/15/2019 Engineering Estimate

    66/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 1+0,209-

    2*,*)3*0 1,333,3921)

    291,-+*0 31*,03

    -),31110 39+,3+000

    2*,*)3*0 2,013,12*)3

    291,-+*0 1,92*,*+010

    -),31110 2,31,-191-

    2*,*)3*0 *,+11,21)

    +2*,2)9*0 9,3--,192+

    -),31110 399,0-20-

    2*,*)3*0 2,*09,9322

    +2*,2)9*0 2,--,-1091

    R' 01,%221%1/3'-4

    -),31110 3,+*,1+2)

    2*,*)3*0 3-,1),1+2*

    311,2)9*0 19,)*3,**)23

    -),31110 1,2*-,*0)+3

  • 8/15/2019 Engineering Estimate

    67/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    2*,*)3*0 13,*1*,)31

    311,2)9*0 -,1+),-+--2

    -),31110 ,))),01*-3

    2*,*)3*0 )-,2++,*112)

    320,3*00 3,+12,**9*

    -),31110 -,)),+231-

    2*,*)3*0 +2,201,9+19*

    320,3*00 29,+1),+)91)

    -),31110 12,+2*,12-+)

    2*,*)3*0 +0,9)-,302)0

    +2*,2)9*0 2-,*)0,)*312

    -),31110 3,*0*,2+++0

    2*,*)3*0 2),3+-,39)-

    291,-+*0 +,+3,02*10

    -),31110 2,1-1,+991

    2*,*)3*0 11,209,--0)3

    291,-+*0 +,19,)*22

    -),31110 1+,9-29

    2*,*)3*0 1,2**,1)-*

    291,-+*0 *92,2+9+)

  • 8/15/2019 Engineering Estimate

    68/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 1+0,209-

    2*,*)3*0 1,333,3921)

    291,-+*0 31*,03

    -),31110 39+,3+000

    2*,*)3*0 2,013,12*)3

    291,-+*0 1,92*,*+010

    R' 4,5%555%461'1,

    -),31110 9-,0-)2

    2*,*)3*0 ),03+,-*+3

    311,2)9*0 -,012,2-930

    -),31110 2,-),02+1

    2*,*)3*0 32,09),*+)23

    320,3*00 1+,*20,1301+

    -),31110 ),+--,)91)*

    2*,*)3*0 21,3*-,13+3

    +2*,2)9*0 2),19),)0120

  • 8/15/2019 Engineering Estimate

    69/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    -),31110 2,0*0,*)-9-

    2*,*)3*0 ),-)0,99)13

    +2*,2)9*0 -,)*+,*100

    -),31110 *,-+1,*9033

    2*,*)3*0 13,21-,1321

    +2*,2)9*0 23,219,-1+-0

    -),31110 1,-0*,9*23

    2*,*)3*0 11,*33,-23*-

    33*,9100 13,01,3-*)9

    R' /-/%4,0%3/5'-4

    R' 440%04,%1,,'55

    R' 01,%221%1/3'-4

    R' 4,5%555%461'1,

    R' /-/%4,0%3/5'-4

  • 8/15/2019 Engineering Estimate

    70/310

    HARGA SATUAN

    ( R' )

     U*LAH HARGA

    ( R' )

    R' ,%5,3%,5,%20/'20

  • 8/15/2019 Engineering Estimate

    71/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    1 1 Kg

    A

    0.07 $

    0.07 $

    0.007 $

    0.004 $

    B

    1.05 Kg

    0.15 Kg

    C

    D

    E

    E

    2 1 &2

    A

    0.52 $0.26 $

    0.026 $

    0.026 $

    B

    0.04 &3

    0.3 Kg

    0.1 tr

    C

    D

    EE

    3 1 &2

    A

    0.52 $

    0.26 $

    0.026 $

    0.026 $

    B

    0.045 &30.3 Kg

    0.1 tr

    C

  • 8/15/2019 Engineering Estimate

    72/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    D

    E

    E

    4 1 &2

    A

    0.66 $

    0.33 $

    0.033 $

    0.033 $

    B

    0.04 &3

    0.4 Kg

    0.2 tr

    0.015 &3

    0.35 '(r

    2 BtgC

    D

    E

    E

    5 1 &2

    A

    0.66 $

    0.33 $

    0.033 $

    0.033 $B

    0.04 &3

    0.4 Kg

    0.2 tr

    0.01% &3

    0.35 '(r

    2 Btg

    C

    D

    E

    E

    6 1 &2

    A

  • 8/15/2019 Engineering Estimate

    73/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.66 $

    0.33 $

    0.033 $

    0.033 $

    B

    0.04 &3

    0.4 Kg

    0.2 tr

    0.015 &3

    0.35 '(r

    6 Btg

    C

    D

    E

    E

    7 1 &2A

    0.66 $

    0.33 $

    0.033 $

    0.033 $

    B

    0.03 &3

    0.4 Kg

    0.2 tr

    0.02 &30.35 '(r

    3 Btg

    C

    D

    E

    E

    1 &2

    A

    0.66 $0.33 $

    0.033 $

    0.033 $

  • 8/15/2019 Engineering Estimate

    74/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    B

    0.03 &3

    0.4 Kg

    0.15 tr

    0.015 &3

    0.35 '(r

    2 Btg

    C

    D

    E

    E

    1 &3

    A

    0.75 $

    0.025 $

    BC

    D

    E

    E

    1 1 &3

    A

    0.3 $

    0.01 $

    B

    1.2 &3C

    D

    E

    E

    11 1 &3

    A

    0.5 $

    0.05 $

    B

    C

    D

    E

    E

  • 8/15/2019 Engineering Estimate

    75/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    12 1 &2

    A

    1.65 $

    0.275 $

    0.02% $

    0.0%3 $

    B

    326 Kg

    760 Kg

    1029 Kg

    215 tr

    C

    D

    E

    E

    13 1 &3A

    1.65 $

    0.275 $

    0.02% $

    0.0%3 $

    B

    371 Kg

    69% Kg

    1047 Kg

    215 trC

    D

    E

    E

    14 1 &2

    A

    1.65 $

    0.275 $

    0.02% $

    0.0%3 $B

    3%4 Kg

    692 Kg

  • 8/15/2019 Engineering Estimate

    76/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    1039 Kg

    215 tr

    C

    D

    E

    E15 1 &2

    A

    2.1 $

    0.35 $

    0.035 $

    0.105 $

    B

    439 Kg

    670 Kg

    1006 Kg215 tr

    C

    D

    E

    E

  • 8/15/2019 Engineering Estimate

    77/310

    ANALISA HARGA SATUAN PE

    PEKERAAN STRUKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.216

  • 8/15/2019 Engineering Estimate

    78/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Pe%8e9+an (g Be9+ P)")9 a#a$ Be9+ U"+! 

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Besi Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Besi Bet!n Rp 10,100.00

    Ka>at Bet!n Rp 16,400.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ P)n(a9+

    Tenaga

    Pekerja Rp 67,550.00 Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00

    Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ S"))* 

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Pe!a"a#an

  • 8/15/2019 Engineering Estimate

    79/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ K)")%

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00

    Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Ba!k Kayu Kas DD Rp 3,03%,500.00

    Py>!!# te(a 9&& Rp 117,%00.00

    8!ken Kayu aa& #ia % : 10 +& / 4 & Rp 2%,500.00Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ Ba")

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00

    Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Ba!k Kayu Kas DD Rp 3,03%,500.00

    Py>!!# te(a 9&& Rp 117,%00.00

    8!ken Kayu aa& #ia % : 10 +& / 4 & Rp 2%,500.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ an#a+

    Tenaga

  • 8/15/2019 Engineering Estimate

    80/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00

    Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Ba!k Kayu Kas DD Rp 3,03%,500.00

    Py>!!# te(a 9&& Rp 117,%00.00

    8!ken Kayu aa& #ia % : 10 +& / 4 & Rp 2%,500.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ D+n(+ngTenaga

    Pekerja Rp 67,550.00

     Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00

    Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Ba!k Kayu Kas DD Rp 3,03%,500.00Py>!!# te(a 9&& Rp 117,%00.00

    8!ken Kayu aa& #ia % : 10 +& / 4 & Rp 2%,500.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    e%a9ang Be+9#+ng Un#$ Tangga

    Tenaga

    Pekerja Rp 67,550.00 Tukang Kayu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

  • 8/15/2019 Engineering Estimate

    81/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Baan

    Kayu Kas DDD terentangC Rp 1,%9%,100.00

    Paku 2@ : 5@ Rp 16,700.00

    "inyak Bekisting Rp 10,%00.00

    Ba!k Kayu Kas DD Rp 3,03%,500.00

    Py>!!# te(a 9&& Rp 117,%00.00

    8!ken Kayu aa& #ia % : 10 +& / 4 & Rp 2%,500.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    engga"+ Tana B+a9a Se(a"a% 1 %e#e! 

    Tenaga

    Pekerja Rp 67,550.00

    "an#!r Rp 105,000.00

    BaanPe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    U!$gan Pa9+! 

    Tenaga

    Pekerja Rp 67,550.00

    "an#!r Rp 105,000.00

    Baan

    Pasir rug Rp 105,200.00Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Peng$!$gan Ke%8a"+

    Tenaga

    Pekerja Rp 67,550.00

    "an#!r Rp 105,000.00

    Baan

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

  • 8/15/2019 Engineering Estimate

    82/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    P!rtan# e&en Rp 1,226.00

    Pasir Bet!n Rp 109.51

    Keriki &aksi&u& 30 &&C Rp 170.14

    )ir Rp 1%.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    P!rtan# e&en Rp 1,226.00

    Pasir Bet!n Rp 109.51

    Keriki &aksi&u& 30 &&C Rp 170.40

    )ir Rp 1%.00Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00Baan

    P!rtan# e&en Rp 1,226.00

    Pasir Bet!n Rp 109.51

    *emb Be$on *u$u 7?c@,4%1 *Pa (K,51)% ":um (,/0/)% c@-%00

    *emb Be$on *u$u 7?c@,6%2*Pa (K//1)% ":um (,/0/)% c@-%13

    *emb Be$on *u$u 7?c@/,%5*Pa (K/1-)% ":um (,/0/)% c@-%10

  • 8/15/2019 Engineering Estimate

    83/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Keriki &aksi&u& 30 &&C Rp 170.14

    )ir Rp 1%.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    P!rtan# e&en Rp 1,226.00

    Pasir Bet!n Rp 109.51

    Keriki &aksi&u& 30 &&C Rp 170.14)ir Rp 1%.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    *emb Be$on *u$u 7?c@2,%/ *Pa (K21-)% ":um (,/0/)% c@-%43

  • 8/15/2019 Engineering Estimate

    84/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

  • 8/15/2019 Engineering Estimate

    85/310

     JUAH

    Daftar Harga Satuan Upah Sumatera Barat

    G! raian pa

     Rp 4,72%.50 1 Tenaga / Pekerja Rp 67,550.00

    Rp 6,615.00 2 Tukang Batu Rp 94,500.00

    Rp 735.00 3 Tukang Kayu Rp 94,500.00

    Rp 420.00 4 Tukang Besi Rp 94,500.00

    5 Tuang P!itur Rp 94,500.00

    Rp 10,605.00 6 "an#!r Rp 105,000.00

    Rp 2,460.00 7 "asinis / $perat!r Rp 16,%00.00

    % Kernet Rp 67,550.00

    Rp 25,563.50 9 Penye&pr!t Rp 40,000.00

    10 Penjaga "aa& Rp 94,500.00

    'p 2($(,.)(% 11 Kepaa Tukang Batu Rp 105,000.00

    12 Kepaa Tukang Kayu Rp 105,000.00

    13 Kepaa Tukang Besi Rp 105,000.00

    Rp 35,126.00 14 Kepaa Tukang Peitur Rp 105,000.00Rp 24,570.00

    Rp 2,730.00

    Rp 2,730.00 Daftar Harga Satuan Bahan Sumatera B

    G! raian at

     Rp 75,924.00 1 P!rtan# e&en kg

     Rp 5,010.00 2 Pasir Bet!n &3

     Rp 1,0%0.00 3 Keriki &aks 30 &&C &3

    4 )ir &3

     Rp 147,170.00 5 Besi Bet!n kg

    6 Ka>at Bet!n Kg 'p 1/*$1*%)%% 7 Kayu Keas DD &3

    % Kayu Keas DDD &3

    9 Paku 2@:5@ kg

     Rp 35,126.00 10 "inyak Bekisting tr

     Rp 24,570.00 11 Py>!!# 9&& &3

     Rp 2,730.00 12 Pasir rug &3

     Rp 2,730.0013 (tg

     Rp %5,414.50Rp 5,010.00

    Rp 1,0%0.00

    8!ken Kayu aa& #ia %:10+&, p; 3&

  • 8/15/2019 Engineering Estimate

    86/310

     JUAH

    Rp 156,660.50

    'p 1(,$,,%)(%

    Rp 44,5%3.00

    Rp 31,1%5.00

    Rp 3,465.00

    Rp 3,465.00

    Rp 75,924.00

    Rp 6,6%0.00

    Rp 2,160.00

    Rp 45,577.50

    Rp 41,230.00

    Rp 57,000.00

    Rp 311,269.50

    'p .11$2,-)(%

    Rp 44,5%3.00

    Rp 31,1%5.00

    Rp 3,465.00

    Rp 3,465.00

    Rp 75,924.00

    Rp 6,6%0.00

    Rp 2,160.00

    Rp 54,693.00

    Rp 41,230.00

    Rp 57,000.00

    Rp 320,3%5.00

    'p .2%$.+()%%

  • 8/15/2019 Engineering Estimate

    87/310

     JUAH

    Rp 44,5%3.00

    Rp 31,1%5.00

    Rp 3,465.00

    Rp 3,465.00

    Rp 75,924.00

    Rp 6,6%0.00

    Rp 2,160.00

    Rp 45,577.50

    Rp 41,230.00

    Rp 171,000.00

    Rp 425,269.50

    'p /2($2,-)(%

    Rp 44,5%3.00

    Rp 31,1%5.00

    Rp 3,465.00

    Rp 3,465.00

    Rp 56,943.00

    Rp 6,6%0.00

    Rp 2,160.00

    Rp 60,770.00Rp 41,230.00

    Rp %5,500.00

    Rp 335,9%1.00

    'p ..($-+1)%%

    Rp 44,5%3.00Rp 31,1%5.00

    Rp 3,465.00

    Rp 3,465.00

  • 8/15/2019 Engineering Estimate

    88/310

     JUAH

    Rp 56,943.00

    Rp 6,6%0.00

    Rp 1,620.00

    Rp 45,577.50

    Rp 41,230.00

    Rp 57,000.00

    Rp 291,74%.50

    'p 2-1$*/+)(%

    Rp 50,662.50

    Rp 2,625.00

    Rp 53,2%7.50

    Rp 53,2%7.50

    Rp 20,265.00

    Rp 1,050.00

    Rp 126,240.00

    Rp 147,555.00

    'p 1/*$((()%%

    Rp 33,775.00

    Rp 5,250.00

    Rp 39,025.00

    'p .-$%2()%%

  • 8/15/2019 Engineering Estimate

    89/310

     JUAH

    Rp 111,457.50

    Rp 25,9%7.50

    Rp 2,940.00

    Rp %,715.00

    Rp 399,676.00

    Rp 75,7%1.%6

    Rp 176,775.24

    Rp 3,%70.00

    Rp %05,203.10

    'p +%($2%.)1%

    Rp 111,457.50

    Rp 25,9%7.50

    Rp 2,940.00

    Rp %,715.00

    Rp 454,%46.00

    Rp 76,437.9%

    Rp 17%,40%.%0

    Rp 3,%70.00

    Rp %62,662.7%

    'p +,2$,,2)*+

    Rp 111,457.50

    Rp 25,9%7.50

    Rp 2,940.00

    Rp %,715.00

    Rp 470,7%4.00

    Rp 75,7%1.%6

  • 8/15/2019 Engineering Estimate

    90/310

     JUAH

    Rp 176,775.24

    Rp 3,%70.00

    Rp %76,311.10

    'p +*,$.11)1%

    Rp 141,%55.00

    Rp 33,075.00

    Rp 3,675.00

    Rp 11,025.00

    Rp 53%,214.00

    Rp 73,372.61

    Rp 171,160.63Rp 3,%70.00

    Rp 976,247.24

    'p -*,$2/*)2/

  • 8/15/2019 Engineering Estimate

    91/310

     JUAH

  • 8/15/2019 Engineering Estimate

    92/310

    arat k!nersi

    arga

     Rp 1,226.00

    Rp 155,100.00 0.4%%6internet Rp 75,7%1.%6

    Rp 232,599.00 0.76internet Rp 176,775.24

    Rp 1%,000.00 0.215 Rp 3,%70.00

    Rp 10,100.00

    Rp 16,400.00Rp 3,03%,500.00

    Rp 1,%9%,100.00

    Rp 16,700.00

    Rp 10,%00.00

    Rp 117,%00.00

    Rp 105,200.00

    Rp 55,400.00

  • 8/15/2019 Engineering Estimate

    93/310

  • 8/15/2019 Engineering Estimate

    94/310

  • 8/15/2019 Engineering Estimate

    95/310

  • 8/15/2019 Engineering Estimate

    96/310

  • 8/15/2019 Engineering Estimate

    97/310

  • 8/15/2019 Engineering Estimate

    98/310

  • 8/15/2019 Engineering Estimate

    99/310

    D A F T A R K U A N T I T A S D A N H A R G A ( D K H )

    PEKERAAN ARSITEKTUR

    Peker9aan > Pembangunan Ru"unaa T#e Pone" / Lan$a#

    Loka"# >

    Sa$uan Ker9a > Penye!#aan Peruma8an Kemen$er#an Peruma8an Rakya$

    Keg#a$an > Penye!#aan Ruma8 Su"un

    Ta8un Anggaran > /-,2

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    100/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    101/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    102/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    103/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    104/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    105/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    106/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    107/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    108/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    109/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    110/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    111/310

    N&' URAIAN PEKERAAN ;uang Bersama 21)0

    Plaond kalsiboard . K?@7 3*

    Pelat bawah tangga dan bordes, angga 5tama   2100

    Pelat bawah tangga dan bordes, angga darurat   2-00

    Pelat bawah atap tangga   *13

    'ist proil plaond g"psum board : .

     Koridor selasar -100 m

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

  • 8/15/2019 Engineering Estimate

    112/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    113/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    114/310

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    115/310

     HARGA SATUAN( R' )

    U*LAH HARGA( R' )

  • 8/15/2019 Engineering Estimate

    116/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

  • 8/15/2019 Engineering Estimate

    117/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

  • 8/15/2019 Engineering Estimate

    118/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

  • 8/15/2019 Engineering Estimate

    119/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    R'

  • 8/15/2019 Engineering Estimate

    120/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

  • 8/15/2019 Engineering Estimate

    121/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    R'

    R'

  • 8/15/2019 Engineering Estimate

    122/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

  • 8/15/2019 Engineering Estimate

    123/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    R'

  • 8/15/2019 Engineering Estimate

    124/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    R'

    R'

    R'

  • 8/15/2019 Engineering Estimate

    125/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

  • 8/15/2019 Engineering Estimate

    126/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    R'

    R'

  • 8/15/2019 Engineering Estimate

    127/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

  • 8/15/2019 Engineering Estimate

    128/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    R'

    R'

  • 8/15/2019 Engineering Estimate

    129/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    R'

    R'

    R'

    R'

    ;p

    ;p

    ;p

    ;p

    ;p

  • 8/15/2019 Engineering Estimate

    130/310

     HARGA SATUAN

    ( R' )

    U*LAH HARGA

    ( R' )

    ;p

    ;p

    R'

  • 8/15/2019 Engineering Estimate

    131/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    132/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    133/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    134/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    135/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    136/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    137/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    138/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    139/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    140/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    141/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    142/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN ;uang Bersama 21)0

    Plaond kalsiboard . K?@7 3*

    Pelat bawah tangga dan bordes, angga 5tama   2100

    Pelat bawah tangga dan bordes, angga darurat   2-00

    Pelat bawah atap tangga   *13

    'ist proil plaond g"psum board : .

     Koridor selasar -100 m

    5nit Aunian   1200 m

    ;uang bersama 10 m

    K?@7   1-00 m

    Lan$a# Dua

    0c LANTAI ATAP

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

  • 8/15/2019 Engineering Estimate

    143/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    144/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    145/310

    DAFTAR KUANTITAS DAN HARGA ( DKH )

    PEKERAAN ARSITEKTUR

    Proyek : Pembangunan Backacker Lo!ge

    Loka"# : Buk#$$#ngg#% Suma$era Bara$

    N&' URAIAN PEKERAAN

  • 8/15/2019 Engineering Estimate

    146/310

      231,1900 29,**0,00)

    219,-1-+0 )),+93,0-)-)

    +3,-+1-0 )99,)-2+

    *),023) 2,3)3,222)0

    10-,+0-20 1-,22-,0+01

    10-,+0-20 -*,3,039)1

    10-,+0-20 1,1*,--*+9

    +,9)2)+ 1,3+,+3111

    +,9)2)+ 1,**-,0119*

    +,9)2)+ 2,+)-,-1-0)

    +,9)2)+ 1,99*,22-*

    +,9)2)+ 3,0)2,123*1

    )++,3*+12 2,++*,1223

    3+0,01)91 *,100,2*3-1

    231,1900 1,*2*,*92

    10-,+0-20 1,+1-,--*0+

    *2,3332) 1+,1*0,)921

    233,**29+ 3),9-1,+30+0

    +9,91-++ 1,921,21++

    293,*33)0 2,+*3,9+090

    HARGA SATUAN( R' )

    U*LAH HARGA (R' )

  • 8/15/2019 Engineering Estimate

    147/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    R' 111%2/1%/42',/

    231,1900 20,-19,319*0

    219,-1-+0 **,)9,-+0+-

    +3,-+1-0 )99,)-2+

    *),023) 2,2-2,329+2

    10-,+0-20 13,*22,*))+

    10-,+0-20 99,**,9**90

    10-,+0-20 1,1*,--*+9

    +,9)2)+ 1,3+,+3111

    +,9)2)+ 1,**-,0119*

    +,9)2)+ 1,+)+,+-2*)

    +,9)2)+ 2,+)-,-1-0)

    +,9)2)+ 2,2+3,-129

    )++,3*+12 2)-,0*2,*)***

    219,-1-+0 +,3*0,+0+*2

    *2,3332) 1*,)*3,1102

    233,**29+ 3),9-1,+30+0

    +9,91-++ 1,921,21++

    293,*33)0 2,+*3,9+090

    R' 12,%2,2%,3-'63

    219,-1-+0 +3,9)*,+*1-+

    10-,+0-20 +),13-,3)3

  • 8/15/2019 Engineering Estimate

    148/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    +,9)2)+ *,1*+,-)-+

    -0),3***- 100,)-,*-**-

    293,*33)0 ,19,*-++

    231,1900 1+,010,1)2+

    10-,+0-20 13,01-,-*2)+

    +,9)2)+ 9+*,9*20

    R' /2/%/36%,,,'01

    R' ***,32*,2+312

    R' *31,313,109

    R' 232,29,111)*

    R' ,%2,3%6/5%121'51

    30+,121*0 1,2+,-2900

    30+,121*0 +,)22,)+)0

    30+,121*0 2,9*2,3))030+,121*0 -1,0,+00)3

    30+,121*0 -,1*2,93-)

    30+,121*0 9,19),)3+1)

  • 8/15/2019 Engineering Estimate

    149/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    30+,121*0 +,+1,*+0

    303,2+990 13,+,*****

    )0-,9*930 19,+*+,)9-)0

    )0-,9*930 1+,*91,02320

    231,02910 1),+2),1)901

    132,-0*0 ),00,1*+0

    132,-0*0 2,-90,20*0

    13,3)00 1,-+),++200

    13,3)00 -0-,-))0

    R' /-/%14,%06,'--

    30+,121*0 +,)22,)+)0

    30+,121*0 2,9*2,3))0

    30+,121*0 -1,0,+00)3

    303,2+990 20,93,9111

    303,2+990

    )0-,9*930 13,131,920

    231,02910 1),+2),1)901

    .

    132,-0*0 -,01*,*)2+0

    +,9)2)+ +13,-3+31

    +,9)2)+ 1,*0)1)

    R' ,0/%522%//1',-

  • 8/15/2019 Engineering Estimate

    150/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    303,2+990 9,31*,3)93

    13,3)00 2,1),29300

    +,9)2)+ 3,0**,2)-+

    +,9)2)+ 2,93-,-*+0

    132,-0*0 ,-0*,)-*1)

    132,-0*0 ,3-0,+1*0

    +,9)2)+ 3,0**,2)-+

    +,9)2)+ 2,93-,-*+0

    3-0,2)1*0 12,+0,-+0*0

    -,)-900 3,+)1,-*9)

    -,)-900 1,33-,*+29

    10,12932 3-,*20,-+0+

    ),2+300 1,)3-,3200

    R' /26%022%100'24

    R' 202,*+1,)9100

    R' 1)2,-33,22*10

    R' 239,)33,*))3+

    R' 0-4%6-3%43/'44

  • 8/15/2019 Engineering Estimate

    151/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    21,99,21292 21,99,21292

    ),1*+,)+*) 12,309,3)911

    1,91,92*00 3,-3,*000

    1,33-,+0)2* 2),-+,12*00

    3,2+*,33+3 ),+90,))-*

    9*-,-+030 1,91*,+0)0

    *,21,9023 *2,1,9022*

    2,20-,2913 +,+1+,*3)*

    R' ,2-%45-%,6/'/3

    1,91,92*00 3,-3,*000

    1,33-,+0)2* 2),-+,12*00

  • 8/15/2019 Engineering Estimate

    152/310

  • 8/15/2019 Engineering Estimate

    153/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    R' /24%2,4%135'20

    2-2,30000 2,-23,00000

    33+,00000 2,00+,00000

    )*1,00000 ),*10,00000

    21+,-)9*0 +,29*,39000

    *2,00000 1,2+,00000

    R' ,0%53-%26-'--

    2-2,30000 2,-23,00000

    33+,00000 2,00+,00000

    )*1,00000 ),*10,00000

    21+,-)9*0 +,29*,39000

    *2,00000 1,2+,00000

    R' ,0%53-%26-'--

    33+,00000 3,3+0,00000

    *2,00000 20,00000

    R' 2%143%---'--

    R' 1),-0,39000

  • 8/15/2019 Engineering Estimate

    154/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    R' 1),-0,39000

    R' 3,*+,00000

    R' 25%,-3%53-'--

    *+,+)*00 32),-9000

    *+,+)*00 9*,*+00

    *+,+)*00 +,0),*3**0

    2*,+*-00 *,0,*)-00

    33,*23-0 1,202,303)

    2),*300 291,9100

    2),*300 339,))+0

    2),*300 1,+,1900

    2),*300 3,39),)+00

    2),*300 +*1,1+)00

    R' ,3%3-,%,,6'/0

  • 8/15/2019 Engineering Estimate

    155/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    *+,+)*00 12,*1,+1*00

    *+,+)*00 1,1-),+++00

    33,*23-0 3,223,303-)

    33,*23-0 1,202,303)

    2),*300 3,39),)+00

    2),*300 +9,91++0

    2),*300 1,+,1900

    2),*300 +*1,1+)00

    R' /4%4,1%,,1'1,

    21-,31990 12,)32,0*-9

    R' ,/%02/%3-1'56

    R' 1,01,1192)

    R' 2+,+1*,11**1

    R' 12,)32,0*-9

    R' 11%346%-4-'11

  • 8/15/2019 Engineering Estimate

    156/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    1,11100 2,90+,2329

    1,11100 30-,-00

    1,11100 *-9,**200

    1,11100 912,-9++0

    1,11100 1,132,))19+

    1,11100 2-1,))*00

    1,11100 2*3,**+00

    1,11100 29,--)00

    1,11100 12,-11,929-9

    1,11100 1,132,))19+

    1,11100 199,9+*++

    .

    *+,+)*00 9*,*+00

    .

    *+,+)*00 12,*1,+1*00

    .

    1+3,09000 *,30,91-*0

    1,11100 1,132,))19+

    2),*300 291,9100

    2),*300 339,))+0

    2),*300 1,+,1900

    2),*300 +*1,1+)00

    R' 44%,05%555'04

  • 8/15/2019 Engineering Estimate

    157/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    1,11100 2,20,1-+90

    1,11100 30-,-00

    1,11100 *-9,**200

    1,11100 3)),-+--*

    1,11100 3)),-+--*

    1,11100 1),--,)2923

    1,11100 2*3,**+00

    1,11100 29,--)00

    1,11100 *9,3319+

    1,11100 199,9+*++

    1,11100 1,-+1,3-2)*

    1,11100 +,13,)+100

    1,11100 391,19-)0

    1,11100 )+9,22)

    1,11100 30,33100

    1,11100 +,99-00

    1,11100 1,0*2,-92+3

    2),*300 1,+,1900

    2),*300 3,39),)+00

    2),*300 +9,91++0

    2),*300 +*1,1+)00

    R' 25%,4-%0//'55

  • 8/15/2019 Engineering Estimate

    158/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    1,11100 +3,)103

    1,11100 1,-02,9--33

    1,11100 1,**1,-*0+

    1,11100 12),---00

    R' 4%//1%,,1',6

    R' ++,1)-,---)+

    R' 3-,1+0,)22--

    R' +,22*,11*19

    R' 31%122%1,1'0-

    )2,))2- 13,1)+,23+02

    2*,*)3*0 2,0+*,0000

    -0,91000 1,)23,12990

    2+,10)0 3)-,)9--

    21-,31990 1,--,)+39+

    21-,31990 1,*21,23930

  • 8/15/2019 Engineering Estimate

    159/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

    21-,31990 1,*21,23930

    +,0290- 3,90+,232*+

    1+9,203)* 9,2*0,)2)30

    2),)+-* 2,*-9,3-*

    R' 25%311%,22'3,

    R' ,%2,3%6/5%121'51

    R' 0-4%6-3%43/'44

    R' /24%2,4%135'20

    R' 25%,-3%53-'--

    R' 11%346%-4-'11

    R' 31%122%1,1'0-

    R' 25%311%,22'3,

    R' /%254%465%-51'1/

  • 8/15/2019 Engineering Estimate

    160/310

     HARGA SATUAN( R' )

    U*LAH HARGA (R' )

  • 8/15/2019 Engineering Estimate

    161/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    1 1.000 &2

    A

    0.600 $

    0.200 $

    0.020 $

    0.030 $

    B

    140.000 Bua

    32.950 Kg

    0.091 &3

    C

    D

    E

    E

    2 1.000 &2

    A0.600 $

    0.200 $

    0.020 $

    0.030 $

    B

    140.000 Bua

    22.200 Kg

    0.102 &3

    C

    DE

    E

    3 1.000 &2

    A

    0.600 $

    0.200 $

    0.020 $

    0.030 $

    B

    22.200 Kg0.100 &3

    C

    D

  • 8/15/2019 Engineering Estimate

    162/310

  • 8/15/2019 Engineering Estimate

    163/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    E

    E

    7 1.000 (

    A

    0.300 $

    0.100 $0.010 $

    0.015 $

    B

    26.500 (

    0.256 Kg

    0.035 &3

    C

    D

    E

    E 1.000 &3

    A

    0.100 $

    0.330 $

    0.033 $

    0.033 $

    0.010 $

    0.005 $

    B

    0.003 m30.200 kg

    3.600 kg

    0.050 kg

    326.000 kg

    0.317 &3

    0.429 &3

    215.000 tr

    C

    D

    E

    E

    1.000 &2

    A

  • 8/15/2019 Engineering Estimate

    164/310

  • 8/15/2019 Engineering Estimate

    165/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    12 1.000 &2

    A

    1.670 $

    1.670 $

    0.167 $

    0.0%3 $

    B

    4.240 &@

    1.060 &@

    1.0%1 &2

    C

    D

    E

    E

    13 1.000 &2

    A0.090 $

    0.090 $

    0.009 $

    0.005 $

    B

    5.300 Bua

    1.140 kg

    0.003 &3

    0.025 kg

    CD

    E

    E

    14 1.000 &2

    A

    0.900 $

    0.450 $

    0.045 $

    0.045 $

    B

    21.200 Bua

    1.140 kg

    0.003 &3

  • 8/15/2019 Engineering Estimate

    166/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.025 kg

    C

    D

    E

    E

    15 1.000 &2A

    0.900 $

    0.450 $

    0.045 $

    0.045 $

    B

    26.500 Bua

    9.300 kg

    0.01% &3

    1.940 kgC

    D

    E

    E

    16 1.000 &2

    A

    0.700 $

    0.350 $

    0.035 $

    0.035 $B

    11.%70 Bua

    10.000 kg

    0.045 &3

    1.500 kg

    C

    D

    E

    E

    17 1.000 &2

    A

    0.700 $

    0.350 $

  • 8/15/2019 Engineering Estimate

    167/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.035 $

    0.035 $

    B

    26.500 Bua

    10.400 kg

    0.045 &3

    1.620 kg

    C

    D

    E

    E

    1 1.000 &2

    A

    1.050 $

    0.525 $

    0.053 $0.053 $

    B

    33.000 Bua

    9.%00 kg

    0.045 &3

    4.375 kg

    C

    D

    E

    E1 1.000 &2

    A

    0.900 $

    0.450 $

    0.045 $

    0.045 $

    B

    2.650 kg

    9.300 kg

    0.01% &3C

    D

    E

  • 8/15/2019 Engineering Estimate

    168/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    E

    2 1.000 &2

    A

    0.100 $

    0.200 $

    0.020 $0.010 $

    B

    2.650 kg

    C

    D

    E

    E

    21 1.000 &2

    A

    0.120 $0.120 $

    0.012 $

    0.006 $

    B

    5.000 kg

    C

    D

    E

    E

    22 1.000 &2A

    0.300 $

    0.150 $

    0.015 $

    0.015 $

    B

    6.240 Kg

    0.024 &3

    C

    D

    E

    E

    23 1.000 &2

  • 8/15/2019 Engineering Estimate

    169/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    A

    0.100 $

    0.050 $

    0.050 $

    0.050 $

    B

    0.450 (r

    0.010 kg

    C

    D

    E

    E

    24 1.000 &2

    A

    0.030 $

    0.070 $0.007 $

    0.002 $

    B

    0.346 &2

    0.010 kg

    C

    D

    E

    E

    25 1.000 &2A

    0.350 $

    0.350 $

    0.035 $

    0.01% $

    B

    140.000 (ua

    22.200 kg

    0.102 &3

    C

    D

    E

    E

  • 8/15/2019 Engineering Estimate

    170/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    26 1.000 &@

    A

    0.060 $

    0.060 $

    0.006 $

    0.003 $

    B

    1.050 &@

    0.150 kg

    C

    D

    E

    E

    27 1.000 &2

    A

    0.020 $0.063 $

    0.006 $

    0.003 $

    B

    0.100 kg

    0.100 kg

    0.260 kg

    C

    D

    E

    E

    2 1.000 &2

    A

    0.020 $

    0.063 $

    0.006 $

    0.003 $

    B

    0.100 kg

    0.100 kg0.260 kg

    C

    D

  • 8/15/2019 Engineering Estimate

    171/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    E

    E

    2 1.000 kg

    A

    0.060 $

    0.060 $0.006 $

    0.003 $

    B

    1.150 Kg

    C

    D

    E

    E

    3 1.000 &2

    A1.000 $

    0.032 $

    B

    C

    D

    E

    E

    31 1.000 &2

    A

    0.300 $0.010 $

    B

    0.01% &3

    C

    D

    E

    E

    32 1.000 &2

    A

    0.130 $

    0.200 $

    0.020 $

    0.010 $

  • 8/15/2019 Engineering Estimate

    172/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    B

    0.130 kg

    0.110 kg

    0.100 (

    0.670 's

    0.330 (r

    C

    D

    E

    E

    33 1.000 &2

    A

    0.400 $

    0.700 $

    0.200 $

    0.200 $B

    0.300 kg

    C

    D

    E

    E

    34 1.000 &2

    A

    1.050 $

    1.050 $0.105 $

    0.005 $

    B

    1.100 &2

    1.050 &2

    C

    D

    E

    E

    35 1.000 &2

    A

    0.200 $

    0.100 $

  • 8/15/2019 Engineering Estimate

    173/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.010 $

    0.010 $

    B

    1.020 (r

    0.200 kg

    C

    D

    E

    E

    36 1.000 &@

    A

    0.250 $

    0.150 $

    0.015 $

    0.013 $

    B1.100 (r

    0.050 kg

    C

    D

    E

    E

    37 1.000 &@

    A

    0.150 $

    0.250 $0.025 $

    0.075 $

    B

    0.011 &3

    0.050 kg

    0.009 &2

    C

    D

    E

    E

    3 1 &@

    A

    0.235 $

  • 8/15/2019 Engineering Estimate

    174/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.776 $

    0.07% $

    0.07% $

    0.025 $

    0.013 $

    B

    326.000 Kg

    0.317 Kg

    0.429 Kg

    215.000 tr

    0.03% &3

    0.043 kg

    21.600 kg

    0.011 kg

    C

    DE

    E

    3 1.000 (ua

    A

    2.610 $

    0.720 $

    0.100 $

    0.072 $

    0.10% $

    B0.371 (

    4.%50 kg

    114.000 kg

    0.120 &3

    0.033 &3

    C

    D

    E

    E

    4 1.000 &@A

    0.075 $

    0.050 $

  • 8/15/2019 Engineering Estimate

    175/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    0.010 $

    0.005 $

    0.10% $

    B

    1.000 (

    1%.900 (

    3.920 kg

    0.024 &3

    0.056 &3

    C

    D

    E

    E

    41 1.000 &2

    A

    0.400 $0.200 $

    0.500 $

    0.020 $

    0.020 $

    B

    10.36% kg

    6.320 kg

    C

    D

    EE

    42 1.000 &@

    A

    0.043 $

    0.043 $

    0.004 $

    0.002 $

    B

    1.100 &@

    1.000 (0.060 (t

    C

    D

  • 8/15/2019 Engineering Estimate

    176/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    E

    E

    43 1.000 &2

    A

    0.0%5 $

    0.0%5 $0.009 $

    0.005 $

    B

    4.400 &@

    4.500 (

    0.270 (t

    C

    D

    E

    E44 1.000 &2

    A

    0.0%5 $

    0.0%5 $

    0.009 $

    0.005 $

    B

    1.100 &2

    10.000 (

    7.000 &@C

    D

    E

    E

    45 1.000 unit

    A

    2.000 $

    1.500 $

    0.150 $

    0.075 $

    B

    32.050 &@

    10.030 &@

  • 8/15/2019 Engineering Estimate

    177/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    2.000 set

    1.000 set

    6.000 p+s

    5.000 set

    17.000 set

    C

    D

    E

    E

    46 1.000 unit

    A

    1.500 $

    1.000 $

    0.100 $

    0.050 $

    B6.500 &@

    3.760 &2

    2.000 set

    1.000 set

    1.000 p+s

    3.000 set

    C

    D

    E

    E

    47 1.000 unit

    A

    1.500 $

    1.000 $

    0.100 $

    0.100 $

    0.050 $

    B

    5.200 &@

    1.000 (1.000 set

    1.000 p+s

    2.000 set

  • 8/15/2019 Engineering Estimate

    178/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    C

    D

    E

    E

    4 1.000 unit

    A1.125 $

    0.750 $

    0.075 $

    0.075 $

    0.03% $

    B

    4.775 &@

    1.000 (

    1.000 set

    2.000 setC

    D

    E

    E

    4 1.000 unit

    A

    1.500 $

    1.000 $

    0.100 $

    0.100 $0.050 $

    B

    6.125 &@

    2.000 (

    1.000 set

    1.000 p+s

    4.000 set

    C

    D

    E

    E

    5 1.000 unit

    A

  • 8/15/2019 Engineering Estimate

    179/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    1.500 $

    1.000 $

    0.100 $

    0.100 $

    0.050 $

    B

    5.275 &@

    6.%40 &@

    2.%20 &2

    1.000 p+s

    2.000 set

    2.%20 &2

    C

    D

    E

    E51 1.000 unit

    A

    2.250 $

    1.500 $

    0.150 $

    0.075 $

    B

    5.375 &@

    17.400 &@

    1.000 p+s2.000 set

    1.100 &2

    C

    D

    E

    E

    52 1.000 unit

    A

    1.500 $

    1.000 $0.100 $

    0.050 $

    B

  • 8/15/2019 Engineering Estimate

    180/310

    ANALISA HARGA SATUAN PE

    PEKERAAN ARSITEKTUR

    Proyek :

    Loka"# :

    NO KOEF SAT

    14.%00 &@

    2.700 &2

    2.000 set

    3.000 set

    6.000 set

    C

    D

    E

    E

    53 1.000 unit

    A

    1.500 $

    1.000 $

    0.100 $

    0.050 $

    B4.300 &@

    0.900 &2

    1.000 set

    2.000 set

    C

    D

    E

    E

  • 8/15/2019 Engineering Estimate

    181/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Pa"angan D#n!#ng Ba$a ,>2

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Bata "era Rp %00.00

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Pa"angan D#n!#ng Ba$a ,>1

    TenagaPekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Bata "era Rp %00.00

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    Pe!a"a#an

    J$%"a A&B&CO'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    P:e"$eran C Ac#an

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    P!rtan# e&ent Rp 1,226.00Pasir Pasang Rp 155,100.00

    Pe!a"a#an

    J$%"a A&B&C

  • 8/15/2019 Engineering Estimate

    182/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Ac#an

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    P!rtan# e&ent Rp 1,226.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    P:e"$eran (,>4)

    TenagaPekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Pa"ang D#n!#ng Ro"$er uk'/-/- cm

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    R!ster pra+etak uk.20 20 +& Rp 10,300.00

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    Pe!a"a#an

    J$%"a A&B&C

  • 8/15/2019 Engineering Estimate

    183/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    Pa"ang G:a"" B:ock uk' /-/-,-

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    ass (!+k Rp 20,000.00

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aanBa:ok !an Ko:om Prak$#" K,51

    Tenaga

    Pekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

     Tukang Kayu Rp 94,500.00

     Tukang Besi Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kayu Kelas III  Rp 1,%9%,100.00Paku 2'-5'  Rp 16,700.00

    Besi Beton  Rp 10,100.00

    Kawat Beton  Rp 16,400.00

    P!rtan# e&ent Rp 1,226.00

    Pasir (et!n Rp 155,100.00

    Keriki Rp 232,599.00

    )ir Rp 1%.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    a$ *en# Be"#

    Tenaga

  • 8/15/2019 Engineering Estimate

    184/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Pekerja Rp 67,550.00

     Tukang at Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    "eni Besi Rp 73,900.00

    Pe!a"a#an

    Kuas  Rp 14,200.00

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    a$ Be"#

    Tenaga

    Pekerja Rp 67,550.00

     Tukang at Rp 94,500.00

    Kepaa Tukang Rp 105,000.00"an#!r Rp 105,000.00

    Baan

    at Besi Rp 52,200.00

     Tinner Rp 17,300.00

    Pe!a"a#an

    Kuas  Rp 14,200.00

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

     Peker9aan Ra#::#ng Tangga P#a B:ack S$ee:Tenaga

    Pekerja Rp 67,550.00

     Tukang 'as Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Pipa Ba+k tee 2 1/2- Rp 2%,%00.00

    Pipa Ba+k tee 1- Rp 11,000.00

    *inis at Rp 32,223.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

  • 8/15/2019 Engineering Estimate

    185/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Peker9aan Tra:#" Be"# Rangka Ho:o 7#n#"8 ca$ an$#=koro"#

    Tenaga

    Pekerja Rp 67,550.00

     Tukang 'as Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Besi !! 36 +& Rp 40,350.00

    Besi !! 510 +& Rp 76,350.00

    at "eni Besi Rp 30,933.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

     Pa"ang :#n$ keram#k bor!er ukuran ,-/-

    TenagaPekerja Rp 67,550.00

     Tukang Batu Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Pint Kera&ik uk.10 20 +& Rp 6,000.00

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    e&en

  • 8/15/2019 Engineering Estimate

    186/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    e&en

  • 8/15/2019 Engineering Estimate

    187/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Kepaa Tukang Rp 105,000.00

    "an#!r Rp 105,000.00

    Baan

    Kera&ik uk. 20 20 +& Rp 6,900.00

    P!rtan# e&ent Rp 1,226.00

    Pasir Pasang Rp 155,100.00

    e&en

  • 8/15/2019 Engineering Estimate

    188/310

    ERAAN ( AHSP )

    Pembangunan Backacker Lo!ge

    Buk#$$#ngg#% Suma$era Bara$

    URAIAN PEKERJAAN HARGA BAHAN / UPAH

    Ha!ga Sa#$an Pee!aan

     a$erroo7#ng bak bunga C anoy

    Tenaga

    Pekerja Rp 67,550.00

     Tukang at Rp 94,500.00

    Kepaa Tukang Rp 105,000.00"an#!r Rp 105,000.00

    Baan

    )uapr!! Rp 39,270.00

    Pe!a"a#an

    J$%"a A&B&C

    O'e!ea( : P!)*+# .10

    Ha!ga Sa#$an Pee!aan

    F:oor Har!ener

    Tenaga

    Pekerja Rp 67,550.00 Tukang Rp 94,500.00

    Kepaa Tukang Rp 105,000.00

    "a