Aakar Abhinav Consultants Pvt. Ltd. (AACPL) is an ISO 9001:2008 Certified company and isone of the leading Engineering Consulting Firms with 18 Years of successful track record ofworking in India as well as International Markets. Established in the year 1998, AACPL has itscorporate office at Navi Mumbai and branch offices in major Indian cities like Thane,Solapur, Bellary, Yadgir, Bidar, Kalburgi, Patna, Gaya and a state-of-the-art lab facility at NaviMumbai.
A team of 130 professionals support our Indian & International operations for our esteemedclients in sectors such as transportation planning, traffic engineering, architecture, urbaninfrastructure and project management. Our wide range of customers include national andlocal governments, public and private utilities, industrial and commercial companies,developers, banks as well as private entrepreneurs.
We provide cost effective and value-driven consultancy services customized for specificprojects and typical requirements. AACPL’s customer focused approach and continuousquest for achieving world class quality have enabled us to attain and sustain lead inEngineering Consultancy in the Indian subcontinent.
MISSION STATEMENT
At AACPL, we believe in progress driven by unbiased service to the community andleveraging our core strengths to attain leadership.
NATION -WIDE RESOURCES
We have over 130 staff working in public and private sector projects in India and overseascountries including Indonesia, Ethiopia, Mauritius, Zambia etc. Our team consists ofaccomplished Engineers, planners, architects, surveyors, designers, consultants andmarketing professionals spread across 8 corporate and regional offices.
-2-
SERVICES
SURVEY & GEOTECH Topographic Survey
Soil Investigation
GIS Mapping
Household Survey
Soil & Material Testing
TRAFFIC ENGINEERING & TRANSPORTATION PLANNING
Traffic Studies
Traffic Impact Assessment
Traffic Projection & Simulation
Parking Demand Survey
Traffic Management Plan
City Mobility Plan
Public Transportation Service Plan
ARCHITECTURE
Architectural Design
Site Planning
Landscape Design
Signage Design
Structural Design
URBAN PLANNING
Master Planning
Development Plans
Development Control Rules
Land Use Plans
Tourism Plans
-3-
City Development Plans
PROJECT MANAGEMENT
Project Management
Third Party Inspection
Quality Assurance & Quality
Control Management
-4-
CLIENTELE
-5-
-6-
MILESTONES
Completed more than 1200 projects.
2700 km of Engineering Survey of roads & 17000 Hectares of Land Survey.
2500 km of Design & Cost estimates of road projects.
500 km of Railway Engineering Surveys.
About 300 traffic studies.
Design of Storm water drainage and Rainwater Harvesting schemes.
Completion of P.M.C. Services for projects worth INR 500 Crore.
Ongoing PMC services for projects worth about INR 700 Crore.
Architectural design for about 110 residential and commercial projects.
Signage Design for about 35 important projects.
Design of manual for Signage system for PWD, Government of Maharashtra.
Two Tourism Master Plans for ECO sensitive Zones.
Tourism Master Plans for four districts of Maharashtra.
-7-
HUMAN RESOURCES
We are a team of experienced and qualified personnel whose prime concern is delivering
best possible solutions. The team members are as under:
1. Amol S. Khair – Managing Director
B.E. (Civil), Master of Planning with Gold Medal & MBA (Finance),
Over 25 years of experience in planning and design of transport infrastructure projects and
tourism infrastructure projects. He looks after the projects related to Engineering surveys,
Traffic & Transportation studies, Urban, Regional and Transportation Planning and Highway
Engineering, bridges etc.
2. Mrs. Neha Khair - Director
Architect with gold medal, Master of Design (Visual Communication) from IIT Mumbai, and
has more than 22 years of experience in Graphic Designing and Architectural projects. She
looks after various projects related to the Multimedia Presentations, Architecture and
Graphic Designing and contributes in the Urban planning and tourism projects.
Office Staff:
Post Graduate Engineers/ Planners : 7 Nos.
Graduate Engineers : 6 Nos.
Diploma Engineers : 5 Nos.
Post Graduate Architects / Planners : 2 Nos.
Architects : 2 Nos.
Post Graduate (Others) : 4 Nos.
Draftsman : 6 Nos
Total 32 Nos.
-8-
Project Management Engineers:
Graduate Engineers : 22 Nos.
Diploma Engineers : 19 Nos.
Supervisors : 24 Nos.
Total 65 Nos.
Engineering Survey Teams:
GPS / Total Station Surveyors : 4 Nos.
Survey Assistants : 3 Nos.
Traffic Survey Supervisors : 2 Nos.
Supporting Staff : 23 Nos
-9-
OFFICE INFRASTRUCTURE
We have several indigenously made soft wares, which are useful for providing simple
solutions to complex problems.
The latest version of MX software: MX(ROAD)-V8.0-XM, MX(RENEW)-V8.0-XM &
MX(URBAN)- V8.0-XM Edition for the land Survey, Highway Design and Pavement Renewal
is also available in the office. This sophisticated tool helps AAKAR in arriving at the correct
Triangulation, preparation of Ground Terrain Model, quick, economical and safe road
alignments and quantity estimation with option of various road alignment alternatives as
well as design modules. The MX–Urban software helps in designing the utilities along the
Urban roads.
Power Civil:
Five Licenses for Power Civil (2006) helps in analysing ground data and preparation of
DTM model. The software helps in design & planning of layers of large areas and
plots division and also designing of water supply, sewer line, channel & road.
E Surveying Solution:
“E sections” is a complete section creation and management solution designed to
help engineers, surveyors and designers to create industry standard drawings and to
generate instant calculation reports related to Road / Railway lines / irrigation /
pipeline design / sewer network project.
The section data in alignment form in CAD can be directly imported into E sections to
create cross sections and longitudinal sections.
AutoCAD:
Latest AutoCAD 2013 full versions licensed copies.
-10-
DETAILS OF EQUIPMENTS & SOFTWARES
S. No. Description No. & Specifications1 Software’s 1. Latest version of MX Software’s :
MX(ROAD)-V8.0-XM,MX(RENEW)-V8.0-XM &MX(URBAN)- V8.0-XM Edition
2. Power CivilFive Licenses for Power Civil
3. Building Design and Quantity Estimation4. Autocad 2014
Five Licenses5. Autocad 2014 LT
Ten Licenses6. Autocad 2013
Ten Licenses7. Autocad 2009
Two Licenses8. MS-Office Software : 15 Nos. of User9. PC ARCH10. Hit-Office Business Version-Inventory (Quantity & Estimation)11. Sketch UP12. Cube software for Traffic studies (version 6.1)
13. Vissim Softwaresi) 3D Networks, Vehicles., Objectii) COM Interface:iii) Dynamic Assignment.Iv) VlSSlGv) Street Trafficvi) Parkingvii) V3DM
14. Geodimeter 2.015. Datalink DLOI V 2.016. TRANSYT software17. Esurvey Cad
2 Portable AxleLoad Pad(Imported type)
Capacity for Single wheel - 10 T.Total weighing range upto 40 T. Including Digital IndicatorModel No. SPET-0436
3 BenkelmanBeam -1 Nos.
Portable three Fold type Benkelman Beam Deflection Test Apparatusmade of Aluminium complete with dial guage duly calibrated. Supplied inwooden carrying case.
-11-
4 Total Station - 8Nos
Pentex PCS-325 – 1 No.Trimble – 4 Nos.Trimble 3603 DRTrimble 3603 DRTrimble 5603 DRTrimble 3603 DRLieca TC 407– 2 Nos.Lieca TC 407Lieca TC 407Lieca TC 503 (TS-02 Power5")– 1 No.
5 Auto Levels - 4Nos
Sokkia – 3 Nos.C 410C 410C 410Pentex – 1 No.
6 State of the artDGPS system
Nikkon – DGPSEPOCH-10i) 7548
ii) 8264
iii) 83547 Hand Held
GlobalPositioningsystem
1 No.
8 Plain tableequipment’s 1 No.
9 VIDEO Camera -13 Nos.
AXIS P 1343 Day/Night : 2 NosSr. No. 00408CA27A06AXIS Verso IP 66 Outdoor Housing with Wall MountSr. No. 111041570087TP Link Poe InjectorSr. No. 11972800235Panasonic : KEW114 L Series : 7 NosPanasonic: Model no .INVR-08 : 4 Nos.
-12-
10 Computers a) DesktopsIntel (R) Core (TM) 2 Duo CPU - 11 Nos.Pentium (R) 4 CPU - 8 Nos.Intel (R) Pentium (R) Dual CPU - 7 Nos.Intel (R) Core (TM) I5 CPU - 3 Nos.Intel (R) Pentium (R) 4 CPU - 2 Nos.Intel (R) I5 - 1 Nos.Intel (R) I6 - 1 Nos.b) Laptops – 7 Nos
11 Scanner /Printers
HP Scan-jet 2400C - A- 4 size colour Scanner.- 1 No.HP 915 All - in - One- A4 size Scan - Copy - Colour Printer - 1 No.HP 500 design-jet - A-0 Size Plotter - 1 No.HP Office jet 7000 - A-3 size Colour printer - 1 NoHP Laser-jet 1015 - 1018 - A-4 size B/W printer - 3 Nos.HP LaserJet CP1525n - A4 size Colour Laser Printer - 1 No.
-13-
LOCATIONS
Registered Office:
C- 401-410, Kukreja Centre, plot no 13,
Sector 11, CBD Belapur, Navi Mumbai- 400 614
Gaya Office:
LIG 70, Housing Board Colony,
AP Colony, Gaya, 823001
Solapur Office:
Shop No.20/21, Cross Road,
Commercial Complex,
Near Old Pune Naka,
Solapur– 413 003
Bellary Office:
111A/115A, Nehru Colony, 3rd Cross,
Near Transit Survey Station,
Bellary - 583101
Patna Office:
B-123, Ground Floor, Buddha
Colony, East Boring Canal
Road, Patna– 800 001.
Yadgir Office:
Plot no 11, Vishwas Ganga nilaya
Chiranjivi Nagar, Opp. Bus depo
Yadgir - 585202
Bidar Office:
R/O H/N 519-1-274 Radha
Swami Nivas Shivnagar South
Bidar - 585401
Kalburgi Office:
H. No. 6, Shanti Nagar,
Near MSK Mill
Kalburgi - 585103
-14-
Communication:
Telephone : +91-22-2758 0192 / 2757 2012 Tele fax : +91-22-2757 2533
Mobile Number :
Amol Khair : +919820286750
Neha Khair : +919820131260
E-mail : [email protected]
Website : www.aakarabhinav.com
-15-
ASSIGNMENTS COMPLETED
TRAFFIC AND TRANSPORTATION STUDIES:
Sr. No. Project Name Client
1 Accident cost study for Ministry of Surface transport inassociation With Tata Consultancy Services.
Tata Consultancy Services
2 Worli - Bandra Sea link in association with Transport &Planning Group and Indian Institute of Technology, Mumbai. MSRDC
3 Widening and Strengthening of Satara- Kolhapur Section ofNH-4
4 Traffic Study for before and after opening of J.J. Flyover
5 Traffic studies for Integrated Road Development for citiesPune, Baramati, Solapur & Nandurbar, Aurangabad.
6 Business plan for space below flyovers
7 Traffic study for Ghoti-Sinnar-Aurangabad-Amaravati-Nagpur corridor, & Kalyan-Shil Road.
8 Prioritization study at 88 retail outlets of Bharat petroleumCorporation in Mumbai
Bharat petroleum Corporation
9 Prioritization study for NH7 from Nagpur to Kanyakumariand on NH-47 from Salem to Ernaculum – 2000 Kms.
NHAI / SPAN Consultants
10 Ro-Ro Service between Bhavnagar (Ghogha) & Dahej Gujarat Maritime Board
11 Traffic studies for MRTS Nagpur. CRRI.
12 Traffic studies for Integrated Road Development Solapur city CRISIL.
13 Traffic study for Chiplun-Karad Road, Karmala Bypass, Ahmednagar-Bhoom Road.
SICOM.
14 Traffic study for Talegaon - Chakan - Shikrapur road. Mohol - Mandrup road, SH-6.
IRB.
15 Bankability proposal for BOT Operations of Truck TerminalVashi
Yash Marketing Services Pvt.Ltd.
16 Traffic study for Pune-Pirangut Road. HCC.
17 Traffic study for widening and strengthening of SH-46 nearVishakhapattanam
Roads & Building Department,Government of Andhra Pradeshin association with CRISIL
18 Traffic study for widening and strengthening of Hyderabad-Karimnagar-Ramagundam road in association with CRISIL.
Roads & Building DepartmentGovernment of Andhra Pradesh
19 Mapping of road based container movement for the portsin Western regions JNPT, Mundra, Pipavav, & Kandla,
Mumbai Port Trust & Eastern regions Calcutta and Haldiya Traffic study to estimate the catchment area of southern
ports such as Cochin, Turicorin & Chennai.
i-maritime Consultancy Pvt. Ltd
20 Traffic study for catchment area of Sabarmati ICD Ltd. D.P. World.
-16-
21 Traffic study for proposed traffic diversion scheme alongproposed Varsova – Andheri – Ghatkopar Metro Link duringconstruction phase.
Reliance Energy Ltd., inassociation with MVAConsultants, Hong Kong.
22 Traffic study & preparation of traffic management plan forproposed residential complex at Kandivali.
Lokhandwala ConstructionIndustries Pvt. Ltd.
23 Traffic study for Demand Estimation for New Road & RailTerminal in MIHAN, Nagpur.
Nagpur SICAL Gupta LogisticsLimited
24 Traffic study for catchment areas of Mundra, Kandla, PipavPort for setting up of new CFS.
KPMG
25 Traffic study for preparation of traffic management schemeat Hiranandani Garden, Powai
Hiranandani Developers
26 Pre – Traffic survey and analysis & traffic revenueprojections for Design and construction of WFSL.
Hindustan Construction Co. Ltd.
27 Demand Assessment study for proposed Railway Siding inShendra MIDC.
Infrastructure DevelopmentCorporation Ltd (IL&FS)
28 Pre-tender services for Repair, Maintenance & operation ofParking lot with access road at Truck Terminal KalamboliNavi Mumbai
Thakur Infrastructure
29 Preparation of Mobility plan for Navi Mumbai NMMC
30 Traffic Study for NH-12 two laning / four laning for sectionfrom Baura to Rajasthan Border as part of DPR.
NHAI along with TechnogemConsultants Pvt. Ltd.
31 Traffic Demand estimates for proposed Integrated BusTerminus Wadala.
India Bulls
32 Traffic Studies for funding of Buses for Uttarakhand underPhase-II scheme - JNNURM.
IDBI Capital/ UttarakhandGovernment
33 Traffic Study for Navi Mumbai Coastal Road. NMMC.
34 Traffic Volume and Occupancy Survey for the Mass TransitSystem for Hinjewadi at Pune.
TRIL
36 Market Research Surveys for the JNPT, Chennai, Mundra andPipavav ports.
CRISIL
37 Traffic study for the proposed connectivity to Lavasa. HCC.
38 Traffic Study for the proposed MRTS system in Hinjewadiarea, Pune
Tata Reality and InfrastructureLtd.
39 Estimation of the traffic along the alignments specified forproper dispersal from and to the traffic generators at BandraKurla Complex.
40 Traffic Management Report for Residential Complex atMohali, Punjab.
Architect Hafeez Contractor
41 Consultancy Services for conducting Origin Destination(O.D), other traffic & transportation surveys required toprepare BRT service plan for its BRTS corridors and toprepare BRT service plan.
Pimpri Chinchwad MunicipalCorporation (PCMC)
-17-
42 Traffic Survey for Mumbai Trans Harbour Link JICA
43 Traffic Study for Novelty Cinema Goodwill
44 Traffic Study for Building No - 39 of Raheja Vihar, Powai K.Raheja
45 Traffic Study for east west connection over Western Rilwaysnear at Jacob Circle
K.Raheja
46 Traffic Survey project for LBS Marg IRSM, Chennai
47 Traffic Study to carry out a comprehensive performanceanalysis for upcoming project in Kandivili (East), Mumbai.
Mahindra & Mahindra Ltd.
48 Bengal SREI – Traffic survey & Demand Assessment Study atTewar Village, Jabalpur for Jabalpur Municipal Corporation
SREI Infrastructure Finance Ltd.
49 Traffic assessment study at Existing Toll Plazas on SH 225 Kalyan Toll Highways Pvt. Ltd.
50 Traffic Analysis for proposed development at SP InfocityChennai
Shapoorji Pallonji InvestmentAdvisors Pvt. Ltd.
TOLL REVENUE STUDIES:
Sr. No. Project Name Client
1 Traffic study for the assessment of toll revenue at Vashi toll plaza on Sion-Panvel Expressway Mulund Toll Plaza on Eastern Express Highway.
MSRDC
2 Traffic Study for the assessment of toll revenue for ROB projectssuch as Phursungi, Daund, Khedgaon, Nepti, Dehre & Rahuri.
3 Traffic study for the assessment of Toll revenue for the Thane-Ghodbunder road.
4 Traffic study for 4/6 laning of Panvel-Indapur section of NH-17.
Dhule Maharashtra border section of NH-3,
Ahmedabad to Dandi National Highway for the heritage route.
NHAI
5 Traffic study and Toll revenue estimates for Gandhidham –Samaklyali road & Chitradurga – Tumkur road
IDFC
6 Traffic Study and toll revenue estimates for Pune – Satara road. India Bulls.
7 Traffic study for Jaipur bypass Pratibha Industries.
8 Traffic study and toll revenues studies for:
Pune – Hadapsar – Saswad Road.
Deoli-Kota section on NH-12.
Bhubneshwar-Puri Section of NH-203.
Sambalpur-Baragarh-Orissa/Chhatisgarh Border Sec. of NH-6.
Madhucon Projects Ltd
-18-
9 Traffic Study and Site Survey for :
2 Laning of Shillong Bypass Connecting NH-40 and NH-44.
4 Laning of Jorbat- Shillong on NH-40.
10 Traffic Study for BOT Projects:
Near Pune-Nashik
Gandhidham-Mundra Stretch.
Sambalpur - Baragarh NH-6.
Belgaum Khanpur - Goa Border NH-4A.
Jetpur Somnath Section of NH-8D on BOT Basis.
Jhansi Khajuraho Section of NH-75 at Madhya Pradesh.
Raebareli - Allahabad NH-24B.
Varanasi - Gorakhpur NH-29.
Kanpur - Kabrari NH-86.
Mohania - Arrah NH-30 on BOT Basis.
Mhow-Ghatabillod Section of SH-27.
Beawar - Pali - Pindwara Section of NH-14.
Rajasthan, Raipur - Bilaspur Section of NH-200 at Chhattisgarh.
11 Traffic studies for toll revenue assessment on following nationalhighways: Ahmedabad - Vadorara Section, Nellore Bypass, Pune - Solapur Road, Belgaum – Dharwad, Tumkur - Chitradurg section, Poonamallee - Walajapet Section, Beawar - Pali - Pindwara Section, Ichhapuram - Anandpuram Section, Panvel - Indapur Section, Bagodara - Dhandhuka – Bhavnagar.
Tata Realty &Infrastructure Ltd.
12 Traffic Study for Ludhiana-Talwandi Bhai Sec. of NH-95, Punjab. IFCI Limited.
13 Technical Investigation of Hinjewadi Inter section Improvement. PS Toll Road Pvt. Ltd./Reliance InfrastructureLtd.
14 Toll Revenue Analysis for Relocation of Toll Plaza at KhedShivapur
PS Toll Road Pvt. Ltd./Reliance InfrastructureLtd.
15 Traffic Study for Mangawan–MP/UP Border Section of NH-27. Unity Infra projects Ltd.
16 Traffic Study for Gwalior - Shivpuri Section of NH-3.
Shivpuri - Dewas Section of NH-3 on DBFOT Basis
Reliance InfrastructureLtd.
-19-
17 Traffic survey, Engineering Topo survey & Geo Tech Survey forproposed ropeway project at Vashi
TRIL
18 Traffic Study for Jabalpur - Lakhandon Section of NH-7.
Bagodara - Dhandhuka - Bhavnagar Road
JMC Project (I) Ltd.
BASED ON OUR TRAFFIC STUDIES, THE FINANCIAL INSTITUTIONS /
BANKS HAVE FUNDED FOLLOWING PROJECTS
Sr. No. Name of the Project BOT Operator Agency Total Cost ofProject(INR in Cr.)
Funded by
1 Bandra-Worli Sea link Project M.S.R.D.C 700 Various Banks
2 Widening & strengthening ofMohal Mandrup
M/s. Ideal Road Builders 82 State Bank ofIndia
3 Pandharpur Bypass M/s. Ashoka Buildcon. 16 SICOM
4 Talegaon-Chakan Shikrapurroad
M/s. Ideal Road Builders 23.5 Punjab NationalBank
5 Improvement to Truck TerminalVashi
M/s. Yash MarketingService Pvt. Ltd.
10.0 Canera Bank
TRAFFIC IMPACT ASSESSMENT STUDIES:
Sr. No. Project Name Client
1 Traffic study and Traffic Management Plan for proposed I.T. SEZ inT.T.C. area Navi Mumbai.
K. Raheja Corporation
2 Traffic Impact Assessment study for proposed IT/ITES SEZ inAiroli,
Proposed Resi. & Public Parking Building at Worli, (Metal Box). Composite Building at A.L. Nair Marg, Jacob Circle, Mumbai.
3 Traffic study preparation of Traffic management plan forLokhandwala residential complex at Kandivali.
LokhandwalaConstructionIndustries Pvt. Ltd.
4 Traffic impact assessment study for Lokhandwala Infrastructure forproposed development at Chinchpokali – Mumbai.
LokhandwalaInfrastructure
5 Traffic impact assessment study for In-Orbit malls for their twomalls in Vadodara.
In-orbit malls
6 Traffic Impact Assessment study for Lodha Acqua on W.E. Highway,Dahisar, & proposed development for Lodha Imperia at GirishTextiles, Bhandup.
Lodha Developers
7 Traffic Demand Estimation and the Traffic Impact Assessment forthe Project at Washington Estate Mumbai.
Lodha Developers Ltd.
-20-
8 Public Parking Demand and Traffic Impact Assessment forProposed Residential Building at Guffic Andheri.
Lodha Impression RealEstate Pvt. Ltd.
9 Traffic Demand estimation and the Traffic Impact Assessment forthe project Lodha Luxuaria for Residential Building at Majiwada atThane
Shree SainathEnterprises (Lodha)
10 Traffic impact assessment study for the proposed developmentalong EEH / Kalwa Creek.
Kapstone.-RustoomjeeDevelopers
11 Traffic impact assessment study for India Bulls for proposedcommercial Complex at Elphinstone Mills Lower Parel, Mumbai.
India Bulls
12 Traffic impact assessment study for Hiranandani Up-scale for theirproposed development at Chennai.
Hiranandani Up-scale
13 Traffic impact assessment and parking circulation plans Corporate ParkPeninsula.
14 Traffic Impact Assessment for development on plot situated atPatel Estate Road, Jogeshwari west.
Patel Reality.
15 Traffic Impact assessment and traffic circulation plan for proposedCricket stadium in Pune (Subroto Rai Stadium)
Maharashtra CricketAssociation.
16 Traffic Impact assessment for Cerebuim SEZ, Pune, Kumar Builders.
17 Traffic Impact Assessment and Traffic Management Scheme for theProposed School Building at Nahar Amrit Shakti at Chandivali.
Nahar Builders
18 Traffic Management Plan for Proposed Development at NagaonVillage, Taluka – Alibaug, Dist-Raigad.
Calcite PropertiesDevelopers Pvt. Ltd.
19 Report on Traffic Management and Signage Design for NaharWhite Lily – Water Lily.
Nahar Builders.
20 Traffic Impact Assessment for Proposed Five Star Hotel near SaharInternational Airport.
Chalet Hotel Ltd.
21 Traffic Impact Study for Kolkata Sez, Tata Consultancy Services Ltd. TCE ConsultingEngineers
22 Traffic Impact Assessment and Junction Improvement at TardeoRoad.
S. D. Corporation
23 Traffic Impact Assessment for Proposed 100 acre township atKanjurmarg.
Jolly Brothers Pvt. Ltd.
24 Traffic Impact Assessment & Design of Internal Roads for theProposed Residential Project at Binnypet, Bangalore (100 acretownship)
Shapoorji Pallonji &Co.
25 Upcoming Redevelopment project at Matunga C.S.No.534,294/10,of Matunga Division, Mahavir Building, Bhandarkar Rd, Mumbai
Satra PropertyDevelopers Pvt. Ltd.
26 Traffic Impact assessment and Parking demand study for property
near Prime Mall, Irla, Andheri for Prime Developers
1 ArchitecturalConsultant
-21-
27 Traffic Analysis study for F.P. No.381, Industrial House Premises,Bhagoji Keer Marg, (Paradise Cinema Lane) Plot No. 189, Off L.J.Road, Mahim (W), Mumbai.
MapletreeProperties PrivateLimited
28 Traffic Demand estimation and the Traffic Impact Assessment forour Oakwood Service Apartment Project on Plot 'B' at Marol,Andheri (East).
Aristo RealtyDevelopers Ltd.
29 Traffic Impact Assessment Report for Residential Complex atMazgaon, Mumbai
Sarah HousingDevelopment Pvt.Ltd.
30 Traffic Impact Assessment report for Residential Complex atPanvel
Godrej Properties
31 Traffic Impact Assessment Report for Residential Complex atCrescent Bay, Parel
L&T Parel Project LLP
32 Traffic Impact Report for Residential Complex at Mumbai TextileMills, Parel.
Jawala Real EstatePvt. Ltd. (Lodha)
33 Parking Demand and Traffic impact Assessment report at Rajawadiroad No. 1, Ghatkopar
Silver LandDevelopers Pvt. Ltd.
34 Traffic Impact Assessment Report for Residential Complex atKandivali.
Vijay KamalProperties Pvt. Ltd.
35 Traffic Demand estimation and the Traffic Impact Assessment forthe proposed project ‘Airavath’ at Dahisar, Mumbai.
NahalchandLaloochand Pvt. Ltd.(NLPL)
36 Traffic Impact and Public Parking Demand Assessment Report ofResidential Complex at Jogeshwari
Pushkar Consultant
37 Traffic Impact Assessment Report of Residential Complex atBetawade, Dombivali
Runwal
38 Impact assessment study of existing & proposed residentialdevelopment at Powai Raheja Vihar, Powai
IIT (K Raheja)
39 Traffic Impact Assessment at Malad Ajmera Group
41 Traffic Impact and Public parking Demand Assessment Report forModella Mill, Thane ‘’
Nirmal Life Style
42 Traffic Impact Assessment Report for the Proposed ResidentialComplex at Khardi, Thane District
Kavya Buildcon Pvt.Ltd.
43 Traffic Impact Assessment Report for the Proposed ResidentialComplex at MHADA Wadhamna and MHADA Colony SubhashRoad, Nagpur
MHADA Nagpur
44 Traffic Impact Assessment Report for the Proposed ResidentialComplex at Village Makhmalabad, Nashik
Sun InfrastructurePvt. Ltd.
45 Traffic Impact Assessment Report for the Proposed Residential andCommercial Complex at Thane (W)
Lodha DevelopersPvt. Ltd.
-22-
45 Traffic Impact Assessment Report for the Proposed ResidentialComplex at Village Gahunje, Pune
Sahajanand Hi-techConstruction Pvt.Ltd.
46 Traffic Impact Assessment Report for the Proposed IT Park atGhansoli
Loma IT ParkDevelopers Pvt. Ltd.
47 Traffic Analysis for Building No.s 2,3,4 along with the main Road ofproposed I.T. Park at Plot No. I.T.5 at (MIDC) Airoli KnowledgePark, Airoli
Gigaplex Estate Pvt.Ltd.
PARKING DEMAND STUDIES & PARKING SOLUTIONS:
Sr. No. Project Name Client
1 Public parking study for Kalpataru Group for their land in LowerParel.
Kalpataru Group
2 Public parking study for Lodha Builders for their land in LowerParel.
Lodha Builders & Developers
3 Parking Demand and Traffic Impact Assessment for Veer Savarkar Road, Prabhadevi, Walkeshwar Road, Malbar Hill, Kanjur Village Road, Kanjur Permanent, Mumbai.
4 Development of Multilevel Parking Facilities in GreaterMumbai – Borivali, Matunga & Kurla.
Municipal Corporation ofGreater Mumbai / UMTC
5 Development of Public Parking Facilities in Worli, Mumbai. Lokhandwala Builders Pvt.Ltd.
6 Development of Public Parking Facilities at LBS Permanent,Mulund (W), & Oshiwara, Andheri (W), Mumbai
Runwal Group.
7 Public Parking Demand and Traffic Impact Assessment atNeapensea Road, Mumbai.
Runwal Group
8 Development of Public Parking Facilities by Suncity at Bhandup(W), Mumbai.
Suncity
9 Development of Public Parking Facilities by Nirmal Galaxy,Mulund (W), Mumbai.
Nirmal Galaxy
10 Parking Demand and Traffic Impact Assessment for CompositeBuilding at Mahalaxmi.
Modern India Ltd
11 Development of Public Parking Facilities at Byculla, Mumbai. Mafatlal Industries Ltd
12 Development of Public Parking Facility at Wadala Mumbai. Dosti Reality Pvt. Ltd
13 Development of Public Parking Facilities at Sion, Mumbai. Maitri Associates
14 Development of Public Parking Facilities at Gokuldham,Goregaon (E), Mumbai
Conwood Construction &Developers Pvt. Ltd.
-23-
15 Development of Public Parking Facilities at Camma IndustrialEstate, Goregaon (E), Mumbai.
Consolidated CropProtection Pvt. Ltd.
16 Development of Public Parking Facility at Grant Road, Mumbai. Goodwill Theater Pvt. Ltd.
17 Development of Public Parking Facility near Goregaon RailwayStation (W).
K.R.Shoppers and Kotharibuilders Private Limited.
18 Traffic Impact and Parking Demand Assessment for “SigniaHigh” at Borivali (E).
Sunteck Realty Ltd.
19 Development of Integrated central parking area. JNPT
20 Traffic Impact and Parking Demand Assessment for ProposedDevelopment at A.K. Permanent, Malabar Hills, Mumbai.
Indyamethyst Lifestyles Pvt.Ltd
21 Traffic Impact and Parking Demand Assessment for ProposedDevelopment at Upper Govind Nagar, Malad (E), Mumbai.
Roha InfrastructureDevelopers Pvt. Ltd
22 Parking Demand and traffic management studies forcommercial premises of K Raheja in Malad.
K Raheja Corporation
23 Parking and circulation studies for Nahar Group Premises inChandivali (3500 Car parks).
Nahar Group
24 Development of Public Parking Facilities at Goregaon. (RNA) Skyline Construction Co.
25 Parking Demand and Traffic Impact Assessment Report at RafiAhmed Kidwai road, Sewri (RNA)
East & West Builders
26 Redevelopment Project at Matunga C.S.No.534,294/10 ofMatunga Div., Mahavir Bldg., Bhandarkar Road, Mumbai-19.
Satra Property Developers
27 Traffic Impact Assessment and Parking Demand Study forproperty near Prime Mall, Irla Andheri.
Prime Developers
28 Parking Demand & Traffic Impact Assessment Report forResidential Complex at Tardeo, Mumbai
M/s Jadhav ChaudhariDevelopers Ltd.
29 Parking Demand & Traffic Impact Assessment Report forResidential Complex at Tardeo, Mumbai
M/s Kora Construction Pvt.Ltd.
30 Consultancy services for Parking demand study towardsredevelopment project at Matunga
Satra Properties
-24-
ENGINEERING DESIGNS:
Sr. No. Project Name Client
1 Design of Panvel bypass – part of Mumbai Pune Expressway.
MSRDC2 Design of toll plaza and pedestrian and parking facilities on
LBS road near Mulund Check Naka.
Vashi toll plaza on Sion- Panvel Highway.
Dahisar toll plaza on Eastern Express Highway.
3 Design and cost estimates for the widening and strengthening of Satara-Patan hill road 65km long.
4 DPR for Kashil-Pal-Tarale-Jalav road – MDR-71.
5 Standardisation of 2/4/6 Lane toll plazas.
6 Consultancy Services for the Project of Capacity Augmentation of Mumbai-Pune Corridor (MPEW & NH-4)- Including 9km of tunnel in western Ghats
7 Design of flyover at Love Grove intersection & Cloverleaf Interchange atMahim Junction as part of Bandra- Worli Sea – Link project.
Severdrup Civil Inc./MSRDC
8 Preliminary design and cost estimates for Bangalore–Mysore Expressway. Nandi InfrastructurePvt. Ltd.
9 Road network design and for Earthquake Rehabilitation andReconstruction for 6 towns in Kutch.
Gujarat UrbanDevelopmentCorporation/ TataConsulting Engineers10 Integrated road Development Program for Solapur City. MSRDC/ MotMacdonald
11 DPR for 2 National Highways namely Patan-Muzzaffpur Road (48km.) &Patan–Bakhtiyarpur Road (55km.)
P&M Infrastructureprojects, Mumbai.
12 Road Network design and Catchment area studies and Road RailInfrastructure studies for International Airport at Pune.
IL&FS.
13 Engineering Design Hotagi road from 3/00km to 21/00km in Solapur. Mehul ConstructionCo.
14 DPR for 30km of Coastal Goa Roads. Mott Mac Donald
15 Pre-feasibility study for 4/6 laning of Shil – Mahape road. MIDC
16 DPR for 6/8 laning of Thane- Belapur road MIDC/NMMC
17 Estimates for four laning of old NH4 from 131/200 to 20/400. MSRDC in Associationwith STB Consultants.
18 Cost estimates for 51Km. of Nashik-Aurangabad SH-30. Backbone Projects
19 Design of Toll Plaza on Bhivandi- Wada Road, Kaman Pygaon. Ideal Road Builders
DPR for 6/8 laning for Bhiwandi Bypass NH-3 Section (23km.)
20 Widening of Port roads and Preparation of traffic management schemesfor the port roads.
JNPT
21 Design of Toll Plaza on Shil – Kalyan Road. Dhruv Consultants
-25-
22 Design of 4 Km. of Hill road in BARC, Anushakti Nagar, Mumbai. BARC
23 Design of Concrete Roads in Navi Mumbai under road vision program;
(i) Vashi – Turbhe link Road
(ii) Turbhe – Phizer Road
(iii) Vashi – Koparkhairane link Road Turbhe Sector-19 from FruitMarket (Annapurna Chowk) to Purnit Corner.
(iv) Turbhe, Sector-20 to Sector-19 C (Palm Beach Permanent)
(v) C.C. Road from Diva Circle to Sec-20 MSEB gate in Airoli,
(vi) Shivaji Chwok to Arenja Corner in Vashi Node,
(vii) T Jn to Mulund Bridge in Airoli Ward
(viii) Vashi ‘Y’ Junction to Mahape Bridge.
(ix) Diva Circle to Airoli
(x) Palm beach road from Arejna Circle to Pawane Junction
Navi MumbaiMunicipalCorporation. (NMMC)
24 DPR for Proposed flyovers, Interchanges along the Palm Beach PermanentRs. 450Cr.
Navi MumbaiMunicipalCorporation
25 Detailed Engineering Designs for Shil-Kalyan Road 21km. long for BKSP-Toll, Malyasia in association with Dhruv Consultants.
BKSP-Toll, Malaysia
26 Preparation of DPR for Short term improvements for road networkaround Buddha Smriti Park – Patna
IDFC
27 Design for Port – Connectivity project for Bedi Port. Gujarat MaritimeBoard
28 DPR for 350 Km. of roads in Bhabhua & 450 Km. of roads in ArariaDistricts in Bihar under PMGSY Scheme.
IL&FS / IIDC
29 Planning, designing and cost estimation for about 70km. of road networkin MIHAN area Nagpur – in Association with SPAN Consultants.
Maharashtra AirportDevelopmentCorporation
30 Road widening of SH-10 Malegaon-Manmad-Yeola-Kopargaon fromKm.95.00 to 170.6 with geometric design of road, junctions etc.
Malegaon – Manmad– Kopargaon –Infrastructure TollRoad Pvt. Ltd.
31 Topographic survey, Geometric Design and traffic study for the proposedroad link from EEH to Bandra-Kurla Complex, in association with SWK,New Delhi.
MumbaiMetropolitanRegionalDevelopmentAuthority (MMRDA).
32 Feasibility study for Airoli interchange on TBR in NMMC area includingtraffic study, preliminary topographic surveys and block cost estimates.
NMMC
33 Preparation of DPR Phase-1 for Rewas Port Connectivity to NH-17 at nearWadlhal.
Rewas Port Ltd(Reliance)
-26-
34 Feasibility study for coastal Road in NMMC area including traffic study,preliminary topographic surveys and block cost estimates
NMMC
35 Development of proposed connectivity from the existing Airport to MROarea in MIHAN-SEZ at Nagpur – Design of Taxiway for the Aircrafts.
MADC
36 Consultancy Services for Preparation of Detailed Project Report forProposed Truck Terminal at Hospet, Bellary District.
DDUTTL
37 Design of Road for Qutar – Petroleum TATA ConsultingEngineers Ltd.
38 Construction of Subway near Income Tax Colony,CBD Belapur NMMC
39 Four laning of Jalgaon-Maharashtra/ Gujarat Border section of NH-6 fromKM 441.950 to KM 650.794 in the State of Maharashtra to be executed onDBFOT pattern under NHDP Phase IV-Detailed Feasibility study forAlternate Alignment in Ghat section from Km 600.000 to 607.000
L & T Great EasternHighway Ltd.
40 Design improvement of five constructed road junctions in Lavasa Lavasa CorporationLtd.
41 Technical report for Everest developers, Thane road works Terraform Realty
42 DPR for Mahape interchange on Thane- Belapur road in NMMC.
DPR for Design of Juinagar ROB
NMMC
43 DPR for Improvements to Highway for:
SH-44 connecting Sankeshwar with Sangam from 36.00 to 76.00km. inBelgaum Dist.
SH-34 Connecting Aurad with Sadashivgad from CH 35.00km to92.00km in Bidar Dist.
SH-55 connecting Yaraghatti with Babaleshwar from Ch. 54 to 79.20 inBagalkot Dist and 79.20 Km to 111.80 Km in Bijapur Districts”.
KRDCL
44 Providing Detailed Engineering of Road Proposed for Evacuation of 4th CTTraffic at JN Port
Jawaharlal NehruPort Trust (JNPT)
45 Consultancy Services for preparation of Detailed Project Report forConstruction of Bridge across Hagari River at Km 6.10 on Raravi-BelurRoad (State Highway-63) in Siruguppa Taluk, District Bellary
Karanataka PublicWork Department
46 Construction of FOB on Vashi-Koparkhairane Link road between sector-15and 9 Vashi
K D Constructions
47 Feasibility report for Roads in Lusaka city in Zambia AFCONS
48 Consultancy assignment of Design for MIDC Bridge at Patalganga. R. K. Madhani & Co
-27-
PRE- BID ENGINEERING SERVICES:
Sr. No. Project Name Client
1 Preliminary cost estimates for Jalendhar-Amritsar Rd (about 50km). HCC
2 Preliminary cost estimates for Nagar – Aurangabad Road & Ahmednagar –Kopargaon Road.
Suyojit BuildTech
3 Preliminary Cost estimates for MIHAN Roads for 100Cr.
Roads in Delhi airport area.
India Bulls.
4 Development and operation / maintenance of 2 MDR under:
Package-II comprising of Mandla-Pindrai & Salimnabad-Vilayatkalan(Total length106.33 Km.) Road section.
Package-VII Phoolsagar-Niwas-Shapura (83.70Km.) in the state of MP on(DBFOT) on Annuity basis through PPP.
4 laning of the Mangawan to MP/UP Border (NH-27).
Unity InfraProjects Ltd.
5 6 laning of Chandikhole-Paradeep Section of NH-5A (For 76.618) in theState of Orissa to be executed as BOT (Toll) on DBFOT Pattern under NHDPPhase-V.
Unity InfraProjects Ltd.
6 Construction of New Bridges/Structures, Repair of existing 4 LaneHighway from Kharagpur to Baleshwar section of NH-60 for Km. 119.300in the state of Orissa and West Bengal and its Operation andMaintenance under NHDP Phase-V,
4 laning of Punjab/Haryana Border – Jind section of NH-71 for 68km.under NHDP Phase-III & Phase IVB to be executed as BOT (Toll) onDBFOT Pattern.
Unity InfraProjects Ltd.
7 Pre-bid Services for EPC Contract from Infrastructure Developmentworks of SEZ Phase I area at JNPT
M/s. ManAjwani InfraconstructionLtd.
8 Pre-tender Engineering services for MORTH Nashik KeshavConstructionCo.
-28-
RAINWATER HARVESTING / STORM WATER DRAINAGE STUDIES:
Sr. No. Project Name Client
1 Rain Water Harvesting Scheme at Essel World. Pan IndiaParyatan Pvt. Ltd.
2 The Hydraulic Design Review of Storm Water Disposal system for CentralPark in sector 23 at Kharghar.
CIDCO
3 Design of Detention pond in sector- 36, Kharghar
4 Balancing of two reservoirs, Telhara and Dahegoan Tanks in MIHAN SEZarea.
MADC.
TOPOGRAPHIC / ENGINEERING SURVEYS & GIS:
Sr. No. Project Name Client
1 Plane Table and contour survey for Panvel Bypass – Part of Mumbai– Pune Expressway. MSRDC
2 Engineering Survey for Nandurbar City road development program.
3 Engineering Surveys and preparation of Land acquisition proposalfor 4 laning of NH-4 from Kolhapur to Maharashtra border.
4 Engineering Survey and preparation of base Map for Navi MumbaiSpecial Economic Zone for an area of 700 Ha.
Reliance – NMSEZ
5 Topographic Survey coastline and road network for WesternFreeway Sea Link.
COMACO / MSRDC
6 Topographic Survey for 450 Ha. Of Dighi Port area Dighi Port Ltd.
7 Topographic Survey for proposed Railway siding near PNP Jetty. PNP Port
8 Topographic Survey for proposed Railway siding for ISPAT IndustriesLtd at Kalmeshwar.
ISPAT Industries Ltd.
9 Topographic survey for about 700 ha. Area in JNPT area. JNPT
10 Topographic Survey for about 1200ha. Of area for NMSEZ-Phase-II. Sea King InfrastructureLtd.
11 Topographic survey for about 400Ha. Of area in Kalamboli. NMSEZ
12 Topographic survey along the Mumbai Trans Harbour Linkalignment for Reliance.
Trans HarbourCompany.
13 Topographic surveys for identifying sliding cross-sections alongKonkan Railway cutting sections for 450Km. for Konkan Railways, inAssociation with Pioneer Geo-technical services Pvt. Ltd.
Konkan Railways
14 Topographic Survey for Remodeling of Mumbai-Airport about400Ha.
Dalal Mac Donald.
-29-
15 Topographic survey for proposed Mumbai Trans Harbour Rail Linkabout 30Km.
RITES Ltd.
16 Topographic survey for Acqulands for 8000 acres of area nearMulashi Lake.
Essel Group Company
17 Topographic survey for 500 Acres of land in Pen Taluka. SKIL Mumbai.
18 Topographic survey for proposed 12km. Monorail from Jacob’scircle to Wadala Truck Terminal.
Rites
19 Topographic survey, obstacle limitation surveys for Proposed SikkimAirport.
Mott MacDonald
20 Demarcation of center line for Mumbai Metro- I. Simplex InfrastructureLtd.
21 Topographic survey for proposed Mumbai Entertainment SEZ –Gorai Manori Region.
Essel Infra
22 Topography survey for Sewerage facilities in Mumbai. Mott MacDonald /MCGM
23 Topographic survey for proposed international airport at Solapuralong with obstacle limitation surveys.
MADC / MottMacDonald
24 Topographic surveys for 124km. long Mumbai – Vadodara ProposedExpressway.
ICT / NHAI
25 Topographic Survey and Cadastral Survey Works for Phase-II ofStrategic Storage Program of ISPRL (INDIAN STRATEGIC PETROLEUMRESERVES LIMITED)
Engineers India Ltd(EIL)
26 Consultancy Services for the work of construction of internal S.W.Drains & Concretization work for NMMT Bus Depot at Turbhe, NaviMumbai.
Swastik Infra-Logic (I)Pvt. Ltd.
27 Topographic/Terrain survey of various areas of BARC forconstruction of various Buildings and different structures of BARC,Trombay Mumbai. (150Ha.)
Bhabha AtomicResearch Centre
28 Surveys for Nuclear Power Corporation land at Jabalpur, MadhyaPradesh.
NPC/ SohamsFoundationEngineering Pvt. Ltd.
29 Topographical / Terrain survey of various area of BARC forconstruction of various buildings and different structures in BARCTrombay, Mumbai.
Bhabha AtomicResearch Centre
30 Topographic surveys for the BARC land about 150 ha.
31 Topographical & Geotechnical Sub Surface Investigations for ChutkaAtomic Power Project
Soham FoundationEngineering Pvt. Ltd.
32 Preparation of Existing land use Plan for Satara Region District Assistant Director ofTown Planning (ADTP) (payment left)
33 Topo Survey for Chutka Atomic Power Project for Jabalpur Soham FoundationEngineering Pvt. Ltd.No status
34 Detailed Project Report (DPR) for Up-gradation to four laningconfiguration of Wakan-Pali-Khopoli Road
MSRDC
-30-
35 Topographical and Utility Survey for Updation of Mumbai MetroRail DPRs
Delhi Metro RailCorporation (DMRC),
36 Total Station Survey for Hockey Ground near Wankhede stadiumMumbai
Shashi Prabhu &Associates
37 Engineering Topo survey for existing road in Matheran Tril
38 Topographical Survey from Ghatkopar to Wadala Depot and JVLR toSamarth Nagar for updation of Mumbai Metro Rail DPRs
DMRC
PROJECT MANAGEMENT SERVICES:
Sr. No. Project Name Client
1 Design and Project Management services for 100Cr. Road works inBellary
Bellary MunicipalCorporation
2 Design and Project Management Consultancy works for BonkodeFlyover Rs. 30 Cr
Navi MumbaiMunicipalCorporation (NMMC)
3 Third Party inspection and supervision consultancy works for SarvaShiksha Abhiyan in Bhabhua and Sasaram districts in Bihar. About600 Schools
Bihar EducationalProject Council (SSA)
4 Development of Parking lot for Vashi along channel. NMMC
5 Design & PMC Services for Preparation of DPR’s, Estimates, TenderDocuments of Infrastructure Projects, including Project Managementfor Hospet.. Rs. 60 Cr
City MunicipalCouncil, Hospet.
6 Design & PMC Services for Preparation of DPR’s, Estimates, TenderDocuments of Infrastructure Projects, including Project Managementfor Kampli. Rs. 20 Cr
Town MunicipalCouncil, Kampli
GEO-TECHNICAL INVESTIGATION STUDIES:
Sr. No. Project Name Client
1 Geo-Technical Investigations for the proposed CFS at Chirale Village,Uran Taluka, Navi Mumbai.
Dragon King CFS
2 Geo-Technical Investigations for Chanje Village, Karanja, Uran, NaviMumbai.
Karanja InfrastructurePvt. Ltd.
3 Topographic survey & Geotechnical Investigation for Dighode Village,Uran Taluka, Navi Mumbai.
GEM Distriparks &Logistic Ltd.
4 Soil Investigation works at your proposed Unit-II at Verna, Salcete, Goa Lupin Ltd.
-31-
5 Geotechnical Investigation for proposed project of 30 storied buildingin Plot 'A' site at Kanjur Marg.
Jolly Brothers Pvt. Ltd.
6 Construction of Rub 72/1 at Ch: 72025 In Connection with Panvel -Pen-Roha doubling Project
Vardhaman Ventures
7 Consultancy Services for load testing of PSC girders at Panvel forCentral Railway
Vardhaman Ventures
8 Consultancy Services for load testing of PSC girders at BhogeshwariRiver Pen for Central Railway
Vardhaman Ventures
9 Soil Investigation at Road Widening & Strengthening of CementConcrete Road from 2+2 lane to 3+3 lane on Shilphata-Mahape Road(SH-40) @ Ch.1/500 to Ch.5/000 including CD works.
PBA InfrastructuresLtd.,
10 Geotechnical Investigation & Foundation Report of locations of: Overhead Service Reservoir for water supply system at Patna City
about 40 Borehole locations. Intake well and approach bridge locations for water supply system.
Gammon India Ltd.
11 Drilling in soil & rock for boring work. R.S.K. Construction.
12 Plate Load Test to determine SBC at Construction of small culvertBridge & Underpass at Balvali on Panvel – Indapur Road NH-17
M/s. Mahavir Road &Infrastructure Pvt. Ltd.
13 Vertical Static Pile load test - 400 T and lateral load test for design loadat PedhiRier Railway bridge, Amravati, M.S.
M/s. India Bull PowerLtd.
14 Plate Load Test to determine SBC at Construction of Pedestrian andVehicular Under Pass at Amtem Village on Panvel – Indapur Road NH-17
M/s. SupremeInfrastructure India Ltd
15 Geotech at APM Terminal Uran M/S. ExtremeInfraPvt. Ltd
16 Geotechnical Investigation for the proposed construction of VUP on,PuneNH4,Wakad
Reliance Infra (KCPL)
17 Geotechnical Investigation by trial pits for improvement of internalroads,Ghansoli,Navi Mumbai
Loma IT Park
18 Dynamic Load Test as per relevant ASTM code on piles at NH4locations,near Wakad Bridge,Pune
KCPL Poona
19 Geotechnical Investigation for foundation report for stallation of STPMachinery at Dadar Pumping Station (MCGM)
Naik EnvironmentEngineers Pvt Ltd
20 Lateral Load Test on RCC Piles at "Construction of 4 lane ROB in LieuLevel Crossing at JNPT (Uran Railway Project)
J.M. Mhatre Infra Pvt.Ltd
21 Consultancy Services for load testing of PSC girders at Nidhi Riverbridge, Nagothane for Central Railway Contractors: M/s.
Vardhman Ventures
22 Conducting Pile Load Test for Approach Bridge piles KEC International Ltd.
-32-
ARCHITECTURAL DESIGN:Sr. No. Project Name Client
1 Architectural Designs for Slum Redevelopment scheme of MMRDA for MUTPfor Span Consultants Mumbai-Metropolitan Regional DevelopmentAuthority:
Mumbai-MetropolitanRegional DevelopmentAuthority
2 Architecture design for Central Chinmaya Mission Trust building at Kharghar7500 sq. feet.
Central ChinmayaMission Trust
3 Preliminary Design for Proposed Sports Complex / Stadium Sector 16 a Ulwe,Navi Mumbai.
Ramsheth Thakur SportsClub
4 Planning, Design for – R & R Scheme for 500 project affected families for TBRDevelopment.
NMMC
5 Vashi Parking above the Nallah near Sector-17
6 Planning, Designing and cost estimation for the proposed fire station inMIHAN Area.
Maharashtra AirportDevelopmentCorporation
7 Beautification and Landscape Design for existing Moti Baug Lake & Garden atJalna.
Jalna Municipal Council
8 Architectural Design including signage design for Metro Stations for thecorridor Andheri to Dahisar & Charkop to Dahisar.
SPAN Consultants Pvt.Ltd.
9 Landscape & Electrical design for water terminals of Mumbai namely Nerul,Ferry wharf & Mandwa
MSRDC / i-maritime Pvt.Ltd.
10 Architectural Design for FOBs on Eastern Express Highway MMRDA
11 Architectural consultancy for the work of construction of Main T.E. Buildingat Vikroli (East) Mumbai.
M.T.N.L
12 Architectural consultancy for the work of construction of Main T.E. Buildingat Andheri
13 Consultancy services for Preparation of conceptual drawings and tenderdrawings for Community Center at Dronagiri, Navi Mumbai
CIDCO
14 Architectural & Structural Services for proposed work of Goenka School Millennium Sports Mng.
15 Landscape design for Garden at Nerul at sector-19 & Landscape along PalmBeach Road.
NMMC
16 Rajiv Gandhi Infotech Park PH-I, I , III @ Hinjawadi Pune.
Providing Consultancy Services and Preparation of comprehensive masterplan for beautification of I.T. Park.
Maharashtra IndustrialDevelopmentCorporation
(MIDC)
17 Proposed Business Development Park for Export and Testing Centre atNMPT, Mangalore
New Mangalore PortTrust
18 Re-Organizing of DPR of Ministry of Tourism (MOT) SREI InfrastructureFinance Ltd.
-33-
GRAPHIC DESIGN:Sr. No. Project Name Client
1 Information system design for Shoppers Stop,Andheri
Shoppers Stop, Andheri
2 Graphic design for Airoli railway station cumcommercial complex.
In association with Consulting EngineeringServices (India) Pvt. Ltd
3 Signage design for Worli Bandra Sea Link project,Panvel Bypass & Shirdi Bypass.
MSRDC
4 Signage design for Rural Hospitals at Islampur andKolhapur
Consulting Engineering Services Pvt. Ltd.
5 Signage Design for the project of SEEPZ++ & IT 2000 MIDC
6 Design of Signage Manual for PWD, Government ofMaharashtra
Public Work Department (PWD)
7 Design of Signage System at Mahape, Navi Mumbai MPCB (Mumbai Pollution Control Board)
URBAN PLANNING/ REGIONAL PLANNING:Sr. No. Project Name Client
1 Pre-Feasibility study for New Mahabaleshwar Hill Station inassociation with Team One Architects and Saral Enviro-TechConsultants.
MSRDC
2 Master planning for 2 land pockets along Mumbai PuneExpressway for M.S.R.D.C. in Association with Vastu YojanaArchitects and Planners Pvt. Ltd.
3 Preparation of Outline Development plan for ‘Captive Power Plantof ISPAT Industries Ltd. near Dharamtar Creek’, & ‘Proposed ISPATTownship near Pen’.
ISPAT Industries Ltd.
4 Preparation of structure plan and General Development ControlRules for the proposed SEZ of 400Ha in Dronagiri node(G.D.C.R)
Navi-Mumbai SpecialEconomic Zone
5 Preliminary Planning for proposed Logistic Hub near ChowkRailway station on Panvel – Karjat Line.
Peninsular FreightTerminals Pvt. Ltd.
6 Planning & design of infrastructure facilities for proposed land fillsite of MCGM at Kanjurmarg- Mumbai.
MCGM / SPAN
7 Land use plan for Ajanta/ Ellora for MTDC Land. MTDC
8 Preparation of Vision Plan for Navi Mumbai. Neptune Developers.
9 Preliminary Planning & Cost Estimation for proposed ports offeredby GMB on PPP basis such as Mudhawa, Porbander, Dahej, Bedi,Muhwa & Rozi for GVK Group in association with i-Maritime.
GMB
10 Detailed Project Preparation for Godavari Ghat improvement andUrban Regeneration / decongestion for NMC under JNNURM inAssociation with SPAN Consultants.
Nashik MunicipalCorporation (NMC)
-34-
11 Preparation of Development Plan and Development Control Rulesfor about 4000 Ha. of MIHAN notified area, at Nagpur. MADC
12 Preparation of Draft Planning Proposal and Development ControlRules (DCR) for Shirdi Airport.
13 Feasibility study for Development of Beach tourism at 5 locations inGujarat
GTPDCL
14 City Development Plan Karad Municipal Council
15 Preparation of conceptual Master Plan for 440 Acres of land in lesGubbies Mauritius.
GREMACH InfrastructureEquipment & Projects Ltd.
16 Tourism Master Plan for Eco sensitive Zone at Mahabaleshwar &Panchgani
MTDC
17 Tourism Master Plan for Eco sensitive Zone at Matheran
18 Preparation of DPR for Beach facility at 25 locations.
19 Master Plan for Old Solapur Airport. MADC20 Preparation of District Tourism Master Plan for Satara District Satara District Collector21 Preparation of District Tourism Master Plan for Nagpur District Nagpur District Collector22 Preparation of District Tourism Master Plan for Aurangabad District Aurangabad District
Collector
23 Preparation of District Tourism Master Plan for Thane District Thane District Collector
24 Consultant for One Time Planning for Preparation ofComprehensive master Plan of Infrastructure Improvement for NaviMumbai Municipal Corporation
Navi Mumbai MunicipalCorporation
25 Dp plan MADC
26 Revive Inputs for Infra Planning Revive Infrastructure
RAILWAY ENGINEERING:Sr. No. Project Name Client
1 Design of railway Sidings for Wani-Gughus line - in association withPPPL.
MSRDC/ PermanentPrestress Pvt. Ltd.
2 Design of railway Sidings for Pipavav port – in association with PPPL. Gujarat Pipavav Portslimited
3 Topographic survey and alignment design for Railway line andMarshelling Yard – in association with PPPL.
Karnataka Thermal PowerCorporation
4 Topographic survey and alignment design for Railway MarshellingYard for L&T Cement plant at Kovaya near Pipavav port - inassociation with PPPL.
L&T Cement plant
5 Feasibility study & Final location survey of Railway line betweenMangaon Railway Station to Tata Power station near Vile- Bhagad.
Permanent Prestress Pvt.Ltd. (PPPL)
6 Re-modeling of Railway marshaling yard for Margoa Port in Goa. PPPL
-35-
7 Road & Rail connectivity for Rewas port from Pen Railway Station. Amma Lines
8 Feasibility survey & Final location survey for Railway line betweenDighi port and Indapur Railway station of about 40km.
Dighi Port Ltd.
9 Topographic survey for earth cutting sections from km.401.215(Shirgaon) to km. 698.900 at Udipi
Konkan RailwayCorporation
10 Feasibility survey for Rail connection between Panvel-Uran & Panvel-JNPT Railway Line near Dronagiri Container Terminal.
JNPT
11 Feasibility survey for the proposed Railway siding for ISPAT Industriesnear Mangalore Port - Harwada in association with ICONS Pvt. Ltd.
ISPAT Industries
12 Detailed Engineering surveys Land acquisition proposals for proposedMetro Corridors for: Andheri(E)- Dahisar(E)-16Km. Charkop-Dahisar-7.5Km. Ghatkopar- Mankhurd-6Km.
MMRDA / SNC LavalinInfrastructure Pvt. Ltd
13 Feasibility survey for railway line from Pen Railway Station. Final Location survey for the railway line from Thal Railway line to
proposed Tata power plant near Dharamtar Creek.
ICONS.
14 Survey Alignment design, geo-technical studies, traffic studies andstation designs for 670 km. railway lines in Ethiopia.
ICONS/OID/EthiopianRailway Corporation
15 Pre-Bid Design Consultancy Services for Design of Alignment for HaulRoad package & Rail package, Indonesia.
AFCONS InfrastructureLtd.
16 Feasibility Study for Railway alignment for Ethopia RailwayCorporation
17 Final location survey for the rail connectivity for the Dighi Port acrossthe creek.
Balaji Port/ ICONS.
18 Preparation of DPR for Ghatkopar-Mankhurd-Andheri (East) HighSpeed Metro Corridor via Chhatrapati Shivaji International Airport.
MMRDA
19 Consultancy Services for conducting Topographic survey for thedevelopment of Rail alignment from Roha to missing link towardsAgardanda for Dighi Port connectivity project in the state ofMaharashtra
IL& FS- ITNL
20 Topographical and Utility Survey for Updation of Mumbai Metro RailDPRs
Delhi Metro RailCorporation (DMRC),
21 Topographical Survey from Ghatkopar to Wadala Depot and JVLR toSamarth Nagar for updation of Mumbai Metro Rail DPRs
DMRC
-36-
ASSIGNMENTS IN HAND
ENGINEERING SURVEYS:
Sr. no Project Name Client
1 Survey & Demarcation of Defence Land & Fixing the Position ofBoundary Pillars of Pune Cantonment Using Total Stations andDGPS & Developing the Interface of GIS / Autocad
Pune Cantonment Board
2 Additional Survey and Demarcation of Defence Land and fixingthe position of Boundary Pillars for Pune Cantonment usingtotal Station, DGPS & Developing the Interface on GIS/Autocad
3 DPR for Topo Survey, GIS Mapping, Socio-economic survey forSasaram town of Rohtas district of Bihar.
WAPCOS Limited
4 Traffic survey, Engineering Topo survey & Geo Tech Survey forproposed ropeway project at Vashi
TRIL
5 Preliminary Engineering Survey for proposed MRTS projectShivaji Nagar- Hinjewadi Metro Alignment Survey
TRIL
6 Detailed Project Report (DPR) for Up-gradation to four laningconfiguration of Wakan-Pali-Khopoli Road
MSRDC
7 Survey of All Packages J Kumar Infraprojects Ltd.
8 DETAILED ROAD SURVEY & GEOTECHNICAL INVESTIGATION forconstruction of proposed Concrete roads Under integratedroad improvement project(IRIP) in Nagpur city
Nagpur MunicipalCorporation (NMC)
ARCHITECTURAL DESIGN:
Sr. No. Project Name Client
1 Proposed Business Development Park for Export and TestingCentre at NMPT, Mangalore
New Mangalore Port Trust
2 Construction of FOB on main nala at Ghansoli connectingsector 5 and sector 6
Om Construction
3 Traffic Study & Design for Yashwant Smart City,Vasai MAAD Realtors & InfraLimited
4 Consultancy services for design of roads and SWD in Sector30,CBD Belapur
NMMC
5 Architect for the Construction of Pedestrian Underpass atKarave Village on palm beach road
NMMC
6 Preparation of Detailed Project Report for MMGSY Roads inBihar
Bihar Road developmentAuthority
-37-
7 Consultancy services for preparation of DPR for the proposedwork of bridges in WEH area.
MMRDA
8 Detailed design services for the work of improvementof road& Construction of storm water drain in Raigad
Tala properties Ltd.
9 Consultancy services for design of vehicular underpass fromShivaji Chowk to Chhatrapati shahu High School, Airoli
NMMC
10 Consultancy services for design of foot over bridge nearTurbhe Station.
NMMC
11 Detailed Project Report (DPR) for Up-gradation to four laningconfiguration of Wakan-Pali-Khopoli Road
MSRDC
12 Design services for the work of improvementof road &Construction of storm water drain in TTC Industrial AreaKoparkhairne
SVIPL
TRAFFIC AND TRANSPORTATION STUDIES:
Sr. No. Project Name Client
1 Traffic study for Yeshwanthpur project land parcel at Bangalore,Karnataka
TRIL Construction Ltd.
2 PREPARATION OF INTEGRATED TRAFFIC REGULATION PLAN FORKDMC
KDMC
3 Traffic Study for Ayon Bhakti Park, Wadala, Mumbai Ajmera Group
4 Traffic Management Plan for Hiranandani Gardens, Powai Hiranandani ConstructionsPvt. Ltd.
5 Traffic Study for connecting Badarpur – Faridabad, NH-2 Dun and Bradstreet
6 Consultancy services for Traffic Management Study for ProjectSunteck City,Avenue 1, Goregaon West
Sunteck
7 Consulting Services for Monitoring & Evaluation and UserSatisfaction survey for BRTS ‘I-BUS’ Indore
Atal Indore City TransportServices Limited
8 Consultancy services for traffic analysis, traffic demand estimation &Traffic Impact Assessment of Worli Naka Project
LokhandwalaInfrastructure(P) Ltd
9 Traffic Study & Design for Yashwant Smart City MAAD Realtors & InfraLimited
TRAFFIC IMPACT ASSESSMENT STUDIES:Sr.No. Project Name Client
1 Additional Traffic Impact Assessment for Gigaplex K Raheja
2 Traffic Impact Assessment for hotel Tip-Top, Pune Fine Envirotech Engineers
-38-
3 Traffic Impact Assessment at Kanjur Marg Jolly Brothers
4 Runwal Traffic Surveys Runwal Developers
5 TIA for Residential Project in Bhandup Fine Envirotech
6 TIA for Mulund Residential Complex Eco Support
7 Traffic Demand estimation and the traffic impact assessment for theproposed IT Complex, Giaplex Airoli ( All ten buildings- Entire Layout)and internal circulation for buildings 5,6,7,8 & 9
Gigaplex Estate Pvt Ltd – SEZDivision
8 Traffic Impact Assessment Consultancy services for a Residentialdevelopment at Thane, Maharashtra
ARDENT PROPERTIES Pvt ltd(TATA Housing DevelopmentCompany Limited)
9 Traffic Impact Assessment for Gigaplex, Airoli K. Raheja
10 Traffic Impact Assessment Study Ajmera Trion in Bhakti Park Ajmera
DESIGN OF TRANSPORT INFRASTRUCTURE:Sr. No. Project Name Client
1 Widening and improvement of MIDC internal Roads in TTCMIDC area- About 11 Roads with cost of about 160 Crs.
NMMC
2 Preparation of Design & Drawing of Water Supply Network inPushpak Nagar at Dapoli CIDCO Ltd.
3 Consultancy Services For Structural Design & Estimation ofRCC culvert SW channels in Sector1 to 6 at karanjade
4 DPR for the bridges at Vakola Junction,Univerisity junctionand BKC junction on SCLR
MMRDA
7 Deisgn & PMC for the Proposed Foot over bridge on thaneBelapur road near Airoli railway station
Mana Electric &Engineering Services
8 Detailed design services for the work of improvementof road& Construction of storm water drain in Raigad
Tala properties Ltd.
9 Consultancy services for design of vehicular underpass fromShivaji Chowk to Chhatrapati shahu High School, Airoli
NMMC
10 Consultancy services for design of foot over bridge nearTurbhe Station.
11 Detailed Project Report (DPR) for Up-gradation to four laningconfiguration of Wakan-Pali-Khopoli Road
MSRDC
12 Design services for the work of improvementof road &Construction of storm water drain in TTC Industrial AreaKoparkhairne
SVIPL
-39-
PROJECT MANAGEMENT SERVICES:Sr. No. Project Name Client
1 Proposed Construction/ Improvement of Major roads inSolapur city under the scheme o Maharashtra Suvarna JayantiNagarotthan Mahaabhiyan Yojana (Sponsored by StateGovernment) Rs. 240 Cr
Solapur MunicipalCorporation
2 Project Management Services for Nagorothana (Phase-2) for: Gulbarga District of Karnataka State. Bidar District of Karnataka State. Bellary District of Karnataka State. Yadgir District of Karnataka State.
Directorate of MunicipalAdministration (DMA)
3 Design & Construction of Flyovers at Savita ChemicalsJunction, Ghansoli Naka , Talavli Naka & Vehicular Underpassat Mahape Junction on Thane Belapur Road. Rs. 155 Cr.
MMRDA
4 PMC for Phase-II of Bellary City Corporation Bellary City Corporation
5 Consultancy Services for Proof Checking of Designs, ProjectManagement and Construction Supervision for the Work of“Construction of Bridge Across Bennethorahallain the Middleof the SH-126 &SH-149 In Chittapura Taluk, Kalburgi district.”
KRDCL
6 Consultancy Services for Proof Checking of Designs, ProjectManagement and Construction Supervision for the Work of“Construction of Bridge Across Bennethorahallain the Middleof the SH-126 &SH-149 In Chittapura Taluk, Kalburgi district.”
7 Consultancy Services for Quality and Quantity audit ofimprovements to the civil works taken up under HKRDBgrants for Kalaburagi District
HKRDB
8 Consultancy Services for Quality and Quantity audit ofimprovements to the civil works taken up under HKRDBgrants for Yadgir District
9 Consultancy Services for Project Management and QualityControl for Implementation of various Gardening, Park andUrban Improvement and Tourist Attraction Developmentprojects under HKRDB
GEO-TECHNICAL INVESTIGATION WORK:Sr. No. Project Name Client
1 Geotechnical Investigation for the proposed cross-section oftowers at various locations from Vashi station to sector 28
Tata Reality
2 Detailed Project Report (DPR) for Up-gradation to four laningconfiguration of Wakan-Pali-Khopoli Road
MSRDC
3 Geotechnical Investigations at various structures on wideningJNPT road
Thakur Infra Project Pvt. Ltd.
4 Geotechnical investigation for Detailed project Report of coastalroad
Frischman Prabhu Inida Pvt.Ltd.
INR 250 cr.
-40-
OUR PRESTIGIOUS CLIENTSGovernment / Semi Government Organizations Consultants
Bhaba Atomic Research Centre. (BARC) Architects Hafeez Contractor
Bharat Petroleum Corporation Ltd. (BPCL) Clique Consultants Pvt. Ltd.
Bellary City Corporation COMACO Ltd.
City & Industrial Development Corporation Ltd.(CIDCO)
Consulting Engineering Services (I) Pvt. Ltd.
Gujarat Maritime Board. (GMB) Dalal Mott Mac Donald.
Jawaharlal Nehru Port Trust (JNPT). Dhruv Consultancy Services Pvt. Ltd.
Konkan Railway Corporation. (KRCL) Fortress Financial Services.
Maharashtra Airport Development Corporation(MADC)
i-maritime Consultancy Services Pvt. Ltd.
Maharashtra Industrial Development Corporation(MIDC)
Integral Infrastructure Consultancy Services,Navi Mumbai.
Maharashtra State Road DevelopmentCorporation (MSRDC)
L & T Ramboll.
Mahanagar Telephone Nigam Limited (MTNL) Multimedia Consulting Engineering Services.
Municipal Corporation of Greater Mumbai.(MCGM)
MVA Hong Kong Limited
Mumbai Metropolitan Regional DevelopmentAuthority (MMRDA)
Permanent Prestress Pvt. Ltd.
Nashik Municipal Corporation. (NMC) P. G. Gas Ltd., Navi Mumbai.
Navi-Mumbai Municipal Corporation. (NMMC) Scott Wilson Kirkpatrick India Pvt. Ltd.,
Pimpari Chinchwad Municipal Corporation.(PCMC)
Shrikhande Consultants Pvt. Ltd.
Public Works Department, Government ofMaharashtra (PWD)
Sir Owen Williams Investments Ltd.
Rail India Techno-economic Services, New Delhi S.N. Bhole & Associates.
Tata Institute of Fundamental Research. (TIFR) SPAN Consultants Pvt. Ltd.
Karnataka Road Development Corporation Ltd.(KRDCL)
SNC Lavalin Consultants Pvt. Ltd.
Karad Municipal Corporation (KMC) STUPS.
Hospet Council IRSM
Delhi Metro Rail Corporation(DMRC) MTHL
Solapur Municipal Corporation (SMC) Sverdrup Civil Inc.
-41-
Engineers India Ltd (EIL) Systra Consulting India Pvt. Ltd.
Devaraj Urse Truck Terminals Pvt. Ltd. Tata Consultancy Services.
Mumbai Metropolitan Region DevelopmentAuthority (MMRDA)
Tata Consulting Engineers Pvt. Ltd.
Pune Cantonment Board Technogem Consultants Pvt. Ltd.
MMTC Ltd, Goa Keshav Construction Co.
Panvel Municipal Council M/s. Man Ajwani Infra construction Ltd.
Hyderabad Karnataka Region Development Board Frischman Prabhu Inida Pvt. Ltd.
New Mangalore Port Trust
U.T. Daman
Financial Institutes CRISIL Infrastructure Advisory Services. SICOM Limited.
Consolidated Toll Network Ltd. KPMG Advisory Services Pvt. Ltd.
IDFC Ltd. Darashaw
IL&FS Infrastructure Leasing & Financial ServicesLimited
Contractors / Developers Ashoka Buildcon Ltd. K. Raheja
Amruta Constructions, Khed. Lokhandwala Developers.
Avdate Construction, Mangalwedha. Lokhandwala Infrastructure.
Backbone Infrastructure, Mumbai. Manoj Construction Co., Uran.
CMS Traffic Systems. Madhucon Projects Ltd.
Corolla Realty Pvt. Ltd. Mehul Construction Co. Solapur.
Dighi Port Ltd. Murli Manohar Hotels Pvt. Ltd.
Dubai Port World Ltd. (D.P. World) Nashik Infrastructure Pvt. Ltd.
Gammon India Ltd. P. G. Thakur & Co., Uran.
Gujarat Positra Infrastructure Ltd. Reliance – NMSEZ Development Co.
GMS Services Inc. USA. Sea King Infrastructure Ltd.
Hiranandani Developer Shell India Marketing Services Pvt. Ltd.
Hindustan Construction Company. Suyojit Build Tech, Nashik.
Hikal Chemical Industries, Taloja. Super Infrastructure toll Bridge Company Ltd.
Ideal Road Builders. Synterprise (Peninsular).
-42-
I.S. Construction Co. Nashik. Tata Realty and Infrastructure Ltd.
ISPAT Industries Ltd. Unity Infraprojects Limited.
India Bulls Vishvaraj Housing Co. Pvt. Ltd., Nagpur.
In Orbit Malls Vipul Octri Services Pvt. Ltd.
Karanja Infrastructure Pvt. Ltd. Yash Marketing & Trading Co. Pvt. Ltd., Mumbai.
Kolte Patil Developers Ltd. Zoom Developers Pvt. Ltd.
Ajmera Group AFCONS
K.D. Constructions Reliance Infra
Kalptaru Revive Infrastructure
Trusts Central Chinmaya Mission Trust Jawarharlal Nehru Port Trust