7 sure-fire steps to a successful rollout

15
www.fusebill.com Call Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved 7 Sure-Fire Steps to a Successful Rollout Steve Adams – Fusebill CEO October, 2013

Upload: fusebill

Post on 13-Jan-2015

189 views

Category:

Technology


6 download

DESCRIPTION

Moving to a new billing system can seem like doing engine repair on a moving car – lots of moving pieces and an incredible amount of risk. But it doesn’t need to be that way. Properly planning your deployment minimizes the risk and does so without slowing things down. This presentation looks at planning, testing, and how to successfully go live with your new billing system.

TRANSCRIPT

Page 1: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

7 Sure-Fire Steps to a Successful Rollout

Steve Adams – Fusebill CEO

October, 2013

Page 2: 7 Sure-Fire Steps to a Successful Rollout

Steve Adams,

Fusebill CEO

[email protected]

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Page 3: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Presentation Agenda

1. Set Goals

2. Involve the Right Players

3. Make a Plan

4. Choose a system of record

5. Test offline

6. Deploy and Migrate

7. Follow-up

Page 4: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

1 - Set Goals

Reporting and Analytics

Error Reduction

Systems Integration

Get to Market Faster

Streamline

Process

Rapidly Make

Changes

Page 5: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

The goal is never “keep doing exactly what we are doing today”

But many implementation projects get stuck in this issue:

“That’s not how we do it today…”

Todays processes:• Evolved to solve yesterday’s problems• Are based on existing systems and limitations• Are part of the problem

Challenge yourself to think about what you want and need to support future growth.

Danger!

Page 6: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

2 - Involve the Right People

Executive Sponsor drives the project and owns the vision

• Often leads the vendor selection process• Projects stall if she backs off too soon.

Billing Prime knows the nitty-gritty details • Often a knowledge gap between the

sponsor and the prime…• Better understanding of what goes wrong

Specialists for integration, Salesforce etc.

1. Executive Sponsor

2. Billing Prime3. Integrator4. Salesforce

expert (if applicable)

Page 7: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Plan

People

SystemsProcess

• Awareness• Training• Responsibilities

• Data Mapping• Integration• Testing

• Workflows• Success case• Failure Cases

3 - Make a Plan – Identify Impacts

Page 8: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Planning via Use Cases

Document the 8-10 most critical activities• Customer signs up for free trial on website…• Sales Rep wins deal …• Client upgrades, or cancels…

Sketch out desired workflow and interactions• Who is involved? • What data needs to be moved between systems?

What are the exceptions to these workflows?• Large clients are treated differently (terms, process?)• Collections issues: Credit card fails, client doesn’t pay etc.• What are the policies? • What is the process? Internal and customer notifications, grace

periods…

Page 9: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

4 - Establish a System of Record

System of Record is the ‘master’ owner of customer data

• Generally, but not always the billing system

Alternatives:• CRM system• Service delivery backend

The biggest problems arise when there is no clear master, or two masters.

Page 10: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Systems Integration

Page 11: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

5 - Test Offline

Create an implementation of your billing system offline

• No customer impact, no financial impacts

Mimic real-life behaviors as much as possible• API integration • Product catalog and price plans

Work through use cases end-to-end

Use for training and familiarity

Page 12: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

6 - Deploy and Migrate

Start small• One product• New customers only

Monitor billing runs closely

Migrate only once there’s comfort with new customers

• Test migration process offline

Page 13: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

7 - Follow-up

Closely review financials after 30 and 60 days

• Reconcile to cash

Review process more frequently• Identify training gaps quickly• Change process as needed

Page 14: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Typical Timelines

• Greenfield deployments – days

• Clear definitions – weeks

• Confusion or false starts – 90 days

Page 15: 7 Sure-Fire Steps to a Successful Rollout

www.fusebill.comCall Us at: 1-888-519-1425 Copyright Fusebill Inc. 2013. All rights reserved

Conclusion

Visit us at

www.fusebill.com

Thank You!

[email protected]: @fusebill