7030 - data sheets
DESCRIPTION
API 653 Data sheets for examTRANSCRIPT
-
API 653 Certification Data Sheets
MSTS 1 October 2013
Answer Reference Documents
1 Fitness for Service (FFS)
2 Risked Based Inspection
3 Low Pressure Storage Tanks
4 Cathodic Protection
5 Tank Bottom Linings
6 Welding on In-Service Equipment containing Flammables
7 NDE Procedure Guidelines
8 Acceptance Standards for RTs of Welds
9 Alternative evaluation for pits and LTAs
10 Welder Qualification
11 Weld Procedure Qualification
12 Impact Testing Method and Equipment Requirements
13 Requirement for new welding electrodes
14 NDE Personnel Qualification (RT & UT Flaw Detection)
15 API 650 Appendix for Frangible Roofs
16 API 650 Appendix for Hot Tanks
Answer Class Abbreviations
1 API 653 Scope (Alteration, Inspection, Repair, Reconstruction)
2 API 653 AIs Employer (Jurisdiction, User, Insurance company, Contractor)
3 API 653 Repair Organization (authorized by Jurisdiction, Owner,
Contractor)
-
API 653 Certification Data Sheets
MSTS 2 October 2013
Answer Dimensions
1 Definitions - Length of shell-to-bottom weld that if repaired is
considered a major repair or alteration
2 Linings - Typically anchor profile of steel surface required for the
installation of a tank bottom lining
3 Welds - Maximum undercut of a vertical weld & nozzle weld
4 Welds - Maximum undercut of a horizontal weld
5 Welds - Maximum diameter of a surface porosity cluster
6 Weld Qualification - Max allowed discontinuity in a Bend Test
7 Nameplates - Minimum size of nameplate letters
8 Bottoms - Minimum external projection of bottom plate on an existing
tank (from toe of shell-to-bottom FW)
9 Reconstruction - Max amount of peaking allowed in vert welds
10 Shell Calcs When calculating tmin for shell LTA, minimum distance
away from a weld where E is always 1.0
11 Shell Patch - Minimum overlap of shell lap-patch used to cover a hole
(edge of hole to edge of patch)
12 NDE - When performing a PT examination, minimum distance to clean
beyond the area to be examined
13 NDE - When performing a MT examination, minimum distance to clean
beyond the area to be examined
14 Reconstruction - Maximum amount of banding allowed in a horizontal
welds
15 Bottoms - Minimum overlap required for single-welded lap joints
16 Bottoms - Minimum external projection of bottom plate on a new tank
17 Vacuum Box - Minimum overlap of previously test surfaces when using
a vacuum box
18 Bottom Patch - Minimum overlap of bottom lap-patch used to cover
corroded area (edge of corrosion to edge of patch)
19 Bottom Patch - Minimum distance bottom lap-patch fillet weld to the
nearest existing bottom weld
20 Shell Patch - Minimum radius of a shell lap-patch
21 Reconstruction - If reusing bottom plates, min distance to cut from
existing bottom welds (if plates are not deseamed)
22 Reconstruction - If reusing roof plates, min distance to cut from
existing roof welds (if plates are not deseamed)
-
API 653 Certification Data Sheets
MSTS 3 October 2013
Answer Dimensions (continued)
23 Shell Pitting - Maximum allowed vertical length of pits on a tank shell
24 Bottom Pitting - Maximum allowed length of pits in the critical zone
that can be repaired by weld-buildup
25 Bottoms - Radial length of critical zone measured from shell
26 Bottoms Suggested pad thickness
27 Welds - Min distance between clusters of surface porosity
28 Shell Patch - Minimum dimension of a shell lap-patch
29 Shell Patch - Minimum radius of a shell flush-patch
30 Shell Calcs When calculating tmin for shell LTA, minimum distance
away from a rivet where E is always 1.0
31 Bottom Patch - Minimum size of bottom lap-patch that does NOT
cross a bottom seam
32 Bottom Patch - Minimum distance between a bottom lap-patch and the
shell for patches that do NOT extend to the shell
33 Reconstruction - If reusing shell plates, min distance to cut from
existing shell welds (if plates are not deseamed)
34 RT - Minimum diagnostic length of a RT for vertical or horizontal
welds
35 Weld Qualification - Minimum length of RT when qualifying a welder
with RT using a coupon or 1st production weld
36 Weld Qualification - Minimum length of RT when qualifying a welding
operator with RT of a test coupon
37 Shell Patch Minimum distance to overlap a shell weld when using a
lap-patch
38 Corrosion Area to dig when checking for soil-to-air corrosion
39 NDE Distance of eye-to-part to count as a Visual Exam
40 Vacuum Box - Typical size of a vacuum box
41 Shell Patch - Minimum dimension of a shell flush-patch
42 Bottoms - Minimum dimension that a 3-lap joint can be from: other 3-
laps, the shell, or annular plate joints
43 Bottom Patch - Minimum dimension of bottom lap-patch that crosses a
bottom seam
44 Foundations - Suggested height above grade for new tank bottoms
-
API 653 Certification Data Sheets
MSTS 4 October 2013
Answer Dimensions (continued)
45 Shell Patch - When adding a shell flush-patch that extends to a
horizontal shell weld, minimum distance to cut the horizontal weld
past the new vertical welds
46 Shell Patch - Dimension of a shell flush-patch that is considered
either a major repair or alteration
47 Definition - Dimension of a shell vertical weld if repaired or replaced
is considered a major repair or alteration
48 Bottom Patch Max width of bottom patch in the critical zone
49 Bottoms - Minimum radial width of annular plate (distance between
shell and nearest bottom fillet weld)
50 NDE Max distance of eye-to-part to count as a Visual Exam
51 Hot Tap - Minimum height of liquid above new nozzle during the hot
tap operation
52 Weld Qualification - Minimum length of RT when qualifying a welding
operator with RT of first production weld
53 NDE - Length of sweep board used when checking for banding or
peaking
54 Welds - Maximum distance between welder ID stamps on a tank weld
55 Shell Patch - Maximum size of shell lap-patch (vertical & horizontal
dimensions)
56 Settlement - Maximum distance between tank settlement survey
points across the inside of the tank
57 Roofs Maximum shunt spacing on floating roof
58 Settlement - Maximum distance between tank settlement survey
points around the outside diameter of the tank
59 NDE - Maximum distance between RTs in horizontal welds when
welding to existing shell plates
60 CP Typical tank size for Galvanic CP systems
61 Shell Calcs - Tank diameter when variable point design method should
always be used to calc shell minimum thickness
62 Shell Minimum offset between vertical welds in adjacent courses
63 Bottoms Minimum size of bottom welds
-
API 653 Certification Data Sheets
MSTS 5 October 2013
Answer Line Sizes
1 Repad - Nozzle size that never requires a repad
2
Repairs On existing tank, new nozzle must use insert plate if shell is
over thick and shell material does not meet current MDMT
requirements
3 RT - Maximum pipe size when using a RT elliptical shot (double-wall
technique, double-wall view)
4 Hot Tap - Maximum nozzle size that can be hot tapped when course
thickness is > and shell has unknown toughness
5 Definition - When adding a new nozzle, nozzle size to be considered a
major alteration
Answer Percentages
1 RT Film Density - Limits of weld as compared to the IQI (range)
2 AI Amount of time inspector must be involved in inspection activities
- required to maintain API 653 certification
3 RT Reconstruction - % to of weld intersections (new welds to old
welds) to be RTd
4 Maximum relative humidity when performing abrasive blasting for tank
bottom linings
5 Maximum relative humidity when installing tank bottom linings
6 % to RT when installing a new insert plate with a nozzle into an
existing shell plate
7
-
API 653 Certification Data Sheets
MSTS 6 October 2013
Answer Temperatures
1 Reconstruction - Base metal temp where welding is not allowed
2 Reconstruction - Base metal temp when hand-warm pre-heat is
required
3 Linings - Minimum temp when performing abrasive blasting
4 Linings - Minimum temp when installing tank bottom linings
5 Corrosion The corrosion rate of steel tank bottoms may double with
this rise in temperature
6 UT Calibration - Calibration Block must be within what temperature of
the part to be examined
7 Vacuum Box - Standard temperature range for VB exam
8 PT - Standard temperature range for a PT exam
9 Impact Test - Design metal temperature that requires weld procedure
used for vertical welds to be impacted tested
10 Brittle - Tank metal temperature where brittle fracture is NOT a
concern
11 Bottom Lap Patches - Metal temp where lap-patches are NOT allowed
in critical zone on SS tank
12 Intervals - If tank product solidify below this temperature, the code
maximum interval rules do not apply
13 Preheat - Approximate temp of a required hand-warm pre-heat
14 Corrosion - Temperature when high strength caustic causes serious
corrosion in CS and 300 SS
15 Preheat - Required pre-heat temperature for shell welds over 1.5
thick during Reconstruction
16 Bottom Lap Patches - Metal temperature where lap-patches are NOT
allowed in the critical zone on CS tanks
17 Temperature Range for API 650 App M
18 Corrosion - Most aggressive temperature range for CUI. Range for
API 575 and API 571
19 Preheat - Minimum pre-heat temperature, when pre-heat is
substituted for PWHT
20 Maximum temperature for UT readings
21 PWHT Temperature
22
-
API 653 Certification Data Sheets
MSTS 7 October 2013
Answer Thicknesses
1 Linings - Thickness of a thin film lining
2 Bottom - Minimum allowed bottom plate thickness when there is a
Reinforced Liner that is > 0.050 thick
3 Bottom - Minimum allowed bottom plate thickness when there is a
means to Detect and Contain a leak
4 Roofs - Minimum allowed average thickness of corroded roof plate
5 Shell - Minimum arbitrary shell thickness (used when calculated
minimum thickness is below this number)
6 Bottom - Minimum allowed thickness of bottom plate at toe of the
external shell-to-bottom fillet weld
7 Bottom - Minimum allowed bottom plate thickness away from critical
zone or an annular plate
8 Bottom - Minimum allowed plate thickness in critical zone that can
be repaired by weld-buildup
9 Roof Rim - Minimum allowed roof rim thickness
10 Roof - Minimum thickness of new roof plate (cone & floating)
11 Roof Rim - Minimum thickness of new roof rim
12 Bottom - Normal minimum thickness of new bottom plate
13 Bottom Patch - Maximum thickness of lap-patch in critical zone
14 Brittle - Thickness when brittle fracture is NOT a concern
15 Shell Patch Max shell thickness when lap-patches are allowed
16 Shell Patch Maximum patch thickness for a shell lap-patch
17 Weld Qualification When can UT be used in lieu of RT to Qualify a
Welder/Welding Operator
18 NDE - When welding existing shell plate. Thickness that requires
100% examination by RT and MT or PT.
19 NDE - Plate thickness which requires 100% of verticals weld to be
radiographed
20 Reconstruction - Shell plate thickness that requires all welds to be
preheated to at least 200 oF.
21 Shell Pits - Minimum remaining thickness allowed below a pit
-
API 653 Certification Data Sheets
MSTS 8 October 2013
Answer Time Intervals
1 Vacuum Box - Minimum duration of each vacuum-testing exam
2 NDE - Minimum time an examiner should be in a darkened area prior
to using a black light for MT & PT exams
3 NDE - Final interpretation of a PT exam after application of developer
(time range)
4 Testing - Minimum time to let oil to penetrate when performing a
diesel oil test of shell-to-bottom weld
5 Testing - Minimum duration for a tank hydrotest to be held at full
height
6 NDE - Max Calibrating Interval - Permanent magnet MT Yoke
7 Intervals - Maximum Interval - Routine In-Service inspection
8 CP - Maximum Interval - Routine check of CP impressed current
sources
9 NDE - Max Calibrating Interval - RT densitometer
10 Reconstruction - Maximum allowed age of last thickness readings,
used to design a reconstructed tank
11 Weld Qualification Maximum Time - Welder or operator maintains
qualifications for a welding process without using that process
12 NDE - Max Calibrating Interval - Electromagnetic MT Yoke
13 CP - Maximum Interval - Detailed check of CP impressed current
facilities
14 CP - Maximum Interval - CP surveys (field potential measurements)
15 NDE - Minimum Time - To keep RTs acquired during tank repairs and
reconstructions
16 Vac Box Max Test Interval - Jaeger 2 eye test for VB oper
17 NDE Max Test Interval - Jaeger 2 eye test for PT/ MT tech
18 AI Time period between API AI recertification
19 Intervals - Maximum Interval - UT readings of a tank shell when the
corrosion rate is unknown
20 Intervals - Maximum Interval - External Inspection
21 AI Time period between API AI on-line recertification
22 Intervals - Maximum Interval - Initial Internal Inspection (without
RBI or other special situations)
-
API 653 Certification Data Sheets
MSTS 9 October 2013
Answer Time Intervals (continued)
23 RBI - Maximum Interval - RBI reassessments
24 Intervals - Maximum Interval - UT readings of a tank shell when the
corrosion rate is known
25 Intervals - Maximum Interval - Internal Inspection when the
corrosion rate is known (without RBI assessment)
26 Linings - Typical life of a properly applied tank lining
27 NDE - Max Calibrating Interval - Check the light intensity of a black
light used in a MT or PT exam
Answer Pressures
1 Scope - Maximum internal pressure for tanks in API 650 & 653
2 Vacuum Box - Normal vacuum required when vacuum testing
3 Pressure Test - Pressure used when air testing the shell-to-bottom
weld
4 Pressure Test - Pressure used when air testing a repad
5 Scope - Maximum internal pressure for tanks in API 620
Answer Slopes
1 Minimum slope of normal tank bottom
2 Minimum slope of cone roof tank (for water runoff)
3 Maximum roof slope on tanks > 50 diameter (if roof is considered to
be fragible)
4 Maximum taper (steepest slope) allowed for an insert plate
5
-
API 653 Certification Data Sheets
MSTS 10 October 2013
Answer Miscellaneous Numbers
1 Roofs - Maximum amount of primary seal that can be removed for
repair while tank is still in service
2 NDE - Minimum number of RTs required on a circular shell
replacement plate
3 FFS Current joint efficiency E in API 650
4 FFS Joint Efficiency E Calculating tmin for an LTA, when LTA is
away from rivets by > 6
5 FFS Joint Efficiency E Calculating tmin for an LTA, when LTA is
away from weld by greater of: 1 or 2t
6 Reconstruction - Number of sets of center punch marks located on
top and bottom edges of each shell piece
7 Weld Qualification - Number of tension tests to qualify a WPS
8 Weld Qualification - Number of bend tests to qualify a welder or
welding operator in welding positions 1G-4G
9 NDE - Minimum # of exposures to RT 360o of a weld using a double-
wall technique, double-wall view (elliptical shot)
10 NDE - RT film Density Range - allowed for the weld & IQI when using
a gamma ray source
11 NDE - Minimum # of exposures to RT 360o of a weld using a double-
wall technique, single-wall view
12 Impact Test - Number of test bars required in each set of impact
test specimens
13 NDE - When using a shim under a hole-type IQI, the number of sides
of the IQI that must be seen in the RT image
14 Hot Tap - Minimum number of UT readings around the circumference
of a new hot tapped nozzle
15 Weld Qualification - Number of bend tests to qualify a WPS
16 Weld Qualification - Number of bend tests required to qualify a
welder in welding positions 5G & 6G
17 FFS - Corrosion Averaging in a Shell LTA - Minimum # of UT readings
to take on each designated vertical line.
18 NDE - Minimum number of RTs required on a square or rectangular
shell replacement plate
19 Settlement - Minimum number of settlement points around
circumference
20
21
22
-
API 653 Certification Data Sheets
MSTS 11 October 2013
Answer Miscellaneous Other
1 Reconstructed Maximum allowed out-of-plumbness
2 Corrosion pH level that causes corrosion to increase
3 Corrosion Chloride level where pitting on steel begins
4 NDE - Weight used to check magnetic strength of an AC yoke
5 Grounding - Maximum electrical resistance permitted from tank to earth
6 NDE Min angle of eye-to-part to count as a Visual Exam
7 NDE - Weight used to check magnetic strength of a DC yoke
8 NDE - Minimum light intensity when performing non-fluorescent MT or PT exams
9 Vacuum Box - Minimum light intensity when performing vacuum testing
10 NDE - Minimum black light intensity when performing fluorescent MT or PT exams
11 Brittle Shell stress when brittle fracture is NOT a concern
12 NDE - Hole size that must be visible in RT when using a hole-type IQI
13 Weld Qualification - Maximum allowed thickness on a WPS based on the plate thickness (T) of a PQR test coupon
14 Weld Qualification The all-position test coupon
15 NDE - Lead letter used during RT to check for backscatter radiation
16 NDE - Lead letter used during RT to indicate a film-side IQI
17 NDE - Lead letter used during RT to indicate a repaired weld
18 Repairs Material where pre-heat can be substituted for a required PWHT
19 Repairs Materials where control deposition welding can be substituted for a required PWHT
20 Hot Taps Nozzle thickness for hot tapped nozzles
-
API 653 Certification Data Sheets
MSTS 12 October 2013
Miscellaneous Other (continued)
21 Repairs Welding processes that can be used when substituting Preheat or Controlled Deposition welding for a required PWHT
22 Corrosion In a corrosion cell, the part that corrodes
23 Corrosion In a corrosion cell, the part that doesnt corrode
24 Linings Minimum surface prep prior to applying lining
25 Weld Qualification Rejectable in RT when qualifying a welder
26