distribution center vsm example_juarez
TRANSCRIPT
Customers
ORD
Order input in BPCS
Production
Production of orders
Whs 65
Put material in Whs 65
loc.
C / T = ~5 min
4:10 AM
Up Time = n/a
Opr = none
Working Time = 1 shift
C / T = ~ 120 min
1 cart = 168 units
No smoking test
Opr = 2 operator
Working Time = 1 shifts
BPCS
Creates scheduling &
skid tagsI
Staging10 min
sx
Final Audit
Revise & release product I
Staging20 min
sx
Whs 75
Put material in location Whs. 75
Staging
I
Staging
Whs 75
Run pickable report & release available orders
Whs 65
Input DRP processI
Staging
I
Staging
Whs 65
Pull material from location
Whs 65
Put material in metro carts I
Staging
Whs 65
Process by packer station
Whs 65Process by
shipper station/Confirm
I
Staging
Whs 65
Put material in skidI
Staging
Whs 65
Stretch wrap & put in truckI
Staging
Ship & billRelease the
truck & process billing
I
Staging
EDI
EDI
Transfer of orders
EDI
BPCS
ORDERSEDI
BPCS
Varsity
Priority codes 99,50,49
EDIImpromtu
C / T = 180 min
Up Time = n/a
Opr = 1 cell
Working Time = 1 shift
Priority codes 99,50,49
C / T = ~ 20 min
1 cart = 168 units
waste = transportation
Opr = 1 operator
Working Time = 1 shifts
1302.5 min
413 min25 min10 min 30 min 15 min 7.5 min 15 min ~ 180 min 25 minC / T = ~20 min
5:00 AM
Up Time = n/a
Opr = none
Working Time = 1 shift
Priority codes 99,50,49
I
C / T = ~ 60 min
Release is combine
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 30 min
All batch combine
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 35 min
I batch
Waste – extra transaction
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 15 min
1 pickable report
Opr = operator
Working Time = 1 shifts
C / T = ~ 10 min
1 batch
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 5 min
1 batch
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 3 min
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 3 min
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 7 min
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 15 min
1 full skid
OTTR 96 % in 24 hrs
Opr = operator
Working Time = 1 shifts
C / T = ~ 60 min
1 truck
Opr = 2 operator
Working Time = 1 shifts
Whs 65Run pickable
report & release order
IRA 94%
3 orders batch
Waste -waiting
Waiting time = 90 min
VSM ACTUAL
Whs 65
Pick TYCO batch pulling
C / T = ~ 30 min
All batch combine
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
Whs 75
Pick UPS/ FEDEX
C / T = ~ 30 min
All batch combine (10 orders)
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
I
Staging10 min
Whs 75
Process order UPS #1/
FEDEX #1
C / T = 2.5 min
Order =
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Whs 75
Process order UPS #2/
FEDEX #2
C / T = 2.5 min
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Whs 75
Put material on FEDEX or UPS’s skid
Order = 1
Whs 75
Wrap / Strap/ Load on
TruckI
Staging 5 min
I
360 min
Staging
d
Whs 75
C / T = 10 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1
C / T = 1 min
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Order = 1
Do Customs paperwork
C / T = 30 min
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
d
Whs 75
Customs process
C / T = 60 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
d
Whs 75
Security release.Driver
documentation
C / T = 30 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
d
METRICOS
Safety = 0 Accidents / Incidents
Quality = 0 Shipping Issues / Internal discrepancies
Cost = Overtime 27 hrs per week (1&2 shifts)
20 min 180 min
120 min
5 min
20 min10 min 20 min 90 min 60 min
30 min 10 min 2.5 min 5 min 2.5 min 1 min 360 min 10 min 30 min 60 min 30 min
= Total NVA
= Total VA
846 min
230 min
EDI
Vastera
Vastera
EDI
Optima
Optima
Audit
Internal audit`
Whs 75
C / T = ~ 20 min
Opr = 1 operator
Working Time = 1 shifts
Waste overprocessed
Pull material from location for
LTLs orders
Put material in pallets I
Staging
Whs 75
Process by picker station
Process by shipper station/ConfirmI
Staging
IStaging
Whs 75
Stretch wrap & put in truck I
Staging
Ship & billRelease the
truck & process billing
I
Staging
607.5 min
314 min
25 min 7.5 min 15 min ~ 180 min 25 minC / T = ~ 5 min
1 batch
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
1 order
Opr = 1 operator
Working Time = 1 shifts
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 15 min
1 full skid
OTTR 96 % in 24 hrs
Opr = operator
Working Time = 1 shifts
C / T = ~ 60 min
1 truck
Opr = 2 operator
Working Time = 1 shifts
15 min 60 min12 min
3 orders batch
Waste -waiting
Whs 75 Whs 75
= Total VA
= Total NVA
C / T = ~ 12 min C / T = ~ 12 min
All batch for LTLs
March 2008
VSM Actual 1
Distribution Center for Juarez Life Safety
May 2009
EDI
Receive Order
SAP
Order input in SAP
Production
Production of orders
Whs 65
Put material in Whs 65
loc.
C / T = ~10 min
4:00 AM
Up Time = N/A
Opr = none
Working Time = 1 shift
C / T = ~5 min
4:10 AM
Up Time = n/a
Opr = none
Working Time = 1 shift
SAP
Creates scheduling &
skid tags
I
Staging
10 min
sx
Final Audit
Revise & release product
Staging
f
I I
Staging
Whs 65
Pull material from location
Whs 65
Put material in metro
carts
I
Staging
Whs 65
Process Packer & shipper station
Whs 65
Put material in skid
Whs 65
Stretch wrap & put in truckI
Staging
Ship & bill
Release the truck &
process billingI
Staging
EDI
EDI
Transfer of orders
EDI
SAP
ORDERSEDI
BPCS
VarsityPriority codes 99,50,49
EDIImpromtu
C / T = 180 min
Up Time = n/a
Opr = 1 cell
Working Time = 1 shiftPriority codes 99,50,49
= Total NVA
= Total VA
0.05 days
0.08 days
0.1 days
342 min
233 min
25 min15 min ~ 180
min25 min
C / T = ~20 min
5:00 AM
Up Time = n/a
Opr = none
Working Time = 1 shiftPriority codes 99,50,49
C / T = ~ 15 min
1 pickable report
Opr = operator
Working Time = 1 shifts
C / T = ~ 10 min
1 batchWaste - transportation
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 5 min
1 batch
Waste - transportationOpr = 1 operator
Working Time = 1 shifts
C / T = ~ 3 min
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 7 min
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 15 min
1 full skid
OTTR 96 % in 24 hrs
Opr = operator
C / T = ~ 60 min
1 truck
Opr = 2 operator
Working Time = 1 shifts
Whs 65
Run pickable report &
release order
VSM FUTURE
C / T = ~ 30 min
All batch combine
Waste - transportation
Opr = 1 operator
Whs 75
Pick UPS/ FEDEX
C / T = ~ 30 min
All batch combine (10 orders)
Waste - transportation
I
Staging
10 min
Whs 75
C / T = 2.5 min
Order =
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Whs 75
Put material on FEDEX or UPS’s skid
Whs 75
Wrap / Strap/ Load on
Truck
I
360 min
Staging
d
Whs 75
C / T = 10 min
Waste - transportationOpr = 1 operator
Working Time = 1 shift
Order = 1
C / T = 1 min
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Order = 1
Do Customs paperwork
C / T = 60 min
Waste - Waiting
Opr = 1 operatorWorking Time = 1 shift
Order = 1 & 2 shift orders
d
Whs 75
Customs process
C / T = 30 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
d
Whs 75
Security release.Driver
documentation
C / T = 30 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
20 min
180 min
120 min
10 min
5 min
20 min10 min 30 min
30 min 10 min 2.5 min 1 min360 min
10 min 60 min 30 min 30 min
= Total NVA
= Total VA
701 min
227.5 min
EDI
Vastera
Vastera
EDI
Optima
Optima
Audit
Internal audit`
Whs 75
C / T = ~ 20 min
Opr = 1 operator
Working Time = 1 shifts
Waste overprocessed
20 min
C / T = ~ 10 min
1 batch
Waste - transportationOpr = 1 operatorWorking Time = 1 shifts
10 min
IRA 94%
Pull material from location
for LTLs orders
Put material in pallets I
Staging
Whs 75
Process by picker station
Process by shipper station/
ConfirmI
Staging
I
Staging
Whs 75
Stretch wrap & put in truck I
Staging
Ship & bill
Release the truck &
process billingI
Staging
25 min 7.5 min 15 min ~ 180 min
25 minC / T = ~ 5 min
1 batch
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
1 order
Opr = 1 operator
Working Time = 1 shifts
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 15 min
1 full skid
OTTR 96 % in 24 hrs
Opr = operatorWorking Time = 1 shifts
C / T = ~ 60 min
1 truck
Opr = 2 operator
Working Time = 1 shifts
15 min 60 min
15 min 25 min180 min5 min
12 min 12 min
25 min 7.5 min
3 orders batch
Waste -waiting
Whs 75 Whs 75
= Total VA
= Total NVA
C / T = ~ 12 min C / T = ~ 12 min
All batch for LTLs
Opr = 1 operator
20 minC / T = ~ 120 min
1 cart = 168 units
No smoking test
Opr = 2 operator
Working Time = 1 shifts
15 min 10 min 5 min 25 min 3 min 15 min7 min 15 min 25 min60 min
Process Packer & shipper station
VSM Actual 2Distribution Center for Juarez Life Safety
Customers
sx
Wh 3000 / 3005
Put material in location Wh 3000 & 3005
Staging
Wh 3000 / 3005
Run pickable report & release
available orders
EDI
SAP
ORDERS
C / T = ~ 20 min
1 cart = 168 units
waste = transportation
Opr = 1 operator
Working Time = 1 shifts
I
C / T = ~ 15 min
Release is combine
Opr = 1 operator
Working Time = 1 shifts
Waiting time = 90 min
VSM ACTUAL
Wh 3000 / 3005
Pick UPS/ FEDEX
C / T = ~ 30 min
All batch combine (10 orders)
Waste - transportation
I
Staging
10 min
Wh 3000 / 3005
Process order UPS /
FEDEX
C / T = 5 min
Order =
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Wh 3000 / 3005
Put material on FEDEX or UPS’s skid
Wh 3000 / 3005
Wrap / Strap/ Load on
Truck
I
360 min
Staging
d
Wh 3000 / 3005
C / T = 10 min
Waste - transportationOpr = 1 operator
Working Time = 1 shift
Order = 1
C / T = 1 min
Waste - Waiting
Opr = 1 operator
Working Time = 1 shift
Order = 1
Do Customs paperwork
C / T = 60 min
Waste - Waiting
Opr = 1 operatorWorking Time = 1 shift
Order = 1 & 2 shift orders
d
Wh 3000 / 3005
Customs process
C / T = 30 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
d
Wh 3000 / 3005
Security release.Driver
documentation
C / T = 30 min
Waste - transportation
Opr = 1 operator
Working Time = 1 shift
Order = 1 & 2 shift orders
20 min 90 min 15 min
30 min 10 min 5 min 1 min360 min
10 min 30 min 30 min
= Total NVA
= Total VA
586 min
75 min
EDI
Vastera
VasteraEDI
Optima
Optima
Audit
Internal audit`
Wh 3000 / 3005
C / T = ~ 20 min
Opr = 1 operator
Working Time = 1 shifts
Waste overprocessed
20 min
C / T = ~ 10 min
1 batch
Waste - transportation
Opr = 1 operatorWorking Time = 1 shifts
10 min
IRA 94%
Pull material from location
for LTLs orders
Put material in pallets I
Staging
Wh 3000 / 3005
Process by picker station I
Staging
I
Staging
Wh 3000 / 3005
Stretch wrap & put in truck I
Staging
Ship & bill
Release the truck &
process billingI
Staging
412.5 min
77 min
25 min 7.5 min 15 min ~ 180 min
25 minC / T = ~ 5 min
1 batch
Waste - transportation
Opr = 1 operator
Working Time = 1 shifts
1 order
Opr = 1 operator
Working Time = 1 shifts
1 order
Opr = 1 operator
Working Time = 1 shifts
C / T = ~ 15 min
1 full skid
OTTR 96 % in 24 hrs
Opr = operatorWorking Time = 1 shifts
C / T = ~ 60 min
1 truck
Opr = 1 operator
Working Time = 1 shifts
15 min 30 min
15 min 25 min180 min5 min
20 min 12 min
25 min 7.5 min
3 orders batch
Waste -waiting
Wh 3000 / 3005
= Total VA
= Total NVA
C / T = ~ 20 min C / T = ~ 12 min
All batch for LTLs
Print orders Automatically
Implement bar Code system
Opr = 1 operator
60 min
Wh 3000 / 3005
Wrap / Strap/ Load on
Truck
Jan 2010
VSM Actual 3
Distribution Center for Juarez Life Safety
Customers
EDI
Receive Order
ORD
Production see order
C / T = ~10 min
6:00 AM
Up Time = N/A
Opr = none
Working Time = 1 shift
C / T = n/a
Up Time = n/a
Opr = none
Working Time = 1 shift
Produce by customer order
and qty
sxAutomatic creates shipping
paperworkI
Staging
Shipping
Pack material
EDI
EDI
Transfer of orders
EDI
BPCS
ORDERS
Priority codes 99,50,49
C / T = 5 min
Up Time = n/a
Opr = 1
Working Time = 1 shift
Priority codes 99,50,49
C / T = 5 min
Opr = 1 operator
waste = transportation
= Total NVA245 min
265 min
240 minC / T = 180 min
6:10 AM
Up Time = n/a
Opr = 1 cell
Working Time = 1 shift
Priority codes 99,50,49
C / T = 5 min
Opr = 1 operator
Working Time = 1 shifts
C / T = 20 min
Opr = 1 operator
Working Time = 1 shifts
C / T = 10 min
Opr = 1 operator
Working Time = 1 shifts
C / T = 10 min
Opr = 1 operator
Working Time = 1 shifts
20 min180 min10 min 0 min
5 min 240 min
6:10 AM
Production Production
Receive scan direct to C.O
ShippingTransport material to shipping
5 min
Shipping
5 min
Shipping
Put material on skid
9:10 AM
9:15 AM
9:20 AM 9:40 AM
C / T = 15 min
Opr = 1 operator
Working Time = 1 shifts
9:55 AM
Machine = Forklift
15 min
Shipping
Put material on truck
2:00 PM
Machine = Forklift
Shipping Shipping
Ship Material Billing
10 min 10 min 10 min
C / T = 10 min
Opr = 1 operator
Working Time = 1 shifts
2:00 PM
Machine = Forklift
VSM IDEAL
July 2010Distribution Center for Juarez Life Safety