DETERMINATION OF CBR VALUE
EXPERIMENT 4
INTRODUCTION
The California bearing ratio (CBR) is a penetration test conducted both in laboratory as well as
insitu for e!aluation of the strength and stability of a soil sa"ple for the construction of roads
or highways# It was de!eloped by the California Depart"ent of Transportation# The results of
the test are e$pressed in %ercentage and are relati!e results# The results are obtained for ' ""
penetration and ' "" penetration#
The CBR !alue is deter"ined by
CBR *+,
"easured pressure for site soils *N-"".,
pressure to achie!e e/ual penetration on standard soil *N-"".,
T01 B23IC CBR T13T
This consists of causing a plunger of standard area to penetrate a soil sa"ple4 (this can be in the
laboratory or on site)# The force (load) re/uired to cause the penetration is plotted against
"easured penetration4 the readings noted at regular ti"e inter!als#
This infor"ation is plotted on a standard graph4 and the plot of the test data will establish the
CBR result of the soil tested#
The test is fully co!ered in
B3 5677 3oils for ci!il engineering purposes%art 84Co"paction related tests#
9
-
8/12/2019 CBR Final1
2/9
T01 R123ON :OR T01 CBR T13T
;e are deter"ining the resistance of the subgrade4 (i#e the layer of naturally occurring "aterial
upon which the road is built)4 to defor"ation under the load fro" !ehicle wheels# 1!en "ore
si"ply put4
-
8/12/2019 CBR Final1
3/9
1. @ >g of the soil sa"ple was weighed in a tray and "i$ed with A99 "l of water# ?oisture
content was ta>en before "i$ing water (Tin 18.35g *Tin 3a"ple, 53.12g)
2. The "ass of the "ould was recorded together with the base plate# (5559g)
3. The "ould was fitted with collar4 filter paper placed at botto" and then filled with the soil
sa"ple#
4. 2 first layer was put and co"pacted using the 2.5 kgra""er gi!ing 27e!enly distributed
blows on the surface#
5. The co"paction was carried out in 6 e/ual layers pro!ided at the end the "ould was filled
abo!e @"" when the collar is re"o!ed#
6. The collar was then re"o!ed and the surplus co"pacted soil tri""ed with the steel
straightedge#
7. The "ass of the "ould4 base plate and co"pacted soil was recorded (@A6 g)
8. The "ould with the sa"ple was placed in the testing "achine with the top face e$posed#
9. 3urcharge weights of 2277.11gand 22.15gwere added and the gauge set to 9 ""#
&
-
8/12/2019 CBR Final1
4/9
10. The "achine was turned on and readings of force were ta>en at e!ery 9#&'""
penetration up to 7#' ""#
11. Then the "ould was re"o!ed and a portion of the top surface was ta>en for "oisture
content# The hole left by the plunger was then fitted with co"pacted soil#
12. The base plate was then re"o!ed and fi$ed at the top of "ould4 thus penetration on the
botto" part was now recorded using the sa"e procedure fro" step A to step 55#
13. The readings were tabulated in the for" gi!en and graphs of load (EN) against
penetration ("") were plotted for the top and botto" face and CBR calculated using the
standard graph also#
OB31RF2TION3 2ND C2GCUG2TION
?ass of soil @ >g
?ass of "ould ''A' g
?ass of "ould Base plate sa"ple @A6 g
?ass of sa"ple co"pacted @A6 ''A' 89A g
6
-
8/12/2019 CBR Final1
5/9
B!"k #$%&'* +, -498235
- 1.778 Mg/3
?oisture ;eight of sa"ple ;eight of dry sa"ple
68#77 &8#@&
59#5' g
The initial dry density,Hd(in Mg/m3), of the sample is calculated from the equation
Dry Density4 Hd Hb-(5w) where w is the "oisture content (+)
Hd
5#77A -
(59#85&&)
1.259
Mg/3
T2BG1 5
Before Test 2fter Test
Top Gayer Botto" layer
;eight of tin-g 5A#6' 5A#&7 5A#9
;t of sa"ple tin-g '6#5& 6A#98 '9#'&
;eight of sa"ple-g 68#77 5#77 65#@&
;t of tin dry sa"ple-g 8 6' 85#@&
;eight of dry sa"ple-g &8#@& 58#6& &&
?oisture -g 59#5' '#8' A#9
?oisture content4 w (+) 85#&6 6A#9@ 6#57
Dry density4 Hd(?g-"6) 5#&@ 5#& 5#&A
T2BG1 &
%enetration of plunger :orce
"" Top gauge Botto" gauge Top-EN Botto" EN
9#&' 59#& #& 9#5A 9#57A
9#'9 56#9 #A 9#&'& 9#59
9#7' 5'#9 5A 9#&5 9#&8A
5#99 5A#9 5@#9 9#68 9#659
5#&' 5#9 5#& 9#6@ 9#67&
5#'9 &5#9 & 9#897 9#8&7
5#7' &6#6 &@#9 9#8'& 9#'98
c &'#9 &A#9 9#8A' 9#'86
&' &7#9 69#& 9#'&8 9#'A@
'9 66#9 9#'@6 9#@89
' 65#9 6'#A 9#@95 9#@'
6#99 66#9 6A#' 9#@89 9#787
6#&' 68#' 85#9 9#@@ 9#7'
6#'9 6@#' 86#' 9#79A 9#A88
6#7' 6A#' 8@#9 9#787 9#A&
8#99 89#9 8A#& 9#77@ 9#6'
8#&' 8 '9#& 9#A5' 9#78
8#'9 86#' '' 9#A88 5#95
8#7' 8'#' '8#A 9#AA6 5#9@6
'#99 87#' '@#' 9#&& 5#9@
'#&' 8#9 'A#& 9#'5 5#5&
'#'9 '5#9 @9#' 9#A 5#578
'#7' '6#9 @' 5#9&A 5#&56
@#99 ''#9 @8#' 5#9@7 5#&'5
@#&' '@#' @@#6 5#9@ 5#&A@
@#'9 'A#' @A#5 5#56' 5#6&5
@#7' @9#9 79#9 5#5@8 5#6'A
7#99 @ 75#A 5#&96 5#66
7#&' @6#' 76#' 5#&6& 5#8&@
7#'9 @@#9 7'#9 5#&A9 5#8''
8
-
8/12/2019 CBR Final1
6/9
JR2%0
F0 T0 0'"
'
-
8/12/2019 CBR Final1
7/9
F0 B00/ 0'"
R13UGT3
The
standard
Goad fro"
B3 for
'"" and
'#9""
penetration
is
interpolated#
The !alues at penetration ' and '#9 ""4 obtained fro" the plotted graph of Goad-EN against
%enetration ("") were tabulated below and the CBR !alue calculated#
@
-
8/12/2019 CBR Final1
8/9
3tandard Goad for '"" penetration 55#' (57#@ K 55#')-8
56#9&' EN
3tandard Goad for '#9"" penetration (57#@ &&)-&
5# EN
T2BG1 6
(5) 2t Top of speci"en
P$%$'0%// %## "0#kN L0# "'$#kN CBR
2.5 13.25 .563 4.33
5. 19.9 .922 4.63
(&) 2t botto" speci"en
P$%$'0%// %## "0#kN L0# "'$#kN CBR
2.5 13.25 .64 4.92
5. 19.9 1.96 5.51
CBR + for '"" penetration at top Goad applied - 3tandard load
(9#'@6 - 56#9&') $ 599
8#66+
3a"e procedure applies for '#9""4 hence the table abo!e being filled#
R13UGT3
CBR !alue at ' "" (8#66 8#&)
&
8#@6+
5 (%$$& 1 )
CBR !alue at '#9 "" (8#@6 '#'5)
&
7
-
8/12/2019 CBR Final1
9/9
'#97+
5 (%$$& 1 )
CONCGU3ION
The soil tested has an al"ost good CBR !alue and can be considered to ha!e a good strength# In
general a soil of CBR less than &+ is of poor /uality and cannot be used in a road construction#
R1:1R1NC13
http--www#highways"aintenance#co"-cbrte$t#ht"
http--www#tpub#co"-content-engineering-58979-css-58979L&77#ht"
B3 5677859
A
http://www.highwaysmaintenance.com/cbrtext.htmhttp://www.tpub.com/content/engineering/14070/css/14070_277.htmhttp://www.highwaysmaintenance.com/cbrtext.htmhttp://www.tpub.com/content/engineering/14070/css/14070_277.htm