app chap 12.doc

Upload: mbhadel

Post on 02-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 App Chap 12.doc

    1/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Chapter 12 - Evaluation

    Appendices

    Topic See Page

    Appendix A - Tool Codes iii

    Appendix B - Cables and Weak Links v

    Appendix C - Radio Silence Checklist vii

    Appendix D - Detailed Shipping Requireents ix

    Appendix ! - "ud Logging Requireents xii

    Appendix # - $uestionnaire %or Daaged !quipent xvi

    Appendix & - R#T Saple Draining Data xviii

    Revision 0June 1! i

  • 8/10/2019 App Chap 12.doc

    2/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    "his page le#t intentionall$ %lan&

    Revision 0June 1! ii

  • 8/10/2019 App Chap 12.doc

    3/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Appendi' A

    "ool Codes

    Revision 0June 1! iii

  • 8/10/2019 App Chap 12.doc

    4/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    "ool Codes

    Tool SLB Code AWS

    Dual Laterolog Resistivit' DLL DLL

    Dual (nduction Resistivit' )( D(#L

    "icro Laterolog "S#L "LL

    Litho Densit' LDT *DL

    +eutron C+T C+L

    &aa Ra' &R &R

    Dipeter ,DT D()

    Stratigraphic Dipeter S,DT S,DT

    Well Seisic S) or CSS S) or cssLong Spacing Accoustic LSS LS-AC

    Regular Accoustic B,C AC

    Ceent Bond CBL.DL CBL.DL

    Side/all Coring SWS SWC

    #oration Tester R#T0 "DT #"T

    Borehole &eoetr' 1CAL 1CAL

    +atural &aa-Ra'Spectroscop'

    +&T SL

    Ceent Bond Tool CBL CBL

    Cased ,ole R#T C,R#T C,#T

    Theral Deca' Tie TDT )D2

    Borehole (ager 3B( CB(L

    Casing (nspection (ager 3S( CB(L

    Revision 0June 1! iv

  • 8/10/2019 App Chap 12.doc

    5/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Appendi' (

    Ca%les and )ea& *in&s

    Revision 0June 1! v

  • 8/10/2019 App Chap 12.doc

    6/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Ca%les and )ea& *in&s

    +i,e in. "$pe )eightl%/#t

    "ensile+trength l%s.

    0 conductor 3 t$pe 044! ! 450

    022 560. single conductor 00 1 12!

    Multicore Conductor Cable

    Weak-point

    Type

    Breaking Tension

    (lbs)

    Weak-point Tension Limit

    (!" Breaking Tension#lb)

    Blue $%% - &%% !%'!

    reen !!% - $*%% %+,!

    ello. +%% - !%% &$%%

    Standard S/ooting Bridle 0se .it/ Multiconductor Cable (Cable '-'& 1T-2L)

    Weak-point Cable Strands3uter#4nner

    Breaking Tension (5ange lbs)

    #& 6%+%

    +#& 6'6!*#& 6&!%

    Standard S/ooting Bridle 0sed .it/ Multiconductor Cable (Cable L-' WB)

    Weak-point Cable Strands

    3uter#4nner

    Breaking Tension (5ange lbs)

    !#& &&!%

    $#& %$%

    #& $%%

    +#& !6%%

    Revision 0June 1! vi

  • 8/10/2019 App Chap 12.doc

    7/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Appendi' C

    Radio +ilence Chec&list

    Revision 0June 1! vii

  • 8/10/2019 App Chap 12.doc

    8/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    RAD7O +7*E8CE C9EC: *7+"

    7AT89 549 W8LL9

    Are all radio transitters turned o%% 4 5.+

    (s radioroo locked and ke' held b' Drilling Supervisor 4 5.+

    Are all hand held transitters o%% and locked a/a' 4 5.+

    Are all vehicle radios o%% and doors locked 4 5.+

    Are there an' large coercial transitters nearb' 4 5.+

    Are all electric /elding achines electric isolated 4 5.+

    Are all personnel a/are o% 6no /elding7 4 5.+

    (s logging unit grounded to /ellhead 4 5.+,as potential di%%erence bet/een rig and logging unit been checked 4 5.+

    ,ave road signs been installed 89: %ro location /arning o% radio silence in progress 4 5.+

    ,ave signs been installed around the /ork area /arning o% ha;ardous operation4 5.+

    Are all non essential personnel instructed to keep clear o% explosives 4 5.+

    (s /eather suitable ie

  • 8/10/2019 App Chap 12.doc

    9/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Appendi' D

    Detailed +hipping Re;uire

  • 8/10/2019 App Chap 12.doc

    10/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    E'ploration / Develop

  • 8/10/2019 App Chap 12.doc

    11/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Develop

    S'ria Shell )etroleu Developentc.oCha )alaceDaascus

    Shipping Manifest

    A cop' o% the ani%est should be sent to>

    Al #urat )etroleu Copan'c.o 5< Abbascc A< AddasAW3Daascus

    Revision 0June 1! 'i

  • 8/10/2019 App Chap 12.doc

    12/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Appendi' E

    Mud *ogging Re;uire

  • 8/10/2019 App Chap 12.doc

    13/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Mud *ogging Re;uire

  • 8/10/2019 App Chap 12.doc

    14/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Mud *ogging Re;uire

    Al #urat )etroleu Copan'c.o 5< Abbas"eridien ,otelDaascus

    Set Cto be kept at the /ellsite until TD0 then sent to Daascus as above

    Chaber Si;e> Chaber Si;e>

    Saple Depth @

    #oration )ressure @psia

    #oration Teperature @o#

    Draining Location @Base.W

  • 8/10/2019 App Chap 12.doc

    18/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    Appendi' ?

    RF" +a

  • 8/10/2019 App Chap 12.doc

    19/19

    AFPC Drilling Operations Manual

    Chapter 12 - Appendices

    8;ample =uestionnaire >or 7amaged 8?uipment

    7escription

    Well> Date o% incident> ?pen or Cased ,ole>

    ,ole.Casing.Tubing Si;e> !quipent Si;e and +uber>

    ,ole Condition @deviation0 dogleg severit'0 /ashout0 undergauge0 %ish in hole0 etc

    Description o% daage>

    3t/er Wellsite 4n>ormation

    Was the TD . ,3D tagged 4 +o 5es E bd%

    An' obstruction observed during logging 4 +o 5es E bd%

    ,o/ /as tool response @overpull etc

    SLB !ngineer> A#)C Rep>

    Signature> Signature>

    3>>ice Comments

    Asset or !xpense ite 4

    Cost estiate >

    Date o% anu%acture @%or Assets onl'>

    Revision 0June 1! 'i'