February 24, 2020
Ms. Barbara Brown Project Coordinator Maryland Department of the Environment 1800 Washington Boulevard Baltimore, MD 21230
Re: RADWP Addendum Area B: Sub-Parcel B1-1 Tradepoint Atlantic Sparrows Point, MD 21219
Dear Ms. Brown:
On behalf of EnviroAnalytics Group, LLC (EAG), ARM Group LLC (ARM) is pleased to submit the following Response and Development Work Plan (RADWP) Addendum to the Maryland Department of the Environment (MDE) and the United States Environmental Protection Agency (USEPA). This RADWP Addendum is being submitted to document a proposed stormwater utility modification for the Sub-Parcel B1-1 development project on the Tradepoint Atlantic property located in Sparrows Point, Maryland.
Project Background
A RADWP is currently being implemented for Sub-Parcel B1-1. The previously submitted RADWP (Revision 1, dated August 30, 2019) was approved for implementation via email by the MDE on July 30, 2019. This RADWP Addendum requests agency approval to modify a stormwater utility alignment and tie-in location, and also addresses outstanding agency comments regarding updated notification requirements for the MDE and USEPA. This project also involves the removal of a limited area of existing surface engineering controls (i.e., caps) within Sub-Parcel B4-1 to install an underground utility, and the subsequent replacement with a new cap. As described below, any disturbed cap will be repaired to meet the specifications of the originally constructed cap.
Project Description
The proposed work will include modifications to a stormwater utility alignment and connection tie-in from the Sub-Parcel B1-1 facility. The proposed utility will traverse approximately 1,140 feet with the trench extending to depths between approximately 13 to 17 feet below ground surface.
ARM Project 160443M-18 2 February 24, 2020
A R M G r o u p L L C
This work will include the removal of existing pavement in select areas within Sub-Parcel B4-1, as well as trenching below the removed pavement cap to facilitate the installation of the stormwater utility. A replacement asphalt cap within Sub-Parcel B4-1 will be installed following utility installation. When the project is complete, the Sub-Parcel B4-1 will remain capped in its entirety by approved controls.
Appendix A contains the project construction drawing for the proposed work. Sheet C2.05A details the proposed stormwater utility extension and highlights the area where existing pavement within Sub-Parcel B4-1 is to be disturbed via a saw cut. Figure 1 provides an overview of the proposed work, incorporating the information shown on Sheet C2.05A to indicate the amended stormwater utility alignment as well as the associated limit of disturbance (LOD) within the Sub-Parcel B4-1 pavement cap. Note that, because the utility tie-in has changed, soil disturbance within a portion of the originally proposed stormwater utility tie-in location is no longer necessary.
Summary of Environmental Conditions
Proposed work extends outside of the area previously addressed by the Sub-Parcel B1-1 RADWP. Therefore, soil and groundwater data proximate to the proposed stormwater utility alignment and connection tie-in are provided herein.
Relevant soil boring locations from the Parcel B4 Phase II Investigation proximate to the utility alignment are shown on Figure 2. Figure S1 through Figure S4 present summaries of the soil sample results that exceeded the Project Action Limits (PALs). PAL exceedances in the soil samples relevant for the proposed utility project were limited to four inorganics (arsenic, hexavalent chromium, lead, and manganese), two semi-volatile organic compounds (SVOCs) (benzo[a]pyrene and naphthalene), three PCBs (Aroclor 1254, Aroclor 1260, and total PCBs), and Diesel Range Organics (DRO). During the Phase II investigation, elevated PCB concentrations were observed in soil boring B4-037-SB, as shown on Figure S2. The PCB impacts at this location have been fully delineated, and do not extend to the proposed work area. More information about the delineation of this location can be found in the document entitled Delineation Activities and Proposed Excavation of PCB Impacted Soil, dated March 22, 2017.
Figure S3 shows the location of a test pit used to investigate a potential stormwater tie-in location. During test pitting, isolated evidence of Non-Aqueous Phase Liquid (NAPL) was observed. According to Tradepoint Atlantic, light sheen was observed on the groundwater when scraping the western wall of the test pit. A concrete obstruction was believed to be the source of the observed NAPL and has since been removed and no longer appears to present a concern. Physical evidence of NAPL was also identified at B4-018-SB during the Phase II Investigation, and is addressed below.
Relevant groundwater sampling locations from the Area B Phase II Investigation proximate to the utility alignment are shown on Figure GW1. Aqueous PAL exceedances include three SVOCs
ARM Project 160443M-18 3 February 24, 2020
A R M G r o u p L L C
(benz[a]anthracene, benzo[a]pyrene, and naphthalene), two inorganics (total manganese and cyanide), and DRO. Based on groundwater elevation data obtained from these locations during the Area B Groundwater Investigation, groundwater is likely to be encountered during ground intrusive work. All groundwater encountered will be managed in accordance with the protocols outlined in the RADWP, as specified below.
General Work Requirements
The construction of the proposed utility will remain subject to the development implementation protocols outlined in the RADWP, including but not limited to the following:
• Oversight will be provided by an Environmental Professional (EP) during ground intrusive construction activities to ensure compliance with soil screening requirements, and proper water management, and during cap repair to document proper cap thickness and construction. The EP will remain continuously on-site when the proposed utility work is within 50 feet of boring B4-018A-PZ to monitor for potential NAPL. Additional contingencies are discussed in the following sections.
• Development activities will be conducted under the property-wide Health and Safety Plan (provided as Appendix K of the RADWP).
• Any ground intrusive work will be performed using Modified Level D Personal Protective Equipment (PPE) in accordance with the requirements outlined in the approved PPE Standard Operational Procedure (SOP) (provided as Appendix E of the RADWP).
• Erosion and sediment controls will be installed as required.
• Dust monitoring will be implemented as required (see Section 5.1.5 of the RADWP).
• If dewatering is necessary, sampling and disposal will be conducted as required (see Section 5.2.2 of the RADWP).
• The Utility Excavation NAPL Contingency Plan will be implemented as required (provided as Appendix J of the RADWP). Additional contingencies are provided below.
In accordance with the RADWP, all utility trenches will be backfilled with bedding and backfill materials approved by the MDE. During field screening by the EP, if there is no evidence of significant contamination (i.e., elevated PID readings, staining, petroleum materials, etc.) the excavated materials may be used as backfill within the utility trenches, or placed elsewhere on the Sub-Parcel B1-1 under areas to be capped. The EP will monitor the soil excavation activities for signs of significantly contaminated material which may not be suitable for reuse. In general, all excavated materials are expected to be suitable for replacement within the utility trenches, with the possible exception of materials generated from the southern portion of the utility tie-in in the vicinity of soil boring B4-018-SB (as discussed below).
ARM Project 160443M-18 4 February 24, 2020
A R M G r o u p L L C
Following utility installation, the section of disturbed cap within Sub-Parcel B4-1 will be replaced as originally constructed. This section of the development area was capped with heavy duty paving consisting of 4 inches of asphalt overlying 3 inches of graded aggregate base as reported in the Sub-Parcel B4-1 Development Completion Report (Revision 0, dated April 11, 2018). The EP will verify the proper cap thickness and construction.
Special Considerations – NAPL Contingency
Previous NAPL observations have been identified in the vicinity of the proposed utility tie-in at the southern end of the stormwater utility. During the Parcel B4 Phase II Investigation, NAPL was identified at B4-018-SB and subsequently delineated using temporary groundwater piezometers. Details regarding these observations and the NAPL delineation can be found in the Parcel B4 NAPL Delineation Completion Report (dated February 18, 2020). Figure 3 shows the southern end of the proposed utility alignment and tie-in location in relation to the NAPL delineation piezometers. It shows that the proposed utility is located outside of the delineated area, suggesting that significant impacts are not likely to be encountered as part of this utility installation. Table 1 is provided to summarize NAPL observations in both soil and groundwater at the delineation piezometers. As specified above, the Utility Excavation NAPL Contingency Plan will be implemented as required, should any NAPL be encountered.
Any notable or non-standard conditions, including but not limited to staining, strong odors, discoloration, evidence of NAPL, or other evidence of contamination which has not previously been characterized, will be reported to the MDE. If required, preventive measures will be implemented in accordance with the Utility Excavation NAPL Contingency Plan to prevent the discharge to, or migration of, petroleum product along a utility conduit via 1) the use of low permeability backfill or 2) installation of trench plugs along the alignment.
Institutional Controls
Based on MDE comments received via email dated November 12, 2019, this RADWP Addendum clarifies the differences between the agency notification requirements for the MDE and USEPA previously outlined in the original RADWP. These anticipated institutional controls were stated in Sections 3.3.2, 3.3.3, 5.4, and 5.5. All relevant sections of the RADWP are hereby amended with the revised institutional controls to include:
• Notice to the MDE at least 30 days prior to any future soil disturbances that are expected to breach the approved capping remedy (i.e., through the pavement cap or marker fabric in landscaped areas).
• Notice to the USEPA at least 30 days prior to any future soil disturbances that are expected to breach the approved capping remedy, only if the proposed duration of intrusive activity
ARM Project 160443M-18 5 February 24, 2020
A R M G r o u p L L C
would exceed the allowable exposure duration determined in the SLRA and the contractor will not use the modified Level D PPE specified in the approved SOP.
The remaining institutional controls in the Sub-Parcel B1-1 RADWP (restriction on the use of groundwater, requirement for a HASP in the event of future excavations, etc.) remain as previously stated. If further clarification/revision is needed regarding the specific institutional controls language, it is anticipated that the final legal language can be refined prior to recordation of the institutional controls in the land records office of Baltimore County.
Schedule & Reporting
At this time, EAG is requesting approval for Tradepoint Atlantic to proceed with the proposed work outside of the original Sub-Parcel B1-1 boundary. It is not expected that the proposed intrusive construction activities will exceed the allowable exposure duration of 80 days specified in the Screening Level Risk Assessment Report for the Parcel B4 Remnant Area (Revision 1), dated November 21, 2019. However, as noted above, Modified Level D PPE will be used throughout the implementation of this fieldwork. Tradepoint Atlantic intends to commence work on the remaining utility installation work and tie-in following agency approval, with an estimated completion date of April 2020. The utility installation and tie-in will be covered by the same Development Completion Report as the remainder of Sub-Parcel B1-1. The Development Completion Report will also document the reinstallation of caps disturbed in Sub-Parcel B4-1 as part of this project.
If you have any questions, or if we can provide any additional information at this time, please do not hesitate to contact ARM Group LLC at 410-290-7775.
Respectfully Submitted, ARM Group LLC
Joshua M. Barna, G.I.T. T. Neil Peters, P.E. Staff Geologist Senior Vice President
FIGURES
Parcel B4
Parcel B5
Proposed Stormwater Utility Limit of Cap Disturbance
Sub-Parcel B4-1Sub-Parcel B1-1Original Stormwater Utility Tie-In
Location (no longer proposed)
Parcel Boundary
EnviroAnalytics GroupARM Project 160443-18
Tradepoint Atlantic
Sub-Parcel B1-1Stormwater Tie-In Location 1Figure
February 20, 2020
0 100 20050Feetq Baltimore County, MD
@A@A
@A
@A
@A
B4-037-SB
B4-038-SB
B4-050-SB
B4-018-SB
B4-019-SB
@AB4-016-SB
EnviroAnalytics Group
ARM Project 160443-18
Tradepoint Atlantic
Sub-Parcel B1-1B4 Soil Boring Locations 2
Figure
February 20, 2020
0 100 20050Feetq Baltimore County, MD
@A B4 Phase II Soil Boring
Proposed Stormwater Utility
Limit of Cap Disturbance
Sub-Parcel B4-1
Sub-Parcel B1-1
Original Stormwater Utility Tie-In
Location (no longer proposed)
Parcel Boundary
Parcel B4
Parcel B5
@A@A
@A
@A
@A
@A
B4-037-SB-1
B4-037-SB-6
B4-037-SB-10
B4-038-SB-1
B4-038-SB-5
B4-038-SB-10
B4-050-SB-1
B4-050-SB-5
B4-018-SB-1
B4-018-SB-5Benzo[a]pyrene: 2.3
B4-019-SB-1
B4-019-SB-5Benzo[a]pyrene: 6.7
B4-016-SB-1
B4-016-SB-5Naphthalene: 32.8
EnviroAnalytics Group
ARM Project 160443-18
S1FigureSub-Parcel B1-1
B4 SVOC Soil Exceedances (mg/kg) February 20, 2020
0 100 20050Feetq Tradepoint Atlantic
Baltimore County, MD
Parcel B4
Parcel B5
@A B4 Phase II Soil Boring
Proposed Stormwater Utility
Limit of Cap Disturbance
Sub-Parcel B4-1
Sub-Parcel B1-1
Original Stormwater Utility Tie-In
Location (no longer proposed)
Parcel Boundary
@A@A
@A
@A
@A
@A
B4-037-SB-1Aroclor 1254: 84.0Aroclor 1260: 39.7PCBs (total): 123
B4-038-SB-1Aroclor 1254: 11.0Aroclor 1260: 6.01PCBs (total): 17.01
B4-050-SB-1
B4-018-SB-1
B4-019-SB-1
B4-016-SB-1EnviroAnalytics Group
ARM Project 160443-18
S2FigureSub-Parcel B1-1
B4 PCB Soil Exceedances (mg/kg) February 20, 2020
0 100 20050Feetq Tradepoint Atlantic
Baltimore County, MD
Parcel B4
Parcel B5
@A B4 Phase II Soil Boring
Proposed Stormwater Utility
Limit of Cap Disturbance
Sub-Parcel B4-1
Sub-Parcel B1-1
Original Stormwater Utility Tie-In
Location (no longer proposed)
Parcel Boundary
@A
@A
@A
@A
B4-037-SB-1B4-037-SB-6DRO: 6,760B4-037-SB-10
B4-038-SB-1B4-038-SB-5B4-038-SB-10
@A
B4-016-SB-1B4-016-SB-5
B4-019-SB-1B4-019-SB-5
@AB4-018-SB-1B4-018-SB-5
B4-050-SB-1B4-050-SB-5
EnviroAnalytics Group
ARM Project 160443-18
S3FigureSub-Parcel B1-1
B4 DRO Soil Exceedances (mg/kg) February 20, 2020
0 100 20050Feetq Tradepoint Atlantic
Baltimore County, MD
@A B4 Phase II Soil Boring
Proposed Stormwater Utility
Limit of Cap Disturbance
Test Pit
Sub-Parcel B4-1
Sub-Parcel B1-1
Original Stormwater Utility Tie-In Location
(no longer proposed)
@ B4 Phase II Soil Boring (w/ evidence of NAPL)AParcel B4
Parcel B5
Parcel Boundary
@A@A
@A
@A
@A
@A
B4-037-SB-1Arsenic: 3.5B4-037-SB-6Arsenic: 6.4B4-037-SB-10Arsenic: 4.0
B4-038-SB-1Arsenic: 13.4B4-038-SB-5B4-038-SB-10Arsenic: 4.7
B4-050-SB-1Arsenic: 20.5B4-050-SB-5
B4-018-SB-1Arsenic: 3.2Lead: 1,450B4-018-SB-5Arsenic: 17.8
B4-019-SB-1Arsenic: 4.5B4-019-SB-5Arsenic: 42.0
B4-016-SB-1Chromium VI: 8.0 J-Manganese: 28,800B4-016-SB-5Arsenic: 36.1
EnviroAnalytics Group
ARM Project 160443-18
Sub-Parcel B1-1B4 Inorganic Soil Exceedances (mg/kg) S4
Figure
February 20, 2020
0 100 20050Feetq Tradepoint Atlantic
Baltimore County, MD
Parcel B4
Parcel B5
@A B4 Phase II Soil Boring
Proposed Stormwater Utility
Limit of Cap Disturbance
Sub-Parcel B4-1
Sub-Parcel B1-1
Original Stormwater Utility Tie-In
Location (no longer proposed)
Parcel Boundary
@A
SW-027-MWSVOC (NE)SVOC (NE)PCB (NE)TPHDRO: 67.5 JInorganic (NE)
@A
SW-028-MWSVOC (NE)SVOCBenz[a]anthracene: 0.053 JPCB (NE)TPHDRO: 144 JInorganicManganese (Total): 477
@A
SW-029-MWSVOC (NE)SVOCBenz[a]anthrancene: 0.066 JBenzo[a]pyrene: 1.2 JNaphthalene: 162PCB (NE)TPHDRO: 1,810 JInorganicCyanide: 1,420
EnviroAnalytics GroupARM Project 160443-18
GW1FigureSub-Parcel B1-1
Area B GW Exceedances (μg/L) February 20, 2020
0 100 20050Feetq Tradepoint Atlantic
Baltimore County, MD
Area B GW Sample
Proposed Stormwater Utility Limit of Cap Disturbance
Sub-Parcel B4-1Sub-Parcel B1-1Original Stormwater Utility Tie-In
Location (no longer proposed)
@A Parcel B4
Parcel B5
Parcel Boundary
NE = No Exceedances
!?
!?
!?
!?
!?!?
!?
@A
B4-018-PZ
B4-018A-PZ
B4-018C-PZ
B4-018B-PZ
B4-018D-PZ
B4-018E-PZB4-018F-PZ
B4-018G-PZ
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/AirbusDS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Delineation Location
@A
Parcel B4Parcel B5
Parcel B10
Parcel B1
Parcel B18
B4-018-PZ3Tie-in and NAPL Delineation Comparison
February 20, 2020
qTradepoint Atlantic
ARM Project 160443M-18EnviroAnalytics GroupBaltimore County, MD
0 25 5012.5Feet
B4-018 NAPL Delineation Figure
@APhase II Boring/NAPLScreening Piezometer
!?Delineation Piezometer(NAPL Observed)
!?Delineation Piezometer(No NAPL)
Proposed Stormwater Utility
DelineationObstructions
Stockpile
Wet/Ponded Area
TABLES
Table 1 - B4-018 Delineation AreaSummary of NAPL Observations
Depth to NAPL in Piezometer
(ft. bgs)
Average Depth to Water (ft. bgs)
Measured NAPL Thickness in Water
Column (ft.)
NAPL Observations in Soil Core (ft. bgs)
B4-018-PZ 15 5-15 6.04 6.75 0.07 Sheen at 6-10; Product at 7.5-8.5B4-018A-PZ 15 5-15 4.16 4.71 0.97 Product at 6.5-8; Sheen at 8-15B4-018B-PZ 15 3-15 - 2.86 - Sheen at 5-13.5B4-018C-PZ 15 5-15 - 3.86 - No NAPL ObservedB4-018D-PZ 15 2-15 - 2.31 - Sheen at 4-15B4-018E-PZ 15 5-15 - 4.70 - No NAPL ObservedB4-018F-PZ 15 5-15 - 4.43 - Sheen at 7-15B4-018G-PZ 15 5-15 - 4.23 - Sheen at 3-7
SHADED = NAPL Detectionbgs = below ground surface
Sample ID
Piezometer Total Depth
(ft. bgs)
Screen Interval (ft. bgs)
3/4/2016-11/27/2019
ARM Project No. 160443M-18 Page 1 of 1 February 20, 2020
APPENDIX A
XX
XX
X
X
XX
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XX
XX
X X X X X
XX
XX
X
XX
X
XXXX
XX
XX
XX
X
XXX
X
X
XXXX
XX
XX
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
I601
M600A
EX.OB-1
M600B
EX.OB-1
M600A
M600B
I601
SHEET NUMBER
JOB NO : SJ2035
PE:DATE : 07/12/2019
REVISIONS
CIV
ILC
ON
TRAC
TOR
CO
NSU
LTIN
G E
NG
INEE
RS
LICENSE #: 50283EXPIRES 12.15.2020
VW P
OR
T O
F EN
TRY
ARC
HIT
ECT:
FDN
STR
UC
T:
MEC
H:
ELEC
:
PLU
M:
D/B
STR
UC
T:
NAT
ION
AL D
ESIG
N B
UIL
D S
VCS
1184
0 BO
RM
AN D
RIV
EM
ARYL
AND
HEI
GH
TS, M
O 6
3146
BEN
JAM
IN V
ACC
A (P
) 314
-874
-307
2TE
RKI
NS,
INC
.11
EAS
T TR
OU
T R
UN
RO
ADEP
HR
ATA,
PA
1752
2JU
STIN
HAN
NA
(P) 7
17-6
06-7
946
GM
A AR
CH
ITEC
TS90
0 N
OR
TH R
OC
K H
ILL
RO
ADST
. LO
UIS
, MIS
SOU
RI 6
3119
TIM
SH
EEH
AN (P
) 314
-822
-519
1
S&S
STR
UC
TUR
ES, I
NC
P.O
. BO
X 20
0BA
ND
ON
, PA
1951
0TI
M S
EYLE
R (P
) 484
-955
-400
1
AED
IFIC
A C
ASE
ENG
INEE
RIN
G79
6 M
ERU
S C
OU
RT
FEN
TON
, MO
632
06D
ANA
TEN
NIL
L (P
) 636
-349
-160
0 X3
57
MC
NEA
LY E
NG
INEE
RIN
G11
457
OLD
E C
ABIN
RO
AD, S
TE. 3
50ST
. LO
UIS
, MO
631
41G
REG
SM
ITH
(P) 3
14-9
97-7
310
BALT
IMO
RE,
MAR
YLAN
D
PERMIT
900
NO
RTH
RO
CK
HIL
L R
OAD
ST. L
OU
IS, M
ISSO
UR
I 631
19(P
) 314
-963
-071
5 (F
) 314
-965
-475
8W
WW
.AR
CO
NAT
ION
AL.C
OM
FIR
E:M
OR
AN G
RO
UP
9204
BO
ND
ST.
OVE
RLA
ND
PAR
K, K
S 66
214
BRET
LO
GEM
ANN
(P) 3
12-2
88-5
888
GEO
:G
EO-T
ECH
NO
LOG
Y AS
SOC
.34
45 B
OX
HIL
L C
OR
POR
ATE
CTR
DR
ABIN
GD
ON
T, M
D 2
1009
THO
MAS
WIR
TH, P
E (P
) 410
-515
-944
634
45-A
BOX
HIL
L CO
RPOR
ATE
CENT
ER D
R.AB
ING
DO
N, M
ARYL
AND
210
09(P
) 410
-515
-900
0 (F
) 410
-515
-900
2W
WW
.MR
AGTA
.CO
M
PROFESSIONAL CERTIFICATION
OWNER/DEVELOPER
BUIL
DIN
G N
o.1
- 150
1 SH
IPYA
RD
RO
ADBU
ILD
ING
No.
2 - 1
401
SHIP
YAR
D R
OAD
SPAR
RO
WS
POIN
T, M
D 2
1219
8/14/2019110/17/20192
OFFSITE STORMDRAIN OUTFALL
C2.05A
EX. OB-1 CONNECTION NOTE:
EX. 36" STORM DRAIN CONNECTION NOTE:
G:\20104\CONSTRUCTION\SITE\ARCO\ARCO-20104-C-SDP-2.1A-SD & Grading.dwg, 12/13/2019 10:31:03 AM, ahalter,
1:1, Copyright 2019 Morris & Ritchie Associates, Inc.