Critical Inspection Items
Critical Inspection Items
Module 14Module 14
Critical Inspection Items
STOP POOR PRACTICES!Bad Quality & Bad Workmanship
ADDRESS CRITICAL ITEMS on the grade to ensure good long term performance
![Page 2: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/2.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-2
Critical Inspection Items
1. Milling & Clean Surface
2. Uniform Tack
3. Continuous Paving
4. Segregation
5. Uniform Surface Texture
6. Compaction
7. Smoothness
8. Approaches & Utilities
9. Joints – tight, even, straight
10. Late Season & Weather
4: SURFACE PREP
5 & 6 : DELIVERY, PAVERS & LAYDOWN
7, 8, 9 & 10: COMPACTION & SMOOTHNESS
11: JOINTS
12: MISC ISSUES
Critical Inspection Items
6. Compaction
Spec Equipment
Proper Temperature
Adequate Compactive Effort
Achieve Required Density
Monitor Rolling Pattern
Proper Compacted Thickness
![Page 3: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/3.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-3
#1Milling & Clean Surface
#1Milling & Clean Surface
Module 4: Surface PreparationModule 4: Surface Preparation
Milling Operations – Section 00620“Cold Plane Pavement Removal”
Purpose:
• Remove existing cracks
• Remove existing ruts
• Remove poor quality materials
• Adjust elevation
#1 - Milling & Clean Surface
![Page 4: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/4.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-4
#1 - Milling & Clean Surface
Milling OperationsProblem Area for Cleaning Inlays
Material in Corners
#1 - Milling & Clean Surface
![Page 5: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/5.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-5
#1 - Milling & Clean Surface
#1 - Milling & Clean Surface
![Page 6: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/6.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-6
#1 - Milling & Clean Surface
#2Uniform Tack
#2Uniform Tack
Module 4: Surface PreparationModule 4: Surface Preparation
![Page 7: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/7.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-7
Section 00730Emulsified Asphalt Tack Coat
Objectives
90% coverage!!!
Proper application rate
Suitable dilution
Proper temperature
Proper spray bar height
No plugged nozzles
Triple lap coverage
Don’t fill in valleys on milled surfaces
#2 – Uniform Tack
![Page 8: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/8.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-8
#2 – Uniform Tack
#2 – Uniform Tack
![Page 9: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/9.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-9
#2 – Uniform Tack
#2 – Uniform Tack
![Page 10: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/10.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-10
#2 – Uniform Tack
#2 – Uniform Tack
![Page 11: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/11.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-11
#3Continuous Paving
#3Continuous Paving
Module 5: Delivery &Module 6: Pavers & Laydown
Module 5: Delivery &Module 6: Pavers & Laydown
00745.46(a)“Deliver the mixture to the paving machine at a rate that provides
continuous operation of the paving machine…”
ROLLERS:- Stop at angle- Leave vibration off- Keep pneumatic moving –
don’t stop on the mat
PAVERS:Rapid Stop – Rapid Start
IF STOPPING IS “UNAVOIDABLE”...
#3 – Continuous Paving
![Page 12: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/12.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-12
00745.43(b)Minimum Temperature Behind Paver
240° F for Dense Mix
#3 – Continuous Paving
![Page 13: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/13.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-13
#3 – Continuous Paving
#4Segregation
#4Segregation
Module 5: Delivery &Module 6: Pavers & Laydown
Module 5: Delivery &Module 6: Pavers & Laydown
00745.60(c)“If segregation continues to occur, stop production...”
![Page 14: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/14.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-14
Segregation
1. Loadout
2. Truck Exchange
3. Paving
– Angel Wings
– Gate Tunnels
– Gear Box
#4 - Segregation
LOADOUT!
312
#4 - Segregation
![Page 15: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/15.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-15
TRUCK EXCHANGE!
00745.46(b)“Deposit ACP from the hauling
vehicles so segregation is prevented”
#4 - Segregation
#4 - Segregation
![Page 16: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/16.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-16
#4 - Segregation
#4 - Segregation
![Page 17: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/17.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-17
#4 - Segregation
#4 - Segregation
![Page 18: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/18.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-18
#4 - Segregation
#4 - Segregation
![Page 19: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/19.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-19
#4 - Segregation
#4 - Segregation
![Page 20: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/20.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-20
#5Uniform Surface Texture
#5Uniform Surface Texture
Module 5: Delivery &Module 6: Pavers & Laydown
Module 5: Delivery &Module 6: Pavers & Laydown
00745.60(b)“Immediately replace boils, slicks,
and oversized material with fresh mixture”
#5 – Uniform Surface Texture
![Page 21: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/21.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-21
#5 – Uniform Surface Texture
![Page 22: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/22.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-22
#5 – Uniform Surface Texture
#5 – Uniform Surface Texture
![Page 23: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/23.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-23
#5 – Uniform Surface Texture
#5 – Uniform Surface Texture
![Page 24: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/24.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-24
#5 – Uniform Surface Texture
#6Compaction
#6Compaction
Module 7: Compaction FundamentalsModule 8: Compaction Equipment & Operations
Module 7: Compaction FundamentalsModule 8: Compaction Equipment & Operations
“Compaction, Compaction, Compaction”
![Page 25: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/25.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-25
6. Compaction
Spec equipment
Proper temperature
Adequate compactive effort
Achieve required density
Monitor rolling pattern
Proper compacted thickness
#6 - Compaction
6. Compaction
Spec Equipment
Static Steel-Wheeled Roller
Pneumatic – Rubber Tired Roller
Vibratory Roller
#6 - Compaction
00745.24 - Compactors
![Page 26: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/26.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-26
Static Steel-Wheeled Rollers (00745.24)
#6 - Compaction
Pneumatic Rollers(00745.24)
#6 - Compaction
![Page 27: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/27.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-27
Reed Tachometer
#6 - Compaction
6. Compaction
Proper Temperature
Surface Temperature00745.40
Mix TemperaturePer JMF, 745.43, 745.49(a-1)
#6 - Compaction
![Page 28: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/28.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-28
#6 - Compaction
![Page 29: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/29.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-29
6. Compaction
Adequate Compactive Effort
Review Control Strip - 8 to 12 passes?
#6 - Compaction
6. Compaction
Achieve Required Density
#6 - Compaction
![Page 30: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/30.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-30
Achieve Required Density
92.0%
#6 - Compaction
00745.49(b)(3)
Boiler Plate Special Provisions
Exception – 91.0% if:First ACP lift & < 3" thick& on agg baseNOT OR!
#6 - Compaction
Low Density(high voids)
- Cracking
- Stripping
- Too Permeable
High Density(low voids)
- Rutting
- Shoving
- Flushing
![Page 31: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/31.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-31
#6 - Compaction
#6 - Compaction
![Page 32: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/32.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-32
6. Compaction
Monitor Rolling Pattern
Consistent, Adequate Effort
#6 - Compaction
#6 - Compaction
![Page 33: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/33.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-33
6. Compaction
Proper Compacted Thickness
#6 - Compaction
#6 - Compaction
![Page 34: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/34.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-34
6. Compaction
Spec equipment
Proper temperature
Adequate compactive effort
Achieve required density
Monitor rolling pattern
Proper compacted thickness
#6 - Compaction
#7Smoothness
#7Smoothness
Module 9: Compaction Testing
Module 10 Smoothness Testing
Module 9: Compaction Testing
Module 10 Smoothness Testing
Which Specification does your project use?
Blue Book? OR Boiler Plate Specials?
![Page 35: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/35.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-35
#7 - Smoothness
#7 - Smoothness
![Page 36: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/36.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-36
#7 - Smoothness
#8Approaches & Utilities
#8Approaches & Utilities
Module 8: Compaction Equipment & OperationsModule 9: Compaction Testing
Module 8: Compaction Equipment & OperationsModule 9: Compaction Testing
![Page 37: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/37.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-37
#8 – Approaches & Utilities
#8 – Approaches & Utilities
![Page 38: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/38.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-38
#8 – Approaches & Utilities
#8 – Approaches & Utilities
![Page 39: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/39.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-39
#9Joints
#9Joints
Module 11: JointsModule 11: Joints
Longitudinal Joints!!!Longitudinal Joints!!!
Tight, Even, & StraightTight, Even, & Straight
#9 - Joints
![Page 40: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/40.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-40
#9 - Joints
#9 - Joints
![Page 41: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/41.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-41
#9 - Joints
#9 - Joints
![Page 42: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/42.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-42
#9 - Joints
#9 - Joints
![Page 43: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/43.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-43
#9 - Joints
#9 - Joints
![Page 44: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/44.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-44
#9 - Joints
#9 - Joints
![Page 45: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/45.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-45
#10Late Season Paving & Weather
#10Late Season Paving & Weather
Module 12: Miscellaneous IssuesModule 12: Miscellaneous Issues
00745.40Season & Temperature Limitations
Season & Temperature Limitations00745.40
![Page 46: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/46.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-46
Rain = Moisture!!!Rain = Moisture!!!
#10 – Late Season & Weather
![Page 47: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/47.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-47
![Page 48: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/48.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-48
#10 – Late Season & Weather
1) Don’t leave open trenches
2) Don’t leave exposed tack
Otherwise, STOP further mix delivery!
WE HAVE TO DO BETTER!!!!WE HAVE TO DO BETTER!!!!
![Page 49: Critical Inspection Items - Oregon · 2020. 1. 22. · ACP Inspector January 2019 Critical Inspection Items 14-11 #3 Continuous Paving Module 5: Delivery & Module 6: Pavers & Laydown](https://reader035.vdocuments.us/reader035/viewer/2022071415/610f8cfbd8edce5047642382/html5/thumbnails/49.jpg)
ACP Inspector January 2019
Critical Inspection Items 14-49
Critical Inspection Items
1. Milling & Clean Surface
2. Uniform Tack
3. Continuous Paving
4. Segregation
5. Uniform Surface Texture
6. Compaction
7. Smoothness
8. Approaches & Utilities
9. Joints – tight, even, straight
10. Late Season & Weather
4: SURFACE PREP
5 & 6 : DELIVERY, PAVERS & LAYDOWN
7, 8, 9 & 10:COMPACTION & SMOOTHNESS
11: JOINTS
12: MISC ISSUES
Critical Inspection Items
6. Compaction
Spec equipment
Proper temperature
Adequate compactive effort
Achieve required density
Monitor rolling pattern
Proper compacted thickness