distribution center vsm example_juarez

4
Customers ORD Orderinputin BPCS Production Production of orders W hs 65 Putmaterial in W hs 65 loc. C /T = ~5 min 4:10 AM Up Time = n/a Opr= none Working Time = 1 shift C /T = ~ 120 min 1 cart= 168 units No smoking test Opr= 2 operator W orking Time = 1 shifts BPCS Creates scheduling & skid tags I Staging 10 min sx Final Audit Revise & release product I Staging 20 min sx W hs 75 P utmaterial in location W hs.75 Staging I Staging W hs 75 Run pickable report& release available orders W hs 65 InputDRP process I Staging I Staging W hs 65 Pull material from location W hs 65 Putmaterial in metro carts I Staging W hs 65 Process by packerstation W hs 65 Process by shipperstation/ Confirm I Staging W hs 65 Putmaterial in skid I Staging W hs 65 Stretch wrap & putin truck I Staging Ship & bill Release the truck & process billing I Staging EDI EDI Transferoforders EDI BPCS ORDERS EDI BPCS Varsity Priority codes 99,50,49 EDI Impromtu C /T = 180 min Up Time = n/a Opr= 1 cell W orking Time = 1 shift Priority codes 99,50,49 C /T = ~ 20 min 1 cart= 168 units waste = transportation Opr= 1 operator W orking Time = 1 shifts 1302.5 m in 413 m in 25 min 10 min 30 min 15 min 7.5 min 15 min ~ 180 min 25 min C /T = ~20 min 5:00 AM Up Time = n/a Opr= none Working Time = 1 shift Priority codes 99,50,49 I C /T = ~ 60 min Release is combine Opr= 1 operator Working Time = 1 shifts C /T = ~ 30 min All batch combine W aste -transportation Opr= 1 operator W orking Time = 1 shifts C /T = ~ 35 min Ibatch Waste – extra transaction Opr= 1 operator Working Time = 1 shifts C /T = ~ 15 min 1 pickable report O pr= operator Working Time = 1 shifts C /T = ~ 10 min 1 batch Waste -transportation Opr= 1 operator Working Time = 1 shifts C /T = ~ 5 min 1 batch Waste -transportation Opr= 1 operator Working Time = 1 shifts C /T = ~ 3 min 1 order Opr= 1 operator Working Time = 1 shifts C /T = ~ 3 min 1 order Opr= 1 operator W orking Time = 1 shifts C /T = ~ 7 min 1 order Opr= 1 operator W orking Time = 1 shifts C /T = ~ 15 min 1 full skid OTT R 96 % in 24 hrs O pr= operator Working Time = 1 shifts C /T = ~ 60 min 1 truck Opr= 2 operator Working Time = 1 shifts W hs 65 Run pickable report& release order IR A 94% 3 orders batch Waste -waiting Waiting time = 90 min VSM ACTUAL W hs 65 Pick TYC O batch pulling C /T = ~ 30 min Allbatch combine Waste -transportation Opr= 1 operator Working Time = 1 shifts W hs 75 Pick U PS/ FEDEX C /T = ~ 30 min Allbatch combine (10 orders) Waste -transportation Opr= 1 operator Working Time = 1 shift I Staging 10 min W hs 75 Process order UPS #1/ FEDEX #1 C /T = 2.5 min Order= W aste -W aiting Opr= 1 operator W orking Time = 1 shift W hs 75 Process order U PS #2/ FEDEX #2 C /T = 2.5 min W aste -Waiting Opr= 1 operator W orking Time = 1 shift W hs 75 Putmaterial on FED EX or UPS’s skid Order= 1 W hs 75 W rap /Strap/ Load on Truck I Staging 5 min I 360 min Staging d W hs 75 C /T = 10 min W aste -transportation Opr= 1 operator W orking Time = 1 shift Order= 1 C /T = 1 min Waste -W aiting Opr= 1 operator Working Time = 1 shift Order= 1 Do Customs paperwork C /T = 30 min W aste -Waiting Opr= 1 operator W orking Time = 1 shift Order= 1 & 2 shiftorders d W hs 75 Customs process C /T = 60 min Waste -transportation Opr= 1 operator Working Time = 1 shift Order= 1 & 2 shiftorders d W hs 75 Security release. Driver documentation C /T = 30 min W aste -transportation Opr= 1 operator W orking Time = 1 shift Order= 1 & 2 shiftorders d M ETRICOS Safety = 0 Accidents /Incidents Quality = 0 Shipping Issues /Internal discrepancies C ost= Overtim e 27 hrs perweek (1&2 shifts) 20 m in 180 m in 120 m in 5 m in 20 m in 10 min 20 m in 90 m in 60 m in 30 m in 10 m in 2.5 m in 5 m in 2.5 min 1 m in 360 m in 10 m in 30 m in 60 m in 30 m in = TotalNVA = Total VA 846 m in 230 m in EDI Vastera Vastera EDI Optima Optima Audit Internal audit ` W hs 75 C /T = ~ 20 min Opr= 1 operator Working Time = 1 shifts Waste overprocessed Pullmaterial from location for LTLs orders Putmaterial in pallets I Staging W hs 75 Process by pickerstation Process by shipper station/Confirm I Staging I Staging W hs 75 Stretch wrap & putin truck I Staging Ship & bill Release the truck & process billing I Staging 607.5 m in 314 m in 25 min 7.5 min 15 min ~ 180 min 25 min C /T = ~ 5 min 1 batch W aste -transportation Opr= 1 operator W orking Time = 1 shifts 1 order Opr= 1 operator W orking Time = 1 shifts 1 order Opr= 1 operator Working Time = 1 shifts C /T = ~ 15 min 1 full skid OTTR 96 % in 24 hrs O pr= operator Working Time = 1 shifts C /T = ~ 60 min 1 truck Opr= 2 operator W orking Time = 1 shifts 15 m in 60 m in 12 min 3 orders batch Waste -waiting W hs 75 W hs 75 = TotalVA = TotalN VA C /T = ~ 12 min C /T = ~ 12 min Allbatch forLTLs March 2008 VSM Actual 1 ribution Center for Juarez Life Safety

Upload: conveyance

Post on 08-Apr-2015

34 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Distribution Center VSM Example_Juarez

Customers

ORD

Order input in BPCS

Production

Production of orders

Whs 65

Put material in Whs 65

loc.

C / T = ~5 min

4:10 AM

Up Time = n/a

Opr = none

Working Time = 1 shift

C / T = ~ 120 min

1 cart = 168 units

No smoking test

Opr = 2 operator

Working Time = 1 shifts

BPCS

Creates scheduling &

skid tagsI

Staging10 min

sx

Final Audit

Revise & release product I

Staging20 min

sx

Whs 75

Put material in location Whs. 75

Staging

I

Staging

Whs 75

Run pickable report & release available orders

Whs 65

Input DRP processI

Staging

I

Staging

Whs 65

Pull material from location

Whs 65

Put material in metro carts I

Staging

Whs 65

Process by packer station

Whs 65Process by

shipper station/Confirm

I

Staging

Whs 65

Put material in skidI

Staging

Whs 65

Stretch wrap & put in truckI

Staging

Ship & billRelease the

truck & process billing

I

Staging

EDI

EDI

Transfer of orders

EDI

BPCS

ORDERSEDI

BPCS

Varsity

Priority codes 99,50,49

EDIImpromtu

C / T = 180 min

Up Time = n/a

Opr = 1 cell

Working Time = 1 shift

Priority codes 99,50,49

C / T = ~ 20 min

1 cart = 168 units

waste = transportation

Opr = 1 operator

Working Time = 1 shifts

1302.5 min

413 min25 min10 min 30 min 15 min 7.5 min 15 min ~ 180 min 25 minC / T = ~20 min

5:00 AM

Up Time = n/a

Opr = none

Working Time = 1 shift

Priority codes 99,50,49

I

C / T = ~ 60 min

Release is combine

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 30 min

All batch combine

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 35 min

I batch

Waste – extra transaction

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 15 min

1 pickable report

Opr = operator

Working Time = 1 shifts

C / T = ~ 10 min

1 batch

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 5 min

1 batch

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 3 min

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 3 min

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 7 min

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 15 min

1 full skid

OTTR 96 % in 24 hrs

Opr = operator

Working Time = 1 shifts

C / T = ~ 60 min

1 truck

Opr = 2 operator

Working Time = 1 shifts

Whs 65Run pickable

report & release order

IRA 94%

3 orders batch

Waste -waiting

Waiting time = 90 min

VSM ACTUAL

Whs 65

Pick TYCO batch pulling

C / T = ~ 30 min

All batch combine

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

Whs 75

Pick UPS/ FEDEX

C / T = ~ 30 min

All batch combine (10 orders)

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

I

Staging10 min

Whs 75

Process order UPS #1/

FEDEX #1

C / T = 2.5 min

Order =

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Whs 75

Process order UPS #2/

FEDEX #2

C / T = 2.5 min

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Whs 75

Put material on FEDEX or UPS’s skid

Order = 1

Whs 75

Wrap / Strap/ Load on

TruckI

Staging 5 min

I

360 min

Staging

d

Whs 75

C / T = 10 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1

C / T = 1 min

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Order = 1

Do Customs paperwork

C / T = 30 min

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

d

Whs 75

Customs process

C / T = 60 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

d

Whs 75

Security release.Driver

documentation

C / T = 30 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

d

METRICOS

Safety = 0 Accidents / Incidents

Quality = 0 Shipping Issues / Internal discrepancies

Cost = Overtime 27 hrs per week (1&2 shifts)

20 min 180 min

120 min

5 min

20 min10 min 20 min 90 min 60 min

30 min 10 min 2.5 min 5 min 2.5 min 1 min 360 min 10 min 30 min 60 min 30 min

= Total NVA

= Total VA

846 min

230 min

EDI

Vastera

Vastera

EDI

Optima

Optima

Audit

Internal audit`

Whs 75

C / T = ~ 20 min

Opr = 1 operator

Working Time = 1 shifts

Waste overprocessed

Pull material from location for

LTLs orders

Put material in pallets I

Staging

Whs 75

Process by picker station

Process by shipper station/ConfirmI

Staging

IStaging

Whs 75

Stretch wrap & put in truck I

Staging

Ship & billRelease the

truck & process billing

I

Staging

607.5 min

314 min

25 min 7.5 min 15 min ~ 180 min 25 minC / T = ~ 5 min

1 batch

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

1 order

Opr = 1 operator

Working Time = 1 shifts

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 15 min

1 full skid

OTTR 96 % in 24 hrs

Opr = operator

Working Time = 1 shifts

C / T = ~ 60 min

1 truck

Opr = 2 operator

Working Time = 1 shifts

15 min 60 min12 min

3 orders batch

Waste -waiting

Whs 75 Whs 75

= Total VA

= Total NVA

C / T = ~ 12 min C / T = ~ 12 min

All batch for LTLs

March 2008

VSM Actual 1

Distribution Center for Juarez Life Safety

Page 2: Distribution Center VSM Example_Juarez

May 2009

EDI

Receive Order

SAP

Order input in SAP

Production

Production of orders

Whs 65

Put material in Whs 65

loc.

C / T = ~10 min

4:00 AM

Up Time = N/A

Opr = none

Working Time = 1 shift

C / T = ~5 min

4:10 AM

Up Time = n/a

Opr = none

Working Time = 1 shift

SAP

Creates scheduling &

skid tags

I

Staging

10 min

sx

Final Audit

Revise & release product

Staging

f

I I

Staging

Whs 65

Pull material from location

Whs 65

Put material in metro

carts

I

Staging

Whs 65

Process Packer & shipper station

Whs 65

Put material in skid

Whs 65

Stretch wrap & put in truckI

Staging

Ship & bill

Release the truck &

process billingI

Staging

EDI

EDI

Transfer of orders

EDI

SAP

ORDERSEDI

BPCS

VarsityPriority codes 99,50,49

EDIImpromtu

C / T = 180 min

Up Time = n/a

Opr = 1 cell

Working Time = 1 shiftPriority codes 99,50,49

= Total NVA

= Total VA

0.05 days

0.08 days

0.1 days

342 min

233 min

25 min15 min ~ 180

min25 min

C / T = ~20 min

5:00 AM

Up Time = n/a

Opr = none

Working Time = 1 shiftPriority codes 99,50,49

C / T = ~ 15 min

1 pickable report

Opr = operator

Working Time = 1 shifts

C / T = ~ 10 min

1 batchWaste - transportation

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 5 min

1 batch

Waste - transportationOpr = 1 operator

Working Time = 1 shifts

C / T = ~ 3 min

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 7 min

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 15 min

1 full skid

OTTR 96 % in 24 hrs

Opr = operator

C / T = ~ 60 min

1 truck

Opr = 2 operator

Working Time = 1 shifts

Whs 65

Run pickable report &

release order

VSM FUTURE

C / T = ~ 30 min

All batch combine

Waste - transportation

Opr = 1 operator

Whs 75

Pick UPS/ FEDEX

C / T = ~ 30 min

All batch combine (10 orders)

Waste - transportation

I

Staging

10 min

Whs 75

C / T = 2.5 min

Order =

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Whs 75

Put material on FEDEX or UPS’s skid

Whs 75

Wrap / Strap/ Load on

Truck

I

360 min

Staging

d

Whs 75

C / T = 10 min

Waste - transportationOpr = 1 operator

Working Time = 1 shift

Order = 1

C / T = 1 min

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Order = 1

Do Customs paperwork

C / T = 60 min

Waste - Waiting

Opr = 1 operatorWorking Time = 1 shift

Order = 1 & 2 shift orders

d

Whs 75

Customs process

C / T = 30 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

d

Whs 75

Security release.Driver

documentation

C / T = 30 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

20 min

180 min

120 min

10 min

5 min

20 min10 min 30 min

30 min 10 min 2.5 min 1 min360 min

10 min 60 min 30 min 30 min

= Total NVA

= Total VA

701 min

227.5 min

EDI

Vastera

Vastera

EDI

Optima

Optima

Audit

Internal audit`

Whs 75

C / T = ~ 20 min

Opr = 1 operator

Working Time = 1 shifts

Waste overprocessed

20 min

C / T = ~ 10 min

1 batch

Waste - transportationOpr = 1 operatorWorking Time = 1 shifts

10 min

IRA 94%

Pull material from location

for LTLs orders

Put material in pallets I

Staging

Whs 75

Process by picker station

Process by shipper station/

ConfirmI

Staging

I

Staging

Whs 75

Stretch wrap & put in truck I

Staging

Ship & bill

Release the truck &

process billingI

Staging

25 min 7.5 min 15 min ~ 180 min

25 minC / T = ~ 5 min

1 batch

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

1 order

Opr = 1 operator

Working Time = 1 shifts

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 15 min

1 full skid

OTTR 96 % in 24 hrs

Opr = operatorWorking Time = 1 shifts

C / T = ~ 60 min

1 truck

Opr = 2 operator

Working Time = 1 shifts

15 min 60 min

15 min 25 min180 min5 min

12 min 12 min

25 min 7.5 min

3 orders batch

Waste -waiting

Whs 75 Whs 75

= Total VA

= Total NVA

C / T = ~ 12 min C / T = ~ 12 min

All batch for LTLs

Opr = 1 operator

20 minC / T = ~ 120 min

1 cart = 168 units

No smoking test

Opr = 2 operator

Working Time = 1 shifts

15 min 10 min 5 min 25 min 3 min 15 min7 min 15 min 25 min60 min

Process Packer & shipper station

VSM Actual 2Distribution Center for Juarez Life Safety

Page 3: Distribution Center VSM Example_Juarez

Customers

sx

Wh 3000 / 3005

Put material in location Wh 3000 & 3005

Staging

Wh 3000 / 3005

Run pickable report & release

available orders

EDI

SAP

ORDERS

C / T = ~ 20 min

1 cart = 168 units

waste = transportation

Opr = 1 operator

Working Time = 1 shifts

I

C / T = ~ 15 min

Release is combine

Opr = 1 operator

Working Time = 1 shifts

Waiting time = 90 min

VSM ACTUAL

Wh 3000 / 3005

Pick UPS/ FEDEX

C / T = ~ 30 min

All batch combine (10 orders)

Waste - transportation

I

Staging

10 min

Wh 3000 / 3005

Process order UPS /

FEDEX

C / T = 5 min

Order =

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Wh 3000 / 3005

Put material on FEDEX or UPS’s skid

Wh 3000 / 3005

Wrap / Strap/ Load on

Truck

I

360 min

Staging

d

Wh 3000 / 3005

C / T = 10 min

Waste - transportationOpr = 1 operator

Working Time = 1 shift

Order = 1

C / T = 1 min

Waste - Waiting

Opr = 1 operator

Working Time = 1 shift

Order = 1

Do Customs paperwork

C / T = 60 min

Waste - Waiting

Opr = 1 operatorWorking Time = 1 shift

Order = 1 & 2 shift orders

d

Wh 3000 / 3005

Customs process

C / T = 30 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

d

Wh 3000 / 3005

Security release.Driver

documentation

C / T = 30 min

Waste - transportation

Opr = 1 operator

Working Time = 1 shift

Order = 1 & 2 shift orders

20 min 90 min 15 min

30 min 10 min 5 min 1 min360 min

10 min 30 min 30 min

= Total NVA

= Total VA

586 min

75 min

EDI

Vastera

VasteraEDI

Optima

Optima

Audit

Internal audit`

Wh 3000 / 3005

C / T = ~ 20 min

Opr = 1 operator

Working Time = 1 shifts

Waste overprocessed

20 min

C / T = ~ 10 min

1 batch

Waste - transportation

Opr = 1 operatorWorking Time = 1 shifts

10 min

IRA 94%

Pull material from location

for LTLs orders

Put material in pallets I

Staging

Wh 3000 / 3005

Process by picker station I

Staging

I

Staging

Wh 3000 / 3005

Stretch wrap & put in truck I

Staging

Ship & bill

Release the truck &

process billingI

Staging

412.5 min

77 min

25 min 7.5 min 15 min ~ 180 min

25 minC / T = ~ 5 min

1 batch

Waste - transportation

Opr = 1 operator

Working Time = 1 shifts

1 order

Opr = 1 operator

Working Time = 1 shifts

1 order

Opr = 1 operator

Working Time = 1 shifts

C / T = ~ 15 min

1 full skid

OTTR 96 % in 24 hrs

Opr = operatorWorking Time = 1 shifts

C / T = ~ 60 min

1 truck

Opr = 1 operator

Working Time = 1 shifts

15 min 30 min

15 min 25 min180 min5 min

20 min 12 min

25 min 7.5 min

3 orders batch

Waste -waiting

Wh 3000 / 3005

= Total VA

= Total NVA

C / T = ~ 20 min C / T = ~ 12 min

All batch for LTLs

Print orders Automatically

Implement bar Code system

Opr = 1 operator

60 min

Wh 3000 / 3005

Wrap / Strap/ Load on

Truck

Jan 2010

VSM Actual 3

Distribution Center for Juarez Life Safety

Page 4: Distribution Center VSM Example_Juarez

Customers

EDI

Receive Order

ORD

Production see order

C / T = ~10 min

6:00 AM

Up Time = N/A

Opr = none

Working Time = 1 shift

C / T = n/a

Up Time = n/a

Opr = none

Working Time = 1 shift

Produce by customer order

and qty

sxAutomatic creates shipping

paperworkI

Staging

Shipping

Pack material

EDI

EDI

Transfer of orders

EDI

BPCS

ORDERS

Priority codes 99,50,49

C / T = 5 min

Up Time = n/a

Opr = 1

Working Time = 1 shift

Priority codes 99,50,49

C / T = 5 min

Opr = 1 operator

waste = transportation

= Total NVA245 min

265 min

240 minC / T = 180 min

6:10 AM

Up Time = n/a

Opr = 1 cell

Working Time = 1 shift

Priority codes 99,50,49

C / T = 5 min

Opr = 1 operator

Working Time = 1 shifts

C / T = 20 min

Opr = 1 operator

Working Time = 1 shifts

C / T = 10 min

Opr = 1 operator

Working Time = 1 shifts

C / T = 10 min

Opr = 1 operator

Working Time = 1 shifts

20 min180 min10 min 0 min

5 min 240 min

6:10 AM

Production Production

Receive scan direct to C.O

ShippingTransport material to shipping

5 min

Shipping

5 min

Shipping

Put material on skid

9:10 AM

9:15 AM

9:20 AM 9:40 AM

C / T = 15 min

Opr = 1 operator

Working Time = 1 shifts

9:55 AM

Machine = Forklift

15 min

Shipping

Put material on truck

2:00 PM

Machine = Forklift

Shipping Shipping

Ship Material Billing

10 min 10 min 10 min

C / T = 10 min

Opr = 1 operator

Working Time = 1 shifts

2:00 PM

Machine = Forklift

VSM IDEAL

July 2010Distribution Center for Juarez Life Safety