Download - Colin Lawton Summary 2
Colin Lawton – Work Experience
Note, Addi8onal Informa8on added from slide 20 to 30. Date 11 January 2015
Colin Lawton -‐ Experience Summary
Contents Experience Overview Health, Safety, Security and Environment Construc8on Management Cri8cal Skills and Capabili8es in Fabrica8on and Construc8on -‐ Offshore Key Experience Requirements – Onshore and Offshore Module Assembly and Hook Up Personal AWributes Capability Statement Project Execu8on Engineering and Procurement Risk Management Interface Management Assurance and Quality Control Contract Management Pre Commissioning and Commissioning Addi8onal Informa8on
Colin Lawton -‐ Experience Summary Over thirty five years experience in the Oil and Gas Industry in the areas of Project, Fabrica8on, Construc8on Commissioning and Management. During this 8me I have fulfilled the roles of Company Representa8ve, In Country Manager, Company Representa8ve, Construc8on Manager, Site Manager, Fabrica8on Manager and Project Manager. I am well versed in all facets of the Heavy Fabrica8on, Equipment and Pipe Spool manufacture, Module/Jacket Fabrica8on and Installa8on, Load out and Transporta8on. I am also experienced managing LNG Plant Construc8on, Compressor and Meter Sta8on, Cross Country Pipelines, Compressor and Meter Sta8ons, Refineries and Chemical Plants, Project Comple8on and Hand Over. I regard the implementa8on of HSSE to be a fundamental part of my normal du8es and essen8al to the success of any project and fully commiWed to ensuring the Companies HSSE Policies and Governance requirements are enforced. I communicate well at all levels and consider that a robust interface management plan is essen8al in ensuring a One Team approach is adopted throughout the project. My past experience in Risk Assurance, Quality Assurance, Flawless Start Up and HSSE has given me valuable strengths in being able to come up to speed quickly with projects and implement requirements in the most effec8ve and efficient manner. I have worked for companies such as, Fluor Daniel, William Brothers, Woodside Energy Limited, Duke Energy Interna8onal, Western Mining Corpora8on, San`e, Occidental, Babcock and Wilcox, Shell, BG/QGC and worked in loca8ons, such Germany, Malaysia, Korea, Australia, Thailand, Russia and throughout the United Kingdom. I am a hands on Manager, who earns the respect of his team. I have high Business Ethics and ensure the Companies Interests are treated with the utmost respect. I take care of my team, their families and site visitors. My Strengths are in my style of Communica8on, I am a good organizer, decision maker, adaptable, persistent, resilient and problem solver.
Colin Lawton Experience Summary
HEALTH, SAFETY, SECURITY & ENVIRONMENT • Totally commiWed to Leading and Promo8ng Safety and Protec8ng the Environment • Ensures Company and Contractor HSSE Policies, Plans and Procedures are in place • Personally take care of the Health, Safety and Welfare of my Team & their Families • Ensures Site Visitors are properly Inducted and their Safety and Welfare is taken care of • Ensures the Security and Environmental Protec8on of Company Assets is taken care of • Enforces Companies Rules on HSSE • Works with Contractors & Sub Contractors to ensure HSSE is in Compliance • Works with and fully support HSSE Advisor • Has completed Tap Root Inves8ga8on Training and conducted Tap Root Inves8ga8ons • Involved in Safety Reviews, Incident Inves8ga8ons and HSSE Audits • Prepares Cri8cal Procedures and Risk Assessments • Involved with the prepara8on of Job Hazard Analysis for Cri8cal ac8vi8es • Joins the Workforce in Tool box Mee8ngs and conducts Site Safety Inspec8ons • Con8nually improves Safety Performance • Develops and Managed numerous Emergency Exercises
Colin Lawton Experience Summary
CONSTRUCTION MANAGEMENT 35 years in the Oil and Gas Industry -‐ On and Offshore, involving: • Site Construc8on Management, Module Fabrica8on, Assembly, Commissioning, Load Out and
Transporta8on • Equipment Manufacture, Pipe spooling, Cross country Pipelines, Compressor & Meter
Sta8ons • Mechanical Comple8on, Pre Commissioning & Commissioning • Structural, Mechanical, Welding, Civils, Buildings, Bridges, Roads, Piping, Scaffolding,
Equipment, Architectural, Electrical, Instrumenta8on, Telemetry & Coa8ngs • Site Set Up, Training, Mobiliza8on, Admin, Security, IR, HR, & De Mobiliza8on etc. Posi8ons Held • Company Representa8ve, Construc8on Manager, Site Manager, Fabrica8on Manager, In
Country Manager and Project Manager Countries Worked Pre Fabrica8on Assessments in: • Korea, Malaysia, Japan, Philippines, Singapore, Thailand, UK and Australia Worked in the Following Countries: • United Kingdom, Germany, Australia, Korea, Russia and Thailand
Colin Lawton Experience Summary
Cri7cal Skills and Capabili7es in Fabrica7on and Construc7on -‐ Offshore, Total 4 years Claymore and Thistle Pla`orms – Hook Up -‐ Occidental & Santé Fe. 97 to 98, 1 year Involved managing Incomplete Work, Job Packs, Punch list close out, Dossier Prepara8on and obtaining Lloyds Cer8fica8on to Opera8on. Interfacing with Hook Up teams, Client, Third Party Vendors, the OIM & Lloyds Register North Rankin A Jacket Pile Installa8on – Herema Offshore. 82 to 83, 1 year. Involved managing NDT and Field Inspec8on of Installed Piles. Directly Interfacing with Herema Management, both on and offshore and directly managing a mul8 discipline team of Inspectors and NDT Technicians South Pepper and North Herald Pla`orms – Mc DermoW/Western Mining 96 to 89, 2 years. Involved directly managing the Fabrica8on, Pre Assembly, Load Out and Installa8on of two Pla`orms with Integrated Decks. This involved direct Client and main Contractor management, direct supervision of a Fabrica8on Team, managing the Fabrica8on Facility, transporta8on, Load Out and Installa8on North Rankin 40inch Sub Sea Pipeline – ETPM Clough 82 to 83, 1 year. Involved managing NDT and Field Inspec8on of Sub Sea Pipeline Installa8on. This involved directly managing and coordina8ng a team of 40 people and interfacing with the Client
Colin Lawton Experience Summary
Key Experience Requirements – Onshore and Offshore, Total 10 Years Extensive experience in Mul8 Discipline Supervisory Experience in Fabrica8on and Construc8on, including direct exposure to Disciplines such as, Structural, Piping, E&I, Coa8ngs, Insula8on, Scaffolding, Welding & Tes8ng
• This requirement is fully demonstrated via the below and the contents of my Resume. I have gained extensive experience in On and Offshore, rela8ng to Pipeline, Meter and Compressor Sta8ons, Maintenance Base Construc8on, Jacket and Module Construc8on, Offshore Hook Up, Jacket Installa8on, Sub Sea Pipelines, Refineries, Vessel and Equipment Manufacture, Fabricators and Vendor Assessment's, NDT and Welding Procedure Qualifica8on and Approval. Vendor Inspec8ons, Coa8ng Trials and Applica8on. All of these have included the Management and supervision of personnel, Opera8ons, Government Officials, Stake Holders, NGO,s and Client Interface.
Min 15 years broad experience in Mechanical and Fabrica8on engineering, sound understanding of sta8c equipment and Rota8ng Equipment used in Oil and Gas Modular Projects. Total 15 years • WMC, 1997 – 1999. Comple8ons Manager. Olympic Dam Project. Waste Heat Recovery Unit, Mixer/SeWler Tanks,
Cranes, Pumps, Tanks, Drive Heads, Gas Engines, Under Ground Train, Tunnels, Hoppers, Fire Pumps, Emergency Shut Down Valves. This involved the supervision of a 600 strong work force. Total 2 years.
• Duke Energy, 1999 -‐2001. Construc8on Manager, Construc8on of Compressor and Two Meter Sta8ons. Taurus 60 Gas Compressors, Air Fin Cooler, Pumps, Tanks, Motorized Block Valves. Total 2 years.
• Sakhalin Energy, 2004 – 2009. Principal Project Engineer. Commissioning of above Block Valves, Equipment shelters, Piping, Sta8c (Air Receivers/Tanks) and Rota8ng Equipment (Gas fired Generators) Total 5 years.
• Woodside Energy Limited, 2001 – 2004. Principal Project Engineer. Pre Commissioning and Commissioning of LNG Train IV. Compressors, Pumps, Turbines, Heat Exchanger, Air Fin Coolers, Oil filtra8on, etc. Total 3 years.
• Woodside Energy, 1990 -‐ 1993 & 2009 – 2010. QA Manager/ Mechanical Comple8ons Coordinator. NR2 Re Development 25k Ton Integrated Deck. Turbines, Compressors, Motorized Valves, Vessels, Columns, Air Fin Coolers, Tanks, Vendors Skids. Total 4 years.
Colin Lawton Experience Summary
Key Experience Requirements (con7nued) – Onshore and Offshore Extensive experience in Mul8 Discipline Supervisory Experience in Fabrica8on and Construc8on, including direct exposure to Disciplines such as, Structural, Piping, E&I, Coa8ngs, Insula8on, Scaffolding, Welding & Tes8ng Experience in a Supervisory role, Supervising 5 individuals or more. Total 10 years • JLV Constructor Yard, 1986 – 1988. Project Manager. Owner JLV. Total 2 years. • HHI,s Yard 1990 – 1993 & 2009 – 2010. QA Manager/ Mechanical comple8ons Coordinator.
Woodside. Total 4 years. • United Construc8ons Yard 1993 – 1994. Site Representa8ve. Woodside. Total 1 Year. • STPI,s Yard 2010 – 2013. Fabrica8on Manager. BG/QGC. Total 3 Years. Experience in working in Module Yards, or similar in South East Asia. Total 10 years Worked in: • JLV Constructor Yard, 1986 – 1988. Project Manager. Owner JLV. Total 2 years. • HHI,s Yard 1990 – 1993 & 2009 – 2010.. QA Manager. Woodside. Total 4 years. • United Construc8ons Yard 1993 – 1994.. Site Representa8ve. Woodside. Total 1 Year. • STPI,s Yard 2010 – 2013. Fabrica8on Manager. BG/QGC. Total 3 Years. Demonstrated Module Construc8on Experience. Total 92,000/100 Plus Modules • BG, 80 LNG Modules, 45,000 Ton. Woodside 1 Integrated Deck 25,000 Ton. Woodside 5 Process
Modules, 20,000 Ton. Woodside 1 PLQ, 2000 Ton
Colin Lawton Experience Summary
MODULE ASSEMBLY and Hook Up
77-‐78 Santé Fe and Occidental – North Sea Pla`orm Hook Up • Claymore and Thistle Pla`orm Up 81-‐82 Woodside Offshore Petroleum Australia – North Rankin A • Plate Girder, Deck Pre Assembly and Onsite Assembly of Process and U8lity Modules 86-‐88 JLV Constructors Australia -‐ South Pepper and North Herald Offshore Pla`orms • Managed the Heavy Fabrica8on Division, Various On Shore and Offshore Contracts, Heavy
Structural Steel, Plate Girders, Sub Assemblies, Jackets and Topsides and Load Out
90-‐93 Woodside Offshore Petroleum Korea Goodwyn A – 5 Process Modules • Fabrica8on, Assembly, Pre Commissioning and Load Out 93-‐94 Woodside Offshore Petroleum Australia -‐ of Goodwyn A -‐ Personnel Living Quarters • Fabrica8on, Construc8on, Pre Commissioing, Commissioning and Load Out
Colin Lawton Experience Summary
MODULE ASSEMBLY -‐ con7nued
01-‐04 Woodside Offshore Petroleum Korea • Fabrica8on, Assembly, Pre Commissioning and Load Out of 72 LNG Air Fin Coolers
09-‐10 Woodside Offshore Petroleum Korea -‐ NR2 24,000 Tone Integrated Deck • Fabrica8on, Assembly, Pre Commissioning, Commissioning and Load Out 10-‐13 BG/QGC Thailand -‐ 80 Modules, 45,000 Ton LNG Modules • Fabrica8on, Assembly, Pre Commissioning and Load Out
Colin Lawton Experience Summary
PERSONAL ATRIBUTES • CommiWed to Leading and Promo8ng Safety • Takes an ac8vely role in Safety Inves8ga8ons (Trained in Tap Root) • Understands the Team, Earns their Respect and Takes Care of them • Highly Organized, Self Mo8vated and Good Communicator • Maintains Business Focus • Appreciates local Culture and Respect their Laws and Regula8ons • Supports Local Chari8es • Fosters good Inter Team Rela8onships • Recognizes and Rewards achievement • Respects and cares for all personnel • Promotes confidence in the Team • Open and Honest and Keep my Word • Be Personally Accountable • Fair, Understanding and were necessary Firm • Delivers Results on 8me, Safely • Holds People Accountable • Persuades and influences others in achieving an Acceptable and Safe Outcome
Colin Lawton Experience Profile CAPABILTY STATEMENT • Strong Experience In Module Construc8on, Fabrica8on and Commissioning Management • Experienced with Mega Projects • Last Project – 4.5 Months Early, No Claims, No Carry Over Work, Excellent Safety Record • Worked in Harsh Environment • Adapts quickly to Cultural Change and Different Management styles • Can communicate (limited) in Korean, Russia and Thai • Works well with a Wide Cross Sec8on Na8onali8es • Ins8lls Camaraderie, Team Work and Top Class Collabora8on, Can do Aptude • Is a Professional and maintains High Ethical standards • Provides Confidence within Team, Management and Contractors • Brings Specialized Skills in Safety, Security, Risks Mi8ga8on & Flawless Start Up • Provides Hands-‐on Knowledge of all Construc8on and Commissioning Disciplines • Quickly to Comes up to Speed in all areas • S8mulates Energy and Passion into the Team
Colin Lawton Experience Summary
PROJECT EXECUTION • Collaborates with Contractor ensuring we are working to the same Goal • Ensure Company and Contractor HSSE Plans are Complied with • Develops Management Strategies, Execu8on and Construc8on Plans • Interrogates the schedule to verify progress and look for ways to improve • Takes ac8on to avert and or arrest Schedule Slippage • Manages Company Governance, Regulatory and Third Party requirements • Monitors and Verifies the Works • Iden8fies, Manages and Controls Risks • Sets KPI requirements and works with the Team to beWer them • Uses Ac8on Tracking to monitor and Close Out Cri8cal issues • Uses Lessons Learnt for future improvement • Closely monitor Equipment/Material ROS Dates to ensure deliveries are 8mely • Ensures Engineering Work Packages are progressed in accordance with the schedule • Monitor Vendor and Fabricator Assessment Reports • Works with all groups to ensure Interfaces are addressed and ac8ons are 8mely • Ensure Team is properly Trained • Ensures site Visitors are properly Inducted and their Welfare is taken care of
Colin Lawton Experience Summary
ENGINEERING & PROCUREMENT
• Monitors and Verifies the Progress of the Design • Ensures Work Packages are Defined and logically Broken Down • Ensures Engineering Work Packages are progressed with the schedule • Par8cipates in Verifying Module Defini8on is accurately carried out • Verifies Engineering Deliverables are Integrated into the Schedule • Par8cipates in Model reviews • Plans and conducts Constructability reviews • Manages Risk Work Shop, establishing Risks and Mi8ga8ons • Ensures Lessons Learnt are Recorded
Colin Lawton Experience Summary
RISK MANAGEMENT Over the years been involved in numerous Risk Work Shops and Managing Risks • Goodwyn A Process Modules Fabrica8on, Assembly and Load Out • Woodside LNG Train IV – Fabrica8on & Installa8on Par8cipated in Team Risks • SEIC Onshore Pipeline Facility Commissioning – Managed Project Risks • Woodside NR2 Re Development – 25 Ton Integrated Deck – Managed Project Risks • QGC/BG 80 Modules/45,000 Ton – Managed Projects Risks
Colin Lawton Experience Summary
INTERFACE MANAGEMENT My key Goals and Objec8ves are: • To ensure all par8es are aligned with the scope of work • Plans and procedures and Interface points are clearly iden8fied • Informa8on is received when it is required and by the people who need it • Ensure an Interface Management Plan is in place • Ensures proper communica8on and coordina8on between the teams • Holds Bi monthly Interface Management Coordina8on mee8ngs • Iden8fies any new interface requirements/monitors exis8ng interfaces • Ensures that necessary coordina8on and planning is working to meet the project schedule • Works with the Engineering Teams/Contractors/Licensors/Government Organiza8ons
Colin Lawton Experience Summary
ASSURANCE & QUALITY CONTROL • Development of Management systems and Opera8ng procedures • Training and Approved as Lead assessor – PE Batalas • Managed the successful Accredita8on of major Engineering Company • Conducts Management reviews and Audits • Review and approval of third part suppliers and fabricators • Follows up on Correc8ve and Improvement No8ces • Fully supports the Quality Assurance and Control effort
Colin Lawton Experience Summary
CONTRACT MANAGEMENT • As a high priority Reads and Understands the Contact and its Responsibili8es • Ensures Companies Governance requirements are fully Implemented • Ensures Integrity and Conformance for Ethical Conduct • Trains Team to understand Contractual requirements and their implica8ons • Ensures Contract is fully Complied with • Implements process's for Claims Avoidance and Defense • Has represented large Company in High Court on Li8ga8on MaWers • As site Manager has applied Liquidated Damages • Review and Approves Progress Payments
Colin Lawton Experience Profile
PRE COMMISSIONING AND COMMISSIONING • Manages Pre commissioning & Commissioning • Manages Project Comple8on • Manages Project Hand Over and Close Out with Opera8ons/Client • Understands and Develops Commissionable Systems • Develops Work Break Down Structures • Develops Mechanical Comple8on Strategies, Plans and Processes • Develops Pre Commissioning and Commissioning Plans and Procedures • Used and understands WinPCS and or similar Comple8ons Data Base
Colin Lawton Experience
Addi7onal Informa7on
Colin Lawton Experience
Work Scope -‐ Korea Experience 1990 -‐1993 -‐ Goodwyn A Gas Pla`orm, 5 Process Modules • Client – Woodside Offshore Petroleum • Contractor Hyundai • Sub Contractors -‐ Various • Loca8on Ulsan Dong Gu • Manage the Companies Quality and Quality Assurance requirements directly with Contractor,
achieved DNV Cer8ficate for Load out and Sail away
2001 – 2002 – LNG Train IV 72 Air Cooled Heat Exchangers • Client – Woodside Energy Limited • Contractor – Jord Engineering • Sub Contractor – Jong Up Heat Exchangers • Loca8on – Neaangsang • Part of my du8es was to monitor offshore Contracts, one in par8cular was a the Contract for
the LNG Train Air Fin Coolers, which was not performing well and was a major risk to the building of the LNG Trains. Such a special assignment issued by the Onshore General Manager to have me deal directly with the Sub Contractor, resolve all issues and have the Air Fin Coolers Built Commissioned and shipped to Australia, which I did successfully and without impact to the Project. This posi8on in Korea became a permanent assignment un8l all work was loaded out
Colin Lawton Experience
Work Scope -‐ Korea Experience Con7nued 2009 – 2010 North Rankin A Project – 24,000 Tone Integrated Deck • Client – Woodside Energy • Contractor – Hyundai • Sub Contractors – Various • Loca8on – Ulsan Dong Gu – Korea • Responsible for Managing all aspects of Mechanical Comple8on, developing the MC system,
and Managing Companies Risk Management and Flawless Start Up process. Interfacing with all disciplines and Commissioning. These ac8vi8es also involved working directly with the Contractor
Colin Lawton Experience
Work Scope -‐ Korea Experience Con7nued 2010 – 2013 – Cur8s Island LNG Project • Client – QGC/Bri8sh Gas • Contractor Bechtel • Sub Contractor – Ilsan Pressure Vessel Company • Loca8on Ilsan Korea Whilst managing the Module Contract in Thailand, it became evident that the delivery of Pressure Vessels were being delayed due to the Sub Contractor having finance difficul8es. As a result of this and my ability to understand and work with Koreans I was dispatched by Execu8ve Management to Korea and assist Contractor in finding solu8ons to have the Sub Contractor Re Open their Yard and re commence work. This was achieved, manufacture re commenced and deliveries were made, which did not impact on the schedule. The reason I was sent was because of my capability of being able to work with and influence the Koreans and show them the Clients interest.
Colin Lawton Experience Contractor Experience 1977 – 1978 – North Sea, Offshore • Project – Claymore and Thistle Pla`orms • Scope – Hook Up two Pla`orms • Posi8on – Clients Cer8fica8on Engineer/Work Pack Coordinator • Client – Occidental and Sa`e • Contractors – Wagley Offshore and Kilpatrick Green 1978 – 1980 – England, Onshore • Projects, USSR Methanol Plant, St Fergus Gas Extract Plant & Sullom Voe Gas Plant • Scope – Pipe Spooling, Structural and Equipment • Posi8on – Contractors Chief Inspector • Clients – Ralph M Parson, William Press & Foster Wheeler • Contractor – Mc Tay Engineering – Later John Mowlem Group 1981 – 1982 – Australia, Onshore • Project – North Rankin A Gas Pla`orm • Scope – Fabrica8on of Plate Girders and Decks • Posi8on – Contractors Quality Assurance Manager • Client – Woodside • Contractor – Johns Perry UIE/Forward Down
Colin Lawton Experience Contractor Experience 1982 – 1983 – Australia, Offshore • Project – North Rankin Installa8on and Sub Sea Pipeline • Scope – Jacket Installa8on & Sub Sea Pipeline • Posi8on – Contractors Opera8ons Manager • Client -‐ Woodside • Contractors – Herema & ETPM Clough • 1983 – 1986 – Australia, Onshore • Project – Dampier to Perth Pipeline • Scope – 1500klm Cross Country Pipelines, Compressor and Meter Sta8ons • Posi8on – Clients Welding Superintendent, Site Manager & Commissioning Superintendent • Client – State Energy Commission Western Australia • Contractors, Saipem & ICC • 1986-‐ 1988 – Australia On and Offshore • Project – South Pepper North Herald Oil Pla`orms • Scope – Design, Build, Transport and Installa8on of Two Pla`orms • Posi8on Contractors Project Manager • Client -‐ Western Mining • Contractor – J Ray Mc DermoW
Colin Lawton Experience Contractor Experience 1989 June -‐1989 Sept Australia, Onshore • Project – Mineral Sands Upgrade – Shut Down • Scope – Design, Procure, Offsite Fabrica8on, Onsite Installa8on and Commission • Posi8on – Contractors Project Manager • Client – Westralian Sands • Contractors – Clyde Carruthers • 1989 – 1900 Australia, Onshore • Project – Cooljarloo Pigment Plant • Scope – Design, Build and Commission Mineral Sands Processing Plant • Posi8on – Clients Quality Assurance Engineer • Client – Minproc • Contractor – Boss Engineering • 1990 – 1993 – Korea • Project – Goodwyn A Gas Pla`orm, 5 Process Modules • Posi8on – Clients Senior Quality Assurance Engineer • Client – Woodside Offshore Petroleum • Contractor -‐ Hyundai
Colin Lawton Experience Contractor Experience 1993 – 1994 – Australia, Onshore • Project – Goodwyn A U8li8es Module • Scope – Design, Build, Pre Commission and Load Out • Posi8on – Company Site Representa8ve • Client – Woodside (seconded to Hardcastle and Richards) • Contractors – United Construc8on 1994 – 1995 Australia, Onshore • Project – Karratha to Port Headland Gas Pipeline • Scope – Design, Build and Commission Cross country Pipeline, Meter & Receiver Sta8ons • Posi8on – Clients Site Construc8on Manager • Client – William Brothers/Western Mining • Contractor – Clough
Colin Lawton Experience Contractor Experience 1995 – 1996 Australia, Onshore Project – Various Scope – Achieve Lloyds ISO 9001 Accredita8on Posi8on – Company Representa8ve Client – Fluor Daniel 1996-‐ 1997 Australia, Onshore Project – Goldfield Gas pipeline Scope – Specifically recruited to recover lost progress and finish the project on 8me Posi8on – Company Comple8ons Manager Client – Western Mining Contractor – Saipem/Leighton's 1997 – 1997 Australia, Onshore Project – Olympic Dam Expansion Scope – Expand exis8ng Plant Posi8on – Companies Construc8on Manager Client – Western Mining Sub Contractors – Thiess, Transfield, ABB & united Construc8on
Colin Lawton Experience Contractor Experience 1999 to 2002, Australia, Onshore • Project – Eastern Gas Pipeline • Scope – Compressor, Metering Sta8on and Gas Pipeline • Posi8on – Companies Site Construc8on Manager • Client – Duke Energy • Contractors – Simon Carves and various local Civil and Mechanical, plus main Vendors 2001 – 2004, Australia/Korea • Project – Train IV LNG Plant • Scope -‐ Various Offshore Contracts (Korea/Thailand) & Australia • Posi8on – Companies Principal Project Engineer/Comple8ons Superintendent • Client – Woodside • Contractors – KJV, CBI, United Construc8on, Sino Thai & Jord 2009 – 2010, Korea • Project – North Rankin A 24,000 Tone Integrated Deck • Scope – Fabricate, Build, Pre Commission, Commission and Load Out • Posi8on – Mechanical Comple8ons Coordinator • Client – Woodside • Contractor – Hyundai • Sub Contractors -‐ Various
Colin Lawton Experience Contractor Experience 2010 – 2013 • Project – Cur8s Island LNG Plant • Scope – Fabricate, Pre Commission & Load Out 45,000 Tone, 80 Modules • Posi8on – Fabrica8on Manager/ In Country Representa8ve • Client – QGC/BG • Contractor – Bechtel