11kw grid tie solar plant simulation report. heliscope

3
Annual Production Report produced by Nithya Varghese © 2016 Folsom Labs 1/3 March 15, 2016 kWh Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 500 1000 1500 2000 Shading: 6.8% Reflection: 3.2% Soiling: 2.0% Irradiance: 1.0% Temperature : 8.0% Mismatch: 10.3% Wiring: 0.2% Clipping: 0.0% Inverters: 2.8% AC System: 0.0%

Upload: nithya-susan-varghese

Post on 11-Feb-2017

224 views

Category:

Engineering


3 download

TRANSCRIPT

Page 1: 11kW Grid Tie Solar Plant Simulation report. Heliscope

AnnualProductionReportproducedbyNithyaVarghese

©2016FolsomLabs 1/3 March15,2016

kWh

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0

500

1000

1500

2000

Shading:6.8%

Reflection:3.2%

Soiling:2.0%

Irradiance:1.0%

Temperature :8.0%

Mismatch:10.3%

Wiring:0.2%

Clipping:0.0%

Inverters:2.8%

ACSystem:0.0%

Page 2: 11kW Grid Tie Solar Plant Simulation report. Heliscope

AnnualProductionReportproducedbyNithyaVarghese

©2016FolsomLabs 2/3 March15,2016

Page 3: 11kW Grid Tie Solar Plant Simulation report. Heliscope

AnnualProductionReportproducedbyNithyaVarghese

©2016FolsomLabs 3/3 March15,2016