12/10/2012 1 Design of Beam-Column Joints: Lessons from the 2010-2012 Christchurch Earthquake Swarm Roberto T. León The Via Department of Civil and Environmental Engineering Virginia Tech, Blacksburg, VA The Fifth Kwang-Hua Forum Tongji University, Shanghai, PRC December 2012 Design of Beam-Column Joints: Lessons from the 2010-2012 Christchurch Earthquake Swarm Roberto T. León The Via Department of Civil and Environmental Engineering Virginia Tech, Blacksburg, VA The Fifth Kwang-Hua Forum Tongji University, Shanghai, PRC December 2012 Background Background Objective: Discuss performance of structures built to the most modern standards and compare to older standards How well are we doing? Motivation: The Christchurch earthquake swarm can be construed, locally, as the MCE (or multiple ones?). Historically there has been a substantial philosophical difference between USA, NZ, and Japan on design approaches to beam-column joints. Some interesting and potentially very important conclusions for joint modeling, cumulative damage, and post-earthquake condition assessment. Some bright Ph.D.s needs to look at these!

Upload: phamque

Post on 15-Mar-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

1

Design of Beam-Column Joints:Lessons from the 2010-2012

Christchurch Earthquake Swarm

Roberto T. León

The Via Department of Civil and Environmental EngineeringVirginia Tech, Blacksburg, VA

The Fifth Kwang-Hua ForumTongji University, Shanghai, PRC

December 2012

Design of Beam-Column Joints:Lessons from the 2010-2012

Christchurch Earthquake Swarm

Roberto T. León

The Via Department of Civil and Environmental EngineeringVirginia Tech, Blacksburg, VA

The Fifth Kwang-Hua ForumTongji University, Shanghai, PRC

December 2012

BackgroundBackground• Objective: Discuss performance of structures

built to the most modern standards and compare to older standards → How well are we doing?

• Motivation: • The Christchurch earthquake swarm can be

construed, locally, as the MCE (or multiple ones?).

• Historically there has been a substantial philosophical difference between USA, NZ, and Japan on design approaches to beam-column joints.

• Some interesting and potentially very important conclusions for joint modeling, cumulative damage, and post-earthquake condition assessment.

• Some bright Ph.D.s needs to look at these!

Page 2: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

2

Kaikuro (New Zealand)

Canterbury Swarm (10/10 –01/12)

Kelvin Berryman GNS –New Zealand

Page 3: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

3

ChristchurchCentral Business District (CBD)

ChristchurchCentral Business District (CBD)

0.9 miles

1.2

mile

s

Area of highest damage

1. Four stations within a mile or so or one another

2. Large variation on records due to local soil conditions

3. No instrumented structures

CCCC

REHS

CBGS

CCHC

Googlemaps

CENTRAL CITY AND NZS1170 SPECTRACLASS D DEEP OR SOFT SOILLarger Horizontal Components

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

Period T(s)

SA

(T)

(g)

NZS1170 2500-yr Class D

NZS1170 500-yr Class D Deep orSoft Soil

CHHC_MaxH_FEB

CCCC_MaxH_FEB

CBGS_MaxH_FEB

REHS_MaxH_FEB

GM_Larger_FEB

NZS 1170.5 Spectra and Largest Horizontal Direction Recorded from CBD Strong Motion Records• Dotted line = ULS design spectrum for normal importance buildings for CBD soil type• Solid red line = the average from the 5 recording stations• Solid black line = the MCE spectrum for normal importance buildings for CBD soil type

Page 4: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

4

The Earthquake Sequence: Impact on Christchurch CBDThe Earthquake Sequence: Impact on Christchurch CBD

• Damaging events to date:• 4 Sept 2010: M 7.1, MM 7, ≈ 0.7 x design*

• 26 Dec 2010: M 5.5?, MM 7 to 8 ≈ 0.6 x design*

• 22 Feb 2011: M 6.3, MM 9 to 10, ≈ 2.0 x design*

• 6 June 2011: M 5.3?, MM 7 to 8 ≈ 0.6 x design

• 13 June, 2011: M 5.4?, MM 7 to 8 ≈ 0.6 x design

• 13 June 2011: M 6.3, MM 8 to 9, ≈ 0.9 x design*+

• 23 December 2011: M 5.5, MM 6 to 7, ≈ 0.6 x design*

• Series is still on-going ( over 10,000 felt earthquakes)

• Cumulative damage and residual strength(>6 x design!)

CCCC: Christchurch Cathedral College

Comparison of Accelerations

Very short duration of strong ground motion ( 6 seconds)

Strong high frequency vertical motion

Studies of cumulative damage needed!!

Page 5: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

5

Christchurch (New Zealand)

Saturday February 24, 2011 (4 days after)Saturday February 24, 2011 (4 days after)

Page 6: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

6

Human Losses – Two Main Reasons Human Losses – Two Main Reasons • About 2/3 of the casualties came from the complete

collapse of two older RC buildings (CCTV & PGC) • About 1/3 came from falling debris from URM structures

(facades, awnings and parapets)

Total: 182 casualties

NZ vs. USA RC Construction Pre-1970: Little or no awareness of seismic design issues NZ similar to Eastern USA practice

1974-1984: Minimum seismic design adopted Discussion between USA, NZ, and Japan on

beam-column joint design NZ begins to utilize precast systems

Post 1984: ChCh introduced more seismic design, roughly

equivalent to USA UBC Zone 2 Beam-column joint design diverges

Page 7: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

7

Pyne Gold Corp. BuildingPyne Gold Corp. Building

• Built 1964• Five bays by five bays• Walls carried lateral loads

but had significant penetrations on the ground floor

Pyne Gold Building• Small, weak gravity columns• Poorly detailed boundary elements• Lightly reinforced walls• No beam-column joint reinforcement• Inadequate splice lengths• Inadequate diaphragm connections

Weaknesses well known for this building

Page 8: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

8

CCTV BuildingCCTV Building

Hyland, C. and Smith, A.,CTV Building Collapse Investigation,Report to the Building Housing Authority,January 2012

• Built in 1987 as office building• Drag struts added in upper floors to North core wall

CCTV Building

Hyland, C. and Smith, A., CTV Building Collapse Investigation,Report to the Building Housing Authority, January 2012

Page 9: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

9

Poor Detailing: Joints for Gravity

System

Poor Detailing: Joints for Gravity

System

• Little or no shear reinforcement• No confinement• Numerous discontinuous planes• Displacement to yield and failure very similar

Building 2: 7-story (1970s)Building 2: 7-story (1970s)

Figure 1: An 8-storey building with two-way RC frames system had a mix of column and beam-column joint shear

failures.

8” thick C-shapedcore wall

North

North-elevation frame

Short columns failure

South-elevation frame

• Figure from Kam, Pampanin & Elwood, 2011 NZSEE Bulletin

Page 10: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

10

Building 2: Joint / Column ShearBuilding 2: Joint / Column Shear

Beam-Column Joint DesignBeam-Column Joint Design

20

• Allowable joint shear (US = 2NZ)• Required bar anchorage lengh (US =⅔NZt• Column-to-beamMoment ratio (US = ¾NZ)

© R. Leon, 1981

Page 11: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

11

NZ vs. USA Design

NZ connection expected to have far better performance under MCE – little stiffness deterioration in joint area

New Zealand Design

• Moderate joint shear stress and large anchorage lengths; hinging in beams with large cracks at joint interface due to extensive, concentrated yielding.

• Force transferred by smaller struts sustained by large amount of transverse reinforcement

Page 12: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

12

Typical NZ Performance

• Distributed shear cracking in the joint• Appreciable plastic hinge formation in the beams• Large cracks at interface

USA Design

• High joint shear stress and poor anchorage = large cracks, loss of stiffness and bar slip

• Relies on large concrete strut sustained by framing members

Page 13: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

13

Typical USA Performance

• No clear plastic hinges in the beams;• Shear failure in the joint

Precast Seismic Systems

Price Waterhouse Coopers Building

Great economy and excellent quality control

Page 14: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

14

Clarendon Towers

Clarendon Towers

• Mid-1990s• Precast system with

complex elements• Moment frame in

two directions• Apparently

undamaged (no visual cues to actual structural damage)

Clarendon Towers (precast units) Clarendon Towers (precast units)

Precast moment frame system

Page 15: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

15

Clarendon Towers Clarendon Towers Floor cracking from beam elongation after the February 22, 2011 earthquake. Cracks ranged from 20 mm to 40 mm; unseating of precast floor evident.

Kam, Pampanin and Elwood, BNZNSEE, 44(4), 2011

Clarendon Towers Clarendon Towers Floor cracking from beam elongation after the February 22, 2011 earthquake. Cracks ranged from 20 mm to 40 mm; unseating of precast floor evident.

Epoxy injection repairs underway after the September 2010 earthquake

Kam, Pampanin and Elwood, BNZNSEE, 44(4), 2011

Page 16: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

16

Clarendon Towers Clarendon Towers

Façade gaps?

Beam Growth Beam

Growth

Peng, B.H.H., Dhakal, R.P., Fenwick, R.C., Carr, A.J., and Bull, D.K., Elongation of Plastic Hinges in Ductile RC Members: Model Development, J. of Advanced Concrete Technology, Vol. 9, No. 3, 2011

Page 17: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

17

Experimental EvidenceExperimental Evidence

Bidirectional loading and slabsBidirectional loading and slabs

This behavior has been flagged as a potential issue in all beam-column joint testing (Leon and Deierlein, EERI, 1996)

Horizontal beam end displacement

Hor

izon

tal b

eam

dis

plac

emen

t

This problem is not newLeon, 1984 & Fenwick et al. 1985

Page 18: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

18

Price Waterhouse CoopersPrice Waterhouse Coopers

Price Waterhouse CoopersPrice Waterhouse Coopers

• 22 storey reinforced concrete building from mid-late 1980s (Restrepo, 1993; Park, 2002 )

• “text-book” in terms of ductile seismic response according to a beam-sway mechanism.

© J. Restrepo

Page 19: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

19

Price Waterhouse CoopersPrice Waterhouse Coopers

37

• Corner joints – bidirectional loading• Notice proportions of beam to column sizes

© J. Restrepo

Lack of Clear Plastic Hinge Lack of Clear Plastic Hinge

Note single large crack = low reinforcement %

Page 20: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

20

Damage to Gravity SystemsDamage to Gravity Systems

Lack of deformation compatibility

Damage to Lateral SystemsDamage to Lateral SystemsDamage to exterior and roof joints in modern moment frames

Page 21: Design of Beam-Column Joints: Lessons from the 2010-2012 ...risedr.tongji.edu.cn/5th_Kwang-Hua_Forum/downfile/Section 4/Robert... · Lessons from the 2010-2012 Christchurch Earthquake

12/10/2012

21

Deconstruction

Less than 4% of major 500 buildings will survive

Grand Chancellor

Deconstruction

Less than 4% of major 500 buildings will survive

Grand Chancellor

www.stuff.co.nz/the-press

SummarySummary• Modern beam-column joints designed to NZ standards

preformed extremely well for the ultimate limit state.• Most NZ frames are not repairable; situation is likely

worse for USA buildings.• Precast system emulating conventional RC

construction are a viable option for high seismic areas.• Cumulative damage, decosntructiuon, beam

elongation and lack of plastic hinge formation are two important issues that need further analytical study.

• Poor beam-column joint detailing in older construction remains a big problem; it is not easy to detect level of damage from smaller events.