hudson river park gansevoort peninsula · presentation and discussion 09/10/2019 presentation and...
Post on 24-Jul-2020
1 Views
Preview:
TRANSCRIPT
HUDSON RIVER PARKGANSEVOORTPENINSULA DESIGN UPDATE | JANUARY 08, 2020
gansevoort peninsula | hudson river park, ny 07.24.2019 | Field operations
gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations
ANALYSIS
03/06/19
COMMUNITY BOARD MEETING
03/26/19
COMMUNITY INPUT WORKSHOP 2
07/24/19
PRESENTATION AND DISCUSSION
09/10/2019
PRESENTATION AND DISCUSSION
01/08/2020
PRESENTATION AND DISCUSSION
CONSTRUCTION START - fALL 2020
COMPLETION - 2022
EARLY SPRING
fINAL DESIGN
CONCEPT DESIGN
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
WHERE WE ARE
CONCEPT SKETCH
IN-WATER HABITAT
INTERTIDAL HABITAT
ENGAGE THE RIVER
UPLAND BEACH
PASSIVE RECREATION
VARIED EDGES
ACTIVE RECREATION
CONCEPT PLAN_CB2 MEETING_09/10/19
CB 2 COMMENTS:
• INCORPORATE fITNESS EqUIPMENT
• MAKE SOUTHERN EDGE MORE OPEN AND ENGAGING
• RESILIENCY APPROACH
KAYAKING COMMUNITY COMMENTS:
• ADD LEDGES fOR LANDING AND LAUNCHING KAYAKS
• ExPLORE SOfTER RAMP MATERIALS
M&O + RESTROOMS
BALLfIELD13TH AVE PROMENADE
OYSTER CAGES & REEf BALLS
RIVER GYM
UPLAND BEACH
LAWN LEDGE
DOG RUN
NORTH NOOKS
HUDSON BALCONY KAYAK ACCESS
BEACH WALK
SOUTH EDGE ACCESS
PINE GROVE
SALT MARSH
CONCESSION
SITE PLAN & PROGRAMS
SITE AERIAL
NORTHERN NOOKS, SALT MARSH, & DOG RUN
RIVER GYM
RIVER GYM
RIVER GYM
RIVER GYM
13TH AVE PROMENADE
13TH AVE LOUNGES
13TH AVE PICNIC GROVE
HUDSON BALCONY
gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations
SOUTHERN EDGE UPDATES
SOUTHERN EDGE - 09/10/19
SOUTHERN EDGE - UPDATE
SOUTHERN EDGE fROM PROMENADE - 09/10/19
SOUTHERN EDGE fROM PROMENADE - UPDATE
KAYAK ACCESS SECTION
KAYAK LANDING - 09/10/19
KAYAK LANDING - UPDATE
SOUTH EDGE @ HIGH TIDE
SOUTH EDGE @ MID TIDE
SOUTH EDGE @ LOW TIDE
gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations
RESILIENCY UPDATES
[x.xx] - ExISTING GRADEx.xx - PROPOSED GRADE - RAIN GARDENS
GRADING PLAN
[x.xx] - ExISTING GRADEx.xx - PROPOSED GRADE - RAIN GARDENS
100 YR STORM ELEV = +13.00’
[x.xx] - ExISTING GRADEx.xx - PROPOSED GRADE
- RETAINING EDGE
GRADING PLAN - ELEVATED BALLfIELD
gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations
ARCHITECTURE UPDATES
Canopy cuts referencingGordon Matta Clark for daylight
Cast-in-place concrete
Sedum roof
Concrete structural wall
Perforated shingle rainscreen
Accent color cladding
Hanging plants
Oyster aggregate concrete
or
+
+
2GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
PORCH CONCEPT
3GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
69'-3"
VOLUME 1VOLUME 2
VOLUME 3
WC MALE(212 SF)
JANITOR(30 SF)
STAFF ROOM /OFFICE (246 SF)
WC FEMALE(212 SF)
ELEC. ROOM(113 SF)
MECH. & PLUM.ROOM (137 SF)
M&O STORAGE(1250 SF)
M&O YARD(1130 SF)
KITCHEN &SERVICE (428 SF)
MEP(95 SF)
TRASH(57 SF)
DRINKINGFOUNTAIN
UTILITYHUB YARD
UTILITY HUB(EXISTING, NIC.)
35'-0" 29'-7"26'-7"64'-3"
34'-2"29'-6"
20'-0
"
25'-0
"
41'-6
"37
'-0"
32'-4
"
7'-0"
15'-0
"12
'-4"
9'-0"
17'-6"
33'-0"
15°
7'-3"
7'-6"
+10.50'FFE
+10.70'FFE
+10.50'FFE
+10.00'FFE
+10.00'FFE
+13.40'FFE
+13.40'FFE
+13.40'FFE
+6.00'FFE
+10.60'
+10.20'9'-0"
9'-0"
FIRST FLOOR PLAN
12.11.19
0 10' 20'1/16" = 1' N
69'-3"
VOLUME 1VOLUME 2
VOLUME 3
WC MALE(212 SF)
JANITOR(30 SF)
STAFF ROOM/OFFICE (246 SF)
WC FEMALE(212 SF)
ELEC. ROOM(113 SF)
MECH. & PLUM.ROOM (137 SF)
M&O STORAGE(1250 SF)
M&O YARD(1130 SF)
KITCHEN &SERVICE (428 SF)
MEP(95 SF)
TRASH(57 SF)
DRINKINGFOUNTAIN
UTILITYHUB YARD
UTILITY HUB(EXISTING, NIC.)
35'-0" 29'-7"26'-7"64'-3"
34'-2"29'-6"
20'-0
"
25'-0
"
41'-6
"37
'-0"
32'-4
"
7'-0"
15'-0
"12
'-4"
9'-0"
17'-6"
33'-0"
15°
9'-11
"5'-
2"
+10.50'FFE
+10.70'FFE
+10.50'FFE
+10.00'FFE
+10.00'FFE
+13.40'FFE
+13.40'FFE
+13.40'FFE
+6.00'FFE
+10.60'
+10.20'9'-0"
9'-0"
FIRST FLOOR PLAN
12.11.19
0 10' 20'1/16" = 1' N
FLOOR PLAN
4GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
View of western porch to ballfield
PARK COMFORT STATION
5GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
PARK COMFORT STATION
View of public WC entry wall
6GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
PARK COMFORT STATION
View of public gateway to ballfield
7GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
VOLUME 1VOLUME 2
VOLUME 3
UTILITY HUB(EXISTING, NIC.)
ROOF PLAN
12.11.19
0 10' 20'1/16" = 1' N
VOLUME 1VOLUME 2
VOLUME 3
UTILITY HUB(EXISTING, NIC.)
ROOF PLAN
12.11.19
0 10' 20'1/16" = 1' N
69'-3"
VOLUME 1VOLUME 2
VOLUME 3
WC MALE(212 SF)
JANITOR(30 SF)
STAFF ROOM/OFFICE (246 SF)
WC FEMALE(212 SF)
ELEC. ROOM(113 SF)
MECH. & PLUM.ROOM (137 SF)
M&O STORAGE(1250 SF)
M&O YARD(1130 SF)
KITCHEN &SERVICE (428 SF)
MEP(95 SF)
TRASH(57 SF)
DRINKINGFOUNTAIN
UTILITYHUB YARD
UTILITY HUB(EXISTING, NIC.)
35'-0" 29'-7"26'-7"64'-3"
34'-2"29'-6"
20'-0
"
25'-0
"
41'-6
"37
'-0"
32'-4
"
7'-0"
15'-0
"12
'-4"
9'-0"
17'-6"
33'-0"
15°
9'-11
"5'-
2"
+10.50'FFE
+10.70'FFE
+10.50'FFE
+10.00'FFE
+10.00'FFE
+13.40'FFE
+13.40'FFE
+13.40'FFE
+6.00'FFE
+10.60'
+10.20'9'-0"
9'-0"
FIRST FLOOR PLAN
12.11.19
0 10' 20'1/16" = 1' N
GREEN ROOF & SUSTAINABILITY
CANOPY DRAINS TO GREEN ROOFAS NATURAL WATER RETENTION SYSTEM
GREEN ROOF AREA2,645 SF
8GANSEVOORT PENINSULAnARCHITECTS
COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020
FLOOD PROOFING
FFE +10'FFE +10.5'
M&O STORAGE ELECTRICALROOM FEMALE WC
FFE +10'
+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF M&O VOLUME
+3'-4" (+13'-4")D.F.E.
+4'-0" (+10'-0")M&O STORAGE FFE
+0'-0" (+6'-0")UTILITY HUB (NIC)
3'-4"
Metal raised deck andstair at Design FloodElevation (13'-4") formechanical equip.
+9.8'-10.7'
Deployable floodbarriers to doors.
Deployable floodbarriers to doors.
MECHANICALROOM
FFE +10.5' FFE +10.5' +10.5'-10.7'+10.5'-10.7'
+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF VOLUME
+2'-7 5/8" (+13'-4")D.F.E.
+0'-0" (+6'-0")UTILITY HUB (NIC)
+4'-0" (+10'-0")M&O STORAGE FFE
CONCESSIONMEP
KITCHEN& SERVICE
Sanitary ventilation pipe,see plumbing drawings
Date:
Revision
Contract No. Cxxxx
Approved by:
Scale:
Drawn by:
DrawingTitle:
Key Plan
DateNo.
Sheet No.
Seal
Commissioner,Mitchell J. Silver
Commissioner,Basil Seggos
Parks & RecreationCity of New York
Environmental ConservationNew York State Department of
Manhattan Borough President
Bill de Blasio
Recreation and Historic Preservation
Governor, State of New York
The Honorable
Vice Chair,Hudson River Park Trust
Commissioner,
Hudson River Park TrustPresident & CEO,
Erik Kulleseid
New York State Office of Parks,
Madelyn Wils
Hudson River Park Trust
Gale A. Brewer
Diana L. Taylor
Justin Sadrian
Chair,
The HonorableAndrew Cuomo
The Honorable
Mayor, City of New York
RIVERHUDSON
PARK
475 10th Avenue, 9th Fl, New York, NY 10017James Corner Field Operations
GansevoortPeninsula
Segment 5
Cxxxx
100% SCHEMATIC DESIGN
Philip Habib & Associates102 Madison Ave, New York, NY 10016
Silman32 Old Slip, 10th Fl, New York, NY 10005
eDesign Dynamics402 West 40th St, New York, NY 10018
TMS Waterfront181 Westchester Ave, Port Chester, NY 10573
Horton Lees Brogden Lighting Design338 East 32nd st, 11th Fl, New York, NY 10016
Altieri Sebor Wieber LLC31 Knight St, Norwalk, CT 06851
Holmes Keough Associates526 East 20th St, Suite 4D, New York, NY 10009
Craul Land Scientist Inc2505, Buchenhorst Rd, State College, PA 16801
Plus Group32 Broadway, Suite 1601, New York, NY 10004
KS Engineers494 Broad Street, 4th Fl, Newark, NJ 07102
CAS Group LLC2219 Sawdust Rd, Suite 1603, The Woodlands, TX 77380
Dharam Consulting1719 Chestnut St, #300, Philadelphia, PA 19103
Northern Designs LLC2089 Hartford Turnpike, North Haven, CT 06473
Langan360 West 31st St, 8th Fl, New York, NY 10001
nArchitects68 Jay St, #317, New York, NY 11201
50% Schematic Design09.13.191
100% Schematic Design09.27.192
A-3011/4" = 1'
BUILDING LONGSECTION
Sep. 26, 2019
MH
LM
01 LONG SECTION1/4" = 1'-0"
FFE +10'FFE +10.5'
M&O STORAGE ELECTRICALROOM FEMALE WC
FFE +10'
+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF M&O VOLUME
+3'-4" (+13'-4")D.F.E.
+4'-0" (+10'-0")M&O STORAGE FFE
+0'-0" (+6'-0")UTILITY HUB (NIC)
3'-4"
Metal raised deck andstair at Design FloodElevation (13'-4") formechanical equip.
+9.8'-10.7'
Deployable floodbarriers to doors.
Deployable floodbarriers to doors.
MECHANICALROOM
FFE +10.5' FFE +10.5' +10.5'-10.7'+10.5'-10.7'
+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF VOLUME
+2'-7 5/8" (+13'-4")D.F.E.
+0'-0" (+6'-0")UTILITY HUB (NIC)
+4'-0" (+10'-0")M&O STORAGE FFE
CONCESSIONMEP
KITCHEN& SERVICE
Sanitary ventilation pipe,see plumbing drawings
Date:
Revision
Contract No. Cxxxx
Approved by:
Scale:
Drawn by:
DrawingTitle:
Key Plan
DateNo.
Sheet No.
Seal
Commissioner,Mitchell J. Silver
Commissioner,Basil Seggos
Parks & RecreationCity of New York
Environmental ConservationNew York State Department of
Manhattan Borough President
Bill de Blasio
Recreation and Historic Preservation
Governor, State of New York
The Honorable
Vice Chair,Hudson River Park Trust
Commissioner,
Hudson River Park TrustPresident & CEO,
Erik Kulleseid
New York State Office of Parks,
Madelyn Wils
Hudson River Park Trust
Gale A. Brewer
Diana L. Taylor
Justin Sadrian
Chair,
The HonorableAndrew Cuomo
The Honorable
Mayor, City of New York
RIVERHUDSON
PARK
475 10th Avenue, 9th Fl, New York, NY 10017James Corner Field Operations
GansevoortPeninsula
Segment 5
Cxxxx
100% SCHEMATIC DESIGN
Philip Habib & Associates102 Madison Ave, New York, NY 10016
Silman32 Old Slip, 10th Fl, New York, NY 10005
eDesign Dynamics402 West 40th St, New York, NY 10018
TMS Waterfront181 Westchester Ave, Port Chester, NY 10573
Horton Lees Brogden Lighting Design338 East 32nd st, 11th Fl, New York, NY 10016
Altieri Sebor Wieber LLC31 Knight St, Norwalk, CT 06851
Holmes Keough Associates526 East 20th St, Suite 4D, New York, NY 10009
Craul Land Scientist Inc2505, Buchenhorst Rd, State College, PA 16801
Plus Group32 Broadway, Suite 1601, New York, NY 10004
KS Engineers494 Broad Street, 4th Fl, Newark, NJ 07102
CAS Group LLC2219 Sawdust Rd, Suite 1603, The Woodlands, TX 77380
Dharam Consulting1719 Chestnut St, #300, Philadelphia, PA 19103
Northern Designs LLC2089 Hartford Turnpike, North Haven, CT 06473
Langan360 West 31st St, 8th Fl, New York, NY 10001
nArchitects68 Jay St, #317, New York, NY 11201
50% Schematic Design09.13.191
100% Schematic Design09.27.192
A-3011/4" = 1'
BUILDING LONGSECTION
Sep. 26, 2019
MH
LM
01 LONG SECTION1/4" = 1'-0"
M&O flood proofing section
top related