ar m g r o u p llc€¦ · arm project 160443m-18 3 february 24, 2020 . ar m g r o u p llc...

18
9 1 7 5 G u i l f o r d R o a d S u i t e 3 1 0 C o l u m b i a , M D 2 1 0 4 6 v o i c e : ( 4 1 0 ) 2 9 0 – 7 7 7 5 f a x : ( 4 1 0 ) 2 9 0 – 7 7 7 6 w w w . a r m g r o u p . n e t February 24, 2020 Ms. Barbara Brown Project Coordinator Maryland Department of the Environment 1800 Washington Boulevard Baltimore, MD 21230 Re: RADWP Addendum Area B: Sub-Parcel B1-1 Tradepoint Atlantic Sparrows Point, MD 21219 Dear Ms. Brown: On behalf of EnviroAnalytics Group, LLC (EAG), ARM Group LLC (ARM) is pleased to submit the following Response and Development Work Plan (RADWP) Addendum to the Maryland Department of the Environment (MDE) and the United States Environmental Protection Agency (USEPA). This RADWP Addendum is being submitted to document a proposed stormwater utility modification for the Sub-Parcel B1-1 development project on the Tradepoint Atlantic property located in Sparrows Point, Maryland. Project Background A RADWP is currently being implemented for Sub-Parcel B1-1. The previously submitted RADWP (Revision 1, dated August 30, 2019) was approved for implementation via email by the MDE on July 30, 2019. This RADWP Addendum requests agency approval to modify a stormwater utility alignment and tie-in location, and also addresses outstanding agency comments regarding updated notification requirements for the MDE and USEPA. This project also involves the removal of a limited area of existing surface engineering controls (i.e., caps) within Sub-Parcel B4-1 to install an underground utility, and the subsequent replacement with a new cap. As described below, any disturbed cap will be repaired to meet the specifications of the originally constructed cap. Project Description The proposed work will include modifications to a stormwater utility alignment and connection tie-in from the Sub-Parcel B1-1 facility. The proposed utility will traverse approximately 1,140 feet with the trench extending to depths between approximately 13 to 17 feet below ground surface.

Upload: others

Post on 24-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

9 1 7 5 G u i l f o r d R o a d • S u i t e 3 1 0 • C o l u m b i a , M D 2 1 0 4 6 v o i c e : ( 4 1 0 ) 2 9 0 – 7 7 7 5 • f a x : ( 4 1 0 ) 2 9 0 – 7 7 7 6 • w w w . a r m g r o u p . n e t

February 24, 2020

Ms. Barbara Brown Project Coordinator Maryland Department of the Environment 1800 Washington Boulevard Baltimore, MD 21230

Re: RADWP Addendum Area B: Sub-Parcel B1-1 Tradepoint Atlantic Sparrows Point, MD 21219

Dear Ms. Brown:

On behalf of EnviroAnalytics Group, LLC (EAG), ARM Group LLC (ARM) is pleased to submit the following Response and Development Work Plan (RADWP) Addendum to the Maryland Department of the Environment (MDE) and the United States Environmental Protection Agency (USEPA). This RADWP Addendum is being submitted to document a proposed stormwater utility modification for the Sub-Parcel B1-1 development project on the Tradepoint Atlantic property located in Sparrows Point, Maryland.

Project Background

A RADWP is currently being implemented for Sub-Parcel B1-1. The previously submitted RADWP (Revision 1, dated August 30, 2019) was approved for implementation via email by the MDE on July 30, 2019. This RADWP Addendum requests agency approval to modify a stormwater utility alignment and tie-in location, and also addresses outstanding agency comments regarding updated notification requirements for the MDE and USEPA. This project also involves the removal of a limited area of existing surface engineering controls (i.e., caps) within Sub-Parcel B4-1 to install an underground utility, and the subsequent replacement with a new cap. As described below, any disturbed cap will be repaired to meet the specifications of the originally constructed cap.

Project Description

The proposed work will include modifications to a stormwater utility alignment and connection tie-in from the Sub-Parcel B1-1 facility. The proposed utility will traverse approximately 1,140 feet with the trench extending to depths between approximately 13 to 17 feet below ground surface.

Page 2: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

ARM Project 160443M-18 2 February 24, 2020

A R M G r o u p L L C

This work will include the removal of existing pavement in select areas within Sub-Parcel B4-1, as well as trenching below the removed pavement cap to facilitate the installation of the stormwater utility. A replacement asphalt cap within Sub-Parcel B4-1 will be installed following utility installation. When the project is complete, the Sub-Parcel B4-1 will remain capped in its entirety by approved controls.

Appendix A contains the project construction drawing for the proposed work. Sheet C2.05A details the proposed stormwater utility extension and highlights the area where existing pavement within Sub-Parcel B4-1 is to be disturbed via a saw cut. Figure 1 provides an overview of the proposed work, incorporating the information shown on Sheet C2.05A to indicate the amended stormwater utility alignment as well as the associated limit of disturbance (LOD) within the Sub-Parcel B4-1 pavement cap. Note that, because the utility tie-in has changed, soil disturbance within a portion of the originally proposed stormwater utility tie-in location is no longer necessary.

Summary of Environmental Conditions

Proposed work extends outside of the area previously addressed by the Sub-Parcel B1-1 RADWP. Therefore, soil and groundwater data proximate to the proposed stormwater utility alignment and connection tie-in are provided herein.

Relevant soil boring locations from the Parcel B4 Phase II Investigation proximate to the utility alignment are shown on Figure 2. Figure S1 through Figure S4 present summaries of the soil sample results that exceeded the Project Action Limits (PALs). PAL exceedances in the soil samples relevant for the proposed utility project were limited to four inorganics (arsenic, hexavalent chromium, lead, and manganese), two semi-volatile organic compounds (SVOCs) (benzo[a]pyrene and naphthalene), three PCBs (Aroclor 1254, Aroclor 1260, and total PCBs), and Diesel Range Organics (DRO). During the Phase II investigation, elevated PCB concentrations were observed in soil boring B4-037-SB, as shown on Figure S2. The PCB impacts at this location have been fully delineated, and do not extend to the proposed work area. More information about the delineation of this location can be found in the document entitled Delineation Activities and Proposed Excavation of PCB Impacted Soil, dated March 22, 2017.

Figure S3 shows the location of a test pit used to investigate a potential stormwater tie-in location. During test pitting, isolated evidence of Non-Aqueous Phase Liquid (NAPL) was observed. According to Tradepoint Atlantic, light sheen was observed on the groundwater when scraping the western wall of the test pit. A concrete obstruction was believed to be the source of the observed NAPL and has since been removed and no longer appears to present a concern. Physical evidence of NAPL was also identified at B4-018-SB during the Phase II Investigation, and is addressed below.

Relevant groundwater sampling locations from the Area B Phase II Investigation proximate to the utility alignment are shown on Figure GW1. Aqueous PAL exceedances include three SVOCs

Page 3: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

ARM Project 160443M-18 3 February 24, 2020

A R M G r o u p L L C

(benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and cyanide), and DRO. Based on groundwater elevation data obtained from these locations during the Area B Groundwater Investigation, groundwater is likely to be encountered during ground intrusive work. All groundwater encountered will be managed in accordance with the protocols outlined in the RADWP, as specified below.

General Work Requirements

The construction of the proposed utility will remain subject to the development implementation protocols outlined in the RADWP, including but not limited to the following:

• Oversight will be provided by an Environmental Professional (EP) during ground intrusive construction activities to ensure compliance with soil screening requirements, and proper water management, and during cap repair to document proper cap thickness and construction. The EP will remain continuously on-site when the proposed utility work is within 50 feet of boring B4-018A-PZ to monitor for potential NAPL. Additional contingencies are discussed in the following sections.

• Development activities will be conducted under the property-wide Health and Safety Plan (provided as Appendix K of the RADWP).

• Any ground intrusive work will be performed using Modified Level D Personal Protective Equipment (PPE) in accordance with the requirements outlined in the approved PPE Standard Operational Procedure (SOP) (provided as Appendix E of the RADWP).

• Erosion and sediment controls will be installed as required.

• Dust monitoring will be implemented as required (see Section 5.1.5 of the RADWP).

• If dewatering is necessary, sampling and disposal will be conducted as required (see Section 5.2.2 of the RADWP).

• The Utility Excavation NAPL Contingency Plan will be implemented as required (provided as Appendix J of the RADWP). Additional contingencies are provided below.

In accordance with the RADWP, all utility trenches will be backfilled with bedding and backfill materials approved by the MDE. During field screening by the EP, if there is no evidence of significant contamination (i.e., elevated PID readings, staining, petroleum materials, etc.) the excavated materials may be used as backfill within the utility trenches, or placed elsewhere on the Sub-Parcel B1-1 under areas to be capped. The EP will monitor the soil excavation activities for signs of significantly contaminated material which may not be suitable for reuse. In general, all excavated materials are expected to be suitable for replacement within the utility trenches, with the possible exception of materials generated from the southern portion of the utility tie-in in the vicinity of soil boring B4-018-SB (as discussed below).

Page 4: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

ARM Project 160443M-18 4 February 24, 2020

A R M G r o u p L L C

Following utility installation, the section of disturbed cap within Sub-Parcel B4-1 will be replaced as originally constructed. This section of the development area was capped with heavy duty paving consisting of 4 inches of asphalt overlying 3 inches of graded aggregate base as reported in the Sub-Parcel B4-1 Development Completion Report (Revision 0, dated April 11, 2018). The EP will verify the proper cap thickness and construction.

Special Considerations – NAPL Contingency

Previous NAPL observations have been identified in the vicinity of the proposed utility tie-in at the southern end of the stormwater utility. During the Parcel B4 Phase II Investigation, NAPL was identified at B4-018-SB and subsequently delineated using temporary groundwater piezometers. Details regarding these observations and the NAPL delineation can be found in the Parcel B4 NAPL Delineation Completion Report (dated February 18, 2020). Figure 3 shows the southern end of the proposed utility alignment and tie-in location in relation to the NAPL delineation piezometers. It shows that the proposed utility is located outside of the delineated area, suggesting that significant impacts are not likely to be encountered as part of this utility installation. Table 1 is provided to summarize NAPL observations in both soil and groundwater at the delineation piezometers. As specified above, the Utility Excavation NAPL Contingency Plan will be implemented as required, should any NAPL be encountered.

Any notable or non-standard conditions, including but not limited to staining, strong odors, discoloration, evidence of NAPL, or other evidence of contamination which has not previously been characterized, will be reported to the MDE. If required, preventive measures will be implemented in accordance with the Utility Excavation NAPL Contingency Plan to prevent the discharge to, or migration of, petroleum product along a utility conduit via 1) the use of low permeability backfill or 2) installation of trench plugs along the alignment.

Institutional Controls

Based on MDE comments received via email dated November 12, 2019, this RADWP Addendum clarifies the differences between the agency notification requirements for the MDE and USEPA previously outlined in the original RADWP. These anticipated institutional controls were stated in Sections 3.3.2, 3.3.3, 5.4, and 5.5. All relevant sections of the RADWP are hereby amended with the revised institutional controls to include:

• Notice to the MDE at least 30 days prior to any future soil disturbances that are expected to breach the approved capping remedy (i.e., through the pavement cap or marker fabric in landscaped areas).

• Notice to the USEPA at least 30 days prior to any future soil disturbances that are expected to breach the approved capping remedy, only if the proposed duration of intrusive activity

Page 5: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

ARM Project 160443M-18 5 February 24, 2020

A R M G r o u p L L C

would exceed the allowable exposure duration determined in the SLRA and the contractor will not use the modified Level D PPE specified in the approved SOP.

The remaining institutional controls in the Sub-Parcel B1-1 RADWP (restriction on the use of groundwater, requirement for a HASP in the event of future excavations, etc.) remain as previously stated. If further clarification/revision is needed regarding the specific institutional controls language, it is anticipated that the final legal language can be refined prior to recordation of the institutional controls in the land records office of Baltimore County.

Schedule & Reporting

At this time, EAG is requesting approval for Tradepoint Atlantic to proceed with the proposed work outside of the original Sub-Parcel B1-1 boundary. It is not expected that the proposed intrusive construction activities will exceed the allowable exposure duration of 80 days specified in the Screening Level Risk Assessment Report for the Parcel B4 Remnant Area (Revision 1), dated November 21, 2019. However, as noted above, Modified Level D PPE will be used throughout the implementation of this fieldwork. Tradepoint Atlantic intends to commence work on the remaining utility installation work and tie-in following agency approval, with an estimated completion date of April 2020. The utility installation and tie-in will be covered by the same Development Completion Report as the remainder of Sub-Parcel B1-1. The Development Completion Report will also document the reinstallation of caps disturbed in Sub-Parcel B4-1 as part of this project.

If you have any questions, or if we can provide any additional information at this time, please do not hesitate to contact ARM Group LLC at 410-290-7775.

Respectfully Submitted, ARM Group LLC

Joshua M. Barna, G.I.T. T. Neil Peters, P.E. Staff Geologist Senior Vice President

Page 6: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

FIGURES

Page 7: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

Parcel B4

Parcel B5

Proposed Stormwater Utility Limit of Cap Disturbance

Sub-Parcel B4-1Sub-Parcel B1-1Original Stormwater Utility Tie-In

Location (no longer proposed)

Parcel Boundary

EnviroAnalytics GroupARM Project 160443-18

Tradepoint Atlantic

Sub-Parcel B1-1Stormwater Tie-In Location 1Figure

February 20, 2020

0 100 20050Feetq Baltimore County, MD

Page 8: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

@A@A

@A

@A

@A

B4-037-SB

B4-038-SB

B4-050-SB

B4-018-SB

B4-019-SB

@AB4-016-SB

EnviroAnalytics Group

ARM Project 160443-18

Tradepoint Atlantic

Sub-Parcel B1-1B4 Soil Boring Locations 2

Figure

February 20, 2020

0 100 20050Feetq Baltimore County, MD

@A B4 Phase II Soil Boring

Proposed Stormwater Utility

Limit of Cap Disturbance

Sub-Parcel B4-1

Sub-Parcel B1-1

Original Stormwater Utility Tie-In

Location (no longer proposed)

Parcel Boundary

Parcel B4

Parcel B5

Page 9: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

@A@A

@A

@A

@A

@A

B4-037-SB-1

B4-037-SB-6

B4-037-SB-10

B4-038-SB-1

B4-038-SB-5

B4-038-SB-10

B4-050-SB-1

B4-050-SB-5

B4-018-SB-1

B4-018-SB-5Benzo[a]pyrene: 2.3

B4-019-SB-1

B4-019-SB-5Benzo[a]pyrene: 6.7

B4-016-SB-1

B4-016-SB-5Naphthalene: 32.8

EnviroAnalytics Group

ARM Project 160443-18

S1FigureSub-Parcel B1-1

B4 SVOC Soil Exceedances (mg/kg) February 20, 2020

0 100 20050Feetq Tradepoint Atlantic

Baltimore County, MD

Parcel B4

Parcel B5

@A B4 Phase II Soil Boring

Proposed Stormwater Utility

Limit of Cap Disturbance

Sub-Parcel B4-1

Sub-Parcel B1-1

Original Stormwater Utility Tie-In

Location (no longer proposed)

Parcel Boundary

Page 10: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

@A@A

@A

@A

@A

@A

B4-037-SB-1Aroclor 1254: 84.0Aroclor 1260: 39.7PCBs (total): 123

B4-038-SB-1Aroclor 1254: 11.0Aroclor 1260: 6.01PCBs (total): 17.01

B4-050-SB-1

B4-018-SB-1

B4-019-SB-1

B4-016-SB-1EnviroAnalytics Group

ARM Project 160443-18

S2FigureSub-Parcel B1-1

B4 PCB Soil Exceedances (mg/kg) February 20, 2020

0 100 20050Feetq Tradepoint Atlantic

Baltimore County, MD

Parcel B4

Parcel B5

@A B4 Phase II Soil Boring

Proposed Stormwater Utility

Limit of Cap Disturbance

Sub-Parcel B4-1

Sub-Parcel B1-1

Original Stormwater Utility Tie-In

Location (no longer proposed)

Parcel Boundary

Page 11: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

@A

@A

@A

@A

B4-037-SB-1B4-037-SB-6DRO: 6,760B4-037-SB-10

B4-038-SB-1B4-038-SB-5B4-038-SB-10

@A

B4-016-SB-1B4-016-SB-5

B4-019-SB-1B4-019-SB-5

@AB4-018-SB-1B4-018-SB-5

B4-050-SB-1B4-050-SB-5

EnviroAnalytics Group

ARM Project 160443-18

S3FigureSub-Parcel B1-1

B4 DRO Soil Exceedances (mg/kg) February 20, 2020

0 100 20050Feetq Tradepoint Atlantic

Baltimore County, MD

@A B4 Phase II Soil Boring

Proposed Stormwater Utility

Limit of Cap Disturbance

Test Pit

Sub-Parcel B4-1

Sub-Parcel B1-1

Original Stormwater Utility Tie-In Location

(no longer proposed)

@ B4 Phase II Soil Boring (w/ evidence of NAPL)AParcel B4

Parcel B5

Parcel Boundary

Page 12: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

@A@A

@A

@A

@A

@A

B4-037-SB-1Arsenic: 3.5B4-037-SB-6Arsenic: 6.4B4-037-SB-10Arsenic: 4.0

B4-038-SB-1Arsenic: 13.4B4-038-SB-5B4-038-SB-10Arsenic: 4.7

B4-050-SB-1Arsenic: 20.5B4-050-SB-5

B4-018-SB-1Arsenic: 3.2Lead: 1,450B4-018-SB-5Arsenic: 17.8

B4-019-SB-1Arsenic: 4.5B4-019-SB-5Arsenic: 42.0

B4-016-SB-1Chromium VI: 8.0 J-Manganese: 28,800B4-016-SB-5Arsenic: 36.1

EnviroAnalytics Group

ARM Project 160443-18

Sub-Parcel B1-1B4 Inorganic Soil Exceedances (mg/kg) S4

Figure

February 20, 2020

0 100 20050Feetq Tradepoint Atlantic

Baltimore County, MD

Parcel B4

Parcel B5

@A B4 Phase II Soil Boring

Proposed Stormwater Utility

Limit of Cap Disturbance

Sub-Parcel B4-1

Sub-Parcel B1-1

Original Stormwater Utility Tie-In

Location (no longer proposed)

Parcel Boundary

Page 13: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

@A

SW-027-MWSVOC (NE)SVOC (NE)PCB (NE)TPHDRO: 67.5 JInorganic (NE)

@A

SW-028-MWSVOC (NE)SVOCBenz[a]anthracene: 0.053 JPCB (NE)TPHDRO: 144 JInorganicManganese (Total): 477

@A

SW-029-MWSVOC (NE)SVOCBenz[a]anthrancene: 0.066 JBenzo[a]pyrene: 1.2 JNaphthalene: 162PCB (NE)TPHDRO: 1,810 JInorganicCyanide: 1,420

EnviroAnalytics GroupARM Project 160443-18

GW1FigureSub-Parcel B1-1

Area B GW Exceedances (μg/L) February 20, 2020

0 100 20050Feetq Tradepoint Atlantic

Baltimore County, MD

Area B GW Sample

Proposed Stormwater Utility Limit of Cap Disturbance

Sub-Parcel B4-1Sub-Parcel B1-1Original Stormwater Utility Tie-In

Location (no longer proposed)

@A Parcel B4

Parcel B5

Parcel Boundary

NE = No Exceedances

Page 14: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

!?

!?

!?

!?

!?!?

!?

@A

B4-018-PZ

B4-018A-PZ

B4-018C-PZ

B4-018B-PZ

B4-018D-PZ

B4-018E-PZB4-018F-PZ

B4-018G-PZ

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/AirbusDS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Delineation Location

@A

Parcel B4Parcel B5

Parcel B10

Parcel B1

Parcel B18

B4-018-PZ3Tie-in and NAPL Delineation Comparison

February 20, 2020

qTradepoint Atlantic

ARM Project 160443M-18EnviroAnalytics GroupBaltimore County, MD

0 25 5012.5Feet

B4-018 NAPL Delineation Figure

@APhase II Boring/NAPLScreening Piezometer

!?Delineation Piezometer(NAPL Observed)

!?Delineation Piezometer(No NAPL)

Proposed Stormwater Utility

DelineationObstructions

Stockpile

Wet/Ponded Area

Page 15: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

TABLES

Page 16: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

Table 1 - B4-018 Delineation AreaSummary of NAPL Observations

Depth to NAPL in Piezometer

(ft. bgs)

Average Depth to Water (ft. bgs)

Measured NAPL Thickness in Water

Column (ft.)

NAPL Observations in Soil Core (ft. bgs)

B4-018-PZ 15 5-15 6.04 6.75 0.07 Sheen at 6-10; Product at 7.5-8.5B4-018A-PZ 15 5-15 4.16 4.71 0.97 Product at 6.5-8; Sheen at 8-15B4-018B-PZ 15 3-15 - 2.86 - Sheen at 5-13.5B4-018C-PZ 15 5-15 - 3.86 - No NAPL ObservedB4-018D-PZ 15 2-15 - 2.31 - Sheen at 4-15B4-018E-PZ 15 5-15 - 4.70 - No NAPL ObservedB4-018F-PZ 15 5-15 - 4.43 - Sheen at 7-15B4-018G-PZ 15 5-15 - 4.23 - Sheen at 3-7

SHADED = NAPL Detectionbgs = below ground surface

Sample ID

Piezometer Total Depth

(ft. bgs)

Screen Interval (ft. bgs)

3/4/2016-11/27/2019

ARM Project No. 160443M-18 Page 1 of 1 February 20, 2020

Page 17: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

APPENDIX A

Page 18: AR M G r o u p LLC€¦ · ARM Project 160443M-18 3 February 24, 2020 . AR M G r o u p LLC (benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and

XX

XX

X

X

XX

X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

XX

XX

X X X X X

XX

XX

X

XX

X

XXXX

XX

XX

XX

X

XXX

X

X

XXXX

XX

XX

XX

XXXXXXXXXXXXXXXXXXXXXXXXXXXX

I601

M600A

EX.OB-1

M600B

EX.OB-1

M600A

M600B

I601

SHEET NUMBER

JOB NO : SJ2035

PE:DATE : 07/12/2019

REVISIONS

CIV

ILC

ON

TRAC

TOR

CO

NSU

LTIN

G E

NG

INEE

RS

LICENSE #: 50283EXPIRES 12.15.2020

VW P

OR

T O

F EN

TRY

ARC

HIT

ECT:

FDN

STR

UC

T:

MEC

H:

ELEC

:

PLU

M:

D/B

STR

UC

T:

NAT

ION

AL D

ESIG

N B

UIL

D S

VCS

1184

0 BO

RM

AN D

RIV

EM

ARYL

AND

HEI

GH

TS, M

O 6

3146

BEN

JAM

IN V

ACC

A (P

) 314

-874

-307

2TE

RKI

NS,

INC

.11

EAS

T TR

OU

T R

UN

RO

ADEP

HR

ATA,

PA

1752

2JU

STIN

HAN

NA

(P) 7

17-6

06-7

946

GM

A AR

CH

ITEC

TS90

0 N

OR

TH R

OC

K H

ILL

RO

ADST

. LO

UIS

, MIS

SOU

RI 6

3119

TIM

SH

EEH

AN (P

) 314

-822

-519

1

S&S

STR

UC

TUR

ES, I

NC

P.O

. BO

X 20

0BA

ND

ON

, PA

1951

0TI

M S

EYLE

R (P

) 484

-955

-400

1

AED

IFIC

A C

ASE

ENG

INEE

RIN

G79

6 M

ERU

S C

OU

RT

FEN

TON

, MO

632

06D

ANA

TEN

NIL

L (P

) 636

-349

-160

0 X3

57

MC

NEA

LY E

NG

INEE

RIN

G11

457

OLD

E C

ABIN

RO

AD, S

TE. 3

50ST

. LO

UIS

, MO

631

41G

REG

SM

ITH

(P) 3

14-9

97-7

310

BALT

IMO

RE,

MAR

YLAN

D

PERMIT

900

NO

RTH

RO

CK

HIL

L R

OAD

ST. L

OU

IS, M

ISSO

UR

I 631

19(P

) 314

-963

-071

5 (F

) 314

-965

-475

8W

WW

.AR

CO

NAT

ION

AL.C

OM

FIR

E:M

OR

AN G

RO

UP

9204

BO

ND

ST.

OVE

RLA

ND

PAR

K, K

S 66

214

BRET

LO

GEM

ANN

(P) 3

12-2

88-5

888

GEO

:G

EO-T

ECH

NO

LOG

Y AS

SOC

.34

45 B

OX

HIL

L C

OR

POR

ATE

CTR

DR

ABIN

GD

ON

T, M

D 2

1009

THO

MAS

WIR

TH, P

E (P

) 410

-515

-944

634

45-A

BOX

HIL

L CO

RPOR

ATE

CENT

ER D

R.AB

ING

DO

N, M

ARYL

AND

210

09(P

) 410

-515

-900

0 (F

) 410

-515

-900

2W

WW

.MR

AGTA

.CO

M

PROFESSIONAL CERTIFICATION

OWNER/DEVELOPER

BUIL

DIN

G N

o.1

- 150

1 SH

IPYA

RD

RO

ADBU

ILD

ING

No.

2 - 1

401

SHIP

YAR

D R

OAD

SPAR

RO

WS

POIN

T, M

D 2

1219

8/14/2019110/17/20192

OFFSITE STORMDRAIN OUTFALL

C2.05A

EX. OB-1 CONNECTION NOTE:

EX. 36" STORM DRAIN CONNECTION NOTE:

G:\20104\CONSTRUCTION\SITE\ARCO\ARCO-20104-C-SDP-2.1A-SD & Grading.dwg, 12/13/2019 10:31:03 AM, ahalter,

1:1, Copyright 2019 Morris & Ritchie Associates, Inc.