dopas training workshop 2015 - etusivu - posiva · for high-level waste in germany is under...

25
DOPAS TRAINING WORKSHOP 2015 Sealing Nuclear Waste Repositories in Salt The ELSA Experiment André Rübel (GRS) D5 4.3.2 18 September 2015 The research leading to these results has received funding from the European Union’s European Atomic Energy Community’s (Euratom) Seventh Framework Programme FP7/2007-2013, under Grant Agreement No. 323273 for the DOPAS project.

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

DOPAS TRAINING WORKSHOP 2015

Sealing Nuclear Waste Repositoriesin Salt

The ELSA Experiment

André Rübel (GRS)

D5 4.3.218 September 2015

The research leading to these results has received funding from theEuropean Union’s European Atomic Energy Community’s (Euratom)

Seventh Framework Programme FP7/2007-2013, under GrantAgreement No. 323273 for the DOPAS project.

Page 2: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

German safety concept for a repository in salt

DOPAS TRAINING WORKSHOP 2015 2

Page 3: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Background

§ Since 1970‘s salt dome Gorleben is investigated as potential site forheat-generating waste§ Start of construction of underground mine in 1986§ Site specific research project on long-term safety 2010 – 2013

• Preliminary Gorleben Safety Analysis (VSG)• ® Sealing concept for salt used in DOPAS is based on VSG work

§ 2011: Phase out from nuclear energy in Germany until 2022§ Strategy of the site selection and licensing procedure for a nuclear waste repository

for high-level waste in Germany is under discussion§ New start of site selection with “white map”§ Three geologies will be considered in the future

• Salt, Clay, Crystalline

DOPAS TRAINING WORKSHOP 2015 3

Page 4: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Geological situation at Gorleben site

Upper/lower

Tertiary

Quaternary

Repository level

lowercretaceous

Jurassic

TriassicZechstein

Permian red beds(c) BGR

DOPAS TRAINING WORKSHOP 2015 4

Page 5: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

View into the Gorleben underground mine

(c) BfS

DOPAS TRAINING WORKSHOP 2015 5

Page 6: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Salt structures in GermanyPerm (296-251 million years)

Salt diapirsSalt pillows

DOPAS TRAINING WORKSHOP 2015 6

BGR

Gorlebensalt dome

Page 7: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Safety concept (general)

German Safety Requirements (2010)

§ Radioactive waste must be concentrated and contained in theIsolating Rock Zone (ewG)§ No intervention or maintenance work is required during the post-closure phase§ The isolating rock zone is part of the repository system which,

in conjunction with the technical sealsin conjunction with the technical sealsensures containment of the waste.§ Release of radioactivity only negligibly

increases the risks associatedwith natural radiation exposure§ Allowance for simplified

radiological statement at ewG boundary

DOPAS TRAINING WORKSHOP 2015 7

Emplacement area

Page 8: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Safety concept salt

Preliminary Gorleben Safety Analysis (VSG)

§ Isolation should be achieved by minimizing contact of the waste with water§ For probable evolutions of repository it is strived for that no or at the most

very small amounts of external water gets in contact with the waste§ Salt host rock is dry and impermeable for water, inflow only through drift system→ Sealing of shaft and access drifts is of high importance for the safety concept→ Sealing of shaft and access drifts is of high importance for the safety concept

• Short term: Constructed shaft and drift seals• Long term: Compacted salt grit backfill in access drifts

- Salt grit is compacted by convergence of the salt host rock- Pre-compaction is used to speed up compaction process- Addition of 0.6% of water is discussed to speed up compaction process- Compaction under these circumstances within a few 1 000 of years to a

permeability to less than 1E-19 m²

DOPAS TRAINING WORKSHOP 2015 8

Page 9: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Safety concept salt

Overburden

Host RockEx

cava

tion

Dis

turb

edZo

ne

Exca

vatio

nD

istu

rbed

Zone

Compaction of backfilland closure of drift

Shaf

t

Excavation Disturbed Zone

Shaftseal

DOPAS TRAINING WORKSHOP 2015 9

RN RN

Backfill (salt grit)

„Water“

Compaction of backfilland closure of drift

DriftExcavation Disturbed Zone

Excavation Disturbed Zone

Drift seal

Page 10: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Safety concept salt

Overburden

Host RockEx

cava

tion

Dis

turb

edZo

ne

Exca

vatio

nD

istu

rbed

Zone

Shaftseal

Shaf

t

Closed Excavation Disturbed Zone

DOPAS TRAINING WORKSHOP 2015 10

Drift seal

RN RN

Long-term sealing bycompacted salt grit

DriftClosed Excavation Disturbed Zone

Closed Excavation Disturbed Zone

Page 11: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Repository concept for a high-level waste repository at Gorleben

DOPAS TRAINING WORKSHOP 2015 11

Page 12: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Repository layout (drift emplacement concept)

DOPAS TRAINING WORKSHOP 2015 12

(c) DBETec

Page 13: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Infrastructure area and drift sealing system

D = sealing elementDrift seal D = sealing elementWL = static abutment

DOPAS TRAINING WORKSHOP 2015 13

(c) DBETec

Shaft 1

Shaft 2

Drift seal

Page 14: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Boundary conditions

Envisaged life time of shaft sealing is 50 000 years

Materials§ Bentonite§ Crushed salt (long-term sealing)§ Salt concrete (cement and crushed salt)§ Sorel concrete (MgO as adhesive cement and crushed salt as aggregate)§ Sorel concrete (MgO as adhesive cement and crushed salt as aggregate)

Main Impacts§ Mechanical

• Forces and tensions like weight, rock pressure, fluid pressure...• Distortions like swelling/shrinkage, creep/relaxation...

§ Chemical• Dissolution and alteration from solutions and gases

§ Temperature induced effects

DOPAS TRAINING WORKSHOP 2015 14

Page 15: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Shaft sealing system

Shaft foundationSupport ringsDrainage layer (sand/gravel)1. Sealing element (bentonite)

Drainage layer (basalt gravel)Abutment (salt concrete)

Abutment/reservoir (basalt gravel)

Long term sealing (compacted salt grit)Sacrificial layer (salt concrete)Abutment (salt concrete)2. Sealing element (salt concrete)Abutment (salt concrete)Abutment/reservoir (basalt gravel + bischofite)3. Sealing element (sorel concrete)Abutment (sorel concrete)

DOPAS TRAINING WORKSHOP 2015 15(c) DBETec

Page 16: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Work on sealing material in DOPAS and related projects

DOPAS TRAINING WORKSHOP 2015 16

Page 17: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

ELSA - Experiment

Phase 1 (completed)§ Boundary conditions and requirements for shaft sealPhase 2 (running)§ Experimental investigations and process modelling

• Optimization of the preliminary shaft sealing concept• Material selection and characterization (Lab tests)• Further development and (in-situ) test of• Further development and (in-situ) test of

- compaction procedures of salt grit or salt grit/bentonite mixtures- injection procedure (EDZ)- specific bitumen elements- accelerated and uniform bentonite plug saturation

Phase 3 (future)§ Large scale in-situ demonstration test of individual functional shaft sealing

components

DOPAS TRAINING WORKSHOP 2015 17

Page 18: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Geochemical laboratory experiments and modelling (GRS)

Static and flow corrosion experiments on salt concrete and sorel concretewith different porosities and different solutions

Matrix corrosion sealing material

sealing material

rock salt

rock salt

sealing material

DOPAS TRAINING WORKSHOP 2015 18

Corrosion on cracks

Corrosion at interfaces

sealing material

sealing material

Page 19: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Geotechnical laboratory experiments and modelling (GRS)

Uniaxial creep

DOPAS TRAINING WORKSHOP 2015 19

Page 20: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Mid-Scale in situ testing on material behaviour (DBETec)

§ In-situ test using sorel concrete• Large borehole including monitoring equipment has been filled• Wait for stable conditions (hardening)• Permeability measurements

DOPAS TRAINING WORKSHOP 2015 20

DBETec

Page 21: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Mid-Scale in situ testing on material behaviour (DBETec)

§ In-situ test using bitumen and asphalt• Permeability ≤ 3E-21 to 6E-20 m² for bitumen and ≤ 3E-20 m² for asphalt

DOPAS TRAINING WORKSHOP 2015 21

DBETec

Page 22: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

In-situ testing on emplacement and compaction procedures (DBETec)

Total porosity: 13.3%Permeability (brine): 6.6E-16 m2 (start)

1,8E-19 m2 (end, 22h)

DOPAS TRAINING WORKSHOP 2015 22

DBETec

Page 23: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Future steps in ELSA experiment

Large scale in-situ demonstration test of individual functional shaft sealingcomponents

§ Already done prior to DOPAS:• Large scale in-situ experiment on gravel column as shaft filling material• Large scale in-situ experiment on bentonite shaft sealing element• Large scale in-situ experiment on salt concrete drift sealing

DOPAS TRAINING WORKSHOP 2015 23

• Large scale in-situ experiment on salt concrete drift sealing

§ Locations for future experiments to be found for experiments on shaft sealingelements from• Salt concrete• Sorel concrete• Crushed salt (Long-term sealing element)

Page 24: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

§ Copyright notice• This material can only be used for non-commercial use• If no reference given, pictures in the presentation by GRS

§ References for further reading:• Reports of the Preliminary Gorleben Safety Analysis (VSG) (mainly in German):

http://www.grs.de/endlagersicherheit/gorleben/ergebnisse• Jobmann, M. (2013). Requirements for shaft seals for HLW repositories in

DOPAS TRAINING WORKSHOP 2015 24

Germany, Technical Report, translated extraction from (Kudla et al. 2013), DBETECHNOLOGY, Peine.http://www.posiva.fi/files/3562/Requirements_shaft-sealing_Germany.pdf

• Herold, P. & Müller-Hoeppe, N. (2013). Safety demonstration and verificationconcept - Principle and application examples - Technical Report, translatedextraction from (Kudla et al. 2013), DBE TECHNOLOGY GmbH, Peine.http://www.posiva.fi/files/3563/Safety_demonstration_for_shaft_sealing_elements_Germany.pdf

Page 25: DOPAS TRAINING WORKSHOP 2015 - Etusivu - Posiva · for high-level waste in Germany is under discussion ... 1,8E-19 m2 (end, 22h) DOPAS TRAINING WORKSHOP 2015 22 DBETec. ... Requirements

Acknowledgement

The research leading to these results has received funding

from the European Atomic Energy Community's (Euratom) SeventhFramework Programme FP7/2007-2013,

under Grant Agreement No. 323273 for the DOPAS project

and contracts02E11122, 02E11132, 02E10377, 02E11142, 02E11193 A and B

from the German Federal Ministry of Economic Affairs and Energy(BMWi).