f.005 final design review requestdqpgtzxn0wn4l.cloudfront.net/docs/lpd/f005 - final design...

1
F.005 FINAL DESIGN REVIEW REQUEST Please complete this application and submit it with required attachments to DUBAI SOUTH Regulatory Affairs / Land Planning & Development Control Dept. A: General Information Project Name: Project Owner: Plot No: Consultant: B: Required Information and Submittals Copy of Consultant’s Registration (Copy of Consultants Professional License to be enclosed) Copy of Preliminary Design Approval Copy of Consultant’s Appointment Letter Project Details Sheet (Updated) NOC from Department of Civil Aviation (If not in compliance) NOC from DEWA for Utilities (Water and Electricity)/ sub-station room location approval NOC from Etisalat for Telecommunications Design NOC from DS-UIM for Sewerage and Drainage Design NOC from DS-UIM for District Cooling ( if Applicable) Design approval from Civil Defense Structural Calculations with Soil Investigation Report Final Design Drawings (2 Hardcopy sets signed by the owner + 1 DWG. format set) AWQAF Approval for Religious use (If Applicable) Services Details (Refer to the attachment) Approved Final Design Review Request Form (If this is a Resubmission) C: Fees Submission Fee*: Received By: Receipt #: Signature: *Warehouses: (AED 3 per M 2 of BUA for Initial Submission or AED 1 per M 2 of BUA for Resubmission. *Residential: (AED 4 per M 2 of BUA for Initial Submission or AED 1 per M 2 of BUA for Resubmission. * A Knowledge fee of AED 10 applies to each transaction. D: Submission Details Submission Details : Initial Submission Resubmission Consultant: STAMP Contact Person: Signature: Email: Date: Tel: Fax: Mobile: E: For Official Use Only Document Receiving: TRN- File: DLC RC AC Received By Signature Date Remarks: Approved Conditional Approval Resubmit Refer Enclosed Name, Signature & Date Reviewed By Architect Reviewed By Structural Engineer Approved By VP – Land Planning & Development Date : PDC-F-005, Rev. 3, Aug 2015 Page 1 of 1

Upload: ngodiep

Post on 31-Jan-2018

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: F.005 FINAL DESIGN REVIEW REQUESTdqpgtzxn0wn4l.cloudfront.net/docs/LPD/F005 - Final Design Review... · FINAL DESIGN REVIEW REQUEST ... NOC from DEWA for Utilities (Water and Electricity)

F.005

FINAL DESIGN REVIEW REQUEST

Please complete this application and submit it with required attachments to DUBAI SOUTH Regulatory Affairs / Land Planning & Development Control Dept.

A: General Information

Project Name:

Project Owner: Plot No:

Consultant: B: Required Information and Submittals

◊ Copy of Consultant’s Registration (Copy of Consultants Professional License to be enclosed)◊ Copy of Preliminary Design Approval◊ Copy of Consultant’s Appointment Letter◊ Project Details Sheet (Updated)◊ NOC from Department of Civil Aviation (If not in compliance)◊ NOC from DEWA for Utilities (Water and Electricity)/ sub-station room location approval◊ NOC from Etisalat for Telecommunications◊ Design NOC from DS-UIM for Sewerage and Drainage ◊ Design NOC from DS-UIM for District Cooling ( if Applicable)◊ Design approval from Civil Defense◊ Structural Calculations with Soil Investigation Report◊ Final Design Drawings (2 Hardcopy sets signed by the owner + 1 DWG. format set) ◊ AWQAF Approval for Religious use (If Applicable)◊ Services Details (Refer to the attachment)◊ Approved Final Design Review Request Form (If this is a Resubmission)

C: Fees Submission Fee*: Received By: Receipt #: Signature:

*Warehouses: (AED 3 per M2 of BUA for Initial Submission or AED 1 per M2 of BUA for Resubmission. *Residential: (AED 4 per M2 of BUA for Initial Submission or AED 1 per M2 of BUA for Resubmission. *A Knowledge fee of AED 10 applies to each transaction.

D: Submission Details

Submission Details : Initial Submission Resubmission

Consultant:

STAMP Contact Person: Signature:

Email: Date:

Tel: Fax: Mobile:

E: For Official Use Only Document Receiving: TRN- File: DLC RC AC

Received By Signature Date Remarks:

Approved Conditional Approval Resubmit Refer Enclosed Name, Signature & Date

Reviewed By Architect

Reviewed By Structural Engineer

Approved By VP – Land Planning & Development

Date :

PDC-F-005, Rev. 3, Aug 2015 Page 1 of 1