a7 · above ramp or stair nosing. 3/8" solid rod welded to pipe and wall bracket wall bracket...

1
WALL BRACKET - SPACE EQUALLY 5'-0" O.C. MAX. & 1'-0" FROM ENDS WALL MOUNT BRACKET WALL MOUNT FINISH EDGE OF WALL 1 1/2" STD Handrail Pipe Rail. Mount Above Ramp or Stair Nosing. 3/8" Solid Rod Welded to Pipe and Wall Bracket Wall Bracket Countersunk Anchors MIN 1 1/2" Steel Angle Welded to Embedded Steel Angle (Prime and Paint) 3' - 6" 1 1/2" x 1 1/2" Steel Tube, Weld to Posts (Prime and Paint) Fully Weld Tube Steel Posts to Steel Angle 2" x 2" Steel Tube, Weld to Posts (Prime and Paint) 3/4" Steel Barstock @ 6" O.C. (Prime and Paint) INTERMEDIATE POST NO MORE THAN 60" O.C. PRIME AND PAINT ALL FERROUS METALS 4" 1 1/2" x 1 1/2" Steel Tube, Weld to Posts (Prime and Paint) 4" J-Mould 5/8" Gypsum Wall Board L.W. Stud Framing Floor Slab Re: Structural Bar Joist Re: Structural 2" x 2" Steel Tube Posts Beyond @ 5'-0" O.C. Max Spacing/Spread Pattern to Fit (Prime and Paint) 1 1/2" x 1 1/2" Steel Tube, Weld to Posts (Prime and Paint) 2" x 2" Steel Tube, Weld to Posts (Prime and Paint) 3/4" Steel Barstock @ 6" O.C. (Prime and Paint) ELEVATION Steel Angle Welded to Embedded Steel Angle (Prime and Paint) Fully Weld Tube Steel Posts to Steel Angle TOGGLE OR EXPANSION BOLT AS REQUIRED TO PROPERLY SECURE HANDRAIL TO WALL MALLEABLE IRON END CAP MALLEABLE IRON FLAT TOPE WALL BRACKET @ 5'-0" O.C. 3' - 0" 1' - 11" 3' - 0" S.S. Plate Cover, Fasten with Appropriate Clip Fastener T.S 1 1/2" Diam. Continuous Handrail (Prime and Paint) T.S 1 1/2" Diam. Continuous Rail (Prime and Paint) Steel Sleeve Set in Slab Fully Weld Tube Steel to Sleeve 5" 3' - 0" T.S 1 1/2" Diam. Post @ 5'-0" O.C. Max Spacing/Spread Pattern to Fit as Shown on 1/A7.2 and 2/A7.2 (Prime and Paint) 8" CMU w/ Ladder Type Reinforcing @ 16" O.C. Vertically Fluid Applied Air/Weather Barrier Over CMU (Applies to Both Sides) 2" Air Space (Applies to Both Sides) Brick Veneer w/ Masonry Ties @ 16" O.C. each way (Applies to Both Sides) Weep Cell Vent @ 24" O.C. Mortar Net Termination Bar Seal Over w/ Liquid Flashing Continuous Coated Copper Flashing Stainless Steel Base Flashing Compacted Fill Cast-in-Place Concrete Slab and Footing Re: Structural 15 mil Vapor Barrier Crushed Stone Fill w/ Grout 8" CMU Bond Beam Fluid Applied Air/Weather Barrier Over CMU (Applies to Both Sides) 2" Air Space (Applies to Both Sides) Brick Veneer w/ Masonry Ties @ 16" O.C. each way (Applies to Both Sides) Metal Flashing (Applies to Both Sides) Membrane Brick Cap Grout Fluid Applied Air/Weather Barrier Over Concrete Stem Wall 8" CMU w/ Ladder Type Reinforcing @ 16" O.C. Vertically Fluid Applied Air/Weather Barrier Over CMU Both Sides (Applies to Both Sides) Weep Cell Vent @ 24" O.C. Mortar Net Termination Bar Seal Over w/ Liquid Flashing Continuous Coated Copper Flashing Stainless Steel Base Flashing Compacted Fill Cast-in-Place Concrete Slab and Footing Re: Structural 15 mil Vapor Barrier Crushed Stone Weep Cell Vent @ 24" O.C. Mortar Net Termination Bar Seal Over w/ Liquid Flashing Continuous Coated Copper Flashing Stainless Steel Base Flashing Fill w/ Grout 2" Air Space (Applies to Both Sides) Brick Veneer w/ Masonry Ties @ 16" O.C. each way (Applies to Both Sides) REGISTEREDRETIHCACTSTATEOFISSSSIIIMPPMichaelW.4822TaylorPROJECT NO. CHECKED BY: DRAWN BY: PryorMorrow PC C 2016 Copyright SCALE: PryorMorrow 9/1/2017 3:35:16 PM As indicated Columbus, Mississippi 2016111 LAS MWT STAIR/RAMP/RAILING DETAILS A7.4 Demonstration School Renovation G.S.#104-187 Bureau of Building, Grounds and Real Property Management 3" = 1'-0" 4 HANDRAIL ATTACHMENT 3" = 1'-0" 7 RAILING DETAIL 1 1/2" = 1'-0" 5 HANDRAIL ATTACHMENT @ WALL 3" = 1'-0" 6 RAILING DETAIL 3" = 1'-0" 2 DETAIL 3" = 1'-0" 3 DETAIL 3" = 1'-0" 1 DETAIL MARK DATE DESCRIPTION SD June 17, 2016 SCHEMATIC DESIGN DD November 30, 2016 DESIGN DEVELOPMENT CD May 31, 2017 CONSTRUCTION DOCUMENTS (75%) CD July 14, 2017 CONSTRUCTION DOCUMENTS (100%) CD September 5, 2017 OFFICIAL BID DOCUMENTS 2017

Upload: others

Post on 18-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A7 · Above Ramp or Stair Nosing. 3/8" Solid Rod Welded to Pipe and Wall Bracket Wall Bracket Countersunk Anchors MIN 1 1/2" Steel Angle Welded to Embedded Steel Angle (Prime and

WALL BRACKET - SPACEEQUALLY 5'-0" O.C. MAX.& 1'-0" FROM ENDS

WALL MOUNT BRACKET

WALL MOUNT

FINISH EDGE OF WALL

1 1/2" STD Handrail Pipe Rail. MountAbove Ramp or Stair Nosing.

3/8" Solid Rod Welded toPipe and Wall Bracket

Wall Bracket

Countersunk Anchors

MIN1 1/2"

Steel Angle Welded toEmbedded Steel Angle(Prime and Paint)

3' - 6

"

1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)

Fully Weld Tube SteelPosts to Steel Angle

2" x 2" Steel Tube, Weld to Posts(Prime and Paint)

3/4" Steel Barstock @ 6" O.C.(Prime and Paint)

INTERMEDIATE POST NOMORE THAN 60" O.C.

PRIME AND PAINT ALLFERROUS METALS

4"

1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)

4"

J-Mould

5/8" Gypsum Wall BoardL.W. Stud Framing

Floor SlabRe: Structural

Bar JoistRe: Structural

2" x 2" Steel Tube Posts Beyond@ 5'-0" O.C. Max Spacing/SpreadPattern to Fit(Prime and Paint)

1 1/2" x 1 1/2" Steel Tube,Weld to Posts(Prime and Paint)

2" x 2" Steel Tube, Weld to Posts(Prime and Paint)

3/4" Steel Barstock @ 6" O.C.(Prime and Paint)

ELEVATION

Steel Angle Welded toEmbedded Steel Angle(Prime and Paint)

Fully Weld Tube SteelPosts to Steel Angle

TOGGLE OR EXPANSION BOLTAS REQUIRED TO PROPERLYSECURE HANDRAIL TO WALL

MALLEABLE IRONEND CAP

MALLEABLE IRON FLAT TOPEWALL BRACKET @ 5'-0" O.C.

3' - 0

"

1' - 11"

3' - 0

"

S.S. Plate Cover, Fasten withAppropriate Clip Fastener

T.S 1 1/2" Diam. ContinuousHandrail (Prime and Paint)

T.S 1 1/2" Diam. Continuous Rail(Prime and Paint)

Steel Sleeve Set in Slab

Fully Weld Tube Steel to Sleeve

5"

3' - 0

"

T.S 1 1/2" Diam. Post @ 5'-0"O.C. Max Spacing/SpreadPattern to Fit as Shown on1/A7.2 and 2/A7.2 (Prime andPaint)

8" CMU w/ Ladder TypeReinforcing @ 16" O.C. Vertically

Fluid Applied Air/Weather BarrierOver CMU (Applies to Both Sides)

2" Air Space (Applies to Both Sides)

Brick Veneer w/ Masonry Ties@ 16" O.C. each way

(Applies to Both Sides)

Weep Cell Vent @ 24" O.C.

Mortar Net

Termination Bar Seal Over w/ Liquid Flashing

Continuous Coated Copper Flashing

Stainless Steel Base Flashing

Compacted Fill

Cast-in-Place Concrete Slaband Footing Re: Structural

15 mil Vapor Barrier

Crushed Stone

Fill w/ Grout

8" CMU Bond Beam

Fluid Applied Air/Weather BarrierOver CMU (Applies to Both Sides)

2" Air Space (Applies to Both Sides)

Brick Veneer w/ Masonry Ties @16" O.C. each way

(Applies to Both Sides)

Metal Flashing(Applies to Both Sides)

MembraneBrick CapGrout

Fluid Applied Air/Weather BarrierOver Concrete Stem Wall

8" CMU w/ Ladder TypeReinforcing @ 16" O.C. Vertically

Fluid Applied Air/Weather BarrierOver CMU Both Sides(Applies to Both Sides)

Weep Cell Vent @ 24" O.C.

Mortar Net

Termination Bar Seal Over w/ Liquid Flashing

Continuous Coated Copper Flashing

Stainless Steel Base Flashing

Compacted Fill

Cast-in-Place Concrete Slaband Footing Re: Structural

15 mil Vapor Barrier

Crushed Stone

Weep Cell Vent @ 24" O.C.

Mortar Net

Termination Bar Seal Over w/ Liquid Flashing

Continuous Coated Copper Flashing

Stainless Steel Base Flashing

Fill w/ Grout

2" Air Space (Applies to Both Sides)

Brick Veneer w/ Masonry Ties@ 16" O.C. each way(Applies to Both Sides)

REGISTERED R

ETIHCA

CT

ST A T E O F ISS SSI

II

M

PP

Michael W.

4822

Taylor

PROJECT NO.

CHECKED BY:DRAWN BY:

PryorMorrow PCC 2016Copyright

SCALE:

PryorMorrow

9/1/

2017

3:3

5:16

PM

As indicated

Col

umbu

s, M

issi

ssip

pi

2016111LAS

MWT

STAIR/RAMP/RAILINGDETAILS

A7.4

Demo

nstra

tion S

choo

l Ren

ovati

onG.

S.#1

04-18

7

Bure

au o

f Bui

ldin

g, G

roun

ds a

nd R

eal P

rope

rty M

anag

emen

t

3" = 1'-0"4 HANDRAIL ATTACHMENT 3" = 1'-0"7 RAILING DETAIL

1 1/2" = 1'-0"5 HANDRAIL ATTACHMENT @ WALL 3" = 1'-0"6 RAILING DETAIL

3" = 1'-0"2 DETAIL

3" = 1'-0"3 DETAIL

3" = 1'-0"1 DETAIL

MAR

KDA

TEDE

SCRI

PTIO

NSD

June

17,

201

6SC

HEM

ATIC

DES

IGN

DD

Nov

embe

r 30,

201

6D

ESIG

N D

EVEL

OPM

ENT

CD

May

31,

201

7C

ON

STR

UC

TIO

N D

OC

UM

ENTS

(75%

)C

DJu

ly 1

4, 2

017

CO

NST

RU

CTI

ON

DO

CU

MEN

TS (1

00%

)C

DSe

ptem

ber 5

, 201

7O

FFIC

IAL

BID

DO

CU

MEN

TS

2017

mtaylor
Signature
mtaylor
Typewritten Text
09/5/2017