Dubai Aviation City Corporation BUILDING COMPLETION CERTIFICATE REQUEST Version: 2.0 / Mar-2019 / Rev: 0 DACC.IMS.P.RADC.11.BCC.F01 DEVELOPMENT CONTROL FORMS DATE Project Name: Project Owner: Plot No: Consultant: Contractor: REQUIRED INFORMATION AND SUBMITTALS: Copy of Building Permit Copy of Building Inspection Log & receipts of payment(s) Copy of Final Inspection Comments from DEWA & Copy of DEWA Estimate Copy of Civil Defense Final Certificate (Original NOC to be shown at the time of application submission) Compliance Certificate from Consultant (Original) Compliance certificate / NOC from Main Developer. Compliance Certificate for External Connections (Original) Compliance Certificate for Telecom (Original) OHSE NOC from DACC NOC from Owner to issue Completion Certificate (Original) Land Demarcation Certificate Fee 1 : AED Knowledge Tariff: AED 10 FEE: Innovation Tariff: AED 10 1. AED 5000 Total: AED Cheque payable to Dubai Aviation City Corporation SUBMISSION DETAILS: Initial Resubmission CONTRACTOR CONSULTANT Name Name Contact No. Contact No. Email Email STAMP STAMP Signature & Date Signature & Date FOR OFFICIAL USE ONLY TN- File: DLC RC AC EC GC MP DGC Received By Signature Date Remarks: Approved Approved With Comments Resubmit Reviewed By Snr. Engineer - Civil Approved By VP – Development Control Date :

Upload: others

Post on 25-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUILDING COMPLETION CERTIFICATE REQUESTdqpgtzxn0wn4l.cloudfront.net/docs/LPD/BUILDING... · Copy of Final Inspection Comments from DEWA & Copy of DEWA Estimate Copy of Civil Defense

Dubai Aviation City Corporation

BUILDING COMPLETION CERTIFICATE REQUEST

Version: 2.0 / Mar-2019 / Rev: 0

DACC.IMS.P.RADC.11.BCC.F01

DEVELOPMENT CONTROL FORMS

DATE

Project Name:

Project Owner: Plot No:

Consultant:

Contractor:

REQUIRED INFORMATION AND SUBMITTALS:

Copy of Building Permit Copy of Building Inspection Log & receipts of payment(s) Copy of Final Inspection Comments from DEWA & Copy of DEWA Estimate Copy of Civil Defense Final Certificate (Original NOC to be shown at the time of application submission) Compliance Certificate from Consultant (Original) Compliance certificate / NOC from Main Developer. Compliance Certificate for External Connections (Original) Compliance Certificate for Telecom (Original) OHSE NOC from DACC NOC from Owner to issue Completion Certificate (Original) Land Demarcation Certificate

Fee 1 : AED

Knowledge Tariff: AED 10

FEE: Innovation Tariff: AED 10

1. AED 5000 Total: AED Cheque payable to Dubai Aviation City Corporation

SUBMISSION DETAILS: Initial Resubmission

CONTRACTOR CONSULTANT

Name Name Contact No. Contact No. Email Email

STAMP

STAMP

Signature & Date Signature & Date FOR OFFICIAL USE ONLY

TN- File: DLC RC AC EC GC MP DGC

Received By Signature Date

Remarks:

Approved Approved With Comments Resubmit

Reviewed By Snr. Engineer - Civil

Approved By VP – Development Control

Date :