j.c. perez on behalf of smc collaboration team j.c. perez

Post on 07-Jan-2016

29 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

ESAC Review of the high field dipole design Magnet structure design, manufacturing, assembly procedure and tests March 2012 for EuCARD-WP7-HFM. J.C. Perez on behalf of SMC collaboration team J.C. Perez. Outline. Magnet structure design Manufacturing status Assembly procedure - PowerPoint PPT Presentation

TRANSCRIPT

ESAC REVIEW OF THE HIGH FIELD DIPOLE DESIGN

MAGNET STRUCTURE DESIGN, MANUFACTURING, ASSEMBLY

PROCEDURE AND TESTS

MARCH 2012FOR EUCARD-WP7-HFM

J.C. Perez on behalf of SMC collaboration team

J.C. Perez

2

OUTLINE

Magnet structure designManufacturing statusAssembly procedurePreparation for cold tests

28

/03

/20

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

3

MAGNET DESIGN

28

/03

/20

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

4

MANUFACTURING STATUS

Price inquiry for the structure launched in September 2011

The order placed in November 2011 has been split between 3 European companies Cold-mass to Aratz (Spain) Coil-pack (& dummy coil) to Boessenkool (Netherland) Axial compression system to Mectalent (Finland)

All detailed drawings have been approved in December 2011

Delivery of all components is expected by middle of April 2012

28

/03

/20

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

5

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

WORK IN PROGRESS ON COMPONENTS

28

/03

/20

12

2 sets of Bladders (60 and 75 mm *1600mm) will be produced @ CERN by end of May

6

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil layer 1-2

Coil layer 3-4

Fiber glass cloth filler

ASSEMBLY PROCEDURE

7

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

2 facing surfaces of the coils will be mold released Gap between coils will be filled with 0.9 mm fiber glass

cloth Impregnation of the fiber glass using the coils as cavity This will guarantee a perfect contact between the 2 coils This technique will allow to separate the coils in case of

failure of one coil

GAP IMPREGNATION

8

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil lifting tool

Coil rotation tooling

9

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Assembly sequence of the coils in the vertical pads

10

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Horizontal pads

COIL-PACK ASSEMBLY

Coil-pack assembly lifting tool

Coil-pack assembly

11

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil-pack rotating tooling

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil-pack lifting tooling

13

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

A CERN standard rotating device will be used to turn the magnet

½ yoke weight: 2400 kg

14

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

POSITIONING THE YOKE2

8/0

3/2

01

2

The 2 half yokes will be aligned with no gap in between

15

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Sliding the aluminum shell

16

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

17

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

An aluminum support structure will be used to clamp the magnet to the rotating device

18

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The flat surfaces of the two 1/2 yokes are in contact

19

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Two bladders will be used to push the ½ yokes towards the shell inner radius to allow gap keys insertion

Standard hydraulic jacks can be used instead of bladders

20

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Gap keys will be inserted in the yoke gap

21

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The assembled parts will be rotated to horizontal position

22

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Yoke and shell will be transported to an assembly table

23

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

INA type bearing rollers will be used to slide the coil-pack into the yoke

24

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The coil-pack will be transported to the assembly table

25

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The coil-pack will be pushed into the yoke aperture

26

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Detailed view of the coil-pack inserted in the yoke

27

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

3 vertical bladders will be used to lift the coil-pack and remove the rollers

28

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Temporary keys will be inserted to center the coil –pack into the yoke aperture

COILS LOADING OPERATION

29

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Horizontal bladders insertion

30

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Pumping horizontal bladders & insertionof horizontal keys

31

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Vertical bladders insertion

32

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Pumping vertical bladders & insertion of vertical keys

33

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Final configuration after loading operation

34

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Axial compression system

Bladders operation to change coil pre-stress remains possible after assembly of the end plates

35

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coils interconnection

36

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Magnet ready to be transported

37

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12From horizontal to vertical position in

SM18

38

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Magnet in the cryostat

39

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

ALUMINUM DUMMY COIL ASSEMBLY

The first mechanical assembly will be performed using aluminum blocks replacing the real coils

This will qualify the support structure, the assembly and loading procedure and validate the FEM

The aluminum dummy coils will be instrumented with strain gauges in the aperture

The way to cool-down the structure to 77 K in LN2 is under investigation

28

/03

/20

12

40

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

ACKNOWLEDGEMENTS

28

/03

/20

12

THANKS FOR YOUR ATTENTION

CEA/Saclay:M. Durante, P. Manil, J.F. Millot, J.M. Rifflet, F. Rondeaux,

CERN:P. Ferracin, E. Fornassiere, J. Humbert, A. Milanese, L. Oberli, M. Timmins, G. Villiger,,

Fresca2 collaboration team

top related