a7 · above ramp or stair nosing. 3/8" solid rod welded to pipe and wall bracket wall bracket...

Post on 18-Jun-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

WALL BRACKET - SPACEEQUALLY 5'-0" O.C. MAX.& 1'-0" FROM ENDS

WALL MOUNT BRACKET

WALL MOUNT

FINISH EDGE OF WALL

1 1/2" STD Handrail Pipe Rail. MountAbove Ramp or Stair Nosing.

3/8" Solid Rod Welded toPipe and Wall Bracket

Wall Bracket

Countersunk Anchors

MIN1 1/2"

Steel Angle Welded toEmbedded Steel Angle(Prime and Paint)

3' - 6

"

1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)

Fully Weld Tube SteelPosts to Steel Angle

2" x 2" Steel Tube, Weld to Posts(Prime and Paint)

3/4" Steel Barstock @ 6" O.C.(Prime and Paint)

INTERMEDIATE POST NOMORE THAN 60" O.C.

PRIME AND PAINT ALLFERROUS METALS

4"

1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)

4"

J-Mould

5/8" Gypsum Wall BoardL.W. Stud Framing

Floor SlabRe: Structural

Bar JoistRe: Structural

2" x 2" Steel Tube Posts Beyond@ 5'-0" O.C. Max Spacing/SpreadPattern to Fit(Prime and Paint)

1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)

2" x 2" Steel Tube, Weld to Posts(Prime and Paint)

3/4" Steel Barstock @ 6" O.C.(Prime and Paint)

ELEVATION

Steel Angle Welded toEmbedded Steel Angle(Prime and Paint)

Fully Weld Tube SteelPosts to Steel Angle

TOGGLE OR EXPANSION BOLTAS REQUIRED TO PROPERLYSECURE HANDRAIL TO WALL

MALLEABLE IRONEND CAP

MALLEABLE IRON FLAT TOPEWALL BRACKET @ 5'-0" O.C.

3' - 0

"

1' - 11"

3' - 0

"

S.S. Plate Cover, Fasten withAppropriate Clip Fastener

T.S 1 1/2" Diam. ContinuousHandrail (Prime and Paint)

T.S 1 1/2" Diam. Continuous Rail(Prime and Paint)

Steel Sleeve Set in Slab

Fully Weld Tube Steel to Sleeve

5"

3' - 0

"

T.S 1 1/2" Diam. Post @ 5'-0"O.C. Max Spacing/SpreadPattern to Fit as Shown on1/A7.2 and 2/A7.2 (Prime andPaint)

8" CMU w/ Ladder TypeReinforcing @ 16" O.C. Vertically

Fluid Applied Air/Weather BarrierOver CMU (Applies to Both Sides)

2" Air Space (Applies to Both Sides)

Brick Veneer w/ Masonry Ties@ 16" O.C. each way

(Applies to Both Sides)

Weep Cell Vent @ 24" O.C.

Mortar Net

Termination Bar Seal Over w/ Liquid Flashing

Continuous Coated Copper Flashing

Stainless Steel Base Flashing

Compacted Fill

Cast-in-Place Concrete Slaband Footing Re: Structural

15 mil Vapor Barrier

Crushed Stone

Fill w/ Grout

8" CMU Bond Beam

Fluid Applied Air/Weather BarrierOver CMU (Applies to Both Sides)

2" Air Space (Applies to Both Sides)

Brick Veneer w/ Masonry Ties @16" O.C. each way

(Applies to Both Sides)

Metal Flashing(Applies to Both Sides)

MembraneBrick CapGrout

Fluid Applied Air/Weather BarrierOver Concrete Stem Wall

8" CMU w/ Ladder TypeReinforcing @ 16" O.C. Vertically

Fluid Applied Air/Weather BarrierOver CMU Both Sides(Applies to Both Sides)

Weep Cell Vent @ 24" O.C.

Mortar Net

Termination Bar Seal Over w/ Liquid Flashing

Continuous Coated Copper Flashing

Stainless Steel Base Flashing

Compacted Fill

Cast-in-Place Concrete Slaband Footing Re: Structural

15 mil Vapor Barrier

Crushed Stone

Weep Cell Vent @ 24" O.C.

Mortar Net

Termination Bar Seal Over w/ Liquid Flashing

Continuous Coated Copper Flashing

Stainless Steel Base Flashing

Fill w/ Grout

2" Air Space (Applies to Both Sides)

Brick Veneer w/ Masonry Ties@ 16" O.C. each way(Applies to Both Sides)

REGISTERED R

ETIHCA

CT

ST A T E O F ISS SSI

II

M

PP

Michael W.

4822

Taylor

PROJECT NO.

CHECKED BY:DRAWN BY:

PryorMorrow PCC 2016Copyright

SCALE:

PryorMorrow

9/1/

2017

3:3

5:16

PM

As indicated

Col

umbu

s, M

issi

ssip

pi

2016111LAS

MWT

STAIR/RAMP/RAILINGDETAILS

A7.4

Demo

nstra

tion S

choo

l Ren

ovati

onG.

S.#1

04-18

7

Bure

au o

f Bui

ldin

g, G

roun

ds a

nd R

eal P

rope

rty M

anag

emen

t

3" = 1'-0"4 HANDRAIL ATTACHMENT 3" = 1'-0"7 RAILING DETAIL

1 1/2" = 1'-0"5 HANDRAIL ATTACHMENT @ WALL 3" = 1'-0"6 RAILING DETAIL

3" = 1'-0"2 DETAIL

3" = 1'-0"3 DETAIL

3" = 1'-0"1 DETAIL

MAR

KDA

TEDE

SCRI

PTIO

NSD

June

17,

201

6SC

HEM

ATIC

DES

IGN

DD

Nov

embe

r 30,

201

6D

ESIG

N D

EVEL

OPM

ENT

CD

May

31,

201

7C

ON

STR

UC

TIO

N D

OC

UM

ENTS

(75%

)C

DJu

ly 1

4, 2

017

CO

NST

RU

CTI

ON

DO

CU

MEN

TS (1

00%

)C

DSe

ptem

ber 5

, 201

7O

FFIC

IAL

BID

DO

CU

MEN

TS

2017

mtaylor
Signature
mtaylor
Typewritten Text
09/5/2017

top related