  • 8/22/2019 23066542 NTPC Training Presentation

    1/26

    At:-

    NTPCLimited

    BadarpurThermalPowerStation

    Badarpur,NewDelhi

    Lovely ProfessionalUniversity

    SIX WEEKS INDUSTRIAL TRAINING

    THERMAL POWER PLANT

    OVERVIEW

    ABHIMANYU PURI

    11000502

    B.tech-Mba(ME.)

  • 8/22/2019 23066542 NTPC Training Presentation

    2/26

    ABOUTNTPCLIMITED

    Formally known as National Thermal

    PowerCorporationLimited.

    Itisamongtheworldslargestandmost

    efficientpowergenerationcompanies.

    In Forbes list of Worlds 500 Largest

    Companies for the year 2007, NTPCoccupies411thplace.

    NTPC has installed capacity of 29,394

    MW.

  • 8/22/2019 23066542 NTPC Training Presentation

    3/26

    ABOUTNTPCLIMITEDItas

    15coalbasedpowerstations(23,395

    MW),

    7 gas based power stations (3,955MW)and

    4 power stations in JointVentures

    (1,794MW).

  • 8/22/2019 23066542 NTPC Training Presentation

    4/26

    PowerPlant(alsoreferredtoasGenerating

    Station or Power Station) is an industrial

    facilityforthegenerationofelectricpower.

    ABOUTPOWERPLANT

    At Power Plants, generators are used as

    rotating machine that converts mechanical

    energy into electrical energy by creating

    relativemotionbetweenamagneticfieldandaconductor.

  • 8/22/2019 23066542 NTPC Training Presentation

    5/26

    ABOUTBADARPURTHERMALPOWERSTATIONThe BadarpurThermal PowerStation has five

    unitsof Steam

    Turbine-Driven

    Generators,whichhasatotal

    capacityof

    705MW.

    A top view of Badarpur

    Thermal Power Station,

    Badarpur, NewDelhi

  • 8/22/2019 23066542 NTPC Training Presentation

    6/26

    Sr.No.

    1.

    2.

    Capacity

    210MW

    95MW

    No.ofGenerators

    2

    3

    Total

    TotalCapacity

    420MW

    285MW

    705MW

    ABOUTBADARPURTHERMALPOWERSTATIONThefuelbeingusedisCoal,whichissupplied

    fromtheJhariaCoalFieldinJharkhand.

    WatersupplyisgivenfromtheAgraCanal.

    Table: Capacity of Badarpur Thermal Power Station, New Delhi

  • 8/22/2019 23066542 NTPC Training Presentation

    7/26

    THERMALPOWERPLANTInaThermalPowerPlant,oneofcoal,oilor

    natural gas is used to heat the boiler to

    convertthewaterintosteam.

    Thesteamisusedtoturnaturbine,whichis

    connectedtoagenerator.

    When the turbine turns, electricity isgenerated and given as output by the

    generator, which goes to the high tension

    transformer then supplied to the consumers

    throughhigh-voltagepowerlines.

  • 8/22/2019 23066542 NTPC Training Presentation

    8/26

    THERMALPOWERPLANT

  • 8/22/2019 23066542 NTPC Training Presentation

    9/26

    OPERATIONOFCOAL--FIREDPOWERPLANT

  • 8/22/2019 23066542 NTPC Training Presentation

    10/26

    Therearebasicallythreemainunitsof

    athermalpowerplant:

    THERMALPOWERPLANT

    1. SteamGeneratororBoiler

    2. SteamTurbine

    3. ElectricGenerator

  • 8/22/2019 23066542 NTPC Training Presentation

    11/26

    Aboilerorsteamgeneratorisadeviceused

    to create steamby applying heat energy to

    water.

    STEAMGENERATORORBOILER

    Itisarectangularfurnaceabout50ft(15m)

    onasideand130ft(40m)tall.

    Itswallsaremadeofawebofhighpressuresteel tubes about 2.3 inches (60 mm) in

    diameter.

  • 8/22/2019 23066542 NTPC Training Presentation

    12/26

    Pulverizedcoalisair-blownintothefurnacefromfuelnozzlesatthefourcornersanditrapidlyburns,formingalargefireballatthe

    center.

    STEAMGENERATORORBOILER

    Thethermalradiationofthefireballheatsthewaterthatcirculatesthroughtheboilertubes

    neartheboilerperimeter.

    The water circulation rate in theboiler isthree to four times the throughput and is

    typicallydrivenbypumps.

  • 8/22/2019 23066542 NTPC Training Presentation

    13/26

    STEAMGENERATORORBOILER

    SchematicDiagramofaSteamGeneratororBoiler

  • 8/22/2019 23066542 NTPC Training Presentation

    14/26

    STEAMGENERATORORBOILER

    Asthewaterintheboilercirculatesitabsorbsheat and changes into steam at 700F o370C.

    Itisseparatedfromthewaterinsideadrumatthetopofthefurnace.

    The saturated steam is introduced intosuperheatpendanttubes.

    Herethesteamissuperheatedto1,000For540Ctoprepareitfortheturbine.

  • 8/22/2019 23066542 NTPC Training Presentation

    15/26

    STEAMTURBINESteam turbines are used to drive thegenerators,whichproduceelectricity.

    The turbines are driven by steam

    generated in 'Boilers' or 'SteamGenerators.

    Energy in the steam after it leaves theboilerisconvertedintorotationalenergyasitpassesthroughtheturbine.

  • 8/22/2019 23066542 NTPC Training Presentation

    16/26

    STEAMTURBINEThe turbine normally consists of threestages with each stage consisting of astationary blade (or nozzle) and arotatingblade.

  • 8/22/2019 23066542 NTPC Training Presentation

    17/26

    STEAMTURBINEStationaryblades convert thepotentialenergy of the steam (temperature andpressure) into kinetic energy (velocity)and direct the flow onto the rotating

    blades.

    The rotatingblades convert the kinetic

    energy into forces, causedbypressuredrop,whichresultsintherotationoftheturbineshaft.

  • 8/22/2019 23066542 NTPC Training Presentation

    18/26

    STEAMTURBINEThe turbine shaft is connected to agenerator,whichproducestheelectricalenergy.

    Therotationalspeedis3000rpm.

  • 8/22/2019 23066542 NTPC Training Presentation

    19/26

    TURBINEGENERATORThe generators are used to convertmechanicalpower, delivered from theshaft of the turbine, into electricalpower.

  • 8/22/2019 23066542 NTPC Training Presentation

    20/26

    TURBINEGENERATORThemechanicalenergyfromtheturbineisconvertedbymeansa

    rotatingmagneticfield

    producedbydirectcurrentinthecopperwindingoftherotororfield,

    which generates three-phase alternating currentsandvoltagesinthecopperwindingofthestator(armature).

    The stator winding is connected toterminals,whichareinturnconnectedtothepower system for delivery of theoutputpowertothesystem.

  • 8/22/2019 23066542 NTPC Training Presentation

    21/26

    TURBINEGENERATORAtBadarpurThermalPowerStation,

    2-pole,

    3000rpm,

    50Hzgeneratorsareused

    of capacities 210 MW and95MW.

    A95MWTurbine

    Generatorat

    BadarpurThermal

    PowerStation,

    ewDelhi

  • 8/22/2019 23066542 NTPC Training Presentation

    22/26

    TRANSFORMERS

    Step-UptheVoltagefrom

    10.5kVto220kVfor95MWGenerators.

    15.75kVto220kVfor210MWGenerators.

    220kV output is transmitted to theswitchyardforfurthertransmission.

  • 8/22/2019 23066542 NTPC Training Presentation

    23/26

    COALHANDLINGDIVISIONTheprocessingofcoalbeforeitisfiredto the furnace, comes under the coalhandlingdivisionofthepowerplant.

    The Coal Handling Division of BTPShasthefollowingparts:

    RailwayWagonTripler

    Conveyor

    CoalStorageGround

    Separator

    PulverizerorBowlMill

  • 8/22/2019 23066542 NTPC Training Presentation

    24/26

    COALHANDLINGDIVISION

    RailwayWagonTripler Conveyor

    CoalStorageGround Separator

  • 8/22/2019 23066542 NTPC Training Presentation

    25/26

    COALHANDLINGDIVISIONPulverizersareusedtocrushitintofinepoweredparticles.

    Pulverizer

    FiredtotheBoilerFurnaceforcombustion

  • 8/22/2019 23066542 NTPC Training Presentation

    26/26

    THANKYOUANYQUERY??