Consultants Architects Symbols & Materials 87 Summer Street Boston, MA 02110 (617) 426-2858 FAX (617) 426-1457 List of Drawings Division of Work Abbreviations General Abbreviations a r c h i t e c t s a n d p l a n n e r s Thompson Engineering Co., Inc. Electrical Engineers Richard D. Kimball Co., Inc. Mechanical Engineers CONCRETE CONCRETE MASONRY UNIT 1 CONCRETE 3.7.1 FINISHED WOOD BATT INSULATION COMPRESSIBLE FILLER/ RIGID INSULATION WOOD END GRAIN COLUMN LINES WOOD BLOCKING WOOD SHIM PLAN DETAIL 14 BRICK BITUMINOUS CONCRETE GYPSUM BOARD EARTH COMPACTED GRAVEL SEALANT STEEL CONTINUOUS 7 FRAME TYPES 1 3.1.5 121.1 DOOR NUMBERS WALL SECTION BUILDING SECTION EXTERIOR ELEVATION DETAIL SECTION 1/3.4.1 1 3.6.2 1/3.5.1 1 N 103.0'± 2 102 PARTITION TYPES ELEVATION CONTRACT LIMIT LINE 102 C WINDOW TYPES (127) PROJECT NORTH 6 5 (127) ROOM NUMBER INTERIOR ELEVATION KEY IN GLAZING TYPES 6 LOUVER TYPES EXISTING CONTOUR FINISH CONTOUR 3 4 DiNisco Design Partnership Limited Foley Buhl Roberts & Assoc., Inc. Structural Engineering AKAL Engineering Plumbing Engineers Schofield Bros of New England Civil Engineers Brown Sardina, Inc. Landscape Architects Crabtree McGrath Assoc., Inc. Food Service Consultants 44 Central Street, Unit 4 Berlin, MA 01503 (508) 869-0403 FAX (508) 869-2891 200 Brickstone Square Andover, MA 01810-1488 (978) 475-0298 FAX (978) 475-5768 2150 Washington Street Newton, MA 02462 (617) 527-9600 FAX (617) 527-9606 10 CIty Square Boston, MA 02129 (617) 227-6818 FAX (617) 886-9090 129 South Street Boston, MA 02111 (617) 482-4703 FAX (617) 482-4882 1071 Worcester Road Framingham, MA 01701 (508) 879-0030 FAX (508) 879-1797 Location Plan DOUGLAS ELEMENTARY SCHOOL DOUGLAS ELEMENTARY SCHOOL Douglas, MA 90% Construction Document Set 14 October 2011 STD Standard VERT Block GL STL Steel BLK MTL Metal MS Machine Screw MT Marble Tile MO Masonry Opening MISC Miscellaneous MH Manhole MIN Minimum AFF Above Finish Floor ALT Alternate ALUM Aluminium AP STLP Steel Liner Panel STRUCT Structure SUSP Suspended Plastic Laminate STR Stair SYS System PLAM QT Quarry Tile J JT Jamb Joint KO KP INT INSUL HP HDWD Access Panel ATC Acoustical Tile Ceiling GL CMU GT PVF Polyvinyl Flouride PVC Polyvinyl Chloride PTN Partition FLR DR Glass Glazed Concrete Masonry Unit Granite Tile GYP Gypsum Ground Face CMU GF CMU BLDG Building NTS Not To Scale NIC Not In Contract NO Number OPG Opening OPP Opposite OHRG Overhead Rolling Grill OHRD Overhead Rolling Door OHFD Overhead Folding Door OC On Center OD Outside Diameter MFR Manufacturer MECH Mechanical MB Marker Board < LP HD HDW Angle [ Channel ø Diameter ADJ Adjustable MAX Maximum PTD Painted PSI Pounds per Square Inch PT Pressure Treated PSF Pounds per Square Foot PREFIN Prefinished PREFAB Prefabricated PNL Panel PR Pair PM Pressed Metal PLY WD Plywood PL or P Plate PLAS Plaster L PCF Premolded Compressible Filler Z Zee RO RCB Resilient Cove Base Rough Opening RCP RM Room RNS Rubber Nailing Strip RD Roof Drain REINF Reinforcing REQʼD Required RHMS Round Head Machine Screw RES Resinous Flooring R Riser RAD Radius Vertical TB Tackboard T Tread TERR Terrazzo T & G Tongue and Groove TO Top of TYP Typical Transparent Dye Finish TDF UCD Undercut Door VAP BAR UON Unless Otherwise Noted USS Underside of Structure UV Unit Ventilator Vapor Barrier VCP Vitrous Clay Pipe W/O Without WWF WWM Welded Wire Mesh WMP Wire Mesh Partition WO Window Opening WD Wood With W/ VSF Vinyl Sheet Flooring VTR Vent Through Roof VWC Vinyl Wall Covering VCT Vinyl Composition Tile VIF Verify In Field LCC LOC Knock Out CONT Continuous CRD Cementitious Roof Deck CT Ceramic Tile CU FT Cubic Foot Cabinet Unit Heater CB Catch Basin / Chalkboard CBB Cementitious Backer Board CJ Control Joint CL or C Center Line L CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column COMP Compressible CONC Concrete CPT Carpet C Course(s) BM Bench Mark BRK Brick DF Drinking Fountain DIM Dimension DN Down DO Door Opening Hardwood Door EXIST'G Detail EJ Expansion Joint EL Elevation (Vertical Height) ELEV Elevation (View) EQ Equal EQUIP Equipment ETBR Existing to be Removed ETR Existing to Remain Drawing Existing EXP Exposed EXT Exterior EA Each FE Fire Extinguisher FF Finish Floor FH Fire Hose FHC Fire Hose Cabinet FIB WD Fibrous Wood FIN Finish DWG Floor FL HD Flat Head FL HD MS Flat Head Machine Screw FP Fire Protection FR Fire Rated FTR Finned Tube Radiation FURN FWP Fabric Covered Acoustical WD Panel FD Floor Drain GALV GC GA ID Head Hardware HVC HM SECT INCL INV Interior Kickplate Furnish, Furnished Low Point Lead Coated Copper Limit Of Contract Galvanize General Contractor Gauge Invert Insulation High Point / Handicapped Hose Valve Cabinet Inside Diameter Include Section Fibrous Wood Panel CU YD Cubic Yard CUH FAP Fibrous Acoustical Panels FCP DTL CVR Cover Hollow Metal GWB GWF Gypsum Wallboard Glazed Wall Finish (Epoxy) SSF SPEC SFTU SHT SF CMU SP SF Seamless Flooring Structural Facing Tile Unit Sheet SIM Similar Station Point Specification Straight Resilient Base SRB Synthetic Sports Flooring Stainless Steel SS Welded Wire Fabric Split Face CMU BSMT Basement DEMO Demolition KIT Kitchen MAR Marble PTT Precast Terrazzo Tile SCI Science BOT Bottom of NGMB Non Glare Markerboard Reflected Ceiling Plan TS Structural Tubing H High W Wide Roof Top Unit RTU MTD Mounted L Low IGU Insulated Glazing Unit LGMF Ligt Gauge Metal Framing TGU Translucent Glazing Unit PJ Panel Joint OPJ Optional Panel Joint 161 West Main Street Georgetown, MA 01833 (978) 352-8500 FAX: (978) 352-8588 168 Main Street, Suite 3, Unit 2 Northfield, MA 01360 (413) 498-0069 FAX: (413) 498-4386 3Si Inc. Technology Consultants 14 October 2011 90% Construction Document Set DIVISION 01 - GENERAL REQUIREMENTS 011000-SUMMARY (Summary of Work) 012200-UNIT PRICE (Unit Prices) 012300-ALTERNATES (Alternates) 015000-TEMP FAC (Temporary Facilities and Controls) DIVISION 02 - EXISTING CONDITIONS 023000-SUBSURFACE EXPLORE (Subsurface Exploration Data) 024100-DEMO (Demolition) 024180-ASB ABATEMENT (Asbestos Abatement) DIVISION 03 - CONCRETE 033000-CAST CONC (Cast-In-Place Concrete) DIVISION 04 - MASONRY 040001-MASONRY (*Masonry Work) DIVISION 05 - METALS 050001-MISC & ORN IRON (*Miscellaneous and Ornamental Iron) 051200-STRCT STL (Structural Steel Framing) 053100-MTL DECK (Metal Decking) 055000-MISC MTL (Miscellaneous Metals (Part of 050001)) DIVISION 06 - WOOD, PLASTICS AND COMPOSITES 061000-RGH CARP (Rough Carpentry) 062000-FIN CART (Finish Carpentry) DIVISION 07 - THERMAL AND MOISTURE PROTECTION 070001-WD&C (*Waterproofing, Dampproofing and Caulking) 070002-ROOF & FLSHG (*Roofing and Flashing) 071326-A&VB (Air and Vapor Barrier) 072100-INSUL (Insulation) 074213-PREFORM CLAD (Preformed Cladding) 077200-ROOF ACC (Roof Accessories) 079500-EXP CONTROL (Expansion Control) DIVISION 08 - OPENINGS 080001-MTL WINDOWS (*Metal Windows) 080002-GLASS/GLAZING (*Glass and Glazing) 081113-HOLLOW MTL (Hollow Metal Doors and Frames) 081416-WD / PLAS DRS (Wood & Plastic Doors) 083323-SPEC DRS (Special Doors) 087100-FIN HRDWR (Finish Hardware) DIVISION 09 - FINISHES 090002-TILE (*Tile) 090003-ACOUST TILE (*Acoustical Tile) 090005-RES FLR (*Resilient Flooring) 090007-PAINT (*Painting) 092116-GWB (Gypsum Board) 096466-WD & ATHL FLR (Wood and Athletic Flooring) 096816-CARPET (Carpeting) 097700-FIBERGLASS WALL PNL (Fiberglass Reinforced Plastic Wall Panels) 098400-ACOUST WALL TRTMNT (Acoustical Wall Treatment) DIVISION 10 - SPECIALTIES 101100-MB & TB (Markerboards and Tackboards) 101400-IDENT DEV (Identifying Devices) 102113-COMPRT & CUBICLES (Compartments and Cubicles) 102600-PREFAB SPECS (Prefabricated Specialties) 102813-TOILET/BATH ACC (Toilet and Bath Accessories) DIVISION 11 - EQUIPMENT 113100-APPL & UNIT KTCHN (Appliances and Unit Kitchens) 114000-FOOD SRVC (Food Service Equipment) 115213-PROJ SCRN (Projection Screens) 116600-ATHL & SPRTS EQUIP (Athletic and Sports Equipment) DIVISION 12 - FURNISHINGS 124813-MATS (Entrance Floor Mats and Frames) 123533-CLSRM CASEWORK (Classroom Casework) DIVISION 14 - CONVEYING EQUIPMENT 140000-ELEV (*Elevators and Lifts) DIVISION 21 - FIRE SUPPRESSION 210001-FIRE PROT (*Fire Protection) DIVISION 22 - PLUMBING 220001-PLUMB (*Plumbing) DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING 230001-HVAC (*Heating, Ventilating and Air-Conditioning) DIVISION 26 - ELECTRICAL 260001-ELEC (*Electrical Work) DIVISION 31 - EARTHWORK 310125-LANDSCAPE MAINT (Landscape Maintenance) 311000-SITE PREP (Site Preparation) 311320-EXSTG PLNTS (Existing Plants to Remain) 312000-EARTHWORK (Earthwork) 312219-FIN GRADE (Finish Grading) 312300-AGGR PIER REINFORC (Aggregate Pier Soil Reinforcement) 312500-EROSION/SEDIMENT CNTRL (Erosion and Sedimentation Control) DIVISION 32 - EXTERIOR IMPROVEMENTS 321200-PAVING (Paving) 321313-SITE CONC (Site Concrete) 321400-PRECAST PAVERS (Precast Unit Pavers) 321600-CURBS/GUTTERS (Curbs and Gutters) 321700-PAVING SPECS (Paving Specialties) 321800-ATHL SURF/PED PVMNT (Athletic Surfacing and Pedestrian Pavement) 321823-INFLD SURF (Infield Surfacing) 323000-MISC SITE IMPRVMNT (Miscellaneous Site Improvements) 323100-FENCE (Fencing) 327000-WETLANDS (Wetlands) 329000-PLANTS (Plantings) 329113-SOIL PREP (Soil Preparation) 329200-LAWN/GRASS (Lawns and Grasses) DIVISION 33 - UTILITIES 331000-WATER DISTR (Water Distribution) 333000-SANITARY SEWER (Sanitary Sewerage) 334000-STORM DRAINAGE (Storm Drainage) 334610-LNDSCP SUBDRAIN (Landscape Subdrainage) GENERAL G.0.01 Title Sheet G.0.02 Code Analysis - Occupancy & Egress Capacity G.0.03 Code Analysis - Fire Resistance Rating G.0.04 Phasing Plans - Phase 1 G.0.05 Phasing Plans - Phase 2 G.0.06 Phasing Plans - Phase 3 G.0.07 Phasing Plans - Phase 4 G.0.08 Phasing Plans - Phase 5 SURVEY 1.0.00 Existing Conditions Plan of Land 1.0.01 Existing Conditions Plan of Land 1.0.02 Existing Conditions Plan of Land 1.0.03 Existing Conditions Plan of Land 1.0.04 Existing Conditions Plan of Land 1.0.05 Roof Survey LANDSCAPE 1.1.0 Sheet Layout and Site Context Plan 1.1.1 Demolition Plan 1.2.1 Layout Plan 1.2.2 Layout Plan 1.2.3 Layout Plan 1.2.4 Layout Plan 1.2.5 Materials Plan 1.2.6 Materials Plan 1.2.7 Materials Plan 1.2.8 Materials Plan 1.2.9 Layout and Materials Plan Enlargement 1.2.10 Layout and Materials Plan Enlargement 1.3.01 Vehicular Pavement Layout & Materials Plan 1.3.02 Vehicular Pavement Layout & Materials Plan 1.3.03 Vehicular Pavement Layout & Materials Plan 1.3.04 Vehicular Pavement Layout & Materials Details 1.3.05 Stormwater Grading and Drainage Plan 1.3.06 Stormwater Grading and Drainage Plan 1.3.07 Stormwater Grading and Drainage Plan 1.3.08 Stormwater Grading and Drainage Plan 1.3.09 Stormwater Grading and Drainage Details 1.3.10 Stormwater Grading and Drainage Details 1.3.11 Site Utilities Plan 1.3.12 Site Utilities Plan 1.3.13 Site Utilities Plan 1.3.14 Site Utilities Details 1.3.15 Erosion and Sediment Control & Wetland Replication Plan 1.3.16 Erosion and Sediment Control & Wetland Replication Plan 1.3.17 Erosion and Sediment Control & Wetland Replication Plan 1.3.18 Erosion and Sediment Control & Wetland Replication Plan 1.3.19 Erosion and Sediment Control & Wetland Replication Details 1.3.20 Erosion and Sediment Control & Wetland Replication Details 1.4.1 Grading Plan 1.4.2 Grading Plan 1.4.3 Grading Plan 1.4.4 Grading Plan 1.5.1 Soils and Underdrainage Plan 1.6.1 Irrigation and Coverage Plan 1.7.1 Planting Plan 1.7.2 Planting Plan 1.7.3 Planting Plan 1.7.4 Planting Plan 1.7.5 Planting Details 1.8.1 Site Details 1.8.2 Site Details 1.8.3 Site Details 1.8.4 Site Details 1.8.5 Site Details 1.8.6 Site Details 1.8.7 Site Details 1.8.8 Track Deduct Alternate Plan STRUCTURAL 2.1.01 General Notes 2.1.02 Typical Details I 2.1.03 Typical Details II 2.1.04 Typical Details III 2.1.05 Typical Details IV 2.1.06 Typical Details V 2.2.01 First Floor/Foundation Plan 2.2.02 Second Floor Framing Plan 2.2.03 Third Floor Framing Plan 2.2.04 Roof Framing Plan 2.2.05 First Floor/Foundation Plan 2.2.06 Second Floor Framing Plan 2.2.07 Third Floor Framing Plan 2.2.08 Roof Framing Plan 2.2.09 Rooftop Mechanical Unit Screen Plans 2.3.01 Base Plate and Pilaster Details 2.3.02 Lateral Load Resisting System Elevations 2.3.03 Lateral Load Resisting System Elevations and Details 2.4.01 Foundation Sections 2.4.02 Foundation Sections 2.5.01 Floor Sections 2.5.02 Floor Sections 2.5.03 Floor Sections 2.6.01 Gymnasium Roof Truss Details 2.6.02 Roof Sections ARCHITECTURAL 3.4.01 First Floor Plan 3.4.02 Second Floor Plan 3.4.03 Third Floor Plan 3.4.04 First Floor Plan 3.4.05 Second Floor Plan 3.4.06 Third Floor Plan 3.5.01 Roof Plan 3.5.02 Roof Plan 3.5.03 Roof Details 3.5.04 Roof Details 3.5.05 Roof Details 3.6.01 Exterior Elevations 3.6.02 Exterior Elevations 3.6.03 Exterior Elevations 3.7.01 Building Section: South-North Cross 3.7.02 Building Section 3.7.03 Building Section 3.7.04 Building Section 3.8.01 Typical Classroom Wall Sections & Typical Bay Elevation 3.8.02 Wall Sections 3.8.03 Wall Sections 3.8.04 Wall Sections 3.8.05 Wall Sections 3.8.06 Wall Sections 3.8.07 Wall Sections 3.8.08 Wall Sections 3.8.09 Wall Sections 3.8.10 Wall Sections 3.8.11 Wall Sections 3.8.12 Not Used 3.8.13 Not Used 3.8.14 Not Used 3.8.15 Stair 2 - Enlarged Sections and Elevations 3.8.16 Stair 2 - Enlarged Sections and Elevations 3.8.17 Stair 2 - Enlarged Sections and Elevations 3.8.18 Stair 2 - Enlarged Plans and Details 3.8.19 Stair 3 - Enlarged Plans and Details 3.8.20 Stair 1 - Enlarged Plans and Details 3.8.21 Not Used 3.8.22 Stair Vertical Details 3.9.01 Construction Details - Exterior 3.9.02 Construction Details - Exterior 3.9.03 Construction Details - Exterior 3.9.04 Construction Details - Exterior 3.9.05 Construction Details - Exterior 3.9.06 Construction Details - Exterior 3.9.07 Not Used 3.9.08 Not Used 3.9.09 Not Used ARCHITECTURAL (cont'd) 3.9.10 Vertical Details - Exterior 3.9.11 Vertical Details - Exterior 3.9.12 Vertical Details - Exterior 3.9.13 Vertical Details - Exterior 3.9.14 Vertical Details - Exterior 3.9.15 Vertical Details - Exterior 3.9.16 Vertical Details - Exterior 3.9.17 Vertical Details - Exterior 4.1.01 Window Elevations 4.1.02 Curtainwall Elevations 4.1.03 Curtainwall Louvers & Fire Rated Frame Elevations 4.1.04 Storefront Elevations 4.1.05 Window Details 4.1.06 Window Details 4.1.07 Window Details 4.1.08 Window Details 4.1.09 Window Details 4.1.10 Curtainwall Details 4.1.11 Curtainwall Details 4.1.12 Curtainwall Details 4.1.13 Curtainwall Details 4.2.01 Door and Frame Schedule 4.2.02 Door and Frame Details 4.2.03 Door and Frame Details 4.3.01 Room Finish Schedule 4.3.02 Wall Details & Partition Types 5.1.01 Reflected Ceiling Plan First Floor 5.1.02 Reflected Ceiling Plan Second Floor 5.1.03 Reflected Ceiling Plan Third Floor 5.1.04 Reflected Ceiling Plan First Floor 5.1.05 Reflected Ceiling Plan Second Floor 5.1.06 Reflected Ceiling Plan Third Floor 5.1.07 Ceiling Details 5.1.08 Ceiling Details 5.2.01 Not Used 5.2.02 Stair 2 - Plans and Sections 5.2.03 Not Used 5.2.04 Elevators, Stairs & Ramps-Plans and Sections 5.2.05 Stair Details 5.2.06 Stair Details 5.3.01 Enlarged Toilet Plans & Elevations 5.3.02 Enlarged Toilet Plans & Elevations 5.4.01 Interior Elevations 5.4.02 Interior Elevations 5.4.03 Interior Elevations 5.4.04 Interior Elevations 5.4.05 Interior Elevations 5.4.06 Interior Elevations 5.4.07 Interior Elevations 5.4.08 Interior Elevations 5.4.09 Interior Elevations 5.4.10 Interior Elevations 5.4.11 Interior Elevations 5.4.12 Interior Elevations 5.4.13 Interior Elevations 5.6.01 Millwork Details 5.6.02 Millwork Plans and Elevations 5.6.03 Millwork Plans and Elevations 5.6.04 Millwork Sections 5.6.05 Millwork Sections 5.6.06 Millwork Plans and Elevations 5.6.07 Millwork Library Plan 5.6.08 Millwork Library Plan 5.6.09 Millwork Library Elevations 5.6.10 Millwork Library Elevations 5.6.11 Millwork Sections 5.6.12 Millwork Sections FOOD SERVICE 6.0.01 Foodservice Equipment Plan 6.0.02 Foodservice Equipment Rough-In Plan 6.0.03 Foodservice Equipment FIRE PROTECTION 7.1.01 Fire Protection Legend, Details and Notes 7.4.01 Fire Protection First Floor (West Wing) 7.4.02 Fire Protection Second Floor (West Wing) 7.4.03 Not Used 7.4.04 Fire Protection First Floor (East Wing) 7.4.05 Fire Protection Second Floor (East Wing) 7.4.06 Fire Protection Third Floor (East Wing) PLUMBING 8.1.01 Plumbing Schedule, Legend & Piping Diagram 8.4.01 Plumbing 1st Floor Plan (West Wing) 8.4.02 Plumbing 2nd Floor Plan (West Wing) 8.4.03 Not Used 8.4.04 Plumbing 1st Floor Plan (East Wing) 8.4.05 Plumbing 2nd Floor Plan (East Wing) 8.4.06 Plumbing 3rd Floor Plan (East Wing) 8.5.01 Plumbing Roof Plan (West Wing) 8.5.02 Plumbing Roof Plan (East Wing) 8.6.01 Kitchen Plumbing Plan 8.7.01 Plumbing Details 8.7.02 Plumbing Details 8.8.01 Plumbing Stack Riser Diagrams MECHANICAL 9.0.01 HVAC Legend, Notes and Abbreviations 9.4.01 HVAC First Floor Plan West 9.4.02 HVAC Second Floor Plan West 9.4.03 HVAC Third Floor Plan West 9.4.04 HVAC First Floor Plan East 9.4.05 HVAC Second Floor Plan East 9.4.06 HVAC Third Floor Plan East 9.5.01 HVAC Roof Plan West 9.5.02 HVAC Roof Plan East 9.6.01 HVAC Mechanical Room Part Plan 9.7.01 HVAC Details 9.7.02 HVAC Details 9.7.03 HVAC Details 9.7.04 HVAC Details 9.8.01 HVAC Controls 9.8.02 HVAC Controls 9.8.03 HVAC Controls 9.8.04 HVAC Controls 9.9.01 HVAC Schedules 9.9.02 HVAC Schedules 9.9.03 HVAC Schedules ELECTRICAL 10.0.01 Symbol List 10.0.02 Technology Symbol List 10.0.03 Light Fixture Schedule 10.1.01 Existing Site Electrical Plan 10.1.02 Site Lighting Plan 10.1.03 Site Power Plan 10.1.04 Site Details Sheet #1 10.1.05 Site Details Sheet #2 10.2.01 First Floor Lighting Plan 10.2.02 First Floor Power Plan 10.2.03 Second Floor Lighting Plan 10.2.04 Second Floor Power Plan 10.2.05 Third Floor Lighting Plan 10.2.06 Third Floor Power Plan 10.2.07 First Floor Lighting Plan 10.2.08 First Floor Power Plan 10.2.09 Second Floor Lighting Plan 10.2.10 Second Floor Power Plan 10.2.11 Third Floor Lighting Plan 10.2.12 Third Floor Power Plan 10.2.13 First Floor Fire Alarm System Plan 10.2.14 Second Floor Fire Alarm System Plan 10.2.15 Third Floor Fire Alarm System Plan 10.2.16 First Floor Fire Alarm System Plan 10.2.17 Second Floor Fire Alarm System Plan 10.2.18 Third Floor Fire Alarm System Plan 10.2.19 Roof Lightning Protection Plan 10.2.20 Enlarged Kitchen Plan 10.3.01 Power Riser Diagram 10.3.02 Panel Schedules 10.3.03 Mechanical Equipment Schedules 10.3.04 Fire Alarm System Riser Diagram and Details Sheet 10.3.05 Voice/Data Riser Diagram 10.3.06 Voice/Data Details 10.3.07 Lighting Control Details Sheet #1 10.3.08 Lighting Control Details Sheet #2 10.3.09 Sound System Details 10.3.10 Details Sheet #1 10.3.11 Details Sheet #2

Upload: others

Post on 16-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOUGLAS ELEMENTARY SCHOOL Location Plan Douglas, MA L 90 Percent Design/11-10-14 90% Construction...Oct 14, 2011  · PT Pressure Treated PSF Pounds per Square Foot PREFIN Prefinished

Consultants

Architects Symbols & Materials87 Summer StreetBoston, MA 02110(617) 426-2858FAX (617) 426-1457

List of DrawingsDivision of WorkAbbreviations

GeneralAbbreviations

a r c h i t e c t s a n d p l a n n e r s

Thompson Engineering Co., Inc.Electrical Engineers

Richard D. Kimball Co., Inc.Mechanical Engineers

CONCRETE

CONCRETEMASONRY UNIT

1

CONCRETE

3.7.1

FINISHED WOOD

BATT INSULATION

COMPRESSIBLE FILLER/RIGID INSULATION

WOOD END GRAIN

COLUMN LINES

WOOD BLOCKING

WOOD SHIM

PLAN DETAIL

14

BRICK

BITUMINOUSCONCRETE

GYPSUM BOARD

EARTH

COMPACTED GRAVEL

SEALANT

STEEL

CONTINUOUS

7 FRAME TYPES

13.1.5

121.1 DOOR NUMBERS

WALL SECTION

BUILDING SECTION

EXTERIOR ELEVATION

DETAIL SECTION

1/3.

4.1

13.6.2

1/3.

5.1

1

N

103.0'±

2

102

PARTITION TYPES

ELEVATION

CONTRACT LIMIT LINE

102

C WINDOW TYPES

(127)

PROJECT NORTH

6

5

(127)

ROOM NUMBER

INTERIOR ELEVATION KEY IN

GLAZING TYPES

6 LOUVER TYPES

EXISTING CONTOUR

FINISH CONTOUR

34

DiNisco Design PartnershipLimited

Foley Buhl Roberts & Assoc., Inc.Structural Engineering

AKAL EngineeringPlumbing Engineers

Schofield Bros of New EnglandCivil Engineers

Brown Sardina, Inc.Landscape Architects

Crabtree McGrath Assoc., Inc.Food Service Consultants

44 Central Street, Unit 4Berlin, MA 01503(508) 869-0403FAX (508) 869-2891

200 Brickstone SquareAndover, MA 01810-1488(978) 475-0298FAX (978) 475-5768

2150 Washington StreetNewton, MA 02462(617) 527-9600FAX (617) 527-9606

10 CIty SquareBoston, MA 02129(617) 227-6818FAX (617) 886-9090

129 South StreetBoston, MA 02111(617) 482-4703FAX (617) 482-4882

1071 Worcester RoadFramingham, MA 01701(508) 879-0030FAX (508) 879-1797

Location Plan

DO

UG

LAS

ELEM

ENTA

RY S

CH

OO

LDOUGLAS ELEMENTARY SCHOOLDouglas, MA

90% Construction Document Set14 October 2011

STD Standard

VERT

Block

GL

STL Steel

BLK

MTL MetalMS Machine ScrewMT Marble TileMO Masonry OpeningMISC MiscellaneousMH ManholeMIN MinimumAFF Above Finish Floor

ALT AlternateALUM AluminiumAP

STLP Steel Liner PanelSTRUCT StructureSUSP Suspended

Plastic Laminate

STR Stair

SYS System

PLAM

QT Quarry Tile

JJT

JambJoint

KOKP

INTINSUL

HPHDWD

Access PanelATC Acoustical Tile Ceiling

GL CMUGT

PVF Polyvinyl FlouridePVC Polyvinyl ChloridePTN Partition

FLR

DR

GlassGlazed Concrete Masonry UnitGranite Tile

GYP Gypsum

Ground Face CMUGF CMU

BLDG Building

NTS Not To ScaleNIC Not In ContractNO Number

OPG OpeningOPP Opposite

OHRG Overhead Rolling GrillOHRD Overhead Rolling DoorOHFD Overhead Folding DoorOC On CenterOD Outside Diameter

MFR ManufacturerMECH MechanicalMB Marker Board

<

LP

HDHDW

Angle[ Channelø DiameterADJ Adjustable

MAX Maximum

PTD PaintedPSI Pounds per Square InchPT Pressure TreatedPSF Pounds per Square FootPREFIN PrefinishedPREFAB PrefabricatedPNL PanelPR PairPM Pressed MetalPLY WD PlywoodPL or P PlatePLAS PlasterL

PCF Premolded Compressible Filler

Z Zee

RO

RCB Resilient Cove Base

Rough Opening

RCP

RM RoomRNS Rubber Nailing Strip

RD Roof DrainREINF ReinforcingREQʼD RequiredRHMS Round Head Machine ScrewRES Resinous Flooring

R RiserRAD Radius

Vertical

TB TackboardT Tread

TERR TerrazzoT & G Tongue and GrooveTO Top ofTYP Typical

Transparent Dye FinishTDF

UCD Undercut Door

VAP BAR

UON Unless Otherwise NotedUSS Underside of StructureUV Unit Ventilator

Vapor BarrierVCP Vitrous Clay Pipe

W/O WithoutWWFWWM Welded Wire Mesh

WMP Wire Mesh PartitionWO Window OpeningWD Wood

WithW/

VSF Vinyl Sheet FlooringVTR Vent Through RoofVWC Vinyl Wall Covering

VCT Vinyl Composition TileVIF Verify In Field

LCCLOC

Knock Out

CONT ContinuousCRD Cementitious Roof DeckCT Ceramic TileCU FT Cubic Foot

Cabinet Unit Heater

CB Catch Basin / ChalkboardCBB Cementitious Backer BoardCJ Control JointCL or C Center LineLCLG CeilingCLR ClearCMU Concrete Masonry UnitCOL ColumnCOMP CompressibleCONC ConcreteCPT Carpet

C Course(s)

BM Bench MarkBRK Brick

DF Drinking FountainDIM DimensionDN DownDO Door Opening

Hardwood

Door

EXIST'G

Detail

EJ Expansion JointEL Elevation (Vertical Height)ELEV Elevation (View)EQ EqualEQUIP EquipmentETBR Existing to be RemovedETR Existing to Remain

Drawing

ExistingEXP ExposedEXT Exterior

EA Each

FE Fire ExtinguisherFF Finish FloorFH Fire HoseFHC Fire Hose CabinetFIB WD Fibrous WoodFIN Finish

DWG

FloorFL HD Flat HeadFL HD MS Flat Head Machine ScrewFP Fire ProtectionFR Fire RatedFTR Finned Tube RadiationFURNFWP

Fabric Covered Acoustical WD PanelFD Floor Drain

GALVGCGA

ID

HeadHardware

HVCHM

SECT

INCL

INVInterior

Kickplate

Furnish, Furnished

Low Point

Lead Coated CopperLimit Of Contract

GalvanizeGeneral ContractorGauge

InvertInsulation

High Point / HandicappedHose Valve Cabinet

Inside DiameterInclude

Section

Fibrous Wood Panel

CU YD Cubic YardCUH

FAP Fibrous Acoustical PanelsFCP

DTL

CVR Cover

Hollow Metal

GWBGWF

Gypsum WallboardGlazed Wall Finish (Epoxy)

SSF

SPEC

SFTUSHTSF CMU

SP

SF Seamless FlooringStructural Facing Tile UnitSheet

SIM SimilarStation PointSpecificationStraight Resilient BaseSRBSynthetic Sports FlooringStainless SteelSS

Welded Wire Fabric

Split Face CMU

BSMT Basement

DEMO Demolition

KIT Kitchen

MAR Marble

PTT Precast Terrazzo Tile

SCI Science

BOT Bottom of NGMB Non Glare Markerboard

Reflected Ceiling Plan

TS Structural Tubing

H High

W Wide

Roof Top UnitRTU

MTD Mounted

L Low

IGU Insulated Glazing Unit

LGMF Ligt Gauge Metal Framing

TGU Translucent Glazing Unit

PJ Panel Joint

OPJ Optional Panel Joint

161 West Main StreetGeorgetown, MA 01833(978) 352-8500FAX: (978) 352-8588

168 Main Street, Suite 3, Unit 2Northfield, MA 01360(413) 498-0069FAX: (413) 498-4386

3Si Inc.Technology Consultants

14 October 2011

90% ConstructionDocument Set

DIVISION 01 - GENERAL REQUIREMENTS011000-SUMMARY " "(Summary of Work)012200-UNIT PRICE " "(Unit Prices)012300-ALTERNATES " "(Alternates)015000-TEMP FAC " "(Temporary Facilities and Controls)DIVISION 02 - EXISTING CONDITIONS023000-SUBSURFACE EXPLORE "(Subsurface Exploration Data)024100-DEMO " " "(Demolition)024180-ASB ABATEMENT "(Asbestos Abatement)DIVISION 03 - CONCRETE033000-CAST CONC " "(Cast-In-Place Concrete)DIVISION 04 - MASONRY040001-MASONRY " "(*Masonry Work)DIVISION 05 - METALS050001-MISC & ORN IRON "(*Miscellaneous and Ornamental Iron)051200-STRCT STL " "(Structural Steel Framing)053100-MTL DECK " "(Metal Decking)055000-MISC MTL" " "(Miscellaneous Metals (Part of 050001))DIVISION 06 - WOOD, PLASTICS AND COMPOSITES061000-RGH CARP " "(Rough Carpentry)062000-FIN CART" " "(Finish Carpentry)DIVISION 07 - THERMAL AND MOISTURE PROTECTION070001-WD&C " " "(*Waterproofing, Dampproofing and Caulking)070002-ROOF & FLSHG "(*Roofing and Flashing)071326-A&VB " " "(Air and Vapor Barrier)072100-INSUL " " "(Insulation)074213-PREFORM CLAD "(Preformed Cladding)077200-ROOF ACC " "(Roof Accessories)079500-EXP CONTROL "(Expansion Control)DIVISION 08 - OPENINGS080001-MTL WINDOWS "(*Metal Windows)080002-GLASS/GLAZING "(*Glass and Glazing)081113-HOLLOW MTL " "(Hollow Metal Doors and Frames)081416-WD / PLAS DRS "(Wood & Plastic Doors)083323-SPEC DRS " "(Special Doors)087100-FIN HRDWR " "(Finish Hardware)DIVISION 09 - FINISHES090002-TILE " " "(*Tile)090003-ACOUST TILE " "(*Acoustical Tile)090005-RES FLR " " "(*Resilient Flooring)090007-PAINT " " "(*Painting)092116-GWB " " "(Gypsum Board)096466-WD & ATHL FLR "(Wood and Athletic Flooring)096816-CARPET " " "(Carpeting)097700-FIBERGLASS WALL PNL "(Fiberglass Reinforced Plastic Wall Panels)098400-ACOUST WALL TRTMNT "(Acoustical Wall Treatment)DIVISION 10 - SPECIALTIES101100-MB & TB " " "(Markerboards and Tackboards)101400-IDENT DEV " "(Identifying Devices)102113-COMPRT & CUBICLES "(Compartments and Cubicles)102600-PREFAB SPECS "(Prefabricated Specialties)102813-TOILET/BATH ACC "(Toilet and Bath Accessories)DIVISION 11 - EQUIPMENT113100-APPL & UNIT KTCHN "(Appliances and Unit Kitchens)114000-FOOD SRVC " "(Food Service Equipment)115213-PROJ SCRN " "(Projection Screens)116600-ATHL & SPRTS EQUIP "(Athletic and Sports Equipment)DIVISION 12 - FURNISHINGS124813-MATS " " "(Entrance Floor Mats and Frames)123533-CLSRM CASEWORK "(Classroom Casework)DIVISION 14 - CONVEYING EQUIPMENT140000-ELEV " " "(*Elevators and Lifts)DIVISION 21 - FIRE SUPPRESSION210001-FIRE PROT " "(*Fire Protection)DIVISION 22 - PLUMBING220001-PLUMB " " "(*Plumbing)DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING230001-HVAC " " "(*Heating, Ventilating and Air-Conditioning)DIVISION 26 - ELECTRICAL260001-ELEC " " "(*Electrical Work)DIVISION 31 - EARTHWORK310125-LANDSCAPE MAINT "(Landscape Maintenance)311000-SITE PREP " "(Site Preparation)311320-EXSTG PLNTS" "(Existing Plants to Remain)312000-EARTHWORK " "(Earthwork)312219-FIN GRADE " "(Finish Grading)312300-AGGR PIER REINFORC "(Aggregate Pier Soil Reinforcement)312500-EROSION/SEDIMENT CNTRL "(Erosion and Sedimentation Control)DIVISION 32 - EXTERIOR IMPROVEMENTS321200-PAVING " " "(Paving)321313-SITE CONC " "(Site Concrete)321400-PRECAST PAVERS "(Precast Unit Pavers)321600-CURBS/GUTTERS "(Curbs and Gutters)321700-PAVING SPECS "(Paving Specialties)321800-ATHL SURF/PED PVMNT "(Athletic Surfacing and Pedestrian Pavement)321823-INFLD SURF " "(Infield Surfacing)323000-MISC SITE IMPRVMNT "(Miscellaneous Site Improvements)323100-FENCE " " "(Fencing)327000-WETLANDS " "(Wetlands)329000-PLANTS " " "(Plantings)329113-SOIL PREP " "(Soil Preparation)329200-LAWN/GRASS " "(Lawns and Grasses)DIVISION 33 - UTILITIES331000-WATER DISTR"(Water Distribution)333000-SANITARY SEWER "(Sanitary Sewerage) " "334000-STORM DRAINAGE "(Storm Drainage)334610-LNDSCP SUBDRAIN "(Landscape Subdrainage)

GENERALG.0.01 "Title SheetG.0.02 "Code Analysis - Occupancy & Egress CapacityG.0.03 "Code Analysis - Fire Resistance RatingG.0.04 "Phasing Plans - Phase 1G.0.05 "Phasing Plans - Phase 2G.0.06 "Phasing Plans - Phase 3G.0.07 "Phasing Plans - Phase 4G.0.08 "Phasing Plans - Phase 5

SURVEY1.0.00 "Existing Conditions Plan of Land1.0.01 "Existing Conditions Plan of Land1.0.02 "Existing Conditions Plan of Land1.0.03 "Existing Conditions Plan of Land1.0.04 "Existing Conditions Plan of Land1.0.05 "Roof Survey

LANDSCAPE1.1.0 "Sheet Layout and Site Context Plan1.1.1 "Demolition Plan

1.2.1 "Layout Plan1.2.2 "Layout Plan1.2.3 "Layout Plan1.2.4 "Layout Plan1.2.5 "Materials Plan1.2.6 "Materials Plan1.2.7 "Materials Plan1.2.8 "Materials Plan1.2.9 "Layout and Materials Plan Enlargement1.2.10 "Layout and Materials Plan Enlargement

1.3.01 "Vehicular Pavement Layout & Materials Plan1.3.02 "Vehicular Pavement Layout & Materials Plan1.3.03 "Vehicular Pavement Layout & Materials Plan1.3.04 "Vehicular Pavement Layout & Materials Details1.3.05 "Stormwater Grading and Drainage Plan1.3.06 "Stormwater Grading and Drainage Plan1.3.07 "Stormwater Grading and Drainage Plan1.3.08 "Stormwater Grading and Drainage Plan1.3.09 "Stormwater Grading and Drainage Details1.3.10 "Stormwater Grading and Drainage Details1.3.11 "Site Utilities Plan1.3.12 "Site Utilities Plan1.3.13 "Site Utilities Plan1.3.14 "Site Utilities Details1.3.15 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.16 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.17 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.18 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.19 "Erosion and Sediment Control & Wetland

"Replication Details1.3.20 "Erosion and Sediment Control & Wetland

"Replication Details

1.4.1 "Grading Plan1.4.2 "Grading Plan1.4.3 "Grading Plan1.4.4 "Grading Plan

1.5.1 "Soils and Underdrainage Plan

1.6.1 "Irrigation and Coverage Plan

1.7.1 "Planting Plan1.7.2 "Planting Plan1.7.3 "Planting Plan1.7.4 "Planting Plan1.7.5 "Planting Details

1.8.1 "Site Details1.8.2 "Site Details1.8.3 "Site Details1.8.4 "Site Details1.8.5 "Site Details1.8.6 "Site Details1.8.7 "Site Details1.8.8 "Track Deduct Alternate Plan

STRUCTURAL2.1.01 "General Notes2.1.02 "Typical Details I2.1.03 "Typical Details II2.1.04 "Typical Details III2.1.05 "Typical Details IV2.1.06 "Typical Details V

2.2.01 "First Floor/Foundation Plan2.2.02 "Second Floor Framing Plan2.2.03 "Third Floor Framing Plan2.2.04 "Roof Framing Plan2.2.05 "First Floor/Foundation Plan2.2.06 "Second Floor Framing Plan2.2.07 "Third Floor Framing Plan2.2.08 "Roof Framing Plan2.2.09 "Rooftop Mechanical Unit Screen Plans

2.3.01 "Base Plate and Pilaster Details2.3.02 "Lateral Load Resisting System Elevations2.3.03 "Lateral Load Resisting System Elevations

"and Details2.4.01 "Foundation Sections2.4.02 "Foundation Sections

2.5.01 "Floor Sections2.5.02 "Floor Sections2.5.03 "Floor Sections

2.6.01 "Gymnasium Roof Truss Details2.6.02 "Roof Sections

ARCHITECTURAL3.4.01 "First Floor Plan3.4.02 "Second Floor Plan3.4.03 "Third Floor Plan3.4.04 "First Floor Plan3.4.05 "Second Floor Plan3.4.06 "Third Floor Plan3.5.01 "Roof Plan3.5.02 "Roof Plan3.5.03 "Roof Details3.5.04 "Roof Details3.5.05 "Roof Details3.6.01 "Exterior Elevations3.6.02 "Exterior Elevations3.6.03 "Exterior Elevations3.7.01 "Building Section: South-North Cross3.7.02 "Building Section3.7.03 "Building Section3.7.04 "Building Section3.8.01 "Typical Classroom Wall Sections &

"Typical Bay Elevation3.8.02 "Wall Sections3.8.03 "Wall Sections3.8.04 "Wall Sections3.8.05 "Wall Sections3.8.06 "Wall Sections3.8.07 "Wall Sections3.8.08 "Wall Sections3.8.09 "Wall Sections3.8.10 "Wall Sections3.8.11 "Wall Sections3.8.12 "Not Used3.8.13 "Not Used3.8.14 "Not Used3.8.15 "Stair 2 - Enlarged Sections and Elevations3.8.16 "Stair 2 - Enlarged Sections and Elevations3.8.17 "Stair 2 - Enlarged Sections and Elevations3.8.18 "Stair 2 - Enlarged Plans and Details3.8.19 "Stair 3 - Enlarged Plans and Details3.8.20 "Stair 1 - Enlarged Plans and Details3.8.21 "Not Used3.8.22 "Stair Vertical Details3.9.01 "Construction Details - Exterior3.9.02 "Construction Details - Exterior3.9.03 "Construction Details - Exterior3.9.04 "Construction Details - Exterior3.9.05 "Construction Details - Exterior3.9.06 "Construction Details - Exterior3.9.07 "Not Used3.9.08 "Not Used3.9.09 "Not Used

ARCHITECTURAL (cont'd)3.9.10 "Vertical Details - Exterior3.9.11 "Vertical Details - Exterior3.9.12 "Vertical Details - Exterior3.9.13 "Vertical Details - Exterior3.9.14 "Vertical Details - Exterior3.9.15 "Vertical Details - Exterior3.9.16 "Vertical Details - Exterior3.9.17 "Vertical Details - Exterior

4.1.01 "Window Elevations4.1.02 "Curtainwall Elevations4.1.03 "Curtainwall Louvers & Fire Rated Frame Elevations4.1.04 "Storefront Elevations4.1.05 "Window Details4.1.06 "Window Details4.1.07 "Window Details4.1.08 "Window Details4.1.09 "Window Details4.1.10 "Curtainwall Details4.1.11 "Curtainwall Details4.1.12 "Curtainwall Details4.1.13 "Curtainwall Details4.2.01 "Door and Frame Schedule4.2.02 "Door and Frame Details4.2.03 "Door and Frame Details4.3.01 "Room Finish Schedule4.3.02 "Wall Details & Partition Types

5.1.01 "Reflected Ceiling Plan First Floor5.1.02 "Reflected Ceiling Plan Second Floor5.1.03 "Reflected Ceiling Plan Third Floor5.1.04 "Reflected Ceiling Plan First Floor5.1.05 "Reflected Ceiling Plan Second Floor5.1.06 "Reflected Ceiling Plan Third Floor5.1.07 "Ceiling Details5.1.08 "Ceiling Details5.2.01 "Not Used5.2.02 "Stair 2 - Plans and Sections5.2.03 "Not Used5.2.04 "Elevators, Stairs & Ramps-Plans and Sections5.2.05 "Stair Details5.2.06 "Stair Details5.3.01 "Enlarged Toilet Plans & Elevations5.3.02 "Enlarged Toilet Plans & Elevations5.4.01 "Interior Elevations5.4.02 "Interior Elevations5.4.03 "Interior Elevations5.4.04 "Interior Elevations5.4.05 "Interior Elevations5.4.06 "Interior Elevations5.4.07 "Interior Elevations5.4.08 "Interior Elevations5.4.09 "Interior Elevations5.4.10 "Interior Elevations5.4.11 "Interior Elevations5.4.12 "Interior Elevations5.4.13 "Interior Elevations5.6.01 "Millwork Details5.6.02 "Millwork Plans and Elevations5.6.03 "Millwork Plans and Elevations5.6.04 "Millwork Sections5.6.05 "Millwork Sections5.6.06 "Millwork Plans and Elevations5.6.07 "Millwork Library Plan5.6.08 "Millwork Library Plan5.6.09 "Millwork Library Elevations5.6.10 "Millwork Library Elevations5.6.11 "Millwork Sections5.6.12 "Millwork Sections

FOOD SERVICE6.0.01 "Foodservice Equipment Plan6.0.02 "Foodservice Equipment Rough-In Plan6.0.03 "Foodservice Equipment

FIRE PROTECTION7.1.01 "Fire Protection Legend, Details and Notes

7.4.01 "Fire Protection First Floor (West Wing)7.4.02 "Fire Protection Second Floor (West Wing)7.4.03 "Not Used7.4.04 "Fire Protection First Floor (East Wing)7.4.05 "Fire Protection Second Floor (East Wing)7.4.06 "Fire Protection Third Floor (East Wing)

PLUMBING8.1.01 "Plumbing Schedule, Legend

"& Piping Diagram

8.4.01 "Plumbing 1st Floor Plan (West Wing)8.4.02 "Plumbing 2nd Floor Plan (West Wing)8.4.03 "Not Used8.4.04 "Plumbing 1st Floor Plan (East Wing)8.4.05 "Plumbing 2nd Floor Plan (East Wing)8.4.06 "Plumbing 3rd Floor Plan (East Wing)

8.5.01 "Plumbing Roof Plan (West Wing)8.5.02 "Plumbing Roof Plan (East Wing)

8.6.01 "Kitchen Plumbing Plan

8.7.01 "Plumbing Details8.7.02 "Plumbing Details

8.8.01 "Plumbing Stack Riser Diagrams

MECHANICAL9.0.01 "HVAC Legend, Notes and Abbreviations

9.4.01 "HVAC First Floor Plan West9.4.02 "HVAC Second Floor Plan West9.4.03 "HVAC Third Floor Plan West9.4.04 "HVAC First Floor Plan East9.4.05 "HVAC Second Floor Plan East9.4.06 "HVAC Third Floor Plan East

9.5.01 "HVAC Roof Plan West9.5.02 "HVAC Roof Plan East

9.6.01 "HVAC Mechanical Room Part Plan

9.7.01 "HVAC Details9.7.02 "HVAC Details9.7.03 "HVAC Details9.7.04 "HVAC Details

9.8.01 "HVAC Controls9.8.02 "HVAC Controls9.8.03 "HVAC Controls9.8.04 "HVAC Controls

9.9.01 "HVAC Schedules9.9.02 "HVAC Schedules9.9.03 "HVAC Schedules

ELECTRICAL10.0.01 "Symbol List10.0.02 "Technology Symbol List10.0.03 "Light Fixture Schedule

10.1.01 "Existing Site Electrical Plan10.1.02 "Site Lighting Plan10.1.03 "Site Power Plan10.1.04 "Site Details Sheet #110.1.05 "Site Details Sheet #2

10.2.01 "First Floor Lighting Plan10.2.02 "First Floor Power Plan10.2.03 "Second Floor Lighting Plan10.2.04 "Second Floor Power Plan10.2.05 "Third Floor Lighting Plan10.2.06 "Third Floor Power Plan10.2.07 "First Floor Lighting Plan10.2.08 "First Floor Power Plan10.2.09 "Second Floor Lighting Plan10.2.10 "Second Floor Power Plan10.2.11 "Third Floor Lighting Plan10.2.12 "Third Floor Power Plan10.2.13 "First Floor Fire Alarm System Plan10.2.14 "Second Floor Fire Alarm System Plan10.2.15 "Third Floor Fire Alarm System Plan10.2.16 "First Floor Fire Alarm System Plan10.2.17 "Second Floor Fire Alarm System Plan10.2.18 "Third Floor Fire Alarm System Plan10.2.19 "Roof Lightning Protection Plan10.2.20 "Enlarged Kitchen Plan

10.3.01 "Power Riser Diagram10.3.02 "Panel Schedules10.3.03 "Mechanical Equipment Schedules10.3.04 "Fire Alarm System Riser Diagram

"and Details Sheet10.3.05 "Voice/Data Riser Diagram10.3.06 "Voice/Data Details10.3.07 "Lighting Control Details Sheet #110.3.08 "Lighting Control Details Sheet #210.3.09 "Sound System Details10.3.10 "Details Sheet #110.3.11 "Details Sheet #2