  • 7/30/2019 Instrumentation Data Sheets

    1/28

    Sr. No. Units

    I General & Process

    1 Process Details

    Average flow

    Peak Factor

    Peak FlowRaw sewage BOD5 at 20 c

    Raw sewage TSS

    Treated sewage BOD

    Treated sewage TSS

    2

    Total Head loss (m) in STP (from stilling chamber of STP to

    Chlorine Contact Tank)

    3 Total land area (hectare) proposed for STP

    II Raw Sewage Pumping Station

    (a) Receiving Chamber

    1 Design Peak Flow

    2 No of Units

    3 Detention Period

    4 Liquid Depth (m)

    5 Length (m)

    6 Width (m)

    7 Water Level (m)

    (b) Coarse Screen Channels

    1 Design Peak Flow

    2 No. of Units (working + stand by)

    3 Clear Spacing Through bars

    4 Width of Channel (m)

    5 Length of Channel (m)

    6 Liquid Depth (m)

    7 Upstream Water Level (m)

    8 Downstream Water Level (m)

    9 Head Loss (mm)

    (d) Wet Well Pump House

    (i) Wet Well Pump House

    1 Design Peak Flow

    2 No of Units

    3 Detention Period

    4 Liquid Depth (m)

    5 Length (m)

    6 Width (m)

  • 7/30/2019 Instrumentation Data Sheets

    2/28

    7 Water Level (m)

    (ii) Pump House

    Size (m*m)

    Height (m)

    Sewage Treatment PlantStilling Chamber

    As required

    Number

    Retention Time

    Material of Construction

    Free Board, mm

    Top

    Steps in Chamber/Sump

    Bar Screens (fine)

    As required

    Number

    Type

    Average Flow

    Peak Factor

    Velocity at Peak Flow Manual Screen

    Bar Size (Manual)

    Bar Size (Mechanical)

    Clear Spacing (Mechanical)Material of Construction

    Size of channels

    Width,m (Manual)

    Length,m

    Liquid Depth (m)

    Free Board, mm

    Screen

    Manual Screen

    Clear Spacing (Manual)

    Material of Construction

    Velocity at Peak Flow Manual Screen

    Bar Size (Manual)

    Make Manual

    Mechanical Screen

    Clear Spacing (Manual)

    Material of Construction

    Velocity at Peak Flow Manual Screen

    Bar Size (Manual)

    Make Mechanical

  • 7/30/2019 Instrumentation Data Sheets

    3/28

    Screen Conveyor to be Provide

    Mechanical Grit Separator

    As required

    Number

    TypeSize of Grit

    Specific Gravity of Grit

    Retention Time (Peak flow)

    Material of Construction

    Size

    Free Board, mm

    Velocity Control Device

    SBR Basins with Biological selector zone

    As required

    System Proposed

    Design Flow

    Inlet BOD (mg/lit)

    Inlet SS (mg/lit)

    Outlet BOD (mg/lit)

    Outlet SS (mg/lit)

    Free Board, mm

    No of SBR Tanks (basin)

    Tank Material of Construction

    Hydrolic Retention timeDetails of Basins

    Length/breadth/ of each basin

    Side Water Depth (m)

    Volume of each basin

    MLSS (mg/lit)

    Oxygen Uptake Rate (OUR) Control Proved yes/No-nos

    PLC and SCADA provided

    Aeration System / Diffusers

    Type

    Material of Diffuser

    Dia and Length of each Diffuser

    Air Flow through each diffuser (Nm3/hr)

    Total nos of Diffuser

    Make

    Air Blowers

    Air Required (m3/hr)

    Type of AIR Blowers

    Make

    No of Blowers

  • 7/30/2019 Instrumentation Data Sheets

    4/28

    Capacity of Blower (Nm3/hr)

    Head of Blower (kg/cm2)

    Blower RPM/ Aerator RPM

    Motor Rating (in kw)

    Decanting Mechanism

    Decanting Rate of Treated Sewage (m3/hr)

    TypeSpeed

    Decanting Capacity of each Decanter (MLD)

    No of Decanters per Basin (No)

    Operating hrs of each decanter hrs

    Motor Rating (in kw)

    No of decanters with VFD operation (No)

    Material of Construction

    Instrument for Air Measurement

    Type

    Nos

    Make

    Instrument Pressure indicator

    Type

    Nos of Pressure

    Make of Pressure Guage

    Disinfection

    As required

    Disinfectant

    Chlorine Dosage Required

    Type

    Total Chlorine Required

    Chlorine shed and neutra pit size

    Material of Construction of chlorination shed and neutra pit

    Contact Tank

    Retention Time, min.

    Size- Chlorine Contact Tank

    As required

    Numbers

    Width / Diameter, m

    Length, m

    Liquid Depth, m

    Free Board, mm

    Tank Material of Construction

    Chlorine Contact Arrangement

  • 7/30/2019 Instrumentation Data Sheets

    5/28

    Chlorine Tonners

    Booster Pumps- Gas Chlorination

    As required

    Numbers

    TypeCapacity

    Head

    Material of Construction

    Make of Pump

    Instruments- Pressure Indicator

    Type

    No of Pressure Guage

    Make of Pressure Guage

    Sludge Sump

    As required

    Dry Sludge Quantity

    Specific Gravity of Sludge

    Solid consistency in Sludge

    Volume of Sludge

    Retention Time, hours

    Size-Sump

    Quantity

    Length, m

    Width, mLiquid Depth, m

    Free Depth, m

    Tank Material of Construction

    Mixing in Sump

    Type

    Mixing Requirment, m3/hr/m3

    Liquid Depth, m

    Air Grid Material of Construction

    Sludge sum Air Blowers

    Type of air blower

    Make

    No of working blowers

    No of stand by blowers

    Capacity of blowers (Nm3/hr)

    Head of Blower (kg/cm2)

    Motor Rating (in kw)

    Return Sludge Pump

  • 7/30/2019 Instrumentation Data Sheets

    6/28

    As required

    Numbers

    Type

    Capacity

    Head

    Material of Construction

    Solid SizeMotor Rating (in kw)

    Make of Pump

    Surplus Activated Sludge Pump

    As required

    Numbers

    Type

    Capacity

    Head

    Material of Construction

    Solid Size

    Motor Rating (in kw)

    Make of Pump

    Centrifuge Feed Pumps

    Pumps

    As required

    Numbers

    Type

    CapacityHead

    Material of Construction

    Make of Pump

    Instruments- Pressure Indicator

    Type

    No of Pressure Guage

    Make of Pressure Guage

    Sludge Dewatering Equipment

    Type

    As required

    Total Sludge (Dry basis)

    Working hrs/day

    Nos.

    Sludge Consistency

    Sludge Volume

    Solids Loading

    Dewatered Sludge Consistency

    Dewatered Sludge Quantity

  • 7/30/2019 Instrumentation Data Sheets

    7/28

    Centrate Quantity

    Material of Construction

    Make

    Dewatering Polyelectrolyte Dosing System

    As requiredQuantityb of Polymer

    Chemical Solution %

    Volume of Chemical Solution

    Service time, hrs

    No of Tank

    Numbers

    Length, m

    Width, m

    Liquid Depth, m

    Free Depth, m

    Tank Material of Construction

    A Mixer- Dewatering Polyelectrolyte Dosing Tank

    As required

    Numbers

    Type

    Capacity

    Material of Construction

    Make of Mixer

    B Dewatering Polyelectrolyte Dosing Tank

    As required

    Numbers

    Type

    Capacity

    Material of Construction

    Make of Pump

    Raw Sewage Submersible Pumps

    As required

    Numbers

    Type

    Capacity

    Material of Construction

    Casing

    Impeller

    Shaft

  • 7/30/2019 Instrumentation Data Sheets

    8/28

    Bearing

    Solid Size

    Motor Rating (in kw)

    Make of Pump

    Diesel Generating Set

    As required

    Numbers

    Capacity

    Type

    Make of Alternator

    Make of Engine

    Type of Supply

  • 7/30/2019 Instrumentation Data Sheets

    9/28

    Details to be furnished by the bidder

  • 7/30/2019 Instrumentation Data Sheets

    10/28

    As proposed by Bidder

    As proposed by Bidder

  • 7/30/2019 Instrumentation Data Sheets

    11/28

    As proposed by Bidder

    As proposed by Bidder

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

  • 7/30/2019 Instrumentation Data Sheets

    12/28

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to SpecifyBidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    As proposed by Bidder

    free chlorine

    Bidder to Specify in mg/lit to achive totalColiform count as required

    Gas chlorination-chlorination with safety

    equipment like canister mask, gloves,

    goggles, safety shower, emergency repair

    kit ect.

    As proposed by Bidder

    1

  • 7/30/2019 Instrumentation Data Sheets

    13/28

    As proposed by Bidder

    Bidder to Specify (W+S)

    Bidder to Specify

    Bidder to Specify

    As proposed by Bidder

  • 7/30/2019 Instrumentation Data Sheets

    14/28

    As proposed by Bidder

    Bidder to Specify (W+S)

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    As proposed by Bidder

    Bidder to Specify (W+S)

    Bidder to Specify

    Bidder to Specify

    Bidder to Specify

    As proposed by Bidder

    Bidder to Specify (W+S)

    Bidder to Specify

    Bidder to SpecifyBidder to Specify

    Solid Bowl Centrifuge

    As proposed by Bidder

  • 7/30/2019 Instrumentation Data Sheets

    15/28

    As proposed by Bidder

    As proposed by Bidder

    Bidder to Specify (W+S)

    As proposed by Bidder

    As proposed by Bidder

  • 7/30/2019 Instrumentation Data Sheets

    16/28

    As proposed by Bidder

  • 7/30/2019 Instrumentation Data Sheets

    17/28

    Chemical Dosing

    Chlorine Dosing for Coliform Removal to meet as per design

    Dose Point

    Chemical Proposed to be

    Used Dose in mg/l Purity, %

    At the inlet of Chlorinecontact Tank Gas Chlorine * *

    At the Inlet of Centrifuge Dewatering Polyelectrolyte

    *-Bidder to Specify

    Sheds & Buildings

    Room for Blowers Bidder to Specify

    Building for Administration

    & Laboratory MCC Panel

    Room with Toilet Min. 200 m2

    Sludge Pump and Pump

    House Bidder to Specify

    Centrifuge Shed Bidder to Specify

    MCC Panel room/ L.t. room/

    H.T. room Bidder to Specify

    Note: As space available for Treatment plant and sewage pumping station is limited, some of the u

  • 7/30/2019 Instrumentation Data Sheets

    18/28

    Quantity in kg/d

    Chemical Solution Required per

    annum

    * *

    nits mentioned above may be accommodateed in double story building.

  • 7/30/2019 Instrumentation Data Sheets

    19/28

    1 Safety Equipment Details to be Furnished by the bidder

    Air Breathing Apparatus

    Instant Action Resuscitator

    Safety Cloths

    Gas Fronted Cabinet

    Emergency Shower with Eye Wash Fountain

    Emergency Repair kit for TonnerResidual Chlorine Test kit

    2 Others

    Trunnions/Roller Support

    Suspended Weigh Scale

    Lifting Beam for toner

    3 Leak Absorption System

    3.1 Half Hood

    Make

    Size

    MOC

    Quantity (Nos.)

    3.2 Caustic Solution Tank

    Make

    Size

    MOC

    Quantity (Nos.)

    3.3 Caustic Solution Pump

    Make

    Type

    Capacity

    Head (m)MOC

    Casing

    Impeller

    Shaft

    Drive Details:

    Make

    Type

    Rating

    3.4 Air Blower

    Make

    Type

    Capacity

    Head (m)

    MOC

    Quantity (Nos.)

    Casing

    Impeller

    Shaft

    Drive Details:

  • 7/30/2019 Instrumentation Data Sheets

    20/28

    Make

    Type

    Rating

    3.5 Diffuser

    Make

    Size/Rating

    MOCRating

    Quantity (Nos.)

    3.6 Caustic Solutin Piping

    3.6.1 Ball Valve

    Size

    MOC

    End Connection

    Quantity (Nos.)

    3.6.2 Non Return Valve

    Size

    MOC

    End Connection

    Quantity (Nos.)

    3.6.3 Y-strainer

    Size

    MOC

    End Connection

    Quantity (Nos.)

    3.6.4 Pressure Gauge

    Make

    RangeType

    End Connection

    Quantity (Nos.)

    Piping & Valve Schedual

    The bidder to fill in the following pipeline schedual-without the pipeline schedual the bid shall be co

    Pipe & Fittings

    From To

  • 7/30/2019 Instrumentation Data Sheets

    21/28

    Valves

    Application Type/Code

  • 7/30/2019 Instrumentation Data Sheets

    22/28

  • 7/30/2019 Instrumentation Data Sheets

    23/28

    sidered as non-responsive. Use additional sheets if required.

    Type/Code Material of Construction Remarks

  • 7/30/2019 Instrumentation Data Sheets

    24/28

    Material of Construction Remarks

  • 7/30/2019 Instrumentation Data Sheets

    25/28

    Instrumentation Schedual

    DATA SHEETS FOR INSTRUMENTATION

    Sl. No. DESCRIPTION VALVE

    A PRESSURE GAUGE

    1 GENERALa Tag No.

    b Quantity

    c Service

    d Type

    e Range

    f Pressure (Nor./Max.) kg/cm2g

    g Temprature (Nor./Max.) OC

    h Case Material

    i Bezel Gasket

    j Zero Adjustment

    k Window Material

    l Accuracy

    m Below Out Protection

    n Over Range Protection

    2 DIAL

    a Size

    b Color

    3 ELEMENT

    a Sensor

    b Sensor Material

    c Movement Material4 CONNECTION

    a Gauge end connection

    b Connection Location

    c Process Connection

    d Rating Connection

    5 ACESSORIES

    a Snubber/Syphon

    b Snubber/Syphon conn.

    c Snubber/Syphon material

    6 DIAPHRAGM SEAL

    a Primary Element

    b Primary Element Material

    c Other Wetted Part

    d Upper Body Material

    e Lower Body Material

    f Seal Fluid

    7 REMARKS

    a Enclosure Protection

    b Mounting

  • 7/30/2019 Instrumentation Data Sheets

    26/28

    c Area Classification

    d Ambient Temp.

    B LEVEL SWITCH

    1 GENERAL

    a Tag no.

    b Quantity

    c Serviced Measuring Range

    e Mounting

    2 ENLOSURE PROTECTION

    a Enclosure Protection

    b Enclosure Protection Material

    c Conn. Size

    d Flange Material

    e Flange Rating

    f Power Supply

    g Switch Relay type

    h Qty

    i Contact Rating

    j Cable Entry Single/Double

    k Time Delay On & Off

    l Fail Safe Setting

    m Prob/Electrode material

    n Ref. Electrode Material

    3 DESIGN DATA

    a Fluid

    b Pressure (Nor./Max.) kg/cm2g

    c Temprature (Nor./Max.) OCd SP. Gravity

    e Probe Length

    f Ref. Electrode Material

    4 SERVICE CONDITION

    a Ambient Temp.

    C LEVEL TRANSMITTER

    1 Type

    2 Type for Prob (MOC)

    3 Extention pipe

    Length:

    MOC:

    4 Measuring Cell linearity

    5 DIAPHRAGM SEAL

    6 Measuring Range

    7 Accuracy

    8 Automatic Temperature Compensation

    9 Output signal

    10 Voltage Protection

    11 Housing MOC

  • 7/30/2019 Instrumentation Data Sheets

    27/28

    12 Make

    D DO ANALYSER

    1 Minimum Measuring range DO Temperature

    2 Accuracy DO Temperature

    3 Reaction Time

    4 Temperature Tolerance

    5 Protection Class6 Resolution of Data

    7 Probe Type

    8 Zero point calibration required/not required

    9 Make

    Transmitter

    10 Display Type

    11 Air Compensation (yes/no)

    12 Separate Output for Temperature (yes/no)

    13 Output Type

    14 Housing MOC

    15 Voltage Protection

    Immersion Armature and Support

    16 Depth of immersion (yes/No)

    17 Support Type

    18 Float Type

    E ULTRASONIC FLOW METER

    GENERAL

    Tag no.

    Quantity

    Meter Size

    Accuracy2 DESIGN DATA

    a Fluid

    b Pressure (Nor./Max.) kg/cm2g

    c Temprature (Nor./Max.) OC

    d Flow Rate (Nor/Max) m3/hr

    e Velocity m/sec

    f Range m3/hr

    g SP. Gravity

    h Viscosity CP

    i Min. Conductivity S/cm

    3 MATERIAL

    a Body

    b Tube

    c Electrode

    d Liner

    e Grounding Ring

    4 FLOW TRANSMITTER

    a Output Isolated

    b Local Display Indicator

  • 7/30/2019 Instrumentation Data Sheets

    28/28

    c Power Supply

    d Cable Entry

    e Location

    f Cable (in case of Remote)

    g Mounting

    5 REMARK

    a Area Classificationb Enclosure Protection

    c Liner Heating System

    d Ambient Temp.

    e Relative Humidity