Colin  Lawton  –    Work  Experience        

             Note,  Addi8onal  Informa8on  added  from  slide  20  to  30.  Date  11  January  2015  

 

Page 2: Colin Lawton Summary 2

Colin  Lawton  -­‐  Experience  Summary  

Contents  Experience  Overview  Health,  Safety,  Security  and  Environment  Construc8on  Management  Cri8cal  Skills  and  Capabili8es  in  Fabrica8on  and  Construc8on  -­‐  Offshore  Key  Experience  Requirements  –  Onshore  and  Offshore  Module  Assembly  and  Hook  Up  Personal  AWributes  Capability  Statement  Project  Execu8on  Engineering  and  Procurement  Risk  Management  Interface  Management  Assurance  and  Quality  Control  Contract  Management  Pre  Commissioning  and  Commissioning  Addi8onal  Informa8on      

                     

Page 3: Colin Lawton Summary 2

Colin  Lawton  -­‐  Experience  Summary  Over  thirty  five  years  experience  in  the  Oil  and  Gas  Industry  in  the  areas  of  Project,  Fabrica8on,  Construc8on    Commissioning  and  Management.  During  this  8me  I  have  fulfilled  the  roles  of  Company  Representa8ve,  In  Country  Manager,  Company  Representa8ve,  Construc8on  Manager,  Site  Manager,  Fabrica8on  Manager  and  Project  Manager.  I  am  well  versed  in  all  facets  of  the  Heavy  Fabrica8on,  Equipment  and  Pipe  Spool  manufacture,  Module/Jacket  Fabrica8on  and  Installa8on,  Load  out  and  Transporta8on.  I  am  also  experienced  managing  LNG  Plant  Construc8on,  Compressor  and  Meter  Sta8on,  Cross  Country  Pipelines,  Compressor  and  Meter  Sta8ons,  Refineries  and  Chemical  Plants,  Project  Comple8on  and  Hand  Over.  I  regard  the  implementa8on  of  HSSE  to  be  a  fundamental  part  of  my  normal  du8es  and  essen8al  to  the  success  of  any  project  and  fully  commiWed  to  ensuring  the  Companies  HSSE  Policies  and  Governance  requirements  are  enforced.  I  communicate  well  at  all  levels  and  consider  that  a  robust  interface  management  plan  is  essen8al  in  ensuring  a  One  Team  approach  is  adopted  throughout  the  project.  My  past  experience  in  Risk  Assurance,  Quality  Assurance,  Flawless  Start  Up  and  HSSE  has  given  me  valuable  strengths  in  being  able  to  come  up  to  speed  quickly  with  projects  and  implement  requirements  in  the  most  effec8ve  and  efficient  manner.    I  have  worked  for  companies  such  as,  Fluor  Daniel,  William  Brothers,  Woodside  Energy  Limited,  Duke  Energy  Interna8onal,  Western  Mining  Corpora8on,  San`e,  Occidental,  Babcock  and  Wilcox,  Shell,  BG/QGC  and  worked  in  loca8ons,  such  Germany,  Malaysia,  Korea,  Australia,  Thailand,  Russia  and  throughout  the  United  Kingdom.  I  am  a  hands  on  Manager,  who  earns  the  respect  of  his  team.  I  have  high  Business  Ethics  and  ensure  the  Companies  Interests  are  treated  with  the  utmost  respect.  I  take  care  of  my  team,  their  families  and  site  visitors.  My  Strengths  are  in  my  style  of  Communica8on,  I  am  a  good  organizer,  decision  maker,  adaptable,  persistent,  resilient  and  problem  solver.        

   

                     

Page 4: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

HEALTH,  SAFETY,  SECURITY  &  ENVIRONMENT  •  Totally  commiWed  to  Leading  and  Promo8ng  Safety  and  Protec8ng  the  Environment  •  Ensures  Company  and  Contractor  HSSE  Policies,  Plans  and  Procedures  are  in  place  •  Personally  take  care  of  the  Health,  Safety  and  Welfare  of  my  Team  &  their  Families  •  Ensures  Site  Visitors  are  properly  Inducted  and  their  Safety  and  Welfare  is  taken  care  of  •  Ensures  the  Security  and  Environmental  Protec8on  of  Company  Assets  is  taken  care  of  •  Enforces  Companies  Rules  on  HSSE  •  Works  with  Contractors  &  Sub  Contractors  to  ensure  HSSE  is  in  Compliance  •  Works  with  and  fully  support  HSSE  Advisor  •  Has  completed  Tap  Root  Inves8ga8on  Training  and  conducted  Tap  Root  Inves8ga8ons  •  Involved  in  Safety  Reviews,  Incident  Inves8ga8ons  and  HSSE  Audits  •  Prepares  Cri8cal  Procedures  and  Risk  Assessments  •  Involved  with  the  prepara8on  of  Job  Hazard  Analysis  for  Cri8cal  ac8vi8es  •  Joins  the  Workforce  in  Tool  box  Mee8ngs  and  conducts  Site  Safety  Inspec8ons  •  Con8nually  improves  Safety  Performance  •  Develops  and  Managed  numerous  Emergency  Exercises  

     

 

Page 5: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

CONSTRUCTION  MANAGEMENT  35  years  in  the  Oil  and  Gas  Industry  -­‐  On  and  Offshore,  involving:  •  Site  Construc8on  Management,  Module  Fabrica8on,  Assembly,  Commissioning,  Load  Out  and  

Transporta8on  •  Equipment  Manufacture,  Pipe  spooling,  Cross  country  Pipelines,  Compressor  &  Meter  

Sta8ons  •  Mechanical  Comple8on,  Pre  Commissioning  &  Commissioning    •  Structural,  Mechanical,  Welding,  Civils,  Buildings,  Bridges,  Roads,  Piping,  Scaffolding,  

Equipment,  Architectural,  Electrical,  Instrumenta8on,  Telemetry  &  Coa8ngs  •  Site  Set  Up,  Training,  Mobiliza8on,  Admin,  Security,  IR,  HR,  &  De  Mobiliza8on  etc.  Posi8ons  Held  •  Company  Representa8ve,  Construc8on  Manager,  Site  Manager,  Fabrica8on  Manager,  In  

Country  Manager  and  Project  Manager  Countries  Worked    Pre  Fabrica8on  Assessments  in:  •   Korea,  Malaysia,  Japan,  Philippines,  Singapore,  Thailand,  UK  and  Australia  Worked  in  the  Following  Countries:  •  United  Kingdom,  Germany,  Australia,  Korea,  Russia  and  Thailand      

 

Page 6: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

Cri7cal  Skills  and  Capabili7es  in  Fabrica7on  and  Construc7on  -­‐  Offshore,  Total  4  years  Claymore  and  Thistle  Pla`orms  –  Hook  Up  -­‐  Occidental  &  Santé  Fe.  97  to  98,  1  year  Involved  managing  Incomplete  Work,  Job  Packs,  Punch  list  close  out,  Dossier  Prepara8on  and  obtaining  Lloyds  Cer8fica8on  to  Opera8on.  Interfacing  with  Hook  Up  teams,  Client,  Third  Party  Vendors,  the  OIM  &  Lloyds  Register  North  Rankin  A  Jacket  Pile  Installa8on  –  Herema  Offshore.  82  to  83,  1  year.  Involved  managing  NDT  and  Field  Inspec8on  of  Installed  Piles.  Directly  Interfacing  with  Herema  Management,  both  on  and  offshore  and  directly  managing  a  mul8  discipline  team  of  Inspectors  and  NDT  Technicians  South  Pepper  and  North  Herald  Pla`orms  –  Mc  DermoW/Western  Mining  96  to  89,  2  years.  Involved  directly  managing  the  Fabrica8on,  Pre  Assembly,  Load  Out  and  Installa8on  of  two  Pla`orms  with  Integrated  Decks.  This  involved  direct  Client  and  main  Contractor  management,  direct  supervision  of  a  Fabrica8on  Team,  managing  the  Fabrica8on  Facility,  transporta8on,  Load  Out  and  Installa8on  North  Rankin  40inch  Sub  Sea  Pipeline  –  ETPM  Clough  82  to  83,  1  year.  Involved  managing  NDT  and  Field  Inspec8on  of  Sub  Sea  Pipeline  Installa8on.  This  involved  directly  managing  and  coordina8ng  a  team  of  40  people  and  interfacing  with  the  Client              

 

Page 7: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

Key  Experience  Requirements  –  Onshore  and  Offshore,  Total  10  Years  Extensive  experience  in  Mul8  Discipline  Supervisory  Experience  in  Fabrica8on  and  Construc8on,  including  direct  exposure  to  Disciplines  such  as,  Structural,  Piping,  E&I,  Coa8ngs,  Insula8on,  Scaffolding,  Welding  &  Tes8ng  

•  This  requirement  is  fully  demonstrated  via  the  below  and  the  contents  of  my  Resume.  I  have  gained  extensive  experience  in  On  and  Offshore,  rela8ng  to  Pipeline,  Meter  and  Compressor  Sta8ons,  Maintenance  Base  Construc8on,    Jacket  and  Module  Construc8on,  Offshore  Hook  Up,  Jacket  Installa8on,  Sub  Sea  Pipelines,  Refineries,  Vessel  and  Equipment  Manufacture,  Fabricators  and  Vendor  Assessment's,  NDT  and  Welding  Procedure  Qualifica8on  and  Approval.  Vendor  Inspec8ons,  Coa8ng  Trials  and  Applica8on.  All  of  these  have  included  the  Management  and  supervision  of  personnel,  Opera8ons,  Government  Officials,  Stake  Holders,  NGO,s  and  Client  Interface.      

 Min  15  years  broad  experience  in  Mechanical  and  Fabrica8on  engineering,  sound  understanding  of  sta8c  equipment  and  Rota8ng  Equipment  used  in  Oil  and  Gas  Modular  Projects.  Total  15  years  •  WMC,  1997  –  1999.  Comple8ons  Manager.  Olympic  Dam  Project.  Waste  Heat  Recovery  Unit,  Mixer/SeWler  Tanks,  

Cranes,  Pumps,  Tanks,  Drive  Heads,  Gas  Engines,  Under  Ground  Train,  Tunnels,  Hoppers,  Fire  Pumps,  Emergency  Shut  Down  Valves.  This  involved  the  supervision  of  a  600  strong  work  force.  Total  2  years.  

•  Duke  Energy,  1999  -­‐2001.  Construc8on  Manager,  Construc8on  of  Compressor  and  Two  Meter  Sta8ons.  Taurus  60  Gas  Compressors,  Air  Fin  Cooler,  Pumps,  Tanks,  Motorized  Block  Valves.  Total  2  years.      

•  Sakhalin  Energy,  2004  –  2009.  Principal  Project  Engineer.  Commissioning  of  above  Block  Valves,  Equipment  shelters,  Piping,  Sta8c  (Air  Receivers/Tanks)  and  Rota8ng  Equipment  (Gas  fired  Generators)  Total  5  years.  

•  Woodside  Energy  Limited,  2001  –  2004.  Principal  Project  Engineer.  Pre  Commissioning  and  Commissioning  of  LNG  Train  IV.  Compressors,  Pumps,  Turbines,  Heat  Exchanger,  Air  Fin  Coolers,  Oil  filtra8on,  etc.  Total  3  years.  

•  Woodside  Energy,  1990  -­‐  1993  &  2009  –  2010.  QA  Manager/  Mechanical  Comple8ons  Coordinator.  NR2  Re  Development  25k  Ton  Integrated  Deck.  Turbines,  Compressors,  Motorized  Valves,  Vessels,  Columns,  Air  Fin  Coolers,  Tanks,  Vendors  Skids.  Total  4  years.  

             

 

Page 8: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

Key  Experience  Requirements  (con7nued)  –  Onshore  and  Offshore  Extensive  experience  in  Mul8  Discipline  Supervisory  Experience  in  Fabrica8on  and  Construc8on,  including  direct  exposure  to  Disciplines  such  as,  Structural,  Piping,  E&I,  Coa8ngs,  Insula8on,  Scaffolding,  Welding  &  Tes8ng    Experience  in  a  Supervisory  role,  Supervising  5  individuals  or  more.  Total  10  years  •  JLV  Constructor  Yard,  1986  –  1988.  Project  Manager.  Owner  JLV.  Total  2  years.  •  HHI,s  Yard  1990  –  1993  &  2009  –  2010.  QA  Manager/  Mechanical  comple8ons  Coordinator.  

Woodside.  Total  4  years.    •  United  Construc8ons  Yard  1993  –  1994.  Site  Representa8ve.  Woodside.  Total  1  Year.    •  STPI,s  Yard  2010  –  2013.  Fabrica8on  Manager.  BG/QGC.  Total  3  Years.      Experience  in  working  in  Module  Yards,  or  similar  in  South  East  Asia.  Total  10  years  Worked  in:    •  JLV  Constructor  Yard,  1986  –  1988.  Project  Manager.  Owner  JLV.  Total  2  years.    •  HHI,s  Yard  1990  –  1993  &  2009  –  2010..  QA  Manager.  Woodside.  Total  4  years.  •  United  Construc8ons  Yard  1993  –  1994..  Site  Representa8ve.  Woodside.  Total  1  Year.  •  STPI,s  Yard  2010  –  2013.  Fabrica8on  Manager.  BG/QGC.  Total  3  Years.    Demonstrated  Module  Construc8on  Experience.  Total  92,000/100  Plus  Modules  •  BG,  80  LNG  Modules,  45,000  Ton.  Woodside  1  Integrated  Deck  25,000  Ton.  Woodside  5  Process  

Modules,  20,000  Ton.  Woodside  1  PLQ,  2000  Ton                  

 

Page 9: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

MODULE  ASSEMBLY  and  Hook  Up    

77-­‐78  Santé  Fe  and  Occidental  –  North  Sea  Pla`orm  Hook  Up      •  Claymore  and  Thistle  Pla`orm  Up    81-­‐82  Woodside  Offshore  Petroleum  Australia  –  North  Rankin  A  •  Plate  Girder,  Deck  Pre  Assembly  and  Onsite  Assembly  of  Process  and  U8lity  Modules    86-­‐88  JLV  Constructors  Australia  -­‐  South  Pepper  and  North  Herald  Offshore  Pla`orms  •  Managed  the  Heavy  Fabrica8on  Division,  Various  On  Shore  and  Offshore  Contracts,  Heavy  

Structural  Steel,  Plate  Girders,  Sub  Assemblies,  Jackets  and  Topsides  and  Load  Out  

90-­‐93  Woodside  Offshore  Petroleum  Korea  Goodwyn  A  –  5  Process  Modules  •  Fabrica8on,  Assembly,  Pre  Commissioning  and  Load  Out    93-­‐94  Woodside  Offshore  Petroleum  Australia  -­‐  of  Goodwyn    A  -­‐  Personnel  Living  Quarters    •  Fabrica8on,  Construc8on,  Pre  Commissioing,  Commissioning  and  Load  Out  

 

 

Page 10: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

MODULE  ASSEMBLY  -­‐  con7nued    

01-­‐04  Woodside  Offshore  Petroleum  Korea  •  Fabrica8on,  Assembly,  Pre  Commissioning  and  Load  Out  of  72  LNG  Air  Fin  Coolers  

09-­‐10  Woodside  Offshore  Petroleum  Korea  -­‐  NR2  24,000  Tone  Integrated  Deck  •  Fabrica8on,  Assembly,  Pre  Commissioning,  Commissioning  and  Load  Out    10-­‐13  BG/QGC  Thailand  -­‐  80  Modules,  45,000  Ton  LNG  Modules  •  Fabrica8on,  Assembly,  Pre  Commissioning  and  Load  Out  

 

 

Page 11: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

PERSONAL  ATRIBUTES  •  CommiWed  to  Leading  and  Promo8ng  Safety  •  Takes  an  ac8vely  role  in  Safety  Inves8ga8ons  (Trained  in  Tap  Root)  •  Understands  the  Team,  Earns  their  Respect  and  Takes  Care  of  them  •  Highly  Organized,  Self  Mo8vated  and  Good  Communicator  •  Maintains  Business  Focus  •  Appreciates  local  Culture  and  Respect  their  Laws  and  Regula8ons  •  Supports  Local  Chari8es  •  Fosters  good  Inter  Team  Rela8onships  •  Recognizes  and  Rewards  achievement  •  Respects  and  cares  for  all  personnel  •  Promotes  confidence  in  the  Team  •  Open  and  Honest  and  Keep  my  Word  •  Be  Personally  Accountable  •  Fair,  Understanding  and  were  necessary  Firm  •  Delivers  Results  on  8me,  Safely  •  Holds  People  Accountable  •  Persuades  and  influences  others  in  achieving  an  Acceptable  and  Safe  Outcome  

 

Page 12: Colin Lawton Summary 2

Colin  Lawton  Experience  Profile  CAPABILTY  STATEMENT  •  Strong  Experience  In  Module  Construc8on,  Fabrica8on  and  Commissioning  Management  •  Experienced  with  Mega  Projects  •  Last  Project  –  4.5  Months  Early,  No  Claims,  No  Carry  Over  Work,  Excellent  Safety  Record  •  Worked  in  Harsh  Environment  •  Adapts  quickly  to  Cultural  Change  and  Different  Management  styles  •  Can  communicate  (limited)  in  Korean,  Russia  and  Thai  •  Works  well  with    a  Wide  Cross  Sec8on  Na8onali8es  •  Ins8lls  Camaraderie,  Team  Work  and  Top  Class  Collabora8on,  Can  do  Aptude  •  Is  a  Professional  and  maintains  High  Ethical  standards  •  Provides  Confidence  within  Team,  Management  and  Contractors  •  Brings  Specialized  Skills  in  Safety,  Security,  Risks  Mi8ga8on  &  Flawless  Start  Up  •  Provides  Hands-­‐on  Knowledge  of  all  Construc8on  and  Commissioning  Disciplines  •  Quickly  to  Comes  up  to  Speed  in  all  areas  •  S8mulates  Energy  and  Passion  into  the  Team  

 

 

Page 13: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

PROJECT  EXECUTION  •  Collaborates  with  Contractor  ensuring  we  are  working  to  the  same  Goal  •  Ensure  Company  and  Contractor  HSSE  Plans  are  Complied  with  •  Develops  Management  Strategies,  Execu8on  and  Construc8on  Plans  •  Interrogates  the  schedule  to  verify  progress  and  look  for  ways  to  improve  •  Takes  ac8on  to  avert  and  or  arrest  Schedule  Slippage  •  Manages  Company  Governance,  Regulatory  and  Third  Party  requirements  •  Monitors  and  Verifies  the  Works  •  Iden8fies,  Manages  and  Controls  Risks    •  Sets  KPI  requirements  and  works  with  the  Team  to  beWer  them  •  Uses  Ac8on  Tracking  to  monitor  and  Close  Out  Cri8cal    issues  •  Uses  Lessons  Learnt  for  future  improvement  •  Closely  monitor  Equipment/Material  ROS  Dates  to  ensure  deliveries  are  8mely  •  Ensures  Engineering  Work  Packages  are  progressed  in  accordance  with  the  schedule  •  Monitor  Vendor  and  Fabricator  Assessment  Reports  •  Works  with  all  groups  to  ensure  Interfaces  are  addressed  and  ac8ons  are  8mely  •  Ensure  Team  is  properly  Trained    •  Ensures  site  Visitors  are  properly  Inducted  and  their  Welfare  is  taken  care  of  

 

Page 14: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

ENGINEERING  &  PROCUREMENT  

•  Monitors  and  Verifies  the  Progress  of  the  Design  •  Ensures  Work  Packages  are  Defined  and  logically  Broken  Down  •  Ensures  Engineering  Work  Packages  are  progressed  with  the  schedule  •  Par8cipates  in  Verifying  Module  Defini8on  is  accurately  carried  out  •  Verifies  Engineering  Deliverables  are  Integrated  into  the  Schedule  •  Par8cipates  in  Model  reviews  •  Plans  and  conducts  Constructability  reviews  •  Manages  Risk  Work  Shop,  establishing  Risks  and  Mi8ga8ons  •  Ensures  Lessons  Learnt  are  Recorded  

 

Page 15: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

RISK  MANAGEMENT  Over  the  years  been  involved  in  numerous  Risk  Work  Shops  and  Managing  Risks  •  Goodwyn  A  Process  Modules  Fabrica8on,  Assembly  and  Load  Out  •  Woodside  LNG  Train  IV  –    Fabrica8on  &  Installa8on  Par8cipated  in  Team  Risks  •  SEIC  Onshore  Pipeline  Facility  Commissioning  –  Managed  Project  Risks  •  Woodside  NR2  Re  Development  –  25  Ton  Integrated  Deck  –  Managed  Project  Risks  •  QGC/BG  80  Modules/45,000  Ton  –  Managed  Projects  Risks  

 

Page 16: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

INTERFACE  MANAGEMENT    My  key  Goals  and  Objec8ves  are:  •  To  ensure  all  par8es  are  aligned  with  the  scope  of  work  •  Plans  and  procedures  and  Interface  points  are  clearly  iden8fied  •  Informa8on  is  received  when  it  is  required  and  by  the  people  who  need  it  •  Ensure  an  Interface  Management  Plan  is  in  place  •  Ensures  proper  communica8on  and  coordina8on  between  the  teams  •  Holds  Bi  monthly  Interface  Management  Coordina8on  mee8ngs  •  Iden8fies  any  new  interface  requirements/monitors  exis8ng  interfaces  •  Ensures  that  necessary  coordina8on  and  planning  is  working  to  meet  the  project  schedule  •  Works  with  the  Engineering  Teams/Contractors/Licensors/Government  Organiza8ons  

 

 

Page 17: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

ASSURANCE  &  QUALITY  CONTROL  •  Development  of  Management  systems  and  Opera8ng  procedures  •  Training  and  Approved  as  Lead  assessor  –  PE  Batalas  •  Managed  the  successful  Accredita8on  of  major  Engineering  Company  •  Conducts  Management  reviews  and  Audits  •  Review  and  approval  of  third  part  suppliers  and  fabricators  •  Follows  up  on  Correc8ve  and  Improvement  No8ces  •  Fully  supports  the  Quality  Assurance  and  Control  effort  

 

Page 18: Colin Lawton Summary 2

Colin  Lawton  Experience  Summary  

CONTRACT  MANAGEMENT  •  As  a  high  priority  Reads  and  Understands  the  Contact  and  its  Responsibili8es  •  Ensures  Companies  Governance  requirements  are  fully  Implemented  •  Ensures  Integrity  and  Conformance  for  Ethical  Conduct  •  Trains  Team  to  understand  Contractual  requirements  and  their  implica8ons  •  Ensures  Contract  is  fully  Complied  with  •  Implements  process's  for  Claims  Avoidance  and  Defense  •  Has  represented  large  Company  in  High  Court  on  Li8ga8on  MaWers  •  As  site  Manager  has  applied  Liquidated  Damages  •  Review  and  Approves  Progress  Payments  

 

Page 19: Colin Lawton Summary 2

Colin  Lawton  Experience  Profile  

PRE  COMMISSIONING  AND  COMMISSIONING  •  Manages  Pre  commissioning  &  Commissioning  •  Manages  Project  Comple8on  •  Manages  Project  Hand  Over  and  Close  Out  with  Opera8ons/Client  •  Understands  and  Develops  Commissionable  Systems  •  Develops  Work  Break  Down  Structures  •  Develops  Mechanical  Comple8on  Strategies,  Plans  and  Processes  •  Develops  Pre  Commissioning  and  Commissioning  Plans  and  Procedures  •  Used  and  understands  WinPCS  and  or  similar  Comple8ons  Data  Base  

 

Page 20: Colin Lawton Summary 2

Colin  Lawton  Experience  

Addi7onal  Informa7on  

 

Page 21: Colin Lawton Summary 2

Colin  Lawton  Experience  

Work  Scope  -­‐  Korea  Experience  1990  -­‐1993  -­‐  Goodwyn  A  Gas  Pla`orm,  5  Process  Modules  •  Client  –  Woodside  Offshore  Petroleum  •  Contractor  Hyundai  •  Sub  Contractors  -­‐  Various  •  Loca8on  Ulsan  Dong  Gu  •  Manage  the  Companies  Quality  and  Quality  Assurance  requirements  directly  with  Contractor,  

achieved  DNV  Cer8ficate  for  Load  out  and  Sail  away  

2001  –  2002  –  LNG  Train  IV  72  Air  Cooled  Heat  Exchangers  •  Client  –  Woodside  Energy  Limited  •  Contractor  –  Jord  Engineering  •  Sub  Contractor  –  Jong  Up  Heat  Exchangers  •  Loca8on  –  Neaangsang  •  Part  of  my  du8es  was  to  monitor  offshore  Contracts,  one  in  par8cular  was  a  the  Contract  for  

the  LNG  Train  Air  Fin  Coolers,  which  was  not  performing  well  and  was  a  major  risk  to  the  building  of  the  LNG  Trains.  Such  a  special  assignment  issued  by  the  Onshore  General  Manager  to  have  me  deal  directly  with  the  Sub  Contractor,  resolve  all  issues  and  have  the  Air  Fin  Coolers  Built  Commissioned  and  shipped  to  Australia,  which  I  did  successfully  and  without  impact  to  the  Project.  This  posi8on  in  Korea  became  a  permanent  assignment  un8l  all  work  was  loaded  out  

 

 

Page 22: Colin Lawton Summary 2

Colin  Lawton  Experience  

Work  Scope  -­‐  Korea  Experience  Con7nued  2009  –  2010  North  Rankin  A  Project  –  24,000  Tone  Integrated  Deck  •  Client  –  Woodside  Energy  •  Contractor  –  Hyundai  •  Sub  Contractors  –  Various  •  Loca8on  –  Ulsan  Dong  Gu  –  Korea  •  Responsible  for  Managing  all  aspects  of  Mechanical  Comple8on,  developing  the  MC  system,  

and  Managing  Companies  Risk  Management  and  Flawless  Start  Up  process.  Interfacing  with  all  disciplines  and  Commissioning.  These  ac8vi8es  also  involved  working  directly  with  the  Contractor  

 

Page 23: Colin Lawton Summary 2

Colin  Lawton  Experience  

Work  Scope  -­‐  Korea  Experience  Con7nued  2010  –  2013  –  Cur8s  Island  LNG  Project  •  Client  –  QGC/Bri8sh  Gas  •  Contractor  Bechtel  •  Sub  Contractor  –  Ilsan  Pressure  Vessel  Company  •  Loca8on  Ilsan  Korea    Whilst  managing  the  Module  Contract  in  Thailand,  it  became  evident  that  the  delivery  of  Pressure  Vessels  were  being  delayed  due  to  the  Sub  Contractor  having  finance  difficul8es.  As  a  result  of  this  and  my  ability  to  understand  and  work  with  Koreans  I  was  dispatched  by  Execu8ve  Management  to  Korea  and  assist  Contractor  in  finding  solu8ons  to  have  the  Sub  Contractor  Re  Open  their  Yard  and  re  commence  work.  This  was  achieved,  manufacture  re  commenced  and  deliveries  were  made,  which  did  not  impact  on  the  schedule.  The  reason  I  was  sent  was  because  of  my  capability  of  being  able  to  work  with  and  influence  the  Koreans  and  show  them  the  Clients  interest.  

 

Page 24: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  1977  –  1978  –  North  Sea,  Offshore  •  Project  –  Claymore  and  Thistle  Pla`orms  •  Scope  –  Hook  Up  two  Pla`orms  •  Posi8on  –  Clients  Cer8fica8on  Engineer/Work  Pack  Coordinator  •  Client  –  Occidental  and  Sa`e  •  Contractors  –  Wagley  Offshore  and  Kilpatrick  Green  1978  –  1980  –  England,  Onshore  •  Projects,  USSR  Methanol  Plant,  St  Fergus  Gas  Extract  Plant  &  Sullom  Voe  Gas  Plant  •  Scope  –  Pipe  Spooling,  Structural  and  Equipment  •  Posi8on  –  Contractors  Chief  Inspector  •  Clients  –  Ralph  M  Parson,  William  Press  &  Foster  Wheeler  •  Contractor  –  Mc  Tay  Engineering  –  Later  John  Mowlem  Group  1981  –  1982  –  Australia,  Onshore  •  Project  –  North  Rankin  A  Gas  Pla`orm  •  Scope  –  Fabrica8on  of  Plate  Girders  and  Decks  •  Posi8on  –  Contractors  Quality  Assurance  Manager  •  Client  –  Woodside    •  Contractor  –  Johns  Perry  UIE/Forward  Down  

 

Page 25: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  1982  –  1983  –  Australia,  Offshore  •  Project  –  North  Rankin  Installa8on  and  Sub  Sea  Pipeline  •  Scope  –  Jacket  Installa8on  &  Sub  Sea  Pipeline  •  Posi8on  –  Contractors  Opera8ons  Manager  •  Client  -­‐  Woodside  •  Contractors  –  Herema  &  ETPM  Clough  •  1983  –  1986  –  Australia,  Onshore  •  Project  –  Dampier  to  Perth  Pipeline  •  Scope  –  1500klm  Cross  Country  Pipelines,  Compressor  and  Meter  Sta8ons  •  Posi8on  –  Clients  Welding  Superintendent,  Site  Manager  &  Commissioning  Superintendent  •  Client  –  State  Energy  Commission  Western  Australia  •  Contractors,  Saipem  &  ICC  •  1986-­‐  1988  –  Australia  On  and  Offshore  •  Project  –  South  Pepper  North  Herald  Oil  Pla`orms  •  Scope  –  Design,  Build,  Transport  and  Installa8on  of  Two  Pla`orms  •  Posi8on  Contractors  Project  Manager  •  Client  -­‐  Western  Mining  •  Contractor  –  J  Ray  Mc  DermoW  

 

Page 26: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  1989  June  -­‐1989  Sept  Australia,  Onshore  •  Project  –  Mineral  Sands  Upgrade  –  Shut  Down  •  Scope  –  Design,  Procure,  Offsite  Fabrica8on,  Onsite  Installa8on  and  Commission  •  Posi8on  –  Contractors  Project  Manager  •  Client  –  Westralian  Sands  •  Contractors  –  Clyde  Carruthers  •  1989  –  1900  Australia,  Onshore  •  Project  –  Cooljarloo  Pigment  Plant  •  Scope  –  Design,  Build  and  Commission  Mineral  Sands  Processing  Plant  •  Posi8on  –  Clients  Quality  Assurance  Engineer  •  Client  –  Minproc  •  Contractor  –  Boss  Engineering  •  1990  –  1993  –  Korea  •  Project  –  Goodwyn  A  Gas  Pla`orm,  5  Process  Modules  •  Posi8on  –  Clients  Senior  Quality  Assurance  Engineer  •  Client  –  Woodside  Offshore  Petroleum  •  Contractor  -­‐  Hyundai  

 

Page 27: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  1993  –  1994  –  Australia,  Onshore  •  Project  –  Goodwyn  A  U8li8es  Module  •  Scope  –  Design,  Build,  Pre  Commission  and  Load  Out  •  Posi8on  –  Company  Site  Representa8ve  •  Client  –  Woodside  (seconded  to  Hardcastle  and  Richards)  •  Contractors  –  United  Construc8on  1994  –  1995  Australia,  Onshore  •  Project  –  Karratha  to  Port  Headland  Gas  Pipeline  •  Scope  –  Design,  Build  and  Commission  Cross  country  Pipeline,  Meter  &  Receiver  Sta8ons  •  Posi8on  –  Clients  Site  Construc8on  Manager  •  Client  –  William  Brothers/Western  Mining  •  Contractor  –  Clough    

 

Page 28: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  1995  –  1996  Australia,  Onshore  Project  –  Various  Scope  –  Achieve  Lloyds  ISO  9001  Accredita8on  Posi8on  –  Company  Representa8ve  Client  –  Fluor  Daniel  1996-­‐  1997  Australia,  Onshore  Project  –  Goldfield  Gas  pipeline  Scope  –  Specifically  recruited  to  recover  lost  progress  and  finish  the  project  on  8me  Posi8on  –  Company  Comple8ons  Manager  Client  –  Western  Mining  Contractor  –  Saipem/Leighton's  1997  –  1997  Australia,  Onshore  Project  –  Olympic  Dam  Expansion  Scope  –  Expand  exis8ng  Plant  Posi8on  –  Companies  Construc8on  Manager  Client  –  Western  Mining  Sub  Contractors  –  Thiess,  Transfield,  ABB  &  united  Construc8on          

 

Page 29: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  1999  to  2002,  Australia,  Onshore  •  Project  –  Eastern  Gas  Pipeline  •  Scope  –  Compressor,  Metering  Sta8on  and  Gas  Pipeline  •  Posi8on  –  Companies  Site  Construc8on  Manager  •  Client  –  Duke  Energy  •  Contractors  –  Simon  Carves  and  various  local  Civil  and  Mechanical,  plus  main  Vendors  2001  –  2004,  Australia/Korea  •  Project  –  Train  IV  LNG  Plant  •  Scope  -­‐  Various  Offshore  Contracts  (Korea/Thailand)  &  Australia  •  Posi8on  –  Companies  Principal  Project  Engineer/Comple8ons  Superintendent  •  Client  –  Woodside  •  Contractors  –  KJV,  CBI,  United  Construc8on,  Sino  Thai  &  Jord  2009  –  2010,  Korea  •  Project  –  North  Rankin  A  24,000  Tone  Integrated  Deck  •  Scope  –  Fabricate,  Build,  Pre  Commission,  Commission  and  Load  Out  •  Posi8on  –  Mechanical  Comple8ons  Coordinator  •  Client  –  Woodside  •  Contractor  –  Hyundai  •  Sub  Contractors  -­‐  Various                    

 

Page 30: Colin Lawton Summary 2

Colin  Lawton  Experience  Contractor  Experience  2010  –  2013  •  Project  –  Cur8s  Island  LNG  Plant  •  Scope  –  Fabricate,  Pre  Commission  &  Load  Out  45,000  Tone,  80  Modules  •  Posi8on  –  Fabrica8on  Manager/  In  Country  Representa8ve  •  Client  –  QGC/BG  •  Contractor  –  Bechtel