j.c. perez on behalf of smc collaboration team j.c. perez

40
ESAC REVIEW OF THE HIGH FIELD DIPOLE DESIGN MAGNET STRUCTURE DESIGN, MANUFACTURING, ASSEMBLY PROCEDURE AND TESTS MARCH 2012 FOR EUCARD-WP7-HFM J.C. Perez on behalf of SMC collaboration team J.C. Perez

Upload: torie

Post on 07-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

ESAC Review of the high field dipole design Magnet structure design, manufacturing, assembly procedure and tests March 2012 for EuCARD-WP7-HFM. J.C. Perez on behalf of SMC collaboration team J.C. Perez. Outline. Magnet structure design Manufacturing status Assembly procedure - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: J.C. Perez on behalf of SMC collaboration team J.C. Perez

ESAC REVIEW OF THE HIGH FIELD DIPOLE DESIGN

MAGNET STRUCTURE DESIGN, MANUFACTURING, ASSEMBLY

PROCEDURE AND TESTS

MARCH 2012FOR EUCARD-WP7-HFM

J.C. Perez on behalf of SMC collaboration team

J.C. Perez

Page 2: J.C. Perez on behalf of SMC collaboration team J.C. Perez

2

OUTLINE

Magnet structure designManufacturing statusAssembly procedurePreparation for cold tests

28

/03

/20

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

Page 3: J.C. Perez on behalf of SMC collaboration team J.C. Perez

3

MAGNET DESIGN

28

/03

/20

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

Page 4: J.C. Perez on behalf of SMC collaboration team J.C. Perez

4

MANUFACTURING STATUS

Price inquiry for the structure launched in September 2011

The order placed in November 2011 has been split between 3 European companies Cold-mass to Aratz (Spain) Coil-pack (& dummy coil) to Boessenkool (Netherland) Axial compression system to Mectalent (Finland)

All detailed drawings have been approved in December 2011

Delivery of all components is expected by middle of April 2012

28

/03

/20

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

Page 5: J.C. Perez on behalf of SMC collaboration team J.C. Perez

5

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

WORK IN PROGRESS ON COMPONENTS

28

/03

/20

12

2 sets of Bladders (60 and 75 mm *1600mm) will be produced @ CERN by end of May

Page 6: J.C. Perez on behalf of SMC collaboration team J.C. Perez

6

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil layer 1-2

Coil layer 3-4

Fiber glass cloth filler

ASSEMBLY PROCEDURE

Page 7: J.C. Perez on behalf of SMC collaboration team J.C. Perez

7

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

2 facing surfaces of the coils will be mold released Gap between coils will be filled with 0.9 mm fiber glass

cloth Impregnation of the fiber glass using the coils as cavity This will guarantee a perfect contact between the 2 coils This technique will allow to separate the coils in case of

failure of one coil

GAP IMPREGNATION

Page 8: J.C. Perez on behalf of SMC collaboration team J.C. Perez

8

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil lifting tool

Coil rotation tooling

Page 9: J.C. Perez on behalf of SMC collaboration team J.C. Perez

9

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Assembly sequence of the coils in the vertical pads

Page 10: J.C. Perez on behalf of SMC collaboration team J.C. Perez

10

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Horizontal pads

COIL-PACK ASSEMBLY

Coil-pack assembly lifting tool

Coil-pack assembly

Page 11: J.C. Perez on behalf of SMC collaboration team J.C. Perez

11

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil-pack rotating tooling

Page 12: J.C. Perez on behalf of SMC collaboration team J.C. Perez

12

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coil-pack lifting tooling

Page 13: J.C. Perez on behalf of SMC collaboration team J.C. Perez

13

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

A CERN standard rotating device will be used to turn the magnet

½ yoke weight: 2400 kg

Page 14: J.C. Perez on behalf of SMC collaboration team J.C. Perez

14

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

POSITIONING THE YOKE2

8/0

3/2

01

2

The 2 half yokes will be aligned with no gap in between

Page 15: J.C. Perez on behalf of SMC collaboration team J.C. Perez

15

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Sliding the aluminum shell

Page 16: J.C. Perez on behalf of SMC collaboration team J.C. Perez

16

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Page 17: J.C. Perez on behalf of SMC collaboration team J.C. Perez

17

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

An aluminum support structure will be used to clamp the magnet to the rotating device

Page 18: J.C. Perez on behalf of SMC collaboration team J.C. Perez

18

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The flat surfaces of the two 1/2 yokes are in contact

Page 19: J.C. Perez on behalf of SMC collaboration team J.C. Perez

19

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Two bladders will be used to push the ½ yokes towards the shell inner radius to allow gap keys insertion

Standard hydraulic jacks can be used instead of bladders

Page 20: J.C. Perez on behalf of SMC collaboration team J.C. Perez

20

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Gap keys will be inserted in the yoke gap

Page 21: J.C. Perez on behalf of SMC collaboration team J.C. Perez

21

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The assembled parts will be rotated to horizontal position

Page 22: J.C. Perez on behalf of SMC collaboration team J.C. Perez

22

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Yoke and shell will be transported to an assembly table

Page 23: J.C. Perez on behalf of SMC collaboration team J.C. Perez

23

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

INA type bearing rollers will be used to slide the coil-pack into the yoke

Page 24: J.C. Perez on behalf of SMC collaboration team J.C. Perez

24

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The coil-pack will be transported to the assembly table

Page 25: J.C. Perez on behalf of SMC collaboration team J.C. Perez

25

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

The coil-pack will be pushed into the yoke aperture

Page 26: J.C. Perez on behalf of SMC collaboration team J.C. Perez

26

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Detailed view of the coil-pack inserted in the yoke

Page 27: J.C. Perez on behalf of SMC collaboration team J.C. Perez

27

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

3 vertical bladders will be used to lift the coil-pack and remove the rollers

Page 28: J.C. Perez on behalf of SMC collaboration team J.C. Perez

28

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Temporary keys will be inserted to center the coil –pack into the yoke aperture

COILS LOADING OPERATION

Page 29: J.C. Perez on behalf of SMC collaboration team J.C. Perez

29

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Horizontal bladders insertion

Page 30: J.C. Perez on behalf of SMC collaboration team J.C. Perez

30

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Pumping horizontal bladders & insertionof horizontal keys

Page 31: J.C. Perez on behalf of SMC collaboration team J.C. Perez

31

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Vertical bladders insertion

Page 32: J.C. Perez on behalf of SMC collaboration team J.C. Perez

32

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Pumping vertical bladders & insertion of vertical keys

Page 33: J.C. Perez on behalf of SMC collaboration team J.C. Perez

33

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Final configuration after loading operation

Page 34: J.C. Perez on behalf of SMC collaboration team J.C. Perez

34

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Axial compression system

Bladders operation to change coil pre-stress remains possible after assembly of the end plates

Page 35: J.C. Perez on behalf of SMC collaboration team J.C. Perez

35

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Coils interconnection

Page 36: J.C. Perez on behalf of SMC collaboration team J.C. Perez

36

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Magnet ready to be transported

Page 37: J.C. Perez on behalf of SMC collaboration team J.C. Perez

37

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12From horizontal to vertical position in

SM18

Page 38: J.C. Perez on behalf of SMC collaboration team J.C. Perez

38

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

28

/03

/20

12

Magnet in the cryostat

Page 39: J.C. Perez on behalf of SMC collaboration team J.C. Perez

39

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

ALUMINUM DUMMY COIL ASSEMBLY

The first mechanical assembly will be performed using aluminum blocks replacing the real coils

This will qualify the support structure, the assembly and loading procedure and validate the FEM

The aluminum dummy coils will be instrumented with strain gauges in the aperture

The way to cool-down the structure to 77 K in LN2 is under investigation

28

/03

/20

12

Page 40: J.C. Perez on behalf of SMC collaboration team J.C. Perez

40

J.C. Pe

rez T

E-M

SC

-MD

T E

uC

AR

D W

P7

-HFM

E

SA

C R

evie

w (C

ER

N)

ACKNOWLEDGEMENTS

28

/03

/20

12

THANKS FOR YOUR ATTENTION

CEA/Saclay:M. Durante, P. Manil, J.F. Millot, J.M. Rifflet, F. Rondeaux,

CERN:P. Ferracin, E. Fornassiere, J. Humbert, A. Milanese, L. Oberli, M. Timmins, G. Villiger,,

Fresca2 collaboration team