ls1 project

Post on 04-Jan-2016

50 Views

Category:

Documents

22 Downloads

Preview:

Click to see full reader

DESCRIPTION

LS1 Project. Weld in dowel holes to move head over bores. Index and install new dowel hole. Remove seat rings for larger valves. Port cylinder head. Cut manifold in half for offset of heads. Flow head and manifold. With manifold cut in half, that makes porting easier. A second view. - PowerPoint PPT Presentation

TRANSCRIPT

LS1 Project

Weld in dowel holes to move head over bores

Index and install new dowel hole.

Remove seat rings for larger valves

Port cylinder head

Cut manifold in half for offset of heads

Flow head and manifold

With manifold cut in half, that makes porting easier.

A second view

Weld manifold together again

A better look at the offset

The bolt holes need to be offset also.

Finished bolt holes

Finished chambers

Rectangular port option

Springs and rocker pads

• For further information;• Call 845 473 1136• E-mail info1@dambest.com• Thanks for your time, have a great

day, John

top related