11kw grid tie solar plant simulation report. heliscope

Post on 11-Feb-2017

224 Views

Category:

Engineering

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

AnnualProductionReportproducedbyNithyaVarghese

©2016FolsomLabs 1/3 March15,2016

kWh

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0

500

1000

1500

2000

Shading:6.8%

Reflection:3.2%

Soiling:2.0%

Irradiance:1.0%

Temperature :8.0%

Mismatch:10.3%

Wiring:0.2%

Clipping:0.0%

Inverters:2.8%

ACSystem:0.0%

AnnualProductionReportproducedbyNithyaVarghese

©2016FolsomLabs 2/3 March15,2016

AnnualProductionReportproducedbyNithyaVarghese

©2016FolsomLabs 3/3 March15,2016