Transcript
Page 1: DOUGLAS ELEMENTARY SCHOOL Location Plan Douglas, MA L 90 Percent Design/11-10-14 90% Construction...Oct 14, 2011  · PT Pressure Treated PSF Pounds per Square Foot PREFIN Prefinished

Consultants

Architects Symbols & Materials87 Summer StreetBoston, MA 02110(617) 426-2858FAX (617) 426-1457

List of DrawingsDivision of WorkAbbreviations

GeneralAbbreviations

a r c h i t e c t s a n d p l a n n e r s

Thompson Engineering Co., Inc.Electrical Engineers

Richard D. Kimball Co., Inc.Mechanical Engineers

CONCRETE

CONCRETEMASONRY UNIT

1

CONCRETE

3.7.1

FINISHED WOOD

BATT INSULATION

COMPRESSIBLE FILLER/RIGID INSULATION

WOOD END GRAIN

COLUMN LINES

WOOD BLOCKING

WOOD SHIM

PLAN DETAIL

14

BRICK

BITUMINOUSCONCRETE

GYPSUM BOARD

EARTH

COMPACTED GRAVEL

SEALANT

STEEL

CONTINUOUS

7 FRAME TYPES

13.1.5

121.1 DOOR NUMBERS

WALL SECTION

BUILDING SECTION

EXTERIOR ELEVATION

DETAIL SECTION

1/3.

4.1

13.6.2

1/3.

5.1

1

N

103.0'±

2

102

PARTITION TYPES

ELEVATION

CONTRACT LIMIT LINE

102

C WINDOW TYPES

(127)

PROJECT NORTH

6

5

(127)

ROOM NUMBER

INTERIOR ELEVATION KEY IN

GLAZING TYPES

6 LOUVER TYPES

EXISTING CONTOUR

FINISH CONTOUR

34

DiNisco Design PartnershipLimited

Foley Buhl Roberts & Assoc., Inc.Structural Engineering

AKAL EngineeringPlumbing Engineers

Schofield Bros of New EnglandCivil Engineers

Brown Sardina, Inc.Landscape Architects

Crabtree McGrath Assoc., Inc.Food Service Consultants

44 Central Street, Unit 4Berlin, MA 01503(508) 869-0403FAX (508) 869-2891

200 Brickstone SquareAndover, MA 01810-1488(978) 475-0298FAX (978) 475-5768

2150 Washington StreetNewton, MA 02462(617) 527-9600FAX (617) 527-9606

10 CIty SquareBoston, MA 02129(617) 227-6818FAX (617) 886-9090

129 South StreetBoston, MA 02111(617) 482-4703FAX (617) 482-4882

1071 Worcester RoadFramingham, MA 01701(508) 879-0030FAX (508) 879-1797

Location Plan

DO

UG

LAS

ELEM

ENTA

RY S

CH

OO

LDOUGLAS ELEMENTARY SCHOOLDouglas, MA

90% Construction Document Set14 October 2011

STD Standard

VERT

Block

GL

STL Steel

BLK

MTL MetalMS Machine ScrewMT Marble TileMO Masonry OpeningMISC MiscellaneousMH ManholeMIN MinimumAFF Above Finish Floor

ALT AlternateALUM AluminiumAP

STLP Steel Liner PanelSTRUCT StructureSUSP Suspended

Plastic Laminate

STR Stair

SYS System

PLAM

QT Quarry Tile

JJT

JambJoint

KOKP

INTINSUL

HPHDWD

Access PanelATC Acoustical Tile Ceiling

GL CMUGT

PVF Polyvinyl FlouridePVC Polyvinyl ChloridePTN Partition

FLR

DR

GlassGlazed Concrete Masonry UnitGranite Tile

GYP Gypsum

Ground Face CMUGF CMU

BLDG Building

NTS Not To ScaleNIC Not In ContractNO Number

OPG OpeningOPP Opposite

OHRG Overhead Rolling GrillOHRD Overhead Rolling DoorOHFD Overhead Folding DoorOC On CenterOD Outside Diameter

MFR ManufacturerMECH MechanicalMB Marker Board

<

LP

HDHDW

Angle[ Channelø DiameterADJ Adjustable

MAX Maximum

PTD PaintedPSI Pounds per Square InchPT Pressure TreatedPSF Pounds per Square FootPREFIN PrefinishedPREFAB PrefabricatedPNL PanelPR PairPM Pressed MetalPLY WD PlywoodPL or P PlatePLAS PlasterL

PCF Premolded Compressible Filler

Z Zee

RO

RCB Resilient Cove Base

Rough Opening

RCP

RM RoomRNS Rubber Nailing Strip

RD Roof DrainREINF ReinforcingREQʼD RequiredRHMS Round Head Machine ScrewRES Resinous Flooring

R RiserRAD Radius

Vertical

TB TackboardT Tread

TERR TerrazzoT & G Tongue and GrooveTO Top ofTYP Typical

Transparent Dye FinishTDF

UCD Undercut Door

VAP BAR

UON Unless Otherwise NotedUSS Underside of StructureUV Unit Ventilator

Vapor BarrierVCP Vitrous Clay Pipe

W/O WithoutWWFWWM Welded Wire Mesh

WMP Wire Mesh PartitionWO Window OpeningWD Wood

WithW/

VSF Vinyl Sheet FlooringVTR Vent Through RoofVWC Vinyl Wall Covering

VCT Vinyl Composition TileVIF Verify In Field

LCCLOC

Knock Out

CONT ContinuousCRD Cementitious Roof DeckCT Ceramic TileCU FT Cubic Foot

Cabinet Unit Heater

CB Catch Basin / ChalkboardCBB Cementitious Backer BoardCJ Control JointCL or C Center LineLCLG CeilingCLR ClearCMU Concrete Masonry UnitCOL ColumnCOMP CompressibleCONC ConcreteCPT Carpet

C Course(s)

BM Bench MarkBRK Brick

DF Drinking FountainDIM DimensionDN DownDO Door Opening

Hardwood

Door

EXIST'G

Detail

EJ Expansion JointEL Elevation (Vertical Height)ELEV Elevation (View)EQ EqualEQUIP EquipmentETBR Existing to be RemovedETR Existing to Remain

Drawing

ExistingEXP ExposedEXT Exterior

EA Each

FE Fire ExtinguisherFF Finish FloorFH Fire HoseFHC Fire Hose CabinetFIB WD Fibrous WoodFIN Finish

DWG

FloorFL HD Flat HeadFL HD MS Flat Head Machine ScrewFP Fire ProtectionFR Fire RatedFTR Finned Tube RadiationFURNFWP

Fabric Covered Acoustical WD PanelFD Floor Drain

GALVGCGA

ID

HeadHardware

HVCHM

SECT

INCL

INVInterior

Kickplate

Furnish, Furnished

Low Point

Lead Coated CopperLimit Of Contract

GalvanizeGeneral ContractorGauge

InvertInsulation

High Point / HandicappedHose Valve Cabinet

Inside DiameterInclude

Section

Fibrous Wood Panel

CU YD Cubic YardCUH

FAP Fibrous Acoustical PanelsFCP

DTL

CVR Cover

Hollow Metal

GWBGWF

Gypsum WallboardGlazed Wall Finish (Epoxy)

SSF

SPEC

SFTUSHTSF CMU

SP

SF Seamless FlooringStructural Facing Tile UnitSheet

SIM SimilarStation PointSpecificationStraight Resilient BaseSRBSynthetic Sports FlooringStainless SteelSS

Welded Wire Fabric

Split Face CMU

BSMT Basement

DEMO Demolition

KIT Kitchen

MAR Marble

PTT Precast Terrazzo Tile

SCI Science

BOT Bottom of NGMB Non Glare Markerboard

Reflected Ceiling Plan

TS Structural Tubing

H High

W Wide

Roof Top UnitRTU

MTD Mounted

L Low

IGU Insulated Glazing Unit

LGMF Ligt Gauge Metal Framing

TGU Translucent Glazing Unit

PJ Panel Joint

OPJ Optional Panel Joint

161 West Main StreetGeorgetown, MA 01833(978) 352-8500FAX: (978) 352-8588

168 Main Street, Suite 3, Unit 2Northfield, MA 01360(413) 498-0069FAX: (413) 498-4386

3Si Inc.Technology Consultants

14 October 2011

90% ConstructionDocument Set

DIVISION 01 - GENERAL REQUIREMENTS011000-SUMMARY " "(Summary of Work)012200-UNIT PRICE " "(Unit Prices)012300-ALTERNATES " "(Alternates)015000-TEMP FAC " "(Temporary Facilities and Controls)DIVISION 02 - EXISTING CONDITIONS023000-SUBSURFACE EXPLORE "(Subsurface Exploration Data)024100-DEMO " " "(Demolition)024180-ASB ABATEMENT "(Asbestos Abatement)DIVISION 03 - CONCRETE033000-CAST CONC " "(Cast-In-Place Concrete)DIVISION 04 - MASONRY040001-MASONRY " "(*Masonry Work)DIVISION 05 - METALS050001-MISC & ORN IRON "(*Miscellaneous and Ornamental Iron)051200-STRCT STL " "(Structural Steel Framing)053100-MTL DECK " "(Metal Decking)055000-MISC MTL" " "(Miscellaneous Metals (Part of 050001))DIVISION 06 - WOOD, PLASTICS AND COMPOSITES061000-RGH CARP " "(Rough Carpentry)062000-FIN CART" " "(Finish Carpentry)DIVISION 07 - THERMAL AND MOISTURE PROTECTION070001-WD&C " " "(*Waterproofing, Dampproofing and Caulking)070002-ROOF & FLSHG "(*Roofing and Flashing)071326-A&VB " " "(Air and Vapor Barrier)072100-INSUL " " "(Insulation)074213-PREFORM CLAD "(Preformed Cladding)077200-ROOF ACC " "(Roof Accessories)079500-EXP CONTROL "(Expansion Control)DIVISION 08 - OPENINGS080001-MTL WINDOWS "(*Metal Windows)080002-GLASS/GLAZING "(*Glass and Glazing)081113-HOLLOW MTL " "(Hollow Metal Doors and Frames)081416-WD / PLAS DRS "(Wood & Plastic Doors)083323-SPEC DRS " "(Special Doors)087100-FIN HRDWR " "(Finish Hardware)DIVISION 09 - FINISHES090002-TILE " " "(*Tile)090003-ACOUST TILE " "(*Acoustical Tile)090005-RES FLR " " "(*Resilient Flooring)090007-PAINT " " "(*Painting)092116-GWB " " "(Gypsum Board)096466-WD & ATHL FLR "(Wood and Athletic Flooring)096816-CARPET " " "(Carpeting)097700-FIBERGLASS WALL PNL "(Fiberglass Reinforced Plastic Wall Panels)098400-ACOUST WALL TRTMNT "(Acoustical Wall Treatment)DIVISION 10 - SPECIALTIES101100-MB & TB " " "(Markerboards and Tackboards)101400-IDENT DEV " "(Identifying Devices)102113-COMPRT & CUBICLES "(Compartments and Cubicles)102600-PREFAB SPECS "(Prefabricated Specialties)102813-TOILET/BATH ACC "(Toilet and Bath Accessories)DIVISION 11 - EQUIPMENT113100-APPL & UNIT KTCHN "(Appliances and Unit Kitchens)114000-FOOD SRVC " "(Food Service Equipment)115213-PROJ SCRN " "(Projection Screens)116600-ATHL & SPRTS EQUIP "(Athletic and Sports Equipment)DIVISION 12 - FURNISHINGS124813-MATS " " "(Entrance Floor Mats and Frames)123533-CLSRM CASEWORK "(Classroom Casework)DIVISION 14 - CONVEYING EQUIPMENT140000-ELEV " " "(*Elevators and Lifts)DIVISION 21 - FIRE SUPPRESSION210001-FIRE PROT " "(*Fire Protection)DIVISION 22 - PLUMBING220001-PLUMB " " "(*Plumbing)DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING230001-HVAC " " "(*Heating, Ventilating and Air-Conditioning)DIVISION 26 - ELECTRICAL260001-ELEC " " "(*Electrical Work)DIVISION 31 - EARTHWORK310125-LANDSCAPE MAINT "(Landscape Maintenance)311000-SITE PREP " "(Site Preparation)311320-EXSTG PLNTS" "(Existing Plants to Remain)312000-EARTHWORK " "(Earthwork)312219-FIN GRADE " "(Finish Grading)312300-AGGR PIER REINFORC "(Aggregate Pier Soil Reinforcement)312500-EROSION/SEDIMENT CNTRL "(Erosion and Sedimentation Control)DIVISION 32 - EXTERIOR IMPROVEMENTS321200-PAVING " " "(Paving)321313-SITE CONC " "(Site Concrete)321400-PRECAST PAVERS "(Precast Unit Pavers)321600-CURBS/GUTTERS "(Curbs and Gutters)321700-PAVING SPECS "(Paving Specialties)321800-ATHL SURF/PED PVMNT "(Athletic Surfacing and Pedestrian Pavement)321823-INFLD SURF " "(Infield Surfacing)323000-MISC SITE IMPRVMNT "(Miscellaneous Site Improvements)323100-FENCE " " "(Fencing)327000-WETLANDS " "(Wetlands)329000-PLANTS " " "(Plantings)329113-SOIL PREP " "(Soil Preparation)329200-LAWN/GRASS " "(Lawns and Grasses)DIVISION 33 - UTILITIES331000-WATER DISTR"(Water Distribution)333000-SANITARY SEWER "(Sanitary Sewerage) " "334000-STORM DRAINAGE "(Storm Drainage)334610-LNDSCP SUBDRAIN "(Landscape Subdrainage)

GENERALG.0.01 "Title SheetG.0.02 "Code Analysis - Occupancy & Egress CapacityG.0.03 "Code Analysis - Fire Resistance RatingG.0.04 "Phasing Plans - Phase 1G.0.05 "Phasing Plans - Phase 2G.0.06 "Phasing Plans - Phase 3G.0.07 "Phasing Plans - Phase 4G.0.08 "Phasing Plans - Phase 5

SURVEY1.0.00 "Existing Conditions Plan of Land1.0.01 "Existing Conditions Plan of Land1.0.02 "Existing Conditions Plan of Land1.0.03 "Existing Conditions Plan of Land1.0.04 "Existing Conditions Plan of Land1.0.05 "Roof Survey

LANDSCAPE1.1.0 "Sheet Layout and Site Context Plan1.1.1 "Demolition Plan

1.2.1 "Layout Plan1.2.2 "Layout Plan1.2.3 "Layout Plan1.2.4 "Layout Plan1.2.5 "Materials Plan1.2.6 "Materials Plan1.2.7 "Materials Plan1.2.8 "Materials Plan1.2.9 "Layout and Materials Plan Enlargement1.2.10 "Layout and Materials Plan Enlargement

1.3.01 "Vehicular Pavement Layout & Materials Plan1.3.02 "Vehicular Pavement Layout & Materials Plan1.3.03 "Vehicular Pavement Layout & Materials Plan1.3.04 "Vehicular Pavement Layout & Materials Details1.3.05 "Stormwater Grading and Drainage Plan1.3.06 "Stormwater Grading and Drainage Plan1.3.07 "Stormwater Grading and Drainage Plan1.3.08 "Stormwater Grading and Drainage Plan1.3.09 "Stormwater Grading and Drainage Details1.3.10 "Stormwater Grading and Drainage Details1.3.11 "Site Utilities Plan1.3.12 "Site Utilities Plan1.3.13 "Site Utilities Plan1.3.14 "Site Utilities Details1.3.15 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.16 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.17 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.18 "Erosion and Sediment Control & Wetland

"Replication Plan1.3.19 "Erosion and Sediment Control & Wetland

"Replication Details1.3.20 "Erosion and Sediment Control & Wetland

"Replication Details

1.4.1 "Grading Plan1.4.2 "Grading Plan1.4.3 "Grading Plan1.4.4 "Grading Plan

1.5.1 "Soils and Underdrainage Plan

1.6.1 "Irrigation and Coverage Plan

1.7.1 "Planting Plan1.7.2 "Planting Plan1.7.3 "Planting Plan1.7.4 "Planting Plan1.7.5 "Planting Details

1.8.1 "Site Details1.8.2 "Site Details1.8.3 "Site Details1.8.4 "Site Details1.8.5 "Site Details1.8.6 "Site Details1.8.7 "Site Details1.8.8 "Track Deduct Alternate Plan

STRUCTURAL2.1.01 "General Notes2.1.02 "Typical Details I2.1.03 "Typical Details II2.1.04 "Typical Details III2.1.05 "Typical Details IV2.1.06 "Typical Details V

2.2.01 "First Floor/Foundation Plan2.2.02 "Second Floor Framing Plan2.2.03 "Third Floor Framing Plan2.2.04 "Roof Framing Plan2.2.05 "First Floor/Foundation Plan2.2.06 "Second Floor Framing Plan2.2.07 "Third Floor Framing Plan2.2.08 "Roof Framing Plan2.2.09 "Rooftop Mechanical Unit Screen Plans

2.3.01 "Base Plate and Pilaster Details2.3.02 "Lateral Load Resisting System Elevations2.3.03 "Lateral Load Resisting System Elevations

"and Details2.4.01 "Foundation Sections2.4.02 "Foundation Sections

2.5.01 "Floor Sections2.5.02 "Floor Sections2.5.03 "Floor Sections

2.6.01 "Gymnasium Roof Truss Details2.6.02 "Roof Sections

ARCHITECTURAL3.4.01 "First Floor Plan3.4.02 "Second Floor Plan3.4.03 "Third Floor Plan3.4.04 "First Floor Plan3.4.05 "Second Floor Plan3.4.06 "Third Floor Plan3.5.01 "Roof Plan3.5.02 "Roof Plan3.5.03 "Roof Details3.5.04 "Roof Details3.5.05 "Roof Details3.6.01 "Exterior Elevations3.6.02 "Exterior Elevations3.6.03 "Exterior Elevations3.7.01 "Building Section: South-North Cross3.7.02 "Building Section3.7.03 "Building Section3.7.04 "Building Section3.8.01 "Typical Classroom Wall Sections &

"Typical Bay Elevation3.8.02 "Wall Sections3.8.03 "Wall Sections3.8.04 "Wall Sections3.8.05 "Wall Sections3.8.06 "Wall Sections3.8.07 "Wall Sections3.8.08 "Wall Sections3.8.09 "Wall Sections3.8.10 "Wall Sections3.8.11 "Wall Sections3.8.12 "Not Used3.8.13 "Not Used3.8.14 "Not Used3.8.15 "Stair 2 - Enlarged Sections and Elevations3.8.16 "Stair 2 - Enlarged Sections and Elevations3.8.17 "Stair 2 - Enlarged Sections and Elevations3.8.18 "Stair 2 - Enlarged Plans and Details3.8.19 "Stair 3 - Enlarged Plans and Details3.8.20 "Stair 1 - Enlarged Plans and Details3.8.21 "Not Used3.8.22 "Stair Vertical Details3.9.01 "Construction Details - Exterior3.9.02 "Construction Details - Exterior3.9.03 "Construction Details - Exterior3.9.04 "Construction Details - Exterior3.9.05 "Construction Details - Exterior3.9.06 "Construction Details - Exterior3.9.07 "Not Used3.9.08 "Not Used3.9.09 "Not Used

ARCHITECTURAL (cont'd)3.9.10 "Vertical Details - Exterior3.9.11 "Vertical Details - Exterior3.9.12 "Vertical Details - Exterior3.9.13 "Vertical Details - Exterior3.9.14 "Vertical Details - Exterior3.9.15 "Vertical Details - Exterior3.9.16 "Vertical Details - Exterior3.9.17 "Vertical Details - Exterior

4.1.01 "Window Elevations4.1.02 "Curtainwall Elevations4.1.03 "Curtainwall Louvers & Fire Rated Frame Elevations4.1.04 "Storefront Elevations4.1.05 "Window Details4.1.06 "Window Details4.1.07 "Window Details4.1.08 "Window Details4.1.09 "Window Details4.1.10 "Curtainwall Details4.1.11 "Curtainwall Details4.1.12 "Curtainwall Details4.1.13 "Curtainwall Details4.2.01 "Door and Frame Schedule4.2.02 "Door and Frame Details4.2.03 "Door and Frame Details4.3.01 "Room Finish Schedule4.3.02 "Wall Details & Partition Types

5.1.01 "Reflected Ceiling Plan First Floor5.1.02 "Reflected Ceiling Plan Second Floor5.1.03 "Reflected Ceiling Plan Third Floor5.1.04 "Reflected Ceiling Plan First Floor5.1.05 "Reflected Ceiling Plan Second Floor5.1.06 "Reflected Ceiling Plan Third Floor5.1.07 "Ceiling Details5.1.08 "Ceiling Details5.2.01 "Not Used5.2.02 "Stair 2 - Plans and Sections5.2.03 "Not Used5.2.04 "Elevators, Stairs & Ramps-Plans and Sections5.2.05 "Stair Details5.2.06 "Stair Details5.3.01 "Enlarged Toilet Plans & Elevations5.3.02 "Enlarged Toilet Plans & Elevations5.4.01 "Interior Elevations5.4.02 "Interior Elevations5.4.03 "Interior Elevations5.4.04 "Interior Elevations5.4.05 "Interior Elevations5.4.06 "Interior Elevations5.4.07 "Interior Elevations5.4.08 "Interior Elevations5.4.09 "Interior Elevations5.4.10 "Interior Elevations5.4.11 "Interior Elevations5.4.12 "Interior Elevations5.4.13 "Interior Elevations5.6.01 "Millwork Details5.6.02 "Millwork Plans and Elevations5.6.03 "Millwork Plans and Elevations5.6.04 "Millwork Sections5.6.05 "Millwork Sections5.6.06 "Millwork Plans and Elevations5.6.07 "Millwork Library Plan5.6.08 "Millwork Library Plan5.6.09 "Millwork Library Elevations5.6.10 "Millwork Library Elevations5.6.11 "Millwork Sections5.6.12 "Millwork Sections

FOOD SERVICE6.0.01 "Foodservice Equipment Plan6.0.02 "Foodservice Equipment Rough-In Plan6.0.03 "Foodservice Equipment

FIRE PROTECTION7.1.01 "Fire Protection Legend, Details and Notes

7.4.01 "Fire Protection First Floor (West Wing)7.4.02 "Fire Protection Second Floor (West Wing)7.4.03 "Not Used7.4.04 "Fire Protection First Floor (East Wing)7.4.05 "Fire Protection Second Floor (East Wing)7.4.06 "Fire Protection Third Floor (East Wing)

PLUMBING8.1.01 "Plumbing Schedule, Legend

"& Piping Diagram

8.4.01 "Plumbing 1st Floor Plan (West Wing)8.4.02 "Plumbing 2nd Floor Plan (West Wing)8.4.03 "Not Used8.4.04 "Plumbing 1st Floor Plan (East Wing)8.4.05 "Plumbing 2nd Floor Plan (East Wing)8.4.06 "Plumbing 3rd Floor Plan (East Wing)

8.5.01 "Plumbing Roof Plan (West Wing)8.5.02 "Plumbing Roof Plan (East Wing)

8.6.01 "Kitchen Plumbing Plan

8.7.01 "Plumbing Details8.7.02 "Plumbing Details

8.8.01 "Plumbing Stack Riser Diagrams

MECHANICAL9.0.01 "HVAC Legend, Notes and Abbreviations

9.4.01 "HVAC First Floor Plan West9.4.02 "HVAC Second Floor Plan West9.4.03 "HVAC Third Floor Plan West9.4.04 "HVAC First Floor Plan East9.4.05 "HVAC Second Floor Plan East9.4.06 "HVAC Third Floor Plan East

9.5.01 "HVAC Roof Plan West9.5.02 "HVAC Roof Plan East

9.6.01 "HVAC Mechanical Room Part Plan

9.7.01 "HVAC Details9.7.02 "HVAC Details9.7.03 "HVAC Details9.7.04 "HVAC Details

9.8.01 "HVAC Controls9.8.02 "HVAC Controls9.8.03 "HVAC Controls9.8.04 "HVAC Controls

9.9.01 "HVAC Schedules9.9.02 "HVAC Schedules9.9.03 "HVAC Schedules

ELECTRICAL10.0.01 "Symbol List10.0.02 "Technology Symbol List10.0.03 "Light Fixture Schedule

10.1.01 "Existing Site Electrical Plan10.1.02 "Site Lighting Plan10.1.03 "Site Power Plan10.1.04 "Site Details Sheet #110.1.05 "Site Details Sheet #2

10.2.01 "First Floor Lighting Plan10.2.02 "First Floor Power Plan10.2.03 "Second Floor Lighting Plan10.2.04 "Second Floor Power Plan10.2.05 "Third Floor Lighting Plan10.2.06 "Third Floor Power Plan10.2.07 "First Floor Lighting Plan10.2.08 "First Floor Power Plan10.2.09 "Second Floor Lighting Plan10.2.10 "Second Floor Power Plan10.2.11 "Third Floor Lighting Plan10.2.12 "Third Floor Power Plan10.2.13 "First Floor Fire Alarm System Plan10.2.14 "Second Floor Fire Alarm System Plan10.2.15 "Third Floor Fire Alarm System Plan10.2.16 "First Floor Fire Alarm System Plan10.2.17 "Second Floor Fire Alarm System Plan10.2.18 "Third Floor Fire Alarm System Plan10.2.19 "Roof Lightning Protection Plan10.2.20 "Enlarged Kitchen Plan

10.3.01 "Power Riser Diagram10.3.02 "Panel Schedules10.3.03 "Mechanical Equipment Schedules10.3.04 "Fire Alarm System Riser Diagram

"and Details Sheet10.3.05 "Voice/Data Riser Diagram10.3.06 "Voice/Data Details10.3.07 "Lighting Control Details Sheet #110.3.08 "Lighting Control Details Sheet #210.3.09 "Sound System Details10.3.10 "Details Sheet #110.3.11 "Details Sheet #2

Top Related