![Page 1: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/1.jpg)
Commissioning Elements of LEED
The Commissioning Process
Presenter -
Gilad Mail, PE, LEED AP
September 25, 2013
![Page 2: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/2.jpg)
About Glumac
Dick Glumac
Company Founder
Established San Francisco office in 1971
Locations: San Francisco, Silicon Valley,
Sacramento, Seattle, Portland, Las Vegas,
Los Angeles, Irvine, and Shanghai
300+ Employees | Over 100 LEED AP’s
30 Commissioning Agents
Dedicated Mission Critical Department
SERVICES
Commissioning | Mechanical | Electrical |
Plumbing | Sustainable Design | Energy
Modeling | BIM, Revit, CFD Technology
Integration | Lighting Design
![Page 3: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/3.jpg)
Agenda/Objectives
What is Mission Critical
Commissioning Process
Five Levels of Commissioning
Commissioning Tools
![Page 4: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/4.jpg)
Mission Critical
Mission Critical
24 x 7 Operation
Impact to critical business operations
Potential for large economic losses
Potential for large disruption to customer or services
Types of Mission Critical Facilities
Data Centers
Central Plants
Pharmaceutical Research and Development
Biomedical Research and Development
Medical Facilities
Industrial Process Facilities
![Page 5: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/5.jpg)
Why Commissioning
Occupant Comfort
Verify design intent achieved
Confirmation of equipment & system operation
Energy Efficiency
Verify inter-system operation: Elec – Mech – BMS
Verify ability to distribute power and cooling
Control automatic systems and controls
Verify component failure and system Fault Tolerance
Verify Failure Modes
PUE
![Page 6: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/6.jpg)
Commissioning - Design Phase
Design Review Submittal Review
Develop
Commissioning
Specifications
Develop DRAFT
Commissioning
Plan
Review
BOD/OPR
Commissioning
Kick off Meeting
![Page 7: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/7.jpg)
Construction and Start-up Phase
Equipment
Start-up
Commissioning
Kick-Off
Meeting
Submittal
Review
GC / Contractor
Progress
Meetings
Final
SU & Cx
Schedule
Controls
Pt to Pt &
Programming
Commissioning
Progress
Meetings
Site
Observations
Preliminary O&M
Manuals
Final Functional
Test Procedures
Equipment
Checklists
Training Review
Construction
Complete
![Page 8: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/8.jpg)
Commissioning and Validation Phase
Project
Close - out
Functional
Testing (L4)
Integrated
Systems
Testing (L5)
O&M
Manuals
Warranty
Information
Owner
Occupancy
Operations
Maintenance
(O&M) Training
Issues
Resolution
Log
Substantial
Completion
![Page 9: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/9.jpg)
Post Occupancy/Warranty Phase
Seasonal
Testing
10-Month
Warranty
Meeting
Systems
Manual
Final Cx Report
![Page 10: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/10.jpg)
Level 1 Commissioning
Level 1
Submittal Review
Factory Witness Testing
![Page 11: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/11.jpg)
Level 2 Commissioning
Level 2
Equipment Installation
Pre Start-up Check-list
![Page 12: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/12.jpg)
Level 3 Commissioning
Level 3
Component Start-up
Installation Verification
![Page 13: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/13.jpg)
Level 4 Commissioning
Level 4
Systems Interface Testing
Functional Performance Testing
![Page 14: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/14.jpg)
Level 5 Commissioning
Level 5
Integrated System Testing
![Page 15: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/15.jpg)
Level 5 Commissioning
Post L5
Client Facilities Training
O&M
Close-out, final documentation
LEED certification
![Page 16: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/16.jpg)
Commissioning Elements of LEED
• OPR – BOD Review
• PEER Reviews
• Commissioning Specification
• Commissioning Plan
• Issue Test Scripts
• Commissioning Meetings
• Develop an Issues Log
• Perform Level 4, 5 Test Scripts
• Final Documentation and
Training Reviews
• Upload to GBC Website
• Issue Final Reports
• Warranty Review
![Page 17: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/17.jpg)
Commissioning Tools - Cx Plan
• Defined Roles and Responsibilities
• Systems Commissioned
• Commissioning Process
• Commissioning Schedule
• Expectations for pre-functional,
functional and integration testing
![Page 18: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/18.jpg)
Commissioning Tools - Scheduling
![Page 19: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/19.jpg)
Commissioning Tools - Tracking Spreadsheets
![Page 20: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/20.jpg)
Commissioning Tools – Functional Procedures
![Page 21: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/21.jpg)
Commissioning Tools - Cx Issues Log
![Page 22: Commissioning Elements of LEED · Commissioning Elements of LEED The Commissioning Process Presenter - Gilad Mail, PE, LEED AP September 25, 2013](https://reader030.vdocuments.us/reader030/viewer/2022033123/5e6375710d4ddb12d96f9504/html5/thumbnails/22.jpg)