A Great Workforce A Great Workplace Er. Tan Kee Chong Deputy Director (Engineering Safety) Occupational Safety and Health Division WSH Performance of the Crane Industry

Upload: dinhthien

Post on 04-Jul-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

A Great Workforce A Great Workplace

Er. Tan Kee Chong

Deputy Director (Engineering Safety)

Occupational Safety and Health Division

WSH

Performance

of the

Crane Industry

Page 2: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Crane-related Statistics + Dangerous

Occurrence

Enhancement to Policies Concerning Crane

Operators

Outline

Page 3: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Crane-related Statistics

0

5

10

15

20

25

30

2009 2010 2011 2012 2013 2014 2015

21

26

20

18 19

12

17

Crane-related Dangerous Occurrences – 2009 to 2015

17 crane-related

dangerous occurrences to

date, compared to total of

12 cases in 2014

Dangerous Occurrences

Collapse or failure of a crane, derrick, winch, hoist, piling

frame or other appliance used in raising or lowering

persons or goods, or any load bearing part thereof (except

breakage of chain or rope slings), or the overturning of a

crane.

* as of 31st August 2015

Page 4: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Crane Related Dangerous Occurrence

Page 5: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Crane Related Dangerous Occurrence

Page 6: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Dangerous Occurrence Cases

Page 7: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Dangerous Occurrence Cases

crane mechanic noted that the hoisting wire rope was misaligned within its

drum during set up. The crane operator fully extended the crane boom to

uncoil the wire rope and as he was about to coil back the wire rope, he slewed

the boom of the crane slightly to the right and caused the crane to collapse.

Page 8: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Dangerous Occurrence Cases

the crane operator was hoisting a clamp shell bucket out of its housing which

was located on the barge. He then slewed the crane to the right when the

boom suddenly started to fall and collapse on the deck of a nearby hopper

barge

Page 9: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Dangerous Occurrence Cases

the truck-mounted mobile crane was deployed outside a maintenance workshop

to assist in the assembly of a grab bucket. When the crane lifted the assembled

grab bucket to about 0.5m above ground, the crane structure suddenly broke

off at its slewing ring, and separated from its chassis

Page 10: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

1. Failure to maintain Cranes in good working order

2. Failure to establish and implement a proper Lifting Plan

3. Failure to ensure that adequate safety measures are taken in respect of any Crane used at the workplace

4. Failure to maintain Lifting Gears in good working condition

5. Failure to implement a proper Permit-To-Work System

Top

5 C

on

trav

en

tio

ns

fro

m E

nfo

rce

me

nt

Op

s

41%

27%

17%

8% 7% Failure to maintain cranes in good working condition

Failure to establish and implement a proper lifting plan

Failure to implement adequate safety measures

Failure to maintain lifting gears in good workingconditionFailure to implement a proper permit-to-work system

Page 11: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Faulty safety latch of crawler crane auxiliary hook

Misalignment of

hoisting wire rope on

winch

Key Findings

1. Failure to maintain cranes in good working condition

Page 12: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Corrosion of hoisting and luffing wire ropes

Faulty over-

hoist limit

switch

Key Findings

1. Failure to maintain cranes in good working condition

Page 13: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Frayed webbing

sling Kinked

wire rope

sling

Key Findings

4. Failure to maintain lifting gears in good working condition

Page 14: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Lorry loader

carrying out

pick-and-

carry

operations

Key Findings

3. Failure to implement adequate safety measures

Page 15: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Rear stabilizers of lorry loader used

to raise and support chassis; lorry

loader operating on ground beyond

acceptable slope

Key Findings

3. Failure to implement adequate safety measures

Page 16: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Lifting plan not

in accordance

with generally

accepted

principles of

safe and sound

practice

Key Findings

2. Failure to establish and implement a proper lifting plan

Page 17: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

• PTW not assessed by Safety Assessor

• PTW approved by WSH Coordinator

instead of Project Manager

Key Findings

5. Failure to implement a proper permit-to-work system

Page 18: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Enhancement to Policy concerning Crane Operators

Page 19: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Enhanced Medical Examination for Crane Operators

- Aging community of crane operators

- Ageing workforce is more susceptible to

chronic diseases

- Important that crane operators undergo

health checks for early detection and

proper management of chronic ill health

- Improve crane operators employability and

allows crane operators to remain in the

profession for a longer time

- health of crane operators is also critical to

ensure crane safety

Effective 1 April 2016

Page 20: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Enhanced Medical Examination for Crane Operators

Age (years) Health Checks Occupational Therapist

Assessment

Below 50 No No

50 – 64 Every 2 years No

65 - 69 Every year No

70 and above Every year Yes*

* Additional operation test will be required if operator fails clinical therapist

assessment

Page 21: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace Specialised Training Course for Mini Crane Operators

- Mini cranes are mobile cranes with safe working load not more than 5 tonnes

- Smaller in size, less complex, designed to lift significantly lighter loads and

generally have a lower risk as compared to typical mobile cranes

Effective 1 Jan 2016

Source: http://www.jpnelson.com.sg/index.php/en/products/crane/mini-crane

Page 22: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace Specialised Training Course for Mini Crane Operators

- a specialised training course for mini cranes will be made available in the first

quarter of 2016 to raise the competency of mini crane operators

- mini crane operators will no longer be required to hold a mobile crane license

from 1 January 2016. Instead, will be required to attend the specialised

training course

Operators of mobile

cranes with Safe Working

Load

Current Requirements From 1 January 2016

Not more than 5 tonnes

(mini cranes)

Holds a valid mobile or crawler

crane operator licence

Holds a certificate following the successfully

completion of a training course acceptable to the

Commissioner for WSH for the operation of mini

cranes, or holds valid mobile or crawler crane

operator licence

More than 5 tonnes Holds a valid mobile or crawler

crane operator licence

Holds a valid mobile or crawler crane operator

licence (no change)

Page 23: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

Effective date of implementation:

All mobile cranes registered with MOM on or after 1 August 2015 will have to be equipped with data loggers; and All existing mobile cranes registered before 1 August 2015, will be required to be retrofitted with data loggers by 1 August 2018.

Data Logger on Mobile Cranes

Page 24: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

• 601- Mobile Crane - Truck Mounted Variable Boom

Length Type

• 602- Mobile Crane - Truck Mounted Fixed Boom

Length Type

• 611- Mobile Crane - Crawler Mounted Variable

Boom Length Type

• 612- Mobile Crane - Crawler Mounted Fixed Boom

Length Type

• 621- Mobile Crane - Wheel Mounted (w/o prime

mover) Variable Boom Length Type

• 622- Mobile Crane - Wheel Mounted (w/o prime

mover) Fixed Boom Length Type

• 651- Mobile Tower Crane (Horizontal Boom)

• 652- Mobile Tower Crane (Luffing Boom)

Note:

1. This classification refers to MOM’s classification

codes for lifting machines

2. Lifting machines under the above classification

codes that does not require the installation of

a load radius indicator (LRI) will be exempted

from the data logger requirements

Examples of types of mobile cranes

required to be installed with DLs

The diagrams/figures are reproduce from Annex A of SS 536 : 2008 with the permission of SPRING Singapore. Singapore Standards are

available from the Singapore Standards eShop

Data Logger on Mobile Cranes

Page 25: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

WSH Council has launched a co-funding scheme which covers 50% of the cost of installation up to $5,000 for each registered crane. The funding is available from 3 August 2015 on a first-come-first serve basis and it will cease on the 31 July 2018 or when the funds have been fully disbursed.

Funding Assistance to support existing fleet of MC

Data Logger Funds for Cranes

www.wshc.sg/dataloggerfund.

Page 26: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

3 Simple Steps

Data Logger Funds for Cranes

STEP 1 Engage crane manufacturers / DL suppliers to install eligible DL on the existing mobile cranes

STEP 2 Engage an Authorised Engineer (AE) to inspect the crane to verify that DL installed is according to requirements

STEP 3 Make the fund application at www.wshc.sg/dataloggerfund. Submit invoice and report from AE

Page 27: A Great Workforce A Great Workplace WSH Performance of the ... · A Great Workforce A Great Workplace Crane-related Statistics 0 ... crane mechanic noted that the hoisting wire rope

A Great Workforce A Great Workplace

End