data management in digsilent powerfactory 2010

28

Click here to load reader

Upload: francisco-gonzalez-longatt

Post on 06-Aug-2015

201 views

Category:

Engineering


9 download

TRANSCRIPT

Page 1: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 1/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

Francisco M. Gonzalez-Longatt, Dr.ScManchester, UK, September, 2009

Tutorial:Data Management in PowerFactory

Page 2: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 2/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

This tutorial describes how data management is used inPowerFactory: Version, Derived Projects, OperationScenarios,

Tutorial:Data Management in PowerFactory

Francisco M. Gonzalez-Longatt, [email protected]

Manchester, September 2009

Page 3: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 3/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

1. Introduction

Page 4: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 4/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

1. Introduction• The project object is allows the user to perform

advanced management tasks such as:– Versioning, (Versions)– Deriving, (Derived Projects)– Comparing,– Merging– and Sharing.

• It simplify the work in multi-user environments whileminimizing the amount of data.

Page 5: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 5/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

1. IntroductionMain Features:

– Network data stored in single or multi-user database– Network Modeller incl. Single Diagrams and Block

Diagrams– Network Variations for expansion planning– Operation Scenarios for operational data– Network Model Versioning– Network Model Sharing in multi-user environment– User accounts, user groups, access rights– Compare and Merge Tool– Change Tracking

Page 6: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 6/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

1. Introduction• PowerFactory allow use of the objects stored inside

them objects to recognize:• The parts of the network model (grids and

expansion stages) to be consider for calculation.• The calculations (and their settings) to be

performed over the selected parts of the network.• The study time.• The active variations.• The active operation scenario.• The calculation results to be stored for reporting.• The graphics to be displayed during the study

Page 7: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 7/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Creating Operation Scenarios and

Expansion Stages

Page 8: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 8/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

1992 Study Time

Time

Page 9: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 9/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

1992 Study Time

Time

Original project version ('Base Project')

e.g. to analyze the network at different times during the day, week or year, where changed loading conditions and different component ratings are considered

Page 10: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 10/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

1992 Study Time

Time

Operation Scenarios: different operative conditions

e.g. to analyze the network at different times during the day, week or year, where changed loading conditions and different component ratings are considered

Page 11: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 11/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages• The Operation Scenario concept is useful to analyze the

network at different times during the day, week or year,where changed loading conditions and differentcomponent ratings are considered

Page 12: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 12/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

1992 Study Time

Time

Variations: Different topological configurations

e.g. Variations can be seen as expansion plans composed of different expansion stages, which are chronologically activated.

Page 13: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 13/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

1992 Study Time

Time

Variations: Different topological configurations

e.g. Variations can be seen as expansion plans composed of different expansion stages, which are chronologically activated.

Page 14: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 14/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages• Variations are objects that can store and implement the

changes which are expected on a network withoutaffecting the original model.

• The changes contained in an expansion stage can beclassified as:

• Changed parameters of network components;• Additions; i.e. objects added to the network.• Deletions; i.e. objects removed from the network

Page 15: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 15/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages• To create a new variation, right-click on the Variations

folder ( ) in the data manager• Select New -> Variation from the context-sensitive

menu.

Page 16: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 16/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

Page 17: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 17/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

Output windows:

Page 18: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 18/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

Stage 1

Page 19: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 19/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

2. Operation Scenarios and Expansion Stages

Stage 1

Output windows:

Page 20: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 20/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

3. Base Project, Versions and Derived

Projects

Page 21: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 21/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

3. Base Project, Versions and Derived Projects

BASE PROJECT

Version 1 Version 2 Version 3

User A

User B

User X

Derived project

Derived project

Derived project

Version n

Public Area (Data Administrator Area

User Area

Latest version of the Base Project

The data administrator issues update to the Base Project in form os version

Page 22: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 22/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

3. Base Project, Versions and Derived Projects

BASE PROJECT

Version 1 Version 2 Version 3

User A

User B

User X

Derived project

Derived project

Derived project

Version n

Public Area (Data Administrator Area

User Area

Latest version of the Base Project

The data administrator issues update to the Base Project in form os version

A Version is a snapshot of a project taken at a certain point in time.

Page 23: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 23/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

3. Base Project, Versions and Derived Projects• Right-click the desired project folder in the right pane of

the Data Manager where the Version is to be created.• Select New --> Version from the context-sensitive

menu.

Page 24: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 24/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

3. Base Project, Versions and Derived Projects• Define the version characteristics in the pops up

windows.

Output window

Page 25: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 25/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

4. Base Project, Versions and Derived Projects

BASE PROJECT

Version 1 Version 2 Version 3

User A

User B

User X

Derived project

Derived project

Derived project

Version n

Public Area (Data Administrator Area

User Area

Latest version of the Base Project

The data administrator issues update to the Base Project in form os version

Derived Project: A 'virtual copy‘ of the original project version ('Base Project')

At certain stages of a system study, several users may wish to work on the same project.

Page 26: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 26/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

4. Base Project, Versions and Derived Projects

BASE PROJECT

Version 1 Version 2 Version 3

User A

User B

User X

Derived project

Derived project

Derived project

Version n

Public Area (Data Administrator Area

User Area

Latest version of the Base Project

The data administrator issues update to the Base Project in form os version

Derived Project: A 'virtual copy‘ of the original project version ('Base Project')

Internally only the data differences between the "Base Project"and the "Derived Project" are stored in the database.

Page 27: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 27/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

4. Base Project, Versions and Derived Projects• A new derived project is created using the Data Manager

as follows:• Right-click the desired project folder in the right pane of

the Data Manager where the Derived Project is to becreated.

• Select New --> Derived Project from the context-sensitive menu.

• Select the source version of the base project from thedata browser that pops up. This will likely be the lastavailable version of a project in a public area, created bythe data administrator.

• Press OK.

Page 28: Data Management in DIgSILENT PowerFactory 2010

Dr. Francisco M. Gonzalez-Longatt, [email protected] .Copyright © 2009 28/23

All

right

s re

serv

ed. N

o pa

rt of

this

pub

licat

ion

may

be

repr

oduc

ed o

r dis

tribu

ted

in a

ny fo

rm w

ithou

t per

mis

sion

of t

he a

utho

r. C

opyr

ight

© 2

009.

http

:ww

w.fg

long

att.o

rg.v

e

Please visit:http://www.fglongatt.org.ve

Comments and suggestion are welcome:[email protected]