bhubaneswar municipal corporation - …portal2.bmc.gov.in/files/keyprojects_01072017011206pm.pdfthe...

54
1 BHUBANESWAR MUNICIPAL CORPORATION NOTICE INVITING TENDER No.14077 Dt.17.06.2017 BMC Division No-II, DETAILED NOTICE INVITING TENDER (DNIT) FOR Bid Reference No. BMC-EED-II-04/2017-18 Dt. 17.06.2017 PART-I: General & Technical Bid “ June ” – 2017

Upload: dothuy

Post on 13-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

1

BHUBANESWAR MUNICIPAL CORPORATION

NOTICE INVITING TENDER No.14077 Dt.17.06.2017

BMC Division No-II,

DETAILED NOTICE INVITING TENDER (DNIT)

FOR

Bid Reference No. BMC-EED-II-04/2017-18 Dt. 17.06.2017

PART-I: General & Technical Bid

“ June ” – 2017

Page 2: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

2

CHECK LIST

Sl.No List of Documents Details of Document

For Office use only

1 2 3 4

1 Registration Certificate

2 PAN CARD

3 VAT Clearance Certificate (Form No-612)

4 EPF Registration Certificate

5 Cost of Tender Paper

6 EMD furnished: 1. No Rs.

2. No Rs.

3. No Rs.

4. No Rs.

5. No Rs.

6. No Rs.

7. No Rs.

8. No Rs.

9. No Rs.

10. No Rs.

(i). Total no of corrections: - (ii). Total no of over writings: - (iii). Total no of interpolations: -

(Signature of bidder) Name of Contractor: -

Address of Contractor: - E-mail:-

Contact Phone No:-

Page 3: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

3

CONTENTS OF

DETAILED NOTICE INVITING TENDER (DNIT)

Sl. No. CONTENTS

1 Invitation For Bids & Notice Inviting Tender

2 Instructions to Bidder for e-Procurement

3 Detailed Conditions of Contract

4 Corporation Agreement

5 Agreement Form

6 Special Conditions of Contract

7 General Conditions of Contract

8 Contractor’s Labour Regulation

9 No Relation Certificate

10 Declaration Certificate and Affidavits

Page 4: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

4

No.14077 Dt.17.06.2017

BHUBANESWAR MUNICIPAL CORPORATION

COMPETITIVE BIDDING THROUGH e-Procurement

NOTICE INVITING TENDER Bid Reference No. BMC-EED-II-04/2017-18 Dt.17.06.2017

On behalf of the Commissioner, Bhubaneswar Municipal Corporation (BMC), on-

line e-tender Percentage Rate Bids are invited by the Executive Engineer-II, BMC from the intending

and eligible class/category of bidders in conformity with the Detailed Tender Call Notice for execution of

the works mentioned in the DTCN.

Only the Bid Reference No.(BMC-EED-II- 04/2017-18) should be written clearly

over (superscribed) the envelop containing the bid documents to be submitted by each intending bidder.

Nowhere on the envelop the bidders should write Work Name & its Sl. No. failing which, such bids shall

be rejected outrightly and will not be opened for evaluation. It is, therefore, urged that all the intending

bidders should go through the tender call notice and DTCN thoroughly and submit their bids accordingly.

In case of any mis-match or inconsistency or contradict among different clauses/conditions/instructions/

information furnished in this tender call notice or in the DTCN, then necessary clarification shall be

issued by BMC on specific request without compromising the transparency. Clarifications required, if

any, on any matter related to this tender notice, shall be furnished by an authorized officer, (during office

hours only) till the stipulated last date and time of submission of on-line tender.

1. Total No. of works for which Tenders invited: 114 Nos.

2. Place of Execution: Different locations in Division-II of Bhubaneswar Municipal Corporation.

3. Estimated Cost of Individual Work: Rs.126074/- to Rs. 4844778/- 4. Eligible Class of Contractors –: Registered Contractors of Class-‘D’ to.” B“ .as indicated against

each work mentioned in the tender call . The contractors having appropriate class or one higher up

class can participate.

5. Intending bidders have to participate through “On-Line” bidding only. The website for online

bidding is https://www.tendersodisha.gov.in.

6. The bid documents will be available in the above website from 11 A.M on 01.07.2017 to5 P.M

on 10.07.2017 for online bidding.

7. Bids received online will be opened at 11.30 A.M on 14.07.2017 The bidder must possess valid

and compatible Digital Signature Certificate (DSC).

8. The bidders bidding @ less than the estimated cost has to furnish A.P.S (Additional Performance

Security) as per OPWD Code amendment to Para-3.5.5(V) failing which the bid shall not be

considered.

9. The DTCN of works shall be available in the e-procurement portal

https://www.tendersodisha.gov.in for on-line bidding .

On behalf of Commissioner, BMC, Bhubaneswar

Executive Engineer

BMC, Division No-II Memo No…………..BMC, Dt…………../.

Copy to PA to Mayor/PA to Commissioner for kind information o f Hon’bl e

Mayor and Commiss ioner , BMC.

Executive Engineer

Page 5: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

5

Memo No…………..BMC, Dt…………../.

Copy forwarded to the Under Secretary to Govt., H&UD Deptt./Water Resources

Deptt./Works Deptt./G.A Deptt., Odisha for kind information.

Executive Engineer

Memo No…………..BMC, Dt…………../.

Copy submitted to the Engineer-in-Chief(PH), Odisha-cum-Inspector of Local

Works, Bhubaneswar Municipal Corporation/Chief Engineer(PH) Urban, Odisha,

Bhubaneswar/Collector & District Magistrate, Khurda for kind information with a request to please

display a copy of this Notice in his/her office Notice Board for wide circulation and information of the

intending bidders.

Executive Engineer Memo No…………..BMC, Dt…………../.

Copy submitted to the City Engineer/ Executive Engineer, BMC, Division-II /Addl.

Commissioners/ Dy. Commissioner (Projects)/CFO/Secretary, Corporation Section, BMC for

information.

Executive Engineer Memo No…………..BMC, Dt…………../.

Copy submitted to the Chief Engineer(DPI & Roads), Odisha/ Superintending

Engineer, Central (R&B) Circle, Bhubaneswar/Executive Engineer, (R&B) Division-I, II, III & IV,

Bhubaneswar/Chief Engineer & Engineer Member, BDA, Bhubaneswar/Superintending Engineer,

Minor Irrigation Circle, Bhubaneswar for kind information with a request to please display a copy of

this Notice in his/her office Notice Board for wide circulation and information of the intending

bidders.

Executive Engineer Memo No…………..BMC, Dt…………../.

Copy to HA-Cum-Acct., BMC, Division-I/Advertisement Section/ Office Notice Board of

Bhubaneswar Municipal Corporation for information of all concerned and the intending bidders.

Executive Engineer

Memo No…………..BMC, Dt…………../.

Copy to P.R.O cum P.O Jnnurm, BMC with request to arrange for publish this

notice in two local leading Oriya daily and one English daily for one day publication at the earliest

using minimum space & front size of “8”.

Executive Engineer

BMC, Division No-II Memo No…………..BMC, Dt…………../.

Copy to M/s Pearl Advertising Agency. Plot No.8-A, Sabarasahi Lane, BJB Nagar BBSR

with a request to publish this notice in all editions of local leading Oriya Dailies (

“……………………….& ………………………….) and one English Daily, “………………….” For

one day publication on or before Dt………………… using minimum space & font size of “8” at

already approved rate.

Dy. Commissioner

Bhubaneswar Municipal Corporation

Page 6: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

6

BHUBANESWAR MUNICIPAL CORPORATION

INVITATION FOR BIDS

COMPETITIVE BIDDING THROUGH e-Procurement

No.14077 Dt.17.06.2017

BMC-EED-II- 04 /2017-18 Dt.17.06.2017

On behalf of the Commissioner, Bhubaneswar Municipal Corporation (BMC), on-line e-

tender Percentage Rate Bids are invited by the Executive Engineer-II, BMC from the intending and eligible

class/category of bidders (#) in conformity with the Detailed Tender Call Notice for execution of the works

mentioned in the table below.

Only the Bid Reference No. (BMC-EED-II- 04/2017-18) should be written clearly over

(superscribed) the envelop containing the bid documents to be submitted by each intending bidder. Nowhere on

the envelop the bidders should write Work Name & its Sl. No. failing which, such bids shall be rejected out rightly

and will not be opened for evaluation. It is, therefore, urged that all the intending bidders should go through the

tender call notice and DTCN thoroughly and submit their bids accordingly. In case of any mis-match or

inconsistency or contradict among different clauses/conditions/instructions/ information furnished in this tender

call notice or in the DTCN, then necessary clarification shall be issued by BMC on specific request without

compromising the transparency. Clarifications required, if any, on any matter related to this tender notice, shall be

furnished by an authorized officer, (during office hours only) till the stipulated last date and time of submission of

on-line tender.

Sl.

No. Name of the Work

Approx. Value

of Work put

to Tender

in Rs.

EMD/Bid

Security

in Rs.

(Minm.)*

Cost of Bid

Documents

including VAT

in Rs.

Period of

Completion in

days

Eligible Class

of

Contractor

#

1 2 3 4 5 6 7

220/17 1 Restoration of Road from Science Park

Square towards Gridco Dispensery Building

end at Science Parks DCP Office road at

Bhoinagar in ward no-29.

2290039 23000 6300 60 C

219/17 2 Improvement of road, widening &

Construction of RCC drain with cover slab

from infront of 2RB Block-62 to DCP office

Science park road at Bhoinagar in ward no-

29.

1603157 16100 6300 60 D

218/17 3 Improvement of road & Widening in front of

Gridco Recreation Club inside Gridco Colony

in ward no-29.

680380 6900 4200 45 D

217/17 4 Construction of RCC Drain with cover slab,

Widening & Improvement of road from

Akhandalmani Temple front to OSEB Colony

UGUP School in ward no-29.

2525504 25300 6300 90 C

29/17 5 Improvement of Vaisnav Vihar Road in ward

no-31.

850223 8600 4200 45 D

72/18 6 Construction of Road and Drain with cover

slab from plot no-1973/78 to Canal road and

Construction of drain from plot no-193/3785

to plot no-194(B) Udayanagar in ward no-31.

816883 8200 4200 45 D

78/17 7 Reconstruction of road from plot no-A/5 to

Bangalisahi main road in ward no-31.

486226 4900 2100 30 D

79/17 8 Construction of road from Konark TV Square

to Vaisnav Menorch Apartment in ward no-

31.

1460152 14700 6300 60 D

Page 7: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

7

80/17 9 Reconstruction of road from plot no-

812/1349 to Mohanty villa at Sabar Sahi

road in ward no-31.

1073121 11000 6300 60 D

81/17 10 Reconstruction of road from plot no-307 to

plot no-1201/B by side of Durga Mandap

Bomikhal and Placement of RCC cover slabs

of different sides from plot no-458(P) to plot

no-1249/3236 at Santoshi Nagar Area in

ward no-31.

993655 10000 4200 60 D

246/17 11 Construction of RCC Drain with cover slab,

road and retaing wall from E-7 to plot no-

786 behind Durga Mandap at Jharapada in

ward no-32.

477697 4800 2100 30 D

248/17 12 Construction of RCC Drain with Culvert from

Divyasingh Patra House to Golekha Mahaknd

House and Road from S.Jena House to

Bhagabat Tungi Martha Sahi & plot no-935

to Golekha Mahakud house and repair of

road near Kabarstan at Jharapada in ward

no-32.

2137850 21400 6300 90 C

240/17 13 Reconstruction of Road from BDA Nursary

towards Alaka market complex & EB-289 to

LB-231 at Stage-II BDA Colony in ward no-32.

2381726 23900 6300 60 C

239/17 14 Reconstruction of Road from EB-405 to EB-

334, EB-290 to EB-416, EB-289 to EB-415,

EB-254 to EB-248, EB-226 to EB-242, EB-222

to EB-234, EB-254 to EB-248, EA-161 back

side & EB-219 to EB-220 at Stage-II BDA

Colony in ward no-32.

2509062 25100 6300 90 C

275/17 15 Reconstruction of Road at Mahadev Nagar

lane no-5 in ward no-32.

1777236 17800 6300 60 D

70/17 16 Re-Construction of portion roads at entrance

of main road, plot no-1127/1630, plot no-

33(B), plot no-1074/3350 and plot no-60(A)

at Jayadurga Nagar in ward no-33.

487156 4900 2100 30 D

71/17 17 Construction of Internal road at Haladipadia

Basti in ward no-33.

691266 7000 4200 60 D

381/16 18 Construction of Park infront of plot no- LB-

118 at stage-IV BDA Colony in ward no-33.

680126 7000 4200 60 D

69/17 19 Widening of road from New Kalika Hotel to

plot no-1/C , plot no-56/C to plot no-55/C at

Jayadurga Nagar in ward no-33.

1313594 13200 6300 60 D

54/17 20 Improvement of road by widening from plot

no-81/C to plot no-10/E, plot no-12/B to plot

no-21/C, plot no-39/C to plot no-81/C at

Jayadurga Nagar in ward no-33.

2086831 20900 6300 60 C

53/17 21 Widening of road infront of Agarwall House

& Restoration of road infront of plot no-108

at Sarala Nagar in ward no-33.

414434 4200 2100 45 D

52/17 22 Construction of road from plot no-1102 to

plot no-1910 at Mahavir Nagar lane-III and

restoration of approach road to Haladipadia

road in ward no-33

545414 5500 4200 60 D

407/16 23 Construction of Drain at back side of unit-9

market in ward no-35.

427610 4300 2100 60 D

599/16 24 Improvement of Balance road at Bhagabati

Basti at unit-9 in ward no-35.

877233 8800 4200 60 D

601/16 25

S/r to road from P.W.D Main road towards

Baya Baba Basti at unit-9 in ward no-35.

793165 8000 4200 60 D

Page 8: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

8

59/16 26 Construction of road at Priti Bar Line in ward

no-35.

1692898 17000 6300 60 D

180/17 27 Improvement of road at the side of Unit-3

Dispensary in ward no-35.

1473514 14800 6300 60 D

181/17 28 Improvement of road and repair of drain

from Co-Housing Colony towards plot no-40

& plot no-35 at Kharavela Nagar Unit-III in

ward no-35.

2958168 29600 6300 120 C

182/17 29 Repair of drain and Improvement of road at

Mali Colony in ward no-35.

635360 6400 4200 45 D

184/17 30 Improvement Road and Construction of

drain at the side of Baeia Baba Matha road

in ward no-35.

2046188 20500 6300 60 C

185/17 31 Improvement of Internal road of Baeia Baba

Matha Basti road in ward no-35.

1829445 18300 6300 60 D

16/17 32 Providing Cover Slab over Existing Internal

Drain of Budheswari Colony in ward no-42.

2057226 20600 6300 120 C

137/17 33 Construction of Road from plot no-57/58 to

plot no-715/49/14 Near Budheswari Old

post office in ward no-43.

896917 9000 4200 60 D

138/17 34 Construction of road from plot no-1143to

plot no-1211 at Uppersahi , Laxmisagar in

ward no-43.

823374 8300 4200 60 D

139/17 35 Construction of road from plot no-1068 to

plot no-1280 and plot no-1280 to plot no-

1070 at Mandap Sahi, Laxmisagar in ward

no-43.

621732 6300 4200 60 D

140/17 36 Construction of road from plot no-500 to

plot no-1044 at Uppersahi , Laxmisagar in

ward no-43.

131316 1400 630 30 D

153/17 37 Construction of road from plot no-927 to

plot no-826 at Mahila Samiti Basti,

Laxmisagar in ward no-43.

1073651 10800 6300 60 D

154/17 38 Construction of Road & Drain from plot no-

716 to plot no-505 at Routsahi, Laxmisagar

in ward no-43.

162151 1400 630 30 D

155/17 39 Construction of road from plot no-9 to plot

no-7 , plot no-10 to plot no-12, plot no-174

to plot no-15, plot no-170 to plot no-173 and

plot no-121 to plot no-253 at Santoshi Vihar,

Laxmisagar in ward no-43.

896932 9000 4200 60 D

142/17 40 S/R to Road from Cuttack road to plot no-

1598/B at Chintamaniswar Main Road in

ward no-45.

4382037 44000 6300 30 B

148/17 41 S/R to Road at Akhandalamani temple from

plot no-1/A to plot no-22/A at BJB Nagar in

ward no-45.

2817670 28200 6300 30 C

146/17 42 S/R to Road from plot no-66/A to plot no-

45/A and plot no-44/A to plot no-23/A at

Vivekananda Park lane, BJB Nagar in ward

no-45.

4725212 47300 6300 120 B

231/17 43 Construction of RCC Drain and Cement

Concrete Road at Nilapanitanki Basti Unit-

08, in ward no-47.

2618758 26200 6300 90 C

232/17 44 Construction of RCC Drain and RCC slab

Culvert by the side of OMC Colony Unit-08 in

ward no-47.

1202070 12100 6300 60 D

Page 9: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

9

233/17 45 Construction of RCC Drain and RCC slab

Culvert by the side of Sisu Mandira Unit-08

in ward no-47.

1375856 13800 6300 60 D

234/17 46 Reconstruction of Drain infront of OMC

Colony Unit-08, in ward no-47.

1981145 19900 6300 90 D

235/17 47 Construction of RCC Drain with Cover slab

and CC road Back side of CBI Office and OCC

Basti to Qtr No-E/291, Unit-08, in ward no-

47.

2400300 24100 6300 90 C

250/17 48 Construction of cement concrete road, RCC

Entrance gate and RCC Drain near Qtr-2RB/1

at Power House Colony in ward no-47.

964999 9700 4200 60 D

251/17 49 Improvement of road from Qtr no-2RB/20 to

Club, Infront of Club, Construction of RCC

Drain from IR/13 to IR/24, Type-II/1 to Type-

II/8 at Power House Colony in ward no-47.

1521965 15300 6300 60 D

252/17 50 Construction of Cement concrete road, at

Khalo Basti and Drain infront of Qtr No-

2RB/18/A Unit-08 in ward no-47.

126074 1300 630 30 D

259/17 51 Construction of RCC Drain and Cement

Concrete Road at Gopabandhu Nagar Basti

Unit-08, in ward no-47.

473931 4800 2100 45 D

195/17 52 Construction of Cement Concrete Road &

RCC Drain at Munda Sahi Basti in ward no-

48.

3050750 30600 6300 90 C

200/17 53 Improvement of Road and Construction of

RCC Drain from Qtr No-v-5/6 to Qtr No-E/82

at OUAT Colony in ward no-48.

3320571 33300 6300 90 C

202/17 54 Improvement of Road and Construction of

Drain from Qtr No-2RB-F/17 to Qtr No-

2RF/15 at OUAT Colony in ward no-48.

2834064 28400 6300 90 C

276/17 55 Improvement of Road from Qr No-3R/82 to

Qr No-3R/81, Qr No-3R/77 to Qr No-3R/78,

RCC Cover slab over existing drain from Qr

No--2R-14/33 to Qr No-E-56 at OUAT Colony

in ward no-48.

1386303 13900 6300 60 D

277/17 56 Improvement of Road from Qtr-2RA/71 to

Qtr No-3R(S)/44 with branch road & Qtr No-

4R/19 to Qtr No-4R/20 OUAT Colony in ward

no-48.

1291126 13000 6300 60 D

89/17 57 Restoration of Road & Construction of Drain

at Ratna Villah of ward no-51.

1654780 16600 6300 90 D

90/17 58 Restoration of Road plot no-116 to plot no-

122, plot no-1555/4025 to plot no-

1521/4339 & Construction of Drain plot no-

1521/4339 to plot no-136 at Soubhagaya

Nagar in ward no-51.

1542285 15500 6300 60 D

111/17 59 Restoration of Road from plot no-1100 to

1084/85, plot no-1095/3361 to plot no-

1093/3780, plot no-1095/10 to plot no-

1093/3703 & infront of plot no-1093/3872

at Satabdi Nagar in ward no-51.

2833382 28400 6300 120 C

345/16 60 Construction of Drain & Road at Rabindra

Garden area in ward no-51.

3183977 31900 6300 120 C

385/14 61 Re-Construction of road from Srabani

Apartment to plot no-216 from plot no-

223/14 & from plot no-753/30 to plot no-

24/223 at Ganganagar in ward no-52.

1838000 18400 6300 60 D

386/14 62 Re-Construction of road from plot no-02/A

to plot no-252/2611 & from plot no-222/08

to plot no-252/2503 at Ganganagar in ward

no-52.

1514900 15200 6300 60 D

Page 10: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

10

387/14

63

Re-Construction of road from Adarsha Sishu

Vidya Mandir to plot no-22-247/2045 at

Bhimpur in ward no-52.

1156000 11600 6300 60 D

25/17 64 Improvement of Internal Road &

Construction of Internal Drain of Bhimpur

area infront of Vivekanda School & Modern

Health Care in ward no-52.

3439333 34400 6300 120 C

65/17 65 Re-Construction of Road and Drain in Kela

Sahi in ward no-52.

1139708 11400 6300 60 D

26/17 66 Improvement of road from plot no-2039 to

plot no-844 at Bhimpur in ward no-52.

383730 3900 2100 30 D

118/17 67 Construction of Internal Road at Tala Jharana

Sahi in ward no-53.

462864 4700 2100 30 D

121/17 68 Construction of Road from plot no-E-1 to

plot no-568/2122 at lane no-14, Aerodrome

Area in ward no-53.

779944 7800 4200 45 D

123/17 69

Construction of Road from plot no-1609 to

plot no-1536/7, plot no-359 to plot no-1608

and plot no-1547 to plot no-1536/4 at lane

no-9 Aerodrome area in ward no-53.

3205776 32100 6300 120 C

112/17 70 Construction of Internal roads from plot no-

704/5108 to plot no-704/01 via plot no-

704/17 and plot no-704/21, Res of

Bhagyadhara Sahoo to plot no-744/P and

Drains from plot no-704/5108 to plot no-

704/01 via plot no-704/17 and plot no-

704/21 and from Res of Bhagyadhar Sahoo

to plot no-729/A via plot no-732, plot no-735

and from plot no-744/P to plot no-772 via

plot no-740, plot no-748 and 761/A at

Rameswar Barik Sahi in ward no-54.

4721440 47300 6300 120 B

113/17 71 Construction of Internal road from plot no-

744/P to plot no-729/A via plot no-735 and

plot no-744/P to Priyadarshi Mishra via plot

no-740,748,761/A and 762/A at Rameswar

Barik Sahi in ward no-54.

4844778 48500 6300 120 B

96/17 72 Re-construction of Road and Drains from

plot no-SN-01 to near plot no-SN-36, plot no-

SN-26 to SN-28, Plot no-967/2393 to SN-

42/A and at bye lane of plot no-1128 in ward

no-58.

4072606 40800 6300 120 B

97/17 73 Re-construction of Road and Construction of

Drain from plot no-2776/B to Res Suranjan

Das at Brahmeswar in ward no-58.

2367576 23700 6300 90 C

99/17 74 Construction of Road and Drain from plot

no- 770/2660 to 646 and from plot no-

386/2405 to 389/2905 at Radhakrishna

Nagar in ward no-58.

910413 9200 4200 60 D

114/17 75 Re-construction of Road from Hatiasuni

Temple to near plot no-2171, near plot no-

76/01 to near plot no-76/2608 and Drain

from plot no-2172 to near plot no-2171 and

from plot no-76/2608 to plot no-76/01 at

Hatiasuni in ward no-58.

728400 7300 4200 45 D

100/14 76 Improvement of Road from near plot no-105

to plot no-171 at Maruti Nagar in ward no-

59.

598556 6000 4200 45 D

189/17 77 Restoration of Road from NH-203 to Maa

Bhubasuni Govt. High School and approach

to Samantarapur Smasan in ward no-59.

1950818 19600 6300 60 D

190/17 78 Restoration of Road inside Samantarapur

Village in ward no-59.

720010 7300 4200 45 D

Page 11: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

11

175/16 79 Re-Construction of Road and Drain from

Devi Mandap to Res of Hemanta Kumar

Mohanty , Prince Laundry towards

Ramakanta Mohanty , Res of Antaryami

Mishra to near plot no-1183/2962 and bye

lane of plot no-1579/1580, Old Town in ward

no-60.

2062156 20700 6300 90 C

401/16 80 Construction of Road and Drain from plot

no-536/3910 to plot no-538 via plot no-

541/3537, from plot no-1481/B to plot no-

1481 at Jagannath Matha Lane, Re-

construction of Drain from plot no-303/2304

to Res of Prafulla Ku Sahoo, from plot no-

335/2515 to plot no-46/2492 at Lingaraj

Nagar, Construction of Drain and Provision

of slab from plot no-1829 to plot no-1834,

from plot no-1990 to Res of Abhinna Behera

and Re-constn. of Road from plot no-1866 to

plot no-1867/2324 at Ananta Nagar in ward

no-60.

4681417 46900 6300 120 B

276.17 81 Re-Construction of compound wall ,water

supply & sanitary system and provision of

Bore well at Cardiology building campoust of

BMC Hospital in Ward No- 60.

1998000 20000 6300 90 D

102/17 82 Reconstruction of Roads Drains and Cover

slabs from plot no-1229/01 to 3303/1318 via

plot no-3309 at Basistha Nagar, from plo no-

1221 to 1221/10, plot no-1220 to 3292 and

from plot no-1325/3036 at Kharakhia at Old

Town in ward no-60.

2845993 28500 6300 120 C

422/15 83 Const. Of road and drain from Plot No.1332

to Res of Ashok Ku. Pati at Bhimatangi in

Ward No.58 at present Ward No.61

2008051 20100 6300 120 C

49/17 84 S/R to Road and Construction of drain from

near plot no-2532 to plot no-1351/51 and

Road from plot no-LB-378 to plot no-LB-353

and from plot no-LB-324 to plot no-LB-353 at

Bhimtangi in ward no-61.

4533200 45400 6300 120 B

103/17 85 Re-const of road from plot no-A/M-29 to

A/L-145, plot no-MIG-1 to A/L-18 from plot

no-1548 to 1548/499/8, bye lane res of

Sikanta Garabadu, Road repair and provision

of slabs from plot no-2751/B to Res of

Dinabandhu Sahu, Construction of drain

from plot no-1548 to Res of Santilata

Mahasuara, Re-const of road and provision

of slab from plot no-545/4532 to plot no-

2489 and from near plot no-545/546 to near

plot no-539 at Bhimatangi in ward no-61.

4513986 45200 6300 120 B

105/17 86 Re-construction of Roads and Drains from

Res of Anitarani Mohanty to Disposal point

near Narayani Club , from Res of Saroj Patra

to Res of Subash Ch. Rout to Res of Akhaya

Ku. Das and Disposal point, plot no-991/A to

plot no-499/07, from Res of Bhubanananda

Padhi to Res of Niladri Subudhi and from

plot no-1514 to Res of Prahallad Mohanty at

Bhimatangi in ward no-61.

2383060 23900 6300 90 C

68/17 87 Re-Construction of road from main road

towards plot no-2153 via plot no-1373/5091

and 1st lane towards Pond at Gandamunda

Basti in ward no-62.

1541515 15500 6300 60 D

85/17 88 Construction of CC road from existing B.T

Road near Gandamunda Auto Association to

plot no-1423 and the side road at

Gandamunda Basti in ward no-62.

697466 7000 4200 60 D

Page 12: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

12

86/17 89 Construction of CC road from plot no-1579

to plot no-1579/2928 and up to plot no-

1579/2927 at Talabania Lane-5, Talabania in

ward no-62.

1498962 15000 6300 60 D

88/17 90 Improvement of internal roads of BDA

Housing plot (from plot no-1 to 42, 5 to 67, 6

to 10, 16 to 20, 26 to 30, 136 to 117(A), 162

to 163, 163 to 167, 157 to 153, 124 to 152,

123 to end of the shopping centre, 102 to 91

and 1 towards police out post) at Pokhariput

in ward no-62.

4670281 46800 6300 90 B

403/16 91 Special Repair of Road at Ganesh Nagar Road

No-3 & Road No-4 at Bhaktamadhu Nagar

Pokhariput in ward no-62.

2206253 22100 6300 90 C

230/17 92 Construction of Concrete Road infront of

Jagamara Jaganath Temple in ward no-63.

772805 7800 4200 60 D

369/16 93 Reconstruction of road at Sidhivihar &

Krishna Garden in ward no-63.

2670192 26800 6300 90 C

243/17 94 Special repair of road at Dharmavihar lane-I

& Lane-II at Jagamara in ward no-63.

3080481 30900 6300 90 C

133/17 95 Repair of road and Construction of drain

near Barabhuja club towards Kuni Pattanaik

house at Jagamara in ward no-63.

1457900 14600 6300 60 D

370/16 96 Improvement of Road & Drain back side of

L.S Kalayan Mandap at Jagamara in ward no-

63.

2562600 25700 6300 120 C

212/16 97 Construction of Road with Drain & Cover

slab from Guljar house towards Talanala at

Jadupur in ward no-64.

2135500 21400 6300 90 C

42/17 98 Construction of CC Road from Muka house

to Foro house at Jadupur in ward no-64.

195960 2000 630 30 D

37/17 99 Construction of RCC drain with cover slab &

Repair of road from Locha house to Gora

house at Jadupur in ward no-64.

707984

7100 4200 60 D

38/17 100 Construction of CC road & RCC drain with

cover slab from Nasim house to Jaria house

at Jadupur in ward no-64.

557976 5600 4200 45 D

39/17 101 Constructiopn of RCC drain with slab from

Anzar house to Kalia house at Jadupur in

ward no-64

262999 2700 2100 30 D

40/17 102 Construction of CC road & RCC drain with

cover slab from Imran house to PWD Main

drain at Jadupur in ward no-64.

889898 8900 4200 60 D

44/17 103 Construction of CC road & RCC drain with

cover slab from Mohhamed Jafar sir house

to Sayed japan ali house at Jadupur in ward

no-64.

1418560 14200 6300 90 D

41/17 104 Construction of RCC drain with cover slab &

road from Tangi squre to Haji Kallimulla

house at Jadupur in ward no-64.

1424752 14300 6300 90 D

33/17 105 Construction of CC Road from Jadupur foot

ball ground back side to MIR Hafisab upto

Mumtaz Ali high school at Jadupur in ward

no-64.

1142700 11500 6300 60 D

32/17

106 Construction of CC Road from Dumduma

P.W.D Main road to Dumduma pond Via plot

no-938 at Jadupur in w

ard no-64.

1104000 11100 6300 60 D

245/17 107 Construction of CC road inside Sridev

housing complex AIIMS Nagar Patrapada in

ward no-65.

636171 6400 4200 45 D

Page 13: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

13

126/17 108 Widening of road from BSUP plot no-1 to

plot no-38 from plot no-246 to plot no-624,

front of Suka Vihar Community Centre and

Raghunath Nagar Community Centre at

Raghunath Nagar in ward no-66.

1577959 15800 6300 60 D

127/17 109 Construction of road from Dukhi Das house

to BSUP plot no-1146, plot no-1155 to plot

no-1158 and from plot no-1171 to plot no-

1256 at Satya Nagar in ward no-66

702601 7100 4200 60 D

128/17 110 Reconstruction of road from front of

Satyanagar Electrical Substation to

Raghunath Sahoo house and the side and

front road of Niranjan Das house at Satya

Nagar in ward no-66.

1934247 19400 6300 60 D

129/17 111 Reconstruction of road from BSUP plot no-

1339 to plot no-1289 and front of Raghunath

Nagar zonal Hospital at Raghunath Nagar in

ward no-66.

3758788 37600 6300 90 C

106/17 112 Re-construction of Road, Drain and Covering

slabs from Res of Kabindra Jena Tofan

Behera Via Madhab Jena, plot no-201 to

near Kapila Prasad UP School from plot no-

1249 to Jagannath Das, Re-Constn. Of Drain

from Giria Behera to Kandu jena, Covering of

slabs on drain from Samiti Office to near

Kapila Prasad UP School and on Drain

alonging to plot no-194 in ward no-67.

3000492 30100 6300 90 C

109/17 113 Re-construction of Internal Roads at

Abhiram Nagar near Abhiram Ashram in

ward no-67.

2634500 26400 6300 90 C

240/16 114 Construction of Road and Drain at Jala

Panka, Kharakhia, Old town in ward no-60.

1453676 14600 6300 90 D

* The facility for exemption of EMD & ISD either in full or in part as per guidelines of Govt. of Odisha/ OPWD

Code/ Govt. of India/ direction of Hon’ble Courts in India (with specified limitation and liberty) can be availed by

intending and eligible class/category of bidders [Contractors with Physical Disabilities/Engineer Contractors/ST or

SC Contractors/such other Agency(s) conferred with this exemption facility, if by Govt. of Odisha/Govt. of

India/Hon’ble Court(s) in India]. However, this facility availed by any bidder(s) for the aforesaid work(s) shall be

treated as genuine and admissible/acceptable subject to submission of required documentary evidence/support

as described below and subsequent verification of the same by BMC.

# a. Each bidder who intend to participate in this bidding process through e-procurement for the works

mentioned above, should have/possess necessary Portal Enrolment (Digital Signature Certificate-DSC) of required

category.

b. Each intending bidder should have been validly registered as a Civil Contractor in the required Class

under Govt. of Odisha/BMC through any Appropriate Public Authority to suit the respective works.

c. Engineering Organisation(s) of Govt. of Odisha/Govt. of India (MES, Railways, etc. ) /Union Territory or

Engineering Public Sector Undertakings / Enterprises/ Company(s) under Govt. of India, duly authorized by the

Appropriate Authority(s) to undertake and execute the respective nature of works mentioned above through on-

line bidding, can also participate as bidder(s) in the required equivalent Grade/Class/Category of Contractor(s)

[Documentary evidence(s) of such authorization is to be attached with the bid(s)].

INFORMATION FOR THE INTENDING BIDDERS

1. Bid documents consisting of plans, specifications, schedule of quantities, a set of terms and conditions of

contract and other necessary documents can be seen in the e-procurement website i.e.

https://www.tendersodisha.gov.in.

2. Each on-line bid must be accompanied by legible scanned copies of valid (a) Contractor’s Registration

Certificate (License), (b) EPF, (c) VAT (d) PAN CARD, (e) Earnest Money Deposit (EMD) Bid Security (save as

described at * above) and Cost of Tender Documents as specified for the respective works in the above

Table Col.4 & 5. The EMD should have been pledged/issued (as applicable) in favour of Municipal

Commissioner, Bhubaneswar Municipal Corporation in shape of Term Deposit Receipt or Fixed Deposit

Page 14: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

14

Receipt or Demand Draft or Banker’s Cheque of any Nationalised or Scheduled Bank(s) or in shape of Small

Savings Instrument of Govt. of India or in a combined shape of two or more of the aforesaid financial

instruments failing which the bid(s) shall be rejected out rightly. The cost of tender documents should be in

shape of Demand Draft and drawn on any Nationalized/Schedule Bank in favour of Municipal

Commissioner, Bhubaneswar Municipal Corporation without which the bid shall not be considered for

evaluation. The Demand Draft to be submitted by each intending bidder for each work towards cost of bid

documents should have been issued/drawn on or after the date of issue of this Notice and should

essentially remain valid at least for three months from the date of its issue. Similarly, Demand

Draft/Banker’s Cheque, if submitted by any bidder for any work towards Bid Security (EMD) as described

above, should have been issued/drawn on or after the date of issue of this Notice and should essentially

remain valid for three months from the date of its issue. In case of interest bearing security(s)/deposit(s), as

mentioned above, to be furnished towards EMD, the invested/deposited amount(s) shall only be taken into

consideration as the amount of EMD furnished for the respective work(s), but not the amount(s) on

maturity or the interest(s) likely to be accrued out of the said investment(s)/deposit(s). Accordingly, the

intending bidders are urged to furnish the EMD(s).

The bidders availing exemption in EMD must submit scanned copies of documentary evidence online in

support of their exemption qualification such as SC/ST license /caste certificate or physically disabled

license /certificate or Engineer Contractor license along with scan copies of affidavits for such exemption.

3. Each on-line bid should also be accompanied with scanned copies of Declaration Certificate & No

Relationship Certificate in the prescribed formats as mentioned in the DTCN without which the bid will be

liable for rejection.

4. For each work the intending bidders should submit :

A ) On-Line Generated Bid-Submission Confirmation Sheet,

B) Original Affidavit(s) in the manner/format as per DTCN,

(1) General affidavit- : Mandatory for all

(2) SC/ST license holder affidavit- :( If applicable)

(3) Physically disability affidavit - : (If applicable)

(4) EPF affidavit - :(as applicable (bidders not possession

EPF registration)

(5) Engineer Contractor affidavit - :( If applicable)

(Submissions of respective affidavits is mandatory for availing exemption in EMD)

C) Original Bid Security (EMD)

D) Cost of Bid Documents

E) Any bidder ( other than the category mention at Sl.2,3,5 above) availing exemption of EMD ( either

full or part ) by any valid order of Govt. of Odisha/Govt. of India/ direction of Hon’ble Courts of India

is to submit self attested copies of documentary evidence in support of such exemption.

F) Additional Performance Security in shape of TDR & DD pledged in favour of Commissioner, BMC,

BBSR as per OPWD Code amendment to Para-3.5.5(V) issued vide Office Order No.5288 dt.4.5.16

i.e Additional Performance Security Shall be obtained from the bidder when the bid amount is less

than the estimated cost put to tender. In such an event, the bidders who have quoted less bid

price/rates than the estimated cost put to tender shall have to furnish the exact amount of

differential cost i.e estimated cost put to tender minus the quoted amount as Additional

Performance Security in shape of Demand Draft/ Term Deposit Receipt pledged in favour of the

Commissioner, BMC, BBSR in the sealed envelope at the time of submission of bids.

The bids of the technically qualified bidders will be opened for evaluation of the price bid . In case

of the bidders quoting less bid price/rate than the estimated cost put to tender and have not

furnished the exact amount of differential cost ( i.e estimated cost put to tender minus the quoted

amount) as Additional Performance Security in shape of Demand Draft/Term Deposit Receipt, their

price bid will not be taken in to consideration for evaluation even if they have qualified in the

technical bid evaluation.

All the above mentioned documents and financial instruments should be placed in a sealed envelope

superscribed with bid identification number only & submitted through regd. Post/speed post within

Page 15: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

15

the stipulated period. Without the above documents the tender shall be liable for rejection.

Affidavits mentioned at Sl.2,3,4,5 is meant for availing exemption in EMD. If any such affidavit in support of exemption is not

furnished in the envelope & required EMD is not submitted the tender shall be rejected, though the bidder is a valid case for

exemption.

If found necessary for further verification /reference /record originals of any documents(s) such as License, PAN, VAT, C.C ,

EPF etc. has to be produced by the respective bidder(s) before the undersigned within such period intimate/informed over

telephone/verbally/email /letter, failing which respective bid shall be treated as incomplete/Non-responsive & hence shall

be rejected.

5. The bid documents will be available in the Govt. website i.e., https://www.tendersodisha.gov.in from 11.00 A.M 01.07.2017.to 5.00

P.M of 10.07.2017 for online bidding.

6. On-line bids shall be received till 5.00 P.M of Dt 10.07.2017

7. Sealed envelops containing the documents mentioned in Cl. 4 above shall be opened at 11.30A.M on 14.07.2017 in the office of the

Executive Engineer, BMC Division No-II, Engineering Block, Bhubaneswar Municipal Corporation, Goutam Nagar, Bhubaneswar. If the

tenders could not be opened on schedule day for any reason beyond the control of EE-II, BMC, then the same shall be opened on the next

official working/functioning day at 11.00 am.

8. After the stipulated date & time of on-line bidding process are over, the Original Bid Security (if applicable) and Demand Draft towards

Cost of Bid documents shall be submitted in the office of the undersigned during office hours on working days through Regd. Post or

Speed Post addressed to the Executive Engineer, Division No-II, Bhubaneswar Municipal Corporation, Goutam Nagar, Bhubaneswar on

or before 5.00 P.M of Dt 13.07.2017 The authority will not be held responsible for postal delay, if any, in the delivery of the documents

and non-receipt of the same in time. The authority shall also not be held responsible for any damage caused to the documents during

transit & handling.

9. The bid shall remain valid for a period of 120 days from the date of opening of Price Bid. Subsequent extension of validity of tender of

the L1 eligible bidder shall be subject to mutual consent of the respective bidder and Executive Engineer-II, BMC.

10. lf the % rate quoted by any bidder for any of the above mentioned work is lower than or equal to 15% less(-), then such bid shall be

rejected and the tender shall be finalized based on merits of the rest bids. But, if more than one bid is quoted at 14.99% (decimals up

to two numbers will be taken for all practical purposes) less, the tender shall be finalised through a transparent lottery system, where

all such bidders/their authorised representatives will remain present.

11. Within 30 days after opening of the bids, the EMD(s) of the unsuccessful bidder(s) except the 2nd lowest bidder (L2) shall be

refunded/returned, preferably in the shape and manner submitted by the respective bidder(s) for each work on written request(s) and

with proper acknowledgement(s). The EMD(s) of L2 bidders can be refunded in the shape & manner to be decided by BMC after

finalisation of the tender(s) for the respective works.

13. The intending bidders are also urged to acquaint themselves with the respective site conditions wherein, the corresponding work is to

be executed and submit their bids accordingly.

14. In case of any inconsistency or contradict among different clauses/conditions/ instructions/ information furnished in this tender call

notice/DTCN, then necessary clarification can be sought for by the bidders before submission of their bids. Similarly, in case of the

Agreements to be drawn by BMC Division-II with the successful bidders, conditions stipulated in the respective Agreements shall be

followed for all practical purposes unless any of those condition(s) is/are found redundant/inapplicable and inconsistent with the

relevant provisions of OPWD Code/Govt. instructions, as issued and amended till the date of invitation of this tender. In such case(s)

the provision(s) in OPWD Code/Govt. guidelines shall prevail over the respective Agreement Condition(s). In case of any dispute

between the respective successful bidder(s) and BMC regarding such overriding effect, decisions of BMC shall be final & binding

without prejudice to the remedies available to either parties under law of the Nation (India). Intending bidders are requested to

understand this condition thoroughly and submit their tenders accordingly. For further clarification or document perusal, may be

consulted (during office hours only).

15. The authority reserves the right to reject any or all the bids without assigning any reason thereof subject to the limitations prescribed

by Central Vigilance Commission and State Regulatory Authorities concerned.

16. The bidders must submit correct phone number , address & email ID for communication. In case of faulty phone number & email ID

BMC shall not be responsible for any miscommunication.

17. Other details can be seen in the DTCN.

By Order of Commissioner, BMC, Bhubaneswar

SD/-

Executive Engineer

BMC, Division No-II

Page 16: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

16

Instruction to Bidder for e-Procurement

1 PARTICIPATING IN THE BID IN THE e-PROCUREMENT PORTAL:

The Contractor/Bidder intending to participate in the bid is required to register in the Portal with some information about the firm/Contractor This is a onetime activity for registering in Portal During registration, the contractor has to attach a Digital Signature Certificate (DSC) to his / her unique user ID The DSC used must be of appropriate class (Class II or Class III) issued from a registered Certifying Authority such as n-Code, Sify, TCS, MTNL etc.

a To log on to the portal the Contractor/Bidder is required to type his/her username and password. The system will again ask to select the DSC and confirm it with the password of DSC. For each login, a user’s DSC will be validated against its date of validity and also against the Certificate Revocation List (CRL) of respective CAs stored in system database. The system checks the unique ID, password and DSC combination and authenticates the login process for use of portal.

b The tender documents uploaded by the Tender Inviting Officer in the website www.tendersodisha.gov.in will appear in the section of “Upcoming Tender” before the due date of tender sale Once the due date has arrived, the tender will move to “Active Tender” Section of the homepage Only a small notification will be published in the newspaper specifying the work details along with mention of the specific website for details The publication of the tender will be for specific period of time till the last date of submission of bids as mentioned in the ‘Invitation for Bid’ after which the same will be removed from the list of Active tenders Any bidder can view or download the bid documents from the web site.

c Contractor exempted from payment of EMD will be able to participate in the tender directly by uploading documentary evidences towards his eligibility for such exemption.

d If the software application has the provision of payment of cost of tender document through payment gateways of authorized bankers by directly debiting the account of the bidders, bidders will be required to avail on-line payment.

1.1 Furnishing scanned copy of such documents is mandatory along with the tender documents otherwise his/her bid shall be declared as non-responsive and thus liable for rejection.

Page 17: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

17

1.2 In the case of any failure, malfunction, or breakdown of the electronic system used during the e-procurement process, the tender inviting officer shall not accept any responsibility for failures or breakdowns other than in those systems strictly within their own control.

1.3 Any third party/company/person under a service contract for operation of e-procurement system in the State or his/their subsidiaries or their parent companies shall be ineligible to participate in the procurement processes that are undertaken through the e-procurement system irrespective of who operates the system.

1.4 For submission of Bids through the e-Procurement Portal, the bidder shall up load the scanned copy/copies of document in prescribed format wherever warranted in support of eligibility criteria and qualification information The on line bidder shall have to produce the original documents in support of the scanned copies and statements uploaded in the portal before the specified date as per DNIT.

1.5 Each bidder shall submit only one bid for one package. A bid is said to be complete if accompanied by cost of bid document and appropriate bid security. The system shall consider only the last bid submitted through the e-Procurement portal.

1.6 The Officer inviting the bid / Engineer-in-Charge will clarify queries on the Contract Data on requisition by the intending Bidder. The bidder may ask question in the e-procurement portal using his DSC, provided the questions are raised before the date mentioned in the home page under critical dates.

1.7 The bids uploaded by the Tender Inviting Officer may consist of general arrangements drawings or typical sections of the project. Bidder may down load these drawings and take out the print for detail study. Any other drawings and documents pertaining to the works available with the officer inviting the Bid as well as in the office of the City Engineer and Executive Engineer as mentioned in the Contract Data will be open for inspection by the bidders. The bidder is required to down load all the documents including the drawings for preparation of his bid. It is not necessary for the part of the Bidder to upload the drawings other Bid documents (after signing) while up-loading his bid. He is required to up load documents related to his eligibility criteria and qualification information and Bill of Quantities duly filled in. It is assumed that while participating in the bid, the bidder has referred all the drawings and documents uploaded by the Officer Inviting the Bid. Seeking any revision of rates or backing out of the bid claiming for not having referred to any or all documents provided in the Bid by the Officer Inviting the Bid will be construed as plea to disrupt the bidding process and in such cases the bid security shall be forfeited.

1.8 Any addendum issued shall be part of the bidding documents and shall be notified in the website www.tendersodisha.gov.in/Notice Board and through paper publication.

1.9 All the volumes/documents shall be provided in the portal by the Officer inviting the bid. The bidder shall carefully go through the document and prepare the required documents and up load the scanned documents in Portable Document Format to the portal in the designated locations of Technical Bid. He will fill up the rates of items or percentage in the BOQ down loaded for the work in designated Cell and uploads the same in designated locations of Financial Bid.

Page 18: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

18

Submission of document shall be effected by using DSC of appropriate class.

2 BID SECURITY:

The Bidder shall furnish, as part of his Bid, a Bid security for the amount mentioned under NIT/Contract Data in shape of KVP /PSB/NSC duly pledged in favour of Municipal Commissioner or Bank draft/pay order/ Bankers Cheque from any Nationalized Bank in favour of Municipal Commissioner, Bhubaneswar Municipal Corporation, Goutam Nagar, Bhubaneswar. The bidder shall scan all the written pages of the bid security and up load the same to the system in designated place. The on line bidder shall deposit the original copy of the ‘Bid Security’ within the specified period mentioned in the DNIT (after receipt date of bid but before opening date & time of bid) with the “Officer inviting the Bid”. The Officer inviting the bid shall not be responsible for any postal delay, and/or non-receipt of the original copy of the bid security on or before specified date and time. Non-submission of bid security within the designated period shall debar the bidder from participating in the on-line bidding system and his portal registration shall be blocked. His name shall also be informed to the registering authority for cancellation of his registration as contractor.

3. BID VALIDITY:

The bid shall remain valid for a period of 120 days from the date of opening of Price Bid.

3.1 In exceptional circumstances, prior to expiry of the original bid validity period, the employer may request that the bidders extend the period of validity for a specified additional period. The request and the responses thereto shall be made in writing or by cable. A bidder may refuse the request without forfeiting its EMD. A bidder agreeing to the request will not be required or permitted to modify its bid.

4. FORMAT AND SIGNING OF BID:

The bidder can download the tender of his choice and save it in his system and undertake the necessary preparatory work off-line and upload the completed tender at his convenience within the final date and time of submission The bidder shall only submit single copy of the required documents and Price Bid in the portal In the Financial bid, the bidder cannot leave any figure blank He has to only write the figures, the words will be self generated The Bidders are advised to up load the completed Bid document well ahead of the last date & time of receipt to avoid any last moment problem of power failures etc.

4.1 The Bidder shall go through the Bid carefully and list the documents those are asked for submission. He shall prepare all documents including cost of Bid Document, Bid Security, Declaration form, price bid etc and store in the system.

4.2 The bidder shall log on to the portal with his DSC and move to the desired tender for up loading the documents in appropriate place one by one simultaneously checking the documents. Once the Bidder makes sure that all the documents have been up-loaded in appropriate place he clicks the submit button to submit the bid to the portal.

Page 19: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

19

4.2.1 The bids once submitted cannot be retrieved or corrected. Tender cannot be re-opened and cannot be submitted after due date and time. Therefore only after satisfying that all the documents have been uploaded, the Bidder should activate submit button.

4.2.2 In the e-Procurement process each processes are time stamped. The system can identify each individual who has entered in to the portal for any bid and the time of entering in to the portal.

4.2.3 The Bidder should ensure clarity of the document up loaded by him to the portal especially the scanned documents by taking out sample printing Non-submission of legible documents may render the bid non-responsive However, the Officer inviting the Bid if so desires can ask for legible copies or original copies for verification with in a stipulated period provided such document in no way alters the Bidder’s price bid If the Bidder fails to submit the original documents with in the stipulated date, his bid security shall be forfeited.

4.2.4 SIGNING OF BID: The online bidder shall digitally sign on all statements documents certificates uploaded by him, owing responsibility for their correctness/authenticity as per IT Act 2000. If any of the information furnished by the bidder is found to be false/fabricated/bogus his EMD/ Bid security shall stand forfeited and the bidder is liable to be blacklisted.

5. SECURITY OF BID SUBMISSION:

5.1 All bid data uploaded by the Bidder to the portal will be encrypted by the DSC of the opener(s). The system shall require all the mandatory forms and fields filled up by the contractor during the process of submission of the bid/tender.

5.2 The Bid shall be received in encrypted format by the system which can only be decrypted / opened by the authorized openers only on or after the due date and time.

6. DEADLINE FOR SUBMISSION OF THE BIDS:

6.1 The online bidding will remain active till the last date and time of the bid submission. Once the date and time (Server date and time) is over, the bidder will not be able to submit the bid. The date & time of bid submission shall remain unaltered even if the specified date for the submission of bids declared as a holiday for the Officer inviting the Bid.

7 LATE BIDS:

7.1 The system shall reject submission of any bid through portal after closure of the receipt time. For all purpose the server time displayed in the e-procurement portal shall be the time to be followed by the bidder and concerned officers.

8 MODIFICATION AND WITHDRAWAL OF BIDS:

8.1 In the e-Procurement Portal, it is allowed to modify the bid any number of times before the final date and time of submission. The bidder shall have to log on to the

Page 20: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

20

system and resubmit the documents as asked for by the system including the price bid. In doing so, the bids already submitted by the bidder will be removed automatically from the system and the latest bid only will be admitted. But the bidder should avoid modification of bid at the last moment to avoid system failure or malfunction of internet or traffic jam or power failure. If the bidder fails to submit his modified bids within the designated time of receipt, the bid already in the system shall be taken for evaluation.

8.2 In the e-Procurement Portal, with drawl of bid is allowed. But in such case he has to write a letter with appropriate reasons for his with drawl addressed to the Officer inviting the bid and up load the scanned document to portal in the respective bid before the closure date and time of receipt of the bid. The system shall not allow any withdrawal after expiry of the closure time of the bid.

9. OPENING OF THE BID:

9.1 Bid opening date is specified during tender creation or can be extended with corrigendum. This date is available in IFB, tender document as well as the home page of portal Bid opening can be done by the authorized users which are defined during the tender publication / approval stage. The bids are encrypted using their public keys and can be decrypted only on or after the Bid Opening due date and time. The bid openers private key will be required to open the bids and all the openers have to log on to the portal during that time.

9.1.1 The bidders who participated in the on line bidding can witness opening of the bid from any system logging on to the portal with the DSC away from opening place. Contractors are not required to be present during the bid opening at the opening location if they so desire.

9.1.2 Each activity is date and time stamped with user details. For time stamping, server time is taken as the reference.

9.2 In the event of the specified date of bid opening being declared a holiday for the Officer inviting the Bid/Engineer-in-Charge, the bids will be opened at the appointed time on the next working day.

9.3 In case bids are invited for more than one package, the order for opening of the “Bid” shall be that in which they appear in the “Invitation for Bid”.

9.4 During bid opening, the covers containing original financial instruments towards Cost of bid and Bid Security in the form specified in the DNIT, received after last date of receipt of bid and before opening of the bids shall be opened and declared.

9.4.1. Combined bid security for more than one work is not acceptable.

9.5 The Bid openers, who have been pre-defined shall log on to the portal with their respective DSC. Unless all the Officers who have been declared as opening officers, log on the portal with their DSC, the tender cannot be opened.

9.5.1 The Opening Officers will systematically check the scanned demand draft towards cost of the bid document and the scanned document of Bid security with that of the original submitted. If found in order, they will continue opening of all other documents in the system provided under Technical Bid.

Page 21: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

21

9.5.2 Subject to confirmation of the bid security by the issuing institutions, the bids

accompanied with appropriate bid cost and valid bid security will be taken up for evaluation with respect to the qualification Information and other information furnished.

9.5.3 After receipt of confirmation of the bid security, the bidder may be asked in writing to clarify to the documents in the Technical Bid, if necessary, with respect to any doubts or illegible documents required for Technical Evaluation.

9.5.4 The bidders will respond in not more than 7 days of issue of the clarification letter, failing which the bid of the bidder will be evaluated on its own merit.

9.5.5 Immediately, on receipt of these clarifications, the Evaluating Officers; predefined in the system for the bid, will finalize the list of responsive bidders. They will log on to the site with their DSC and record their comments on the Technical evaluation page in the system. The Officer Inviting the Bid if also the accepting authority, shall log on to the system with his digital signature and check the technical evaluation. He can either accept or pass on to the evaluating officers for re-evaluation. Upon acceptance of technical evaluation by the Accepting authority in the system, the system shall automatically generate letter to all the responsive bidders and the system shall forward the letter to all the responsive bidder that their technical bid has been evaluated responsive with respect to the data/information furnished by him and the letter shall also intimate him the date & time of opening of Financial bid. The system shall also inform the non-responsive bidders in their e-mail ID that their bid has been found non-responsive.

9.6 The Technical evaluation of all the bids will be taken up as per the information furnished by the Bidders. But evaluation of the bid does not exonerate the bidders from checking their original documents and if at a later date the bidder is found to have mislead the evaluation through wrong information, action as per relevant clause of DNIT shall be taken against the bidder/contractor.

9.7 After technical evaluation of the bidders and selection of the qualified bidders, the financial bids of the technically qualified bidders shall be opened on the due date of opening Members of the bid opening committee log on to the system in sequence and open the financial bids for the technically qualified bidders. The opening of financial bid by the opening officer using their DSC shall decrypt the financial bids.

9.7.1 Opening of price bid and evaluation of lowest bidder is subject to satisfaction of other qualification information.

9.7.2 The Financial Bid will be opened on the notified date & time in the presence of bidders or their authorized representative who wish to be present.

9.7.3 At the time of opening of “Financial Bid”, the names of the bidders whose technical bids were found responsive will be announced and the bids of only those bidders will be opened. The remaining bids will be rejected.

9.7.4 The responsive bidders’ name, the bid prices, the item wise rates the total

Page 22: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

22

amount of each item, any discounts and withdrawals, and such other details as the officer inviting the tender may consider appropriate, will be announced by him or his authorized representatives at the time of opening.

9.7.5 Rebate/discount offer if any uploaded to the system shall be declared and recorded first.

9.7.6 The Financial bid of the bidders shall be opened one by one by the designated officers. The system shall auto-generate the Comparative Statement.

9.7.7 The Bidder can witness the principal activities and view the documents/summary reports for that particular work by logging on to the portal with his DSC from anywhere.

10. CLARIFICATION OF BIDS:

10.1 For examination, evaluation, and comparison of bids, the officer inviting the bid may, at his discretion, ask lowest bidder for clarification of his rates including reduction of rate on negotiation and breakdowns of unit rates.

10.2 On opening of the price bid the system shall arrange the financial bids in order of

their value (L1 first, followed by L2, L3 …) for subsequent evaluation. The evaluation status (Sheet) will be visible to all the participating bidders after opening on their respective logins. Each activity is recorded in the system with date and time stamping.

11. NOTIFICATION OF AWARD AND SIGNING OF AGREEMENT:

11.1 In the e-Procurement Portal, the system shall generate the template of award letter and the Officer Inviting the Bid shall mention the amount of Performance Security and Additional Security required to be furnished in the letter and intimate the bidders in his e-mail ID. The issue of the letter of acceptance shall be treated as closure of the Bid process and Commencement of the Contract.

Page 23: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

23

Detailed Conditions of Contracts

1. VAT Clearance Certificate in Form Odisha VAT-612:

Tenderers are required to submit self attested copies of valid Odisha VAT Clearance Certificates along with their offers, failing which their offers will not be considered for evaluation. Any bidder from outside the State of Odisha intending to participate in this tender but not registered under Odisha VAT Act is also allowed to participate subject to the condition that he/she/they should submit a Declaration-cum-Undertaking featuring that he/she/they is/are not registered under the Odisha VAT Act as he/she/they has/have not started any business in the State and he/she/they has/have no liability under the said Act. Such tenderer(s), if became successful, then he/she/they will have to produce the Odisha VAT Clearance Certificate in the required form VAT-612 within a month from the date of intimation of the conditional tender acceptance letter. Failure to comply this instruction within the stipulated period shall render his /her/their tender incomplete and shall be rejected with other punitive action against the said defaulter bidder(s) as deemed fit by BMC.

2. This DTCN forms a part of the agreements for the respective works to be drawn

between the successful bidders and BMC, whether or not this DTCN is attached to the agreements.

3. lf L1 bidder does not turn up for agreement after finalization of the tender, then

he shall be debarred from participation in bidding for three years and action will be taken to blacklist the contractor. In that case, the L2 bidder, if fulfils, other required criteria would be called for drawing agreement for execution of work subject to the condition that L2 bidder negotiates at par with the rate quoted by the L1 bidder otherwise the tender will be cancelled .In case a contractor is black listed, it will be widely published and intimated to all departments of Government and also to Govt. of India Agencies working in the state.

4. Incomplete tenders:

Tenders received in incomplete shape are liable for rejection.

5. No claim for cancellation of tenders: No claim shall be entertained towards any expenses made by any party for submission of the tender in case of cancellation, rejection or withdrawal of the tender.

6 A site order book shall be issued to the contractor by the Engineer-in-charge or

his representative. The Contractor shall keep this Book always at site and any special order or construction to be issued to the contractor shall be recorded in this Book by the Engineer-in charge or his representative. The Contractor shall sign all orders and instructions as token of his knowledge about the same. The

Page 24: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

24

site Order Book shall be the property of the BMC but will remain during the period of the progress of the work with the Contractor. The safe custody of the site order book during this period shall be the responsibility of the Contractor. After completion of the work the Book shall be returned back by the Contractor to the Engineer-in charge which will be enclosed in the final bill.

7. Custody of the Materials:

The contractor shall be responsible for safe custody of the materials at site and the BMC will not be responsible for any loss or damage of the property at site.

8. Guarantee/Performance: The Contractor shall furnish a guarantee to the effect that all items of the work constructed and supplied by him shall be free from any defect both in terms of materials and workmanship for a period of not less than 12 months from the date of the final completion of the work and commissioning. During this period the Contractor shall replace the defective materials, if any or rectify the defects, if any at his own cost as would be pointed out by the Engineer-in-charge to the satisfaction of the later.

9. Unilateral stoppage of work.

Unilateral stoppage of work by the Contractor without prior written permission of the Engineer-in charge shall be considered as breach of contract and the Corporation reserves the right to take such actions as it may deem fit.

10. Resident Engineer:-

The Contractor having “B” Class license & above shall engage for this work competent, qualified and authorized resident Engineers and Assistants to the satisfaction of the Engineer-in charge. The Resident Engineer shall represent the contractor in his absence in receiving directions from Engineers in charge of the work or any authority of the Corporation which will be binding on the Contractor.

11. Damages to persons and property:-

The contractor shall take every precaution not to damage or injure adjoining or other property of any persons. He shall indemnify and keep indemnified the employee/Officers of BMC against all claims for injuries or damages to any person or any such property (including surface or land or crops in site) which may arise out of or in consequence of any negligence or default on the representatives and against all claim, demands, proceedings, damages, costs, charges and expenses whatsoever in respect of or in relation thereto. The Corporation does not take any responsibility on this account.

12. Work not to be sub-contracted/sublet:- The Contractor shall not subcontract the work assigned to him. And if the contractor shall assign or sublet his contract or attempt to do so, the contract shall be rescinded with forfeiting the EMD and penalty will be imposed as may be decided by BMC.

Page 25: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

25

13. Action and compensation payable in case of bad work:- If it shall appear to the Engineer-in charge or his subordinate Engineer in charge of the work that any work has been executed with unsound imperfect or unskillful workmanship or with materials of any inferior description ors that any materials or articles provided by him for the execution of the work are unsound or of a quality inferior to that contracted for or otherwise not in accordance with the contract or usual practice, the contractor shall on demand in writing from the Engineer-in charge specifying the work ,materials or articles complained of notwithstanding that the same may have been inadvertently passed certified and paid for forthwith rectify or remove and reconstruct the work so specified in whole or in part, as the case may require or the case may be, remove the materials or articles so specified and provided other proper and suitable materials or articles at his own charge and cost, and in the event of his failing to do so within a period to be specified by the Engineer-in charge and or his subordinate Engineer in charge in his demand aforesaid then the contractor shall be liable to pay compensation art the rate of one percent on the amount of the estimate for every day not exceeding ten days while his failure to do so shall continue and in case of any such failure the Engineer in charge and his subordinate Engineer may rectify or remove and re-execute the work or remove the replace with others the materials or articles complained of as the case may be at the risk and expense in all respect of the contractor.

14. Engagement of Labourers and age limits etc.- The Contractor shall not employ for the purpose of this contract any person who is below the age of eighteen years and shall pay to each labourer for the work done by such labour, wages not less than the wages as prescribed by Government of Orissa. The Engineer in charge shall have the right to enquire into and decide and complaint alleging that the wages paid by the Contractor to any labour for the work done by such labourer is less than the wages prescribed by the Government of Orissa. The Engineer in charge and /or his subordinate Engineers immediate charge of the work shall have the right to decide whether any labour employed by the Contractor is below the age of eighteen years and to refuse to allow any labourer whom he decides to be below the age of eighteen years, to be employed by the Contractor. The Contractor shall have to grant a weekly paid holiday to his labourers/staff. The Contractor shall have to comply with all Labouor laws and other rules in force while carrying out the work.

15. Indemnify the Corporation under workman’s Act & Rules:-

The Corporation shall not be held liable to pay any compensation to any workman under workman’s compensation Act, 1923. The Contractor shall have to pay the entire compensation if decided in any Court of law for any injury/loss to any workman caused during the execution of contract work. If by order of any court corporation pays any compensation to honour the award, then the amount shall be recovered from the bill and security of the Contractor.

Page 26: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

26

16. No escalation:-

The amount quoted in the price bid shall remain firm until completion of the project.

17. The detailed plan, specification and scope of work if required can be ascertained from the Office of the Bhubaneswar Municipal Corporation during any working hours on working days prior to the last date of sale of tender papers.

18. The tenders containing extraneous conditions, not covered by the tender call notice are liable to rejection. Rate quoted should be fairly reasonable rates being abnormal. Super-fatuous and unworkable rates are liable for rejection.

19. No lump sum tender will be entertained if the tenderer does not quote any rate

for any items shown in the bill of Quantity, the tender will, in no case be considered and shall be rejected.

20. The tenderer shall quote any rate against each item shown in the bill of quantity

in wards and figures. In case of variation of the rates between words and figures, the rates quoted in word shall be deemed to be the properly quoted rate, for consideration.

21. Scoring, over writing, Interpolating, cutting should preferably be initialed by the

tenderers to avoid complication. The authority shall take no responsibility, in the matter of complications arise but of scoring over writing or interpolating the tenders should be written legibly.

22. The tender, shall accompanied with attested photo copies of valid & up to date

ITCC or PAN card/VAT CC (Form No-612). Non submission of any of these documents, the authority shall reserve the right to reject the tender. However, if authority desires, the original copies can be asked for verification, before the consideration for a final checking. The selected tenderer shall submit the Initial Security Deposit (ISD) within seven days of intimation. The ISD shall be deposited in shape of NSC, Postal term deposit Pass Book, Bank Draft/Bankers Cheque, duly pledged in favour of Municipal Commissioner, Bhubaneswar Municipal Corporation. The selected tenderer shall deposit 2.00 % of the ISD within seven days of intimation after adjusting the EMD amount deposited. Non submission of the ISD by the stipulated date the BMC shall have the right to forfeit the EMD and proceed for subsequent steps. The initial Security Deposit together with Earnest Money shall be retained by the BMC till the completion of entire work and payment of final bill or till the completion of the guarantee period of twelve months and the security deposit shall not carry any interest.

23. The BMC shall deduct the statutory deductions as applicable under the Income Tax Act, 1961, Orissa Value Added Tax Act, 2004 and any other statutory deductions.

Page 27: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

27

24. When the bid amount is up to 10% less than the estimated cost, no additional performance security is required to be deposited. When the bid amount is less than the estimated cost by more than 10% and within 15%, in such an event, the successful bidder will deposit the additional performance security along with the S.D. and before execution of agreement to the extent of 1.5 times of the differential cost of the bid amount and 90% of the estimated cost in shape of KVP/PSB/NSC duly pledged in favour of Municipal Commissioner, BMC or Demand Draft/Bankers Cheque from any Nationalized/Scheduled Bank drawn in favour of Municipal Commissioner, Bhubaneswar Municipal Corporation. The APS shall be released after the completion of the work to the satisfaction of the Corporation authority and after completion of guarantee period of twelve months.

25. Each bidder should submit the details of quarry for procurement of the materials required for the respective work while submitting the bid. The successful bidder shall be responsible for procurement of materials from authorised sources and should disclose/intimate in writing voluntarily the source of procurement of those quarry materials before each bill for the respective work.

26. lf the rate quoted by the bidder is less than 15% of the tendered amount then

such a bid shall be rejected and the tender shall be finalized basing on merits of rest bids. But if more than one bid is quoted at 14.99% (Decimals up to two numbers will be taken for all practical purposes) less than the estimated cost, the tender accepting authority will finalize the tender through a transparent lottery system, where all bidders/their authorised representatives, the concerned Executive Engineer will remain present.

27. Before acceptance of tender, the successful bidder will be required to submit a work programme and milestone basing on the financial achievement so as to complete the work within the stipulated time and in case of failure on the part of the agency to achieve the milestone liquidated damage will be imposed.

28. The successful tenderer after execution of the agreement and after issuance of the

Work order, submit a detail programme of work immediately to the concerned Executive Engineer for approval.

29. The successful tenderer who executes a valid agreement with the Bhubaneswar

Municipal Corporation shall be called contractor and shall abide by the terms and conditions of the agreement as prescribed from time to time

30. The work will be completed in every respect within the stipulated period of completion as mentioned in the Notice Inviting Tender from the date of commencement of the work to be stipulated in the Work Order, to be issued by or on behalf of the Municipal Commissioner, Bhubaneswar Municipal Corporation. There shall be no extension of contract period except on valid reasons to the satisfaction of the BMC and the contractor shall submit such request for extension. The Corporation may consider such request for extension after taking into the considerations the valid reasons.

Page 28: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

28

31. If the contractor disproportionate or abandoned or failed to progress the work

according to the time schedule submitted he shall be liable penalty under relevant clause of the item rate contract.

32. All Cement concrete works shall be executed in a mechanical form and shall use the concrete Mixer, Vibrator, Pumps, Road roller, Tar boiler, Hot mix plant etc at the own cost of the Contractor for the purpose.

33. The Contractor shall use approved and tested materials as approved by the Engineer in charge according to IRC/PWD specification and the Contractor shall arrange the materials lat his own cost and after completion of the work the Contractor shall clear the site along with all equipments at his own cost.

34. Shuttering and centering shall be with Steel plate or seasoned hardwood planks inside of which shall be lined with suitable sheeting and made leak proof and water tight as approved by the site Engineer-in charge.

35. The Site Engineer-in charge will have the right to inspect the scaffolding, centering

and shuttering made for the work and can reject partly or fully such structures, if found defective in their opinion.

36. The contractor shall arrange necessary tools and plants at his own cost required for

the efficient execution of work and the rates quoted should be inclusive of the running charges of each plant including cost of transportation thereof.

37. All earth work measurement shall be done by section measurement after the earth is

consolidated including rolling with hand or power road roller and sheep foot roller at optimum moisture condition. No extra payment will be made for the jungle clearance for taking earth from the borrow areas.

38. After the work is finished all surplus materials should be removed from the site of

work. Preliminary work such as vats, mixing platforms etc. should be dismantled and all materials removed from the site and premises left neat and clean and this should be inclusive of the rates.

39. No payment shall be made for bench marks, level pillars, profiles and benching and

leveling the ground where required. The rates to be quoted should be for finished items of work inclusive of carriage of all materials and incidental items of works.

40. No claim shall be entertained in regard to extra item of works or extra quantity of

any items besides estimated amount unless specific written order is issued from the Municipal Commissioner, Bhubaneswar Municipal Corporation

41. The tenders shall have to abide by the C.P.W.D. safety code rules.

Page 29: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

29

42. The rate quoted by the contractor shall cover the latest approved rates of labour, materials, POL and royalties. Arrangement of borrow areas; land, approach road to the bridge site etc. are the responsibility of contractor.

43. The rate for each work and concrete items wherever dewatering is imperatively

necessary, the term dewatering shall mean the execution or operation of the items due to standing water as well as due percolation of water. The quoted rates will be inclusive of this.

44. The materials, borrow areas, and hutments at sites should be arranged by the

contractor at his own cost. No future complaint on this account shall be entertained. 45. Items of work not covered by tender notice will be paid at the Current schedule of

rates of the Public Health Department/Public Works Department and those not covered by the SR will be paid on actual analysis after being approved by the City Engineer.

46. Standard Public Works Deptt. / Public health Deptt./Electrical Deptt. Specification of Govt. of Odisha /ISI specification where applicable as to be decided by the Engineer-in-charge will be followed in executing the work.

47. The contractor will make no claim on the rates, quantities and amounts that will

appear in the agreement and the total work, in a complete shape, will be handed over to Bhubaneswar Municipal Corporation within the time allowed by Bhubaneswar Municipal Corporation.

48. From the commencement of the works to the completion of the same, they are to be under the contractors charge. The contractor is to be held responsible to make good all injuries, damages and repair occasioned or rendered necessary to the same by fire or other causes and they are to hold the Govt. of Odisha harmless for any claims for injuries to person or structural damage to property happening from any neglect, default, want of proper care or misconduct on the part of the contractor or any one in his employment during the execution of the works. Also no claim shall be entertained for loss due to earthquake, flood, cyclone, epidemic, riot or any other calamity whether natural or incidental and damage so caused will have to be made good by the contractor at his own cost.

49. For diversion road, the contractor will have to make his own arrangement to make

the same in private land if necessary for which arrangement of such land by the side of C.D works and the rental charges for such private land shall be borne by the contractor including the proper maintenance with lighting arrangements during night time and signaling during day time and barricading etc. till the C.D works are open to the traffic. No extra rate will be paid to the contractor for above rental charges etc. His rates in the tender for other times shall include this arrangement, land rental charges for the land and maintenance, lighting and removal or such temporary road crust from the private land to bring the land to its original conditions etc. complete.

Page 30: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

30

50. Any damage caused by natural calamities should be done by the contractor at his own cost. The Bhubaneswar Municipal Corporation shall not be any way responsible for the same and will not pay any cost towards the repair done by the contractor.

51. In case of any dispute in the meaning of specification, description of items, rates,

conditions of agreement or due to errors/typo-graphical errors, omissions, the decision of the Tender Accepting Authority, Bhubaneswar Municipal Corporation with due recommendation of the Engineer-in charge of work is final and binding to the Contractor.

52. The tenderer shall bear cost of various incidentals, sundries and contingencies

necessitated by work in full within the following or similar category.

(a) Rent, royalties and other charges of materials, all other taxes including Sales Tax, ferry, tolls conveyance charge and other cost on account of land and buildings including temporary building & temporary electric connection to work site as well as construction of service road & diversion road & its maintenance till completion of work as required by the tenderer for collection of materials,

(b) Storage, housing of staff or other purpose of the work. No tenderer will

however be liable to pay Govt. for temporary occupation of land owned by Govt. at the site of the work.

(c) Labour camps or huts necessary to a suitable scale including conservancy and

sanitary arrangements there in to the satisfaction of the local health authorities.

(d) Suitable water supply including pipe water supply wherever available for the

staff and labour as well as for the work.

(e) Fees and duties levied by the Municipal, canal or water supply authorities.

(f) Suitable equipments and wearing apparatus for the labour engaged in risky operation.

(g) Suitable fencing barriers, signals including paraffin and electric signals where

necessary at works and approaches in order to protect the public and employees from accidents.

(h) Compensation including cost of any suit for injury to persons or property due

to neglect of any measure/ precautions also become payable due to operation of the workmen compensation act.

(i) The contractor has to arrange adequate lighting arrangement for the work

wherever necessary at his own cost. C.C & R.C.C items are to be sufficiently cured with Gunny bags, if necessary.

Page 31: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

31

53. Tenderers are required to abide by the fair wages clause as introduced by Govt. of Odisha, Works Department letter No.VIII R - 8/5225 dt. 26.2.1955 and No.II M 56/6 28842 (5) dt. 27.9.1961 as amended from time to time.

54. In case of any complaint by the labour working about the nonpayment or less

payment of his wages as per latest minimum wages act the Executive Engineer will have the right to investigate and if the contractor is found to be in default, he may recover such amount due from the contractor and pay such amount to the labour directly under intimation to the local labour officer of the Govt. The decision of the Executive Engineer is final and binding on the contractor.

55. That for the purpose of jurisdiction in the event of any dispute, it shall be at Bhubaneswar.

56. The Authority reserves the right to reject any or all the tenders without assigning any

reason thereof.

Signature of the Tenderer Executive Engineer

BMC Division No. II

Page 32: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

32

CORPORATION AGREEMENT

AGREEMENT NO________________ Dt._____________

Name of the Work:

Estimated Amount: Name of Contractor: Agreement Value:

Initial Security Deposit:

Date of Commencement:

Stipulated date of Completion:

Extension of time granted upto:

Authority and No and Date in which extension of time granted :

Reference to Letter No. and Date in which the copy of Agreement submitted to :

Page 33: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

33

BHUBANESWAR MUNICIPAL CORPORATION

Form No.W.III

(Rule 341) Name of Work: Name of Contractor:

Contract Agreement Form for Works

I do hereby agree to execute the under mentioned descriptions of work

in accordance with the conditions noted on the reverse and in consideration of

payment being made by the Municipal Corporation.......... ...............................at

the rate specified in the following schedule for the quantity of work executed.

Description of work Quantity Rate Unit Amounts Remarks

Space for

embossing stamp

Page 34: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

34

CONDITIONS (Reverse) 1. The work is to be carried on with due diligence and all work executed is to be done in a workman like manner. The materials use when supplied by the party tendering are to be the best of the several kinds procurable and in all cased will be subject to the approval of the Executive Engineer/Municipal Commissioner whose decision as to the rate of progress and the quality of the work of materials shall be final. 2. The quantity of work executed shall be measured and payments made as frequently as possible subject to a deduction of 10 percent pending completion land check measurement if no security was furnished by the contractor in the shape of a lump sum and on the completion of the work final measurements will be made and the amount adjusted accordingly.

3. The Executive Engineer/Municipal Commissioner may put an end to this agreement, at his option at any time and in the case of bad work or materials he may removal the same and have it replaced, deducting the value of the work rejected, or materials removed or the cost of replacing the same as he may think proper from any amount due, or that may become due, to the party making this agreement. Signature of the Party making this agreement.......................................... Date................................................... Witnesses........................................... Residence.......................................... Date..................................................

Accepted by me

Page 35: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

35

TENDER FOR WORKS

I / We hereby tender for the execution for the Bhubaneswar Municipal

Corporation of the work specified in the written memorandum at the rate specified

therein within a period of _____ years months from the date of written order to

commence and in accordance in all respects with the specifications, designs,

drawings and other documents referred to in rule I hereof and subject to annexed

conditions of contract and with such materials as are provided for by and in all other

respects in accordance with such conditions so far as applicable

MEMORANDUM

a) Name of Work :

(If several sub-works are included they should detailed in separate list)

b) Estimated Cost : Rs

c) Earnest Money : Rs

d) Initial security deposit (including

earnest money) (This deposit will be 2% of the estimated cost of the work)

: Rs

e) Percentage to be deducted from bills @ 5%(Five Percent) (This percentage deduction from bills will be credited to the Contractor’s Security Deposit)

f) Time required for the work from date of written order to commence _______ months

g) Date of written order to commence

h) Total number of work tendered for

Page 36: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

36

SPECIAL CONDITIONS OF CONTRACT

1. The date of commencement of the work shall be the date on which the

Municipal Commissioner, Bhubaneswar Municipal Corporation signs the

agreement.

2. Any delay on the part of Bhubaneswar Municipal Corporation in issuing work

order after the date of acceptance of agreement by the Municipal

Commissioner shall not be construed as the cause of delay in the

commencement of work.

3. The Contractor shall not be entitled to any compensation on account of delay

in handing over site, making of alignment of layout or supply of P & T

materials or any natural calamities of labour unrest or non availability of

labour or the delay in supply of stock materials or T & P water scarcity or

testing or due to any difficulty encountered by the contractor in any form. But

extension of time beyond the stipulated date of completion shall be granted

on plain paper from the contractor before expiry of 75% of the period of

completion or 7 days before the stipulated date of completion, whichever is

earlier.

4. The satisfaction of Municipal Commissioner/Mayor Bhubaneswar Municipal

Corporation as to the genuineness or otherwise of the cause of delay shall be

final and binding on the contractor.

5. The Contractor is bound to show proportionate progress of the work, the

quantum of work being assessed by the supervising officers of Bhubaneswar

Municipal Corporation at suitable intervals from time to time.

6. If for no particular reason as aforesaid, the contractor is unable to show

proportionate progress, the Municipal Commissioner Bhubaneswar Municipal

Corporation shall have the right to make such deductions as deemed fit from

the amount payable to the Contractor in shape of running bills.

7. The amount so deducted shall be considered to be released only at the time

of payment of the final bill if the Contractor improves in the working.

8. If the Municipal Commissioner/Mayor Bhubaneswar Municipal Corporation

satisfied regarding the genuineness of delay in completion of the work and

Page 37: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

37

the stipulated period, he may impose penalty @1/2% per day of delay

beyond the said date subject to a maximum 10% of the agreement amount

the amount of such penalty shall be fixed exclusively at the discretion of

Municipal Commissioner/Mayor Bhubaneswar Municipal Corporation.

9. In case of non completion of work, Municipal Commissioner, Bhubaneswar

Municipal Corporation shall have the right to rescind the contract and entrust

the balance portion of the work to such agency as deemed fir and the excess

expenditure if any incurred in the process of execution of the balance quantity

of work shall be recovered from the Contractor.

10. Municipal Commissioner, Bhubaneswar Municipal Corporation shall have the

right to resort to any of the aforesaid penal clauses (Clause. 8 &9) as deemed

fit by him.

11. Recovery towards hire charges of machineries of Bhubaneswar Municipal

Corporation shall be made from the Contractor bill amount from time to time

at such rate as in vogue on the date of execution of agreement.

12. The Contractor also shall remain solely responsible for materials collected by

him for utilization in the work till it is fully utilized irrespective of any payment

made to him in respect of such collection.

13. Municipal Commissioner, Bhubaneswar Municipal Corporation reserves the

right, without informing the Contractor to make such increase of decrease in

the quantities of items of work mentioned in the schedule of rates attached

here to as may be considered necessary to complete the work fully and

satisfactorily. Such increase or decrease shall in no case invalidate of various

items of work are liable to alteration and commission or addition and

deduction and such commission, addition; deduction shall in no case

invalidate the contracts.

14. Any extra quantity of work done over the approved quantity shall be executed

by the Contractor as per his agreement rates after accept of order to that

effect.

15. Any extra item of work executed beyond the items of the work covered in the

agreement shall be executed after execution of supplementary agreement at

CSR in force on the date of execution of the agreement such supplementary

Page 38: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

38

agreement if required will be approved by Municipal Commissioner

Bhubaneswar Municipal Corporation.

16. All work shall conform to the detailed standard specification of OPWD code

with amendment from time to time.

17. A Contractor shall put his signature on the measurement book and the bill

before payment is made to him as a token of acceptance of the quantities,

specification, rate and amount of the bill and no claim shall be entertained at

a later date.

18. All such work show measurement and quantity cannot be verified at a later

date shall not be got measured by the concerned sectional officer and got

check measured by Asst. Engineer, Executive Engineer, or any officer superior

to him in the Corporation before utilization, execution and covering up. No

claim an account of execution of such work shall be entertained, if the

quantity of work cannot be measured or check measured or verified after

execution.

19. The Contractor shall make his own arrangement for water supply of bailing

out water manually or mechanically at his own cost from the working area of

building of bridge foundations, if required for the purpose.

20. The Contractor shall make his own arrangement for the internal road to the

quarry of materials and for quarrying the materials and supplying stacking at

road side or work site as directed by the supervising staff in measurable

boxes of stacks including cost of all royalty freight and taxes which shall be

borne by the contractor and the rate for such items of works shall be the

furnished rate as herein agreed upon.

21. It shall be the sole responsibility of the Contractor to keep the site clear of

any debris or light shrub jungle before layout of alignment at his own cost. It

shall also be the responsibility of the Contractor present the finished work or

the building in a useful or habitable condition within the scope of the contract

and all site clearance or cleaning required for the purpose shall be done at his

own cost.

22. Night work can be done in the interest of the work provided the Contractor

makes his arrangement for security, safety and lighting.

Page 39: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

39

23. The Contractor shall not sublet any part of the work to any other agency on

contract or subcontract basis. Any such act by the Contractor shall be deemed

as unauthorized and Bhubaneswar Municipal Corporation shall not be in any

manner responsible for such act of dispute or controversy or loss of damage

arising out of such act.

24. The Bhubaneswar Municipal Corporation shall not be bound to pay any

compensation on account of damage or loss due to carelessness or

mishandling or natural calamity caused to any labours, machinery, stock

materials or such portion as completed or incomplete work which shall be

exclusively borne by Contractor till the date of completion of the work.

25. The Contractor shall not engage any under aged labourer.

26. The Contractor shall not engage any labourer above the age of 60 years

except those engaged in supervising or accounting work of the Contractor.

27. The Contractor shall not engage any sick labourer and any woman in

advanced stage of pregnancy. The Contractor shall not engage and person

who is originally accused or convicted or undergoing sentence of

imprisonment.

28. The Contractor shall abide by such rules regulation and wages and conditions

as laid down by the Government of Orissa in labour on part of such other

appropriate departments.

29. The Contractor shall remain liable to such actions orders and penal actions as

shall be deemed fit by the Government of Orissa in labour department of

other proportionate Departments as unforced by such officers of the

Government of Orissa who have been legally authorized to take such action

from time to time and the Bhubaneswar Municipal Corporation shall not be

held responsible for such actions taken against the Contractor.

30. The Contractor shall not engage any woman labour within 1 KM of Military or

Para Military barrack or any cantonment area Tank.

31. The Contractor shall remain responsible for general sanitation security and

safety of all labourers engaged by him and of accommodation and supply or

ration to labourers staying at his work site.

Page 40: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

40

32. Any compensation payable to labour in any form due to any cause shall be

the exclusive responsibility of Contractor.

33. All stock and T & P materials outstanding against the Contractor including

surplus material shall be returned at the place of delivery in good useful or

serviceable condition failing which the recovery of cost of the same shall be

made from the amount of payment to the Contractor.

34. If in the opinion of Municipal Commissioner, Bhubaneswar Municipal

Corporation the Contractor has failed to return such quantity of materials with

malicious motive then the Municipal Commissioner, Bhubaneswar Municipal

Corporation shall have the right to recover from the Contractor’s outstanding

bill amount or security deposit and amount up to equal to five times the cost

of such materials.

35. A site order book shall be maintained by the Contractor which shall paged and

got certified by the Executive Engineer and kept at work site for recording

such order as may be required from time to time in the interest of work by

the supervising staff and such order shall be signed by the Contractor. He will

be the custodian of site book till completion of the work after which the book

shall be returned to A.E /J.E in charge.

36. Security shall be kept deducted at the rate 5% from every running bill and

final bill in respect of infrastructure woks in addition to E.M.D and I.S.D

deposited at the time of tender or agreement and the same shall be released

after expiry of One year from the date of payment of the final bill/after post

audit provided that Municipal Commissioner, Bhubaneswar Municipal

Corporation shall have the right to make such relaxation on the release of

security deposit as deemed fit by him.

37. Any claim regarding, any monetary compensation due to the Contractor shall

be referred in writing to the Municipal Commissioner, Bhubaneswar Municipal

Corporation within seven days occurrence of two cause of such claim. The

decision of the Municipal Commissioner, Bhubaneswar Municipal Corporation

shall be final and binding on the Contractor.

38. In case it is felt by the Contractor that any amount or compensation or loss or

damage is payable to him over and above the decision of the Municipal

Page 41: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

41

Commissioner , Bhubaneswar Municipal Corporation, the same can be decided

in the appropriate Court of law, on move by the Contractor in his form of a

money suit only.

39. For the purpose of Jurisdiction in case of such litigation shall be deemed to

have occurred within the jurisdiction of subordinate judge, Bhubaneswar.

40. The aforesaid clauses and special conditions are only illustrative and not

exhaustive and such other conditions and contingency as shall arise from time

to time shall be decided in conformity with natural justice.

Certified that I have fully read & understood the meaning & implication of the

clauses and special conditions of the contract and to hereby undertake to

abide by the said clause and conditions without reservation.

Signature of Tenderer/Authorized person Executive Engineer Representing Contractor BMC,Division No-II

Page 42: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

42

GENERAL CONDITIONS

1. The EMD of tenderers accepted or proposed to be accepted shall be

retained in the Municipal Corporation Office till such time after completion

of the work as the competent authority of the Municipal Corporation shall

deem fit.

2. On acceptance of valid offer by the Bhubaneswar Municipal Corporation

intimation will be given by ordinary post to the participant Contractor for

deposit of prescribed amount of I.S.D and execution of agreement and

non deposit of I.S.D shall entitle for forfeitures of Earnest money

deposited.

3. The successful Contractor who executes a valid agreement with the

Bhubaneswar Municipal Corporation shall be called as the executing

agency and shall abide by the terms and conditions of the Corporation as

prescribed from time to time.

4. The work will be completed in every respect within period of (time of

completion) ……… / months from the date of commencement of the work

as indicated in the work order by the Bhubaneswar Municipal Corporation.

5. The extension application will be considered in case of delay in completion

of work subject to valid reason and timely intimation as stipulated in the

agreement to be eventually drawn with the successful Contractor.

6. This D.T.C.N. forms part of the agreement and each page of the DTCN is

be signed by the Contractor as a token of acceptance of the terms and

conditions of the DTCN as enclosed to the Contract document.

7. If the Contractor stops of slow down the progress of work under any plea

whatsoever he shall be liable to pay the full penalty under relevant clause

of the contract.

Page 43: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

43

8. Cement concrete in bridge/culvert slabs, road concrete, beams, foundation

etc. prescribed by the Executive Engineer and /or Assistant Engineer or

Junior Engineer-in-charge shall be machine mixed and vibrated and

Contractor shall arrange his own concrete mixer, Vibrator, Pumps, Road

Roller, Tar boiler Hot mix plant etc. at his own cost for the purpose.

9. All the materials to be used in work should got approved by Engineer-in-

charge material testing will be done as per IRC/PWD specification and the

expenditure will be borne by Contractor. After completion of the works the

Contractor shall arrange at his own cost all requisite and equipments for

testing the building roads water supply and sewerage system, electrical

Installation if found necessary and bear the entire cost of such test.

10. Rubble stone boulders, rough stone soling stones are to be measured by

volume of closely packed stacks, volumes for void should normally be

deducted from closely packed stacks, for loosely packed stacks percentage

of void should be determined on actual observations and deducted or

assessed at site by the Engineer-in-charge/ Assistant Engineer, Junior

Engineer of the authority.

11. 12 percent will be deducted from metal and moorum stacks. The box

heaps of 1.5 x 1.5 x 0.5m to be measured as 1.5 x 1.5 x 0.43m= 1 cum,

similar measurement to be adopted for gravel stacks and void deducted.

The rates should be excluding voids.

12. Item work not covered by Contract will be paid at the Current Schedule of

Rates of the Public Health Department/Public Works Department and

those not covered by the S.R. will be paid on actual analysis approved by

the Executive Engineer.

13. Standard public works Department/Public Health Department/Electrical

Department specification of Govt. of Odisha/I.S.I specification where

Page 44: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

44

applicable as to be decided by the Engineer-in-charge will be followed in

executing the work.

14. The Contractor will make no claim on the rates quantities and amounts

that will appears in the agreement and the total work in complete shape

will be handed over to Bhubaneswar Municipal Corporation within the

time allowed by Bhubaneswar Municipal Corporation.

15. In case of any dispute in the meaning of specification description of items

rates, conditions of agreement or due to errors/typo-graphical errors

omissions or due to any other reasons the decision of the Executive

Engineer, Bhubaneswar Municipal Corporation is final and binding on both

parties.

16. No part of contract shall be sublet without written permission of the

Municipal Commissioner, Bhubaneswar Municipal Corporation.

Bhubaneswar or transfer be made by power of attorney authorizing others

to receive payment on Contractor s behalf.

17. In case of non completion of work the Municipal Commissioner/Mayor

Bhubaneswar Municipal Corporation shall have the right to rescind the

contract and entrust the balance portion of work to other agency as

deemed fit.

Signature of Tenderer/Authorized person Executive Engineer Representing Contractor BMC,Division No-II

Page 45: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

45

ODISHA PWD / ELECTRICITY DEPARTMENT CONTRACTOR’S LABOUR REGULATION

1. Short Title – These regulation may be called “ The Odisha Public Works Department / Electricity Department Contractor’s Regulation”

2. Definition – In these Regulation, unless otherwise expressed or indicated the following words and expressions shall have the meaning hereby assigned to them respectively that is to say –

i. “Labour” means worker employed by a contractor of the Odisha Public Works

Department / Electricity Department directly or indirectly through a sub-contractor or other person, by an agent on his behalf

ii. “Fair Wages” means wages whether for the time or piecework described by the State Public Works Department / Electricity Department for the area in which the work is done

iii. “Contractor” shall include every person whether a sub-contractor or headman or agent employing labour on the work taken on contract

iv. “Wages” shall have the same meaning as define in the Payment of Wage Act

and include time and piece rate wages, if any

3. Display of notice regarding wages, etc: a. The Contractor shall Before he commence the work on contract display and

correctly maintain and continue to display and correctly maintain in a clean and legible condition, in conspicuous place on the work, notices in English and in the local Indian language spoken by the majority of the workers, giving the rate of wage prescribed by the State Public Works Department / Electricity Department for the district where the work is done.

b. Send a copy of such notices to the Engineer-in-charge of the work. 4. Payment of Wages: a. Wages due to every worker shall be paid to him direct b. All wages shall be paid in current coin or currency or in both 5. Fixation of Wage Period: a. The contractor shall fix the wage period in respect of which the wages be

payable b. No wage period shall exceed one month c. Wages of every workman employed on the contract shall be paid before the

expiry of the days, after the last day of the wage period in respect of which the wages are payable

d. When the employment of any worker is terminated by or on behalf of the contractor, the wages earned by him shall be pay before the expiry of the day succeeding the one on which his employment is terminated.

e. All payments of wages shall be made on a working day

Page 46: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

46

6. Water Book and Wage Card : a. The Contactor shall maintain a wage book of each worker in such form as

may be convenient, but the same shall include the following particulars – i. Rate of daily or monthly wages ii. Nature of work on which employed iii. Total number of days work during each wage period iv. Total amount payable for the work during each wage period v. All deductions made from the wages with an indication in each case of

the ground for which the deduction is made vi. Wage actually paid for each work period

b. The Contactor shall also maintain a wage card for each worker employed on the work

c. The Engineer-in-Charge may grant an exemption from the maintenance of wage bond, wage cards to a contractor who, in his opinion may not directly or indirectly employ more than 10 persons on the work

7. Fines deduction which may be made from wages: a. The wages of a worker shall be paid to him without any deduction of any kind

except the following – i. Fines

ii. Deduction for absence from duty, ie for the place or places where by the terms of his employment he is required to work The amount of deductions shall be in proportion to the period for which he was absent

iii. Deduction for damage to or loss of goods expressly entrusted to the employed person for custody or for loss of money for which he is required to account where such damage or loss is directly attributable to his neglect or default

iv. Any other deductions, which the Odisha Government may from time to time allow.

b. No fines shall be imposed on a worker and no deduction for damage or loss shall be made from his wages until the worker has been given an opportunity or showing cause against the such fines or deductions

c. The total amount of fines which may be imposed in any one wage period on a work shall not exceeded an amount equal to five paisa in rupee of the wages payable to him in respect of that wage period

d. No fine imposed on any worker shall be recovered from him by installment, or after the expiry of 60 days from the date on which it was imposed.

8. Register of fines, etc: a. The contractor shall maintain a register of fines and of all deductions for

damage or loss Such Register shall mention the reason for which fine was imposed or deduction for damage or loss was made

b. The contractor shall maintain a list in English and in the local Indian language clearly defining acts and omission for which penalty or fine can be imposed It shall display such list and maintain it in a clean and legible condition in conspicuous places in the work

Page 47: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

47

9. Preservation of Register: The wage register, the wage cards and the register of files deduction required to be maintained under these regulations shall be preserved for 12 months after date of the last entry made in them.

10. Power of Labour Welfare Officer to make investigation or inquiry :

The Labour Welfare Officer or any other persons authorized by the Government of Odisha on their behalf shall have power to make inquiries with a view for ascertaining and enforcing due and proper observance of the fair wage clauses and the provisions of these regulations He shall investigate to any complain regarding default made by the contractor, sub-contractor in regard to such provisions

11. Report of the Labour Welfare Officers: The Labour Welfare Officer or

others authorized as aforesaid shall submit a report of the results of his investigation or inquiry to the Engineer-in-Charge concerned, indicating the extend if any to which the default has been committed with a note that necessary deductions from the contractor’s bill be made and wages and other dues be paid to the labourers concerned

12. Appeal against the decision of Labour Welfare Officers: Any person

aggrieved by the decision and recommendation of the Labour Welfare Officer or other persons so authorized may appeal against such decision to the Labour Commissioner within 30 days from the date of decision forwarding simultaneously a copy of his appeal to Engineer-in-Charge concerned but subject to such appeal, the decision of the officer shall be final and binding upon the contractor

13. Inspection of Register : The Contractor shall allow inspection of the wage

book and wage cards to any of his workers or to his agent at a convenient time and place after due notice is received, or to the Labour Commissioner or any other person authorized by the Government of Odisha on his behalf

14. Submission of Return: The contractor shall submit periodical returns as

may be specified from time to time. 15. Amendments : The Government of Odisha may from time to time , add to

or amend these regulations and on any question as to the application, interpretation of effect of these regulations, the decision of the Labour Commissioner or any other person authorized by the Govt of Odisha in that behalf shall be final.

Page 48: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

48

SCHEDULE-A

CERTIFICATE OF NO RELATIONSHIP

I/We hereby certify that I/We* am/are* related/not related (*) to any officer of

Bhubaneswar Municipal Corporation of the rank of Assistant Engineer & above and

any officer of the rank of Assistant Engineer/Under Secretary and above of the

Urban Department, Govt. of Odisha I/We* am/are* aware that, if the facts

subsequently proved to be false, my/our* contract will be rescinded with forfeiture

of E.M.D and security deposit and I/We* shall be liable to make good the loss or

damage resulting from such cancellation.

I//We also note that, non-submission of this certificate will render my / our tender

liable for rejection.

(*) - Strike out which is not applicable Signature of the Tenderer

Date:-

Page 49: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

49

DECLARATION CERTIFICATE 1. I/We have visited the site and have fully acquainted with the local situation

regarding the materials, labour and factors pertaining to the work for completion in all respect before submitting the tender.

2. I/We have carefully studied the conditions of the construction, specification,

contract condition and all other document relating to this work and agree to execute the same accordingly.

3. I/We solemnly pledge that I/We shall be sincere in discharging my/our duties

as responsible contractor and complete the work within the prescribed time limit In case there are deviation from the construction programme I/We shall abide by the decision of Engineer-in-charge for revision of the programme and arrange for the labours, materials, equipment’s etc accordingly.

4. In the event of award of the work to me/us, I/We under the entire

responsibility for the structural stability to reconstruct / replace the whole or part of the component of the structure in the event of failure or improper functioning/improper construction within a period of one year from the date of completion without asking for extra payment from any account to the department.

5. I/We undertake that I/We shall not claim any escalation of cost on account of

materials, labourers, taxes, natural calamities, public nuisance, miscreants or from any account in connection with work within execution of the work till the actual completion period and shall not be entertained by the department (Bhubaneswar Municipal Corporation).

6. In case of violation of contents of department’s tender documents in shape of

extra conditions, or in any form, my / our offer / tender shall be rejected by the department without any intimation to me/us.

SIGNATURE OF CONTRACTOR

Page 50: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

50

AFFIDAVIT

(Applicable for All Bidders)

1. I, Sri/Smt/Ms……………………………………………,Son/Daughter/Wife of …………….., hereby declare as the Contractor/as the authorized signatory on behalf of the Contractor,”…………………………………………………..”(strike out whichever is not applicable) that I/we am/are validly registered as …………Class Contractor under Govt. of Odisha.

2. It is hereby declared that I/we are not currently deprived from tendering in any Govt. Organisation including BMC and I/we have furnished the required eligibility documents as a valid tenderer for the above mentioned work.

3. I/We hereby authorise and request any bank, person, firm or organisation to furnish information to BMC as deemed necessary by it in connection with my/our eligibility criteria and document verification related to my/our tender for the aforesaid work. I/We also authorise BMC to refer, peruse, consider & correlate my/our documents submitted in connection with other tenders of BMC Division No.II (if any) and I /we have no objection if such documents either in whole or part are perused, referred and considered.

4. The undersigned undertake to submit further information/ documents as may be requested for/required by BMC in connection with this tender within the stipulated period to be intimated by BMC either through letter or through my/our Telephone No. furnished below. Non-response to this instruction by me/us within the stipulated period shall render my/our tender as non-response/incomplete and hence BMC shall be at liberty to take any action as deemed fit against me/us as well as to decide/cancel my/our the tender for the work and I/we will have no claim against such decision of BMC.

5. My/our present address for correspondence is ………………………………………………………………and my Telephone Contact number

is……………………………………..and e-mail ID for correspondence

is…………………………………………. I/We shall promptly and voluntarily intimate the Tender Inviting Officer (Executive Engineer, BMC, Division-II) about subsequent

changes, if any, of my/our telephone number, e-mail ID and address for

correspondence within a week from the date of occurrence of such changes falling which, I/we will be held responsible for any eventual delay/gap in correspondences/communications between me/us and BMC and subsequent follow-up actions and situation which may arise due to such delay/gaps.

6. I/We hereby declare that all the information and documents furnished herewith by me/us in connection with my/our tender for the work, “……………………………… …………………………………………………………………………………………………………………….….. invited by BMC vide Bid Reference No. BMC-EED-II-04/2017-18 (Sl. No……………) are true and correct.

(Deponent)

(Signature of the Tenderer/Authorised Signatory in case of Partnership

Page 51: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

51

Firm/Company with Seal of the Firm/Company)

AFFIDAVIT

(Applicable for SC/ST Bidders)

1. I, Sri/Smt/Ms……………………………………………,Son/Daughter/Wife of …………….., hereby declare that;

a. I am a registered ………..Class ST/SC Contactor under Govt. of Odisha

or

b. The Partnership Firm/Private Ltd. Company named/titled, as “….………………… …………” is a registered SC/ST Contractor under Govt. of Odisha within the ambit specified in Works Department Resolution No.27748 dt.11.10.77 and I, Sri/Smt/Ms………………………..………………………………,Son/Daughter/Wife of …………….., is the authorized signatory on behalf of the Firm/Company (scanned authorization copy with my signature duly certified and attested/identified has been submitted on-line with our tender).

[Tick (a) or (b) above whichever is applicable and fill up accordingly.]

2. As per Works Department, Govt. of Odisha Resolution No.27748 dt.11.10.77, I/My Firm/My Company am/is entitled for exemption of EMD & ISD and accordingly, I/My Firm/My Company have/has submitted tender for the work,”…………………………. ……………………………………………………………………………………………………………..” vide BMC Division No.II, NIT No.14077

3. Necessary documentary evidence(s) as prescribed in the Tender Notice at * and at

Sl.2 & 4 (Information for the Intending Bidders) in support of my/our aforesaid claim for exemption of EMD & ISD have/has been duly up-loaded/submitted on-line along with my/our tender for the aforesaid work.

4. In addition to those, other documents and original(s), as required by EE-II, BMC to sustain my/our aforesaid claim shall be submitted by me/us within a week from the date of instruction/intimation of EE-II, BMC through telephone/letter/e-mail failing which my/our tender shall be liable for rejection.

(Strike out whichever is not applicable)

(Deponent)

(Signature of the Tenderer/Authorised Signatory in case of Partnership Firm/Company with Seal of the Firm/Company)

Page 52: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

52

AFFIDAVIT

(Applicable for Contractors with Physical Disabilities)

1. I, Sri/Smt/Ms……………………………………………,Son/Daughter/Wife of …………….., hereby declare that I am a registered ………..Class Contactor with Physical Disabilities within the ambit prescribed in Works Department Resolution No.23934 dt.8.11.91.

2. As per the said Resolution I am entitled for exemption of EMD & ISD and accordingly, I have submitted tender for the work,”…………………………. ………………………………… …………………………………………………………………………..” vide BMC Division No. II, NIT No. 14077

Necessary documentary evidence(s) as prescribed in the Tender Notice at * and at

Sl.2 & 4 (Information for the Intending Bidders) in support of my aforesaid claim for exemption of EMD & ISD have/has been duly up-loaded/submitted on-line along with my tender for the aforesaid work.

4. In addition to those, other documents and original(s), as required by EE-II, BMC to sustain my aforesaid claim shall be submitted by me within a week from the date of instruction/intimation of EE-II, BMC through telephone/letter/e-mail failing which my tender shall be liable for rejection.

(Deponent)

Page 53: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

53

AFFIDAVIT

(Applicable for the Bidders not Registered under EPF)

I, Sri/Smt/Ms………………………………………………………….., hereby declare as the Contractor/as the authorized signatory on behalf of the Contractor,”…………………………………………………..”(strike out whichever is not applicable) do hereby solemnly affirm and state as follows.

1. That as on date, I/we am/are not registered with RPFC (Regional Provident

Fund Commission), Odisha, Bhubaneswar and solemnly affirm that, I/we shall

follow the “Employees Provident Fund and Misc. Provision Act, 1952 &

rules / schemes”, made there under, in case this work is awarded to me/us.

2. That, BMC authority will be at liberty to deduct 26% of the labour

component amount of the Contract & shall retain it as an additional security with BMC.

3. That, in case I/we submit the EPF registration certificate, then the said

additional security shall be released to me/us by BMC without any interest

subject to fulfillment of other compliances / conditions.

4. That, this affidavit is required to be produced before the authority of

Bhubaneswar Municipal Corporation for tender purpose.

That the facts stated above are true to the best of my/our knowledge.

(Deponent)

(Signature of the Tenderer/Authorised Signatory in case of Partnership Firm/Company with Seal of the Firm/Company)

Page 54: BHUBANESWAR MUNICIPAL CORPORATION - …portal2.bmc.gov.in/Files/Keyprojects_01072017011206PM.pdfThe DTCN of works shall be available in the e-procurement portal ... Bhubaneswar Municipal

54

AFFIDAVIT

(Applicable for Engineer Contractors Intending to Avail Exemption of EMD

& ISD as per OPWD Code)

1) I, Sri/Smt/Ms………………………………………………………….., hereby declare as the Contractor/as the authorized signatory on behalf of the Contractor,”…………………………………………………..”(strike out whichever is not applicable) do hereby solemnly affirm and state as follows.

2) That, I/we am/are a registered ………….. Class Engineer Contractor.

3) That, I/we herewith claim exemption of EMD during the year………………for participation in the tender for this work.

4) That, I/we have not exhausted the facility available to me as an Engineer

Contractor during the year…………. for exemption of EMD & ISD as per Works

Deptt. Guideline & OPWD Code.

5) That, I/we shall ensure production of my/our valid Original Contractor’s

Registration Certificate (license) after or during opening of bids (as per

direction of Executive Engineer, BMC Division-II) for the above work for

verification and also for subsequent entry of exemption of EMD and/or ISD(if

found eligible and availed the exemption of EMD and/or ISD in my/our

license) as per direction of Executive Engineer, BMC Division-II within such

time as directed by him failing which action, as decided by BMC, may be

taken against me/us and appropriate steps may be taken by BMC to facilitate

execution of the tendered work.

(Deponent)

(Signature of the Tenderer/Authorised Signatory in case of Partnership Firm/Company with Seal of the Firm/Company)