2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog...

20
BILL OF QUANTITIES PROPOSED ABU DHABI BRANCH REFURBISHMENT BANK OF BARODA OWNER PROJECT MANAGEMENT CONSULTANT CONTRACTOR

Upload: others

Post on 29-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

BILL OF QUANTITIES

PROPOSED ABU DHABI BRANCH REFURBISHMENT

BANK OF BARODA

OWNER PROJECT MANAGEMENT

CONSULTANT CONTRACTOR

Page 2: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

PROJECT

BILL #

1

2

3

4

5

6

7

8

9

PROPOSED AD BRANCH BANK OF BARODA, HAMDAN ST, AD, UAE

FLOORING FINISHING

CEILING FINISHINGS

JOINERY WORK

MEP WORKS

PROVISIONAL SUM

GRAND TOTAL

Summary of BOQ Items

WALL PARTITIONS / FINISHING

DESCRIPTION TOTAL (AED)

PRELIMINARIES

CIVIL WORKS

DEMOLITION WORKS

Page 3: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 1 BOQ

1 PRELININARIES

1.1 Mobilization LS 1

1.2 Approvals & work Permits, Handing over. LS 1

1.3Preparation of Shop drawings & submittal of samples.

LS 1

1.4 Site Cleaning LS 1

1.5Allow for transportation of debris to the municipality dump yard.

LS 1

1.6 As Built Drawings LS 1

1.7 Insurance LS 1

AED -

BILL OF QUANTITIES

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

TOTAL ( 1 - PRELININARIES)

PAGE: 1/18

Page 4: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 2 BOQ

2 DEMOLITION & SITE PREPERATION WORK

2.1Demolisioning un-necesary block walls that are relocated or canceled as per the new design.

LS 1

2.2Demolisioning of all unnecessary exisiting MEP fixtures and ducting, to match the new design.

LS 1

2.3Remove exisiting Walls & Doors required as per proposed plan

LS 1

2.4 Remove exisiting floor finish in the area. LS 1

2.5Remove Steel cabinet install inside hall in proposed dining area..

LS 1

2.6 Preparation of Site LS 1

AED -

S/NO DESCRIPTION UNIT QUANTITY RATE

TOTAL ( 2- DEMOLITION & SITE PREPERATION WORK)

AMOUNT

PAGE: 2/18

Page 5: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 3 BOQ

3 CIVIL WORKS

3.1Screeding (cement sand - 100mm ) for the for Bathroom flooring and all area of to cover Floor MEP SERVICES location

M2 251

3.2Concrete work at Safe Closet after installation of Sensore by others. M3 1

3.3Supply & Fix Steel Sheet on walls inside the Safe Closet and repiar the existing wall steel sheet. ITEM 1

3.4 Supply & lay 100mm think hollow block wall. M2 6.25

3.5 Supply & lay 100mm think Solid block wall. M2 1.1

3.6 Supply & lay 150mm thick hollow block wall. M2 0

3.7 Supply & lay 150mm thick Solid block wall. M2 0

3.8 Supply & lay 200mm thick hollow block wall. M2 0

3.9 Supply & lay 200mm thick Solid block wall. M2 24.9

,3.10Supply & apply of water proofing to exisiting floors before finishing. Area: Bathrooms, Kitchens & Store only. M2 24.9

3.11Supply & apply of water proofing to New and exisiting walls. (Area: Bathrooms, Kitchens & Store only) M2 2.5

3.12Walls Chasing works for MEP Services Related scope of work. ITEM 1

3.13chipping existing screeding above slub and re fill it with cement after completing shifting of MEP Related scope of work.

ITEM 1

3.14Supply & Apply plastering at existing all areas in Main Hall, Offices, Bathroom, Pantry and Etc. M2 684

AED -

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

TOTAL ( 3 - CIVIL WORKS )

PAGE: 3/18

Page 6: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 4 BOQ

4 WALL PARTITIONS / FINISHES

4.1W-1 : Supply and fix 10 MM Temperd Glass with textures Partitions (3 M Hight - up to ceiling Level ) as per drawings.

M2 135

4.2

W-2 : Supply and fix Gypsum board wall cladding of 12mm thick (Knauf / Equivalent) system. Cof 10 cm total thickness , double Leaf with steel studs.

M2 192

4.3W-3 : Supply and fix 10 MM Temperd Glass (1.8 CM hight) a as per drawings.

M2 68.4

4.4W-4 : Supply and fix 10 MM Temperd Glass (1.6 CM hight) a as per drawings.

M2 32

4.5W-5 : Supply and fix Ceramic Tiles (40*40) Existing Male Washroom, and new constructed washrooms

M2 51

4.6W-8 : Supply and Apply Acralic Paint Brand (Jotun/National) on wall sheets - as per design.

M2 234

4.7GD1 - Tempered Glass Door ( 100*220 CM) 10 MM thickness with irenmongry.

ITEM 5

.4.8 GD2 - MAIN DOOR MAINTENANCE ITEM 1

4.9 GD2 - ATM DOOR MAINTENANCE ITEM 1

AED - TOTAL (4 - Wall Partition / Finishes )

AMOUNTS/NO DESCRIPTION UNIT QUANTITY RATE

PAGE: 4/18

Page 7: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 5 BOQ

5 FLOOR FINISHING

5.1 F1-Gray Carpet flooring M2 210

5.2 F2-Ivory Marble with texture as specified. M2 120

5.3 F3- Porcelain Tile . M2 96

5.4 F4- Ceramic Tile (60*60 CM) as Specifies. M2 36

5.5F5- Ceramic Tile Non Slip (40*40 CM) as Specified.

M2 30

5.6 F6- Vinyle floor as specified. M2 143

AED - TOTAL ( 5 - FLOOR FINISHES )

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

PAGE: 5/18

Page 8: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 6 BOQ

6 CEILING FINISHES

6.1

C1- Supply and install 12mm thick water proof Plain gypsum ceiling: Standard gypsum board 12mm thick (Knauf / Equivalent) using GI furring channel Suspension System, finished with Acralic paint (2) coats. (Brand : National / Jotun).

M2 433

6.2C2- Supply and install Suspended ceiling acoustic tile (60*60 CM) (Knauf / Equivalent) using GI furring channel Suspension System.

M2 49

6.3C3 -Supply and fix of water proof Gypsum Bulkhead.

M2 30

6.4C4 -Supply and fix of (60 * 60 CM) Aluminum ceiling tiles.

M2 65

AED -

S/NO DESCRIPTION UNIT QUANTITY

TOTAL (6 - CEILING FINISHES )

RATE AMOUNT

PAGE: 6/18

Page 9: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 7 BOQ

7 JIONARY AND FIT-OUT

7.1

Tellar Counter Wooden IVORY White Satin Paint (BRAND: JUTON/NATIONAL). Front Lower area to be claded as per drawings. Cabin shall be (10 mm thick) Glass partitioned.

ITEM 4

7.2D2- Wooden Door ( 85*220 CM) IVORY White Satin Paint (BRAND: JUTON/NATIONAL) With ironmongry.

ITEM 4

7.3D3 -Wooden Door ( 100*220 CM) IVORY White Satin Paint (BRAND: JUTON/NATIONAL) With ironmongry.

ITEM 2

7.4D4 - Maintenanc and repaint Wooden Door ( 90*220 CM) IVORY White Satin Paint (BRAND: JUTON/NATIONAL) With ironmongry.

ITEM 3

7.5Wooden Cladding: Reception back area including Staron Rectangular sheet and Stainless Steel BOB Logo and per design.

M2 4.35

7.6Wooden Cladding: Front curve portion per design.

M2 17.2

7.7Acralic Cladding behind ATM Machines, Glass Printed (COLOR: RAL 2004)

M2 14.8

7.8Wooden Counter: (4 CM) with malimine finish (White Color) at Dinning Area.

LM 6.2

7.9Wooden Counter: (4 CM) with malimine finish (White Color) at ATM Area.

ITEM 2

.7.10Wooden Counter: (4 CM) with malimine finish (White Color) at Tellar Area. As per design

ITEM 3

7.11 Wooden cabinets ( 44*100*180 CM) ITEM 30

7.12 Executive Wooden cabinets ITEM 10

7.13Custom made - Circular OFFICE Desk (Type 1) MDF with Curved Area With Inlay Strips

ITEM 4

7.14Custom Made - Circular OFFICE Desk (Type 2) MDF with Curved Area Installaed With Inlay Strips

ITEM 11

7.15OFFICE DESK Round Table with (4) Chair at main lobby

ITEM 2

7.16 EXECITIVE OFFICE DESK ITEM 57.17 VIP EXECITIVE OFFICE DESK ITEM 17.18 Meeting Room Table With Chair (3) ITEM 1

7.19 Staff Dining Table With Chair (8 TO 10) ITEM 1

AED -

S/NO DESCRIPTION UNIT QUANTITY RATE

TOTAL (6 - CEILING FINISHES )

AMOUNT

PAGE: 7/18

Page 10: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 8 BOQ

.7.20 Chair Type 1 (Employee Chair - Standerd) ITEM 29

7.21 Chair Type 2 (Employee Chair - Executive) ITEM 5

7.22 Chair Type 3 (Customer Chair - Standerd) ITEM 17

7.23 Chair Type 4 (Customer Chair - Executive) ITEM 10

7.24 Chair Type 5 (Conference Room) ITEM 30

7.25 Chair Type 6 (for Reception Desk) ITEM 2

7.26 Chair Type 6 (Bar Chair at Dinning) ITEM 6

7.27Leather Sofa Type 1 ( Single Seat) Orange Colour (LF-12)

ITEM 30

7.28 Leather Sofa Type 2 ( Single Seat) Orange Colour ITEM 1

7.29Leather Sofa Type 3 ( Double Seat) Orange Colour

ITEM 5

7.3 Leather Sofa Type 4 ( Triple Seat) Orange Colour ITEM 3

7.31 Custome Made Reception desk ITEM 1

AED - TOTAL (7 - JOINARY WORK )

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

PAGE: 8/18

Page 11: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 9 BOQ

8 MEP WORKS

8.1 ELECTRICAL WORK

A

The contractor should condsider in his estimate the required quantity according to prospective shop drawings of the related system with no extra time and cost.

A1

Provide and install the complete electrical installation strictly in accordance with the specification and as indicated on drawings and all builder's work as, but not limited to the following items:

A2

Incoming Mains InstallationsAllow for all works required by the specification and shown on the drawings for providing an incoming mains installation all builder's work and attendance required upon ADDC

item

A3Allow for liaising with ADDC and paying all charges in connection with the main incoming supply.

item

A4

Allow for any additional items /part of this item to each item above in the BOQ , but necessary for the successful completion of this system in good working condition has to be included in the above and no additional claim /cost or time shall be allowed.

BExisting SUB - MAIN DISTRIBUTION BOARDS Connection

B1

Allow to connect with Sub-main distribution boards and terminations including breakers, all interconnecting cables , wires termination and trays from FDB

ITEM 1

B2Allow for all associated work and attendance on ADDC in connection with the supply and installation of KWH meters.

NOS 1

B3

Allow for any additional items/ part of this item to each item above in the BOQ, but necessary for the successful completion of this system in good working condition has to be included in the above and no additional claim/ cost or time shall be allowed.

ITEM 1

AED -

S/NO DESCRIPTION UNIT QUANTITY

TOTAL (8.1 - ELECTRICAL WORK cont. )

RATE AMOUNT

PAGE: 9/18

Page 12: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 10 BOQ

ELECTRICAL WORK (CONT.)

Isolators

DIsolators to mechanical equipment as specified and shown on the drawings

ITEM 1

Cables and Cable Support System

E

Cable trays, cable ducts, GI cable trunking, cable cleats etc. including all fixings complete as shown on drawings

ITEM 1

E-1

Armoured cables from submain switch board to final Distribution Boards as shown on the drawing

ITEM 1

FFinal Sub Circuit, Fixtures & AccessoriesLight point as Specified and as shown on the drawings including ,switches, conduit and cablesupports, fixation accessories, terminations etc.

ITEM 1

F1Power piont as specified and as shown on the drawings including socket conduit, wires , supports , fixation accessories and termenation

ITEM 1

F2Ditto, but for 13A switched socket outlets.

ITEM 1

F3 Ditto, but for 15A switched socket outlets.

ITEM 1

F4Ditto, but for floor box switched socket outlets. Ditto, but for 13A double switched socket ITEM 1

F5HOT plate outlet (pantry)

NOS 1

F6Ditto, but for socket cooker

NOS 1

F7Ditto, but for water heater outlet

NOS 1

F8Ditto, for any other item of equipment shown on thedrawings.

ITEM 1

SWITCHES

multi gang grid switch NOS 2

One gang and 2 gang switch ITEM 2

AED - TOTAL (8.1 - ELECTRICAL WORK cont. )

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

PAGE: 10/18

Page 13: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 11 BOQ

ELECTRICAL WORK (CONT.)

GLight fixtures

G1Supply and install light and power fixtures as specified ITEM 1

G2featured pendent light

ITEM 1

G3light cast double focus down light

ITEM 1

G4recessed dirctional spotslights

ITEM 1

G5track light

ITEM 1

G6indirect 60 x 60 flourescent light

ITEM 1

G7linear pendent light

ITEM 1

G8featured recessed flourescent light

ITEM 1

G9covelight

ITEM 1

G10Ditto, for any other item of equipment shown on thedrawings.

ITEM 1

HElectrical Services to Mechanical Works

H1Empty conduits and draw wires between FCU's and thermostats for wiring. ITEM 1

JAnalouge Addressable Fire Alarm and Detection System

J1Supply and install main fire panel including all cable accessories ,

ITEM 1

J2Addressable smoke detector.

ITEM 1

J3Ditto, but wall mounted fire alarm flusher.

nos. 2

J4Ditto, but break glass.

ITEM 1

J5Ditto, for any other item of equipment shown on the drawings.

ITEM 1

J6Co-ordination and interfacing with all systems as specified & shown on the

ITEM 1

J7Interface module with ZCV

ITEM 1

Remote LED Indicators if required

Interface module with main fire alarm panel.

ITEM 1

Interface module with access control system

ITEM 1

AED -

QUANTITY RATE AMOUNT

TOTAL (8.1 - ELECTRICAL WORK cont. )

S/NO DESCRIPTION UNIT

PAGE: 11/18

Page 14: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 12 BOQ

ELECTRICAL WORK (CONT.)

KMATV & SMATV System

K1Supply, install, and commissioning MATV and SMATV system head end station

ITEM 1

LMASTER CLOCK SYSTEM

L1The contractor shall design , supply ,install , test and commission a complete

ITEM 1

MPuplic address and Music System

M1Supply, install puplic address system as specified and shown on drawings.

ITEM 1

N

N1

O Digital Signage system

O1Supply , install, testting & commission the following visual voice Evacuation system and

ITEM 1

Q PAVA System

Q1Supply , install ,testting & commission the following public address and voice alarm

ITEM 1

RIP Closed Circuit Television System (IP CCTV)

R1Supply , install ,testting & commission the following CCTV system and outlets complete

ITEM 1

S Access Control System

S1Supply, install , testting & commission commission a complete Access Control

ITEM 1

S2

S3

S4

TEMERGENCY/EXIT LIGHT (SELF-CONTAINED)

T1Supply, install, testing and commission a complete Central Battery system as

ITEM 1

T21X8W Surface Mounted Emergency Light (Self-Contained)

ITEM 1

T3 Exit Sign 2 side ITEM 1

T41X8W Surface Mounted Emergency Light (Self-Contained)

ITEM 1

T5 Installation, Testing and Commissioning Charges ITEM 1

AED -

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

TOTAL (8.1 - ELECTRICAL WORK )

PAGE: 12/18

Page 15: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 13 BOQ

8.2 MECHANICAL INSTALLATIONThe contractor should condsider in his estimate the required quantity according to prospective shop drawings of the related system with no extra time and cost

WATER INSTALLATIONS :

ASupply and install all valves shown on the pipes netwrok and required for any maintenance and air vent ITEM 1

B

Supply and install PPR PN20 for cold water pipes . PPR PN25 for hot water system and in the bath rooms above false ceiling with pex pipe system for all branches to fixture and outlet as pe drawing

ITEM 1

C All cold water distribution pipe work as specified and shown on drawings.

C1 Dia. 32mm

C2 Dia. 40mm

D

All cold and hot water from main pipes to the distribution pipe work within bathrooms and kitchens in PPR pipe as specified.

D1 Dia. 25 mm ,

D2 Dia. 32 mm ,

D3 Dia. 40 mm ,

EAllow for insulation to hot water installation as required by the specifications.

FAllow for all valves for cold and hot water installation as required by the specifications.and drawings

GDomestic water heaters complete with all acessores ( EWH- 1 ) as per drawing and specification. 50 liters

Sundries

HAllow for submittals, samples, shop drawings, Approved from ADDC inspecting, as built drawings etc.

IAllow for builder's work including all sleeves, fire resistant sealant etc.

JAllow for testing & commissioning

KAllow for maintenance of the complete plumbing installation as specified

Lsupply and install hand sprays for each toilet as per drawing

Additional Items

The tenderer is to detail below any additional items with quantities and rates not previously included to complete the build up of the lump sum tender price for this section of the works. Should the tenderer fail to insert any items here, it will be deemed that his lump sum price for the tender includes all work as required by the tender drawings and specification and no subsequent claim for any additional item will be entertained.

AED -

UNIT QUANTITY RATE AMOUNT

TOTAL (8.2 - MECHANICAL INSTALLATION )

S/NO DESCRIPTION

PAGE: 13/18

Page 16: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 14 BOQ

MECHANICAL INSTALLATION (cont.)

AIR CONDITIONING Disassembling works (cont.) :

A

Disassemblying ,dismantling, removing, storing, the existing FCUs , with fully manintenance (clean, service, ----- etc ) and keeping all tag no. and model nos. as per drawings for each floor separate

ITEM 1

B ITEM 0

C

Disassemblying , removing , transporting from site the existing internal HVAC duct of FCUs,to outside the project with coordination with the client and his approval. ITEM 1

D

Disassemblying , removing , transporting from the site the existing air outlets ( girlles , difusers ---- etc ) to outside the project with coordination with the client and his approval. . ITEM 1

EDisassemblying , removing , transporting from site the existing thermostat including the wires and conduites and to be used for the new location.

ITEM 1

F

Disassemblying , removing , transporting from site the existing internal chilled water pipes started from main GV valves and DRVs beside the riser in ecah floor to FCUs, AHUs to outside the project with coordination with the client and his approval.

ITEM 1

GDisassemblying , removing , transporting from site the existing condensate drain pipes exclude the risers. ITEM 1

H Draining the chilled water from the existing chilled water system. ITEM 1

I

clean and make full service for exsting FCUs then Re- install the existing fan coil units as shown on drawings complete with CHW piping connections, drain to waste, anti- vibration mountings, and all necessary electrical connections and remote wall mounted thermostats and controller.

ITEM 1

JSupply and install wall mounted Thermostats complete with the wiring and the conduites as per specified and drawings.

ITEM 1

K

Supply and install Galvanised sheet steel for the ductwork complete with, turning vanes, stiffeners, splitter dampers, test holes, branch openings, supports etc. for all supply and reurn air,ventilation duct ..etc as shown on A/C drawing

ITEM 1

L

Supply and install thermal fiber glass insulation for the duct works complete with canvas and fooster as per specified and drawings

ITEM 1

AED -

S/NO DESCRIPTION UNIT

TOTAL ( 7.2 - MECHANICAL INSTALLATION)

QUANTITY RATE AMOUNT

PAGE: 14/18

Page 17: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 15 BOQ

MECHANICAL INSTALLATION (cont.)AIR CONDITIONING Installation works:

Aclean the existing chilled water pipes for the FCUs including the supports and apply anti fungus fooster as per specified and drawings.

NOS 9

Brecheck all valves IVs, DRVs strainers, BTPs ….etc. for the FCUs a as per specified and drawings NOS 9

Crecheck the exisiting modulatiing two port controlling valves for the FCUs s as per specified and drawings

ITEM 1

DAllow for all volume control dampers and motorized VCDs as required and as specification and drawings ITEM 1

EAllow for all fire dampers as specified and indicated on drawings and as required by the local regulations. ITEM 1

F Allow for acoustic insulation to the ductwork as required by the specification. ITEM 1

G

supply and install all air outles Grilles, diffusers and registersas specified and shown on drawings including flexible connections, collars, plenums, volume control dampers... etc.

ITEM 1

Sundries

AAllow for submittals, samples, shop drawings, inspections, as built drawings, operation and maintenance manuals and the like.

ITEM 1

B Allow for testing and commissioning by specialist third party subject to consultant approval. ITEM 1

CAllow for builders work in connection with air conditioning installation including all sleeves, fire resistant sealant, etc. ITEM 1

D Allow for maintenance of the complete air conditioning installation as specified ITEM 1

E Allow for spares to be handed over to client ITEM 1

F Allow for all painting, identification and tagging to the installations and equipment. ITEM 1

Additional Items

The tenderer is to detail below any additional items with quantities and rates not previously included to complete the build up of the lump sum tender price for this section of the works. Should the tenderer fail to insert any items here, it will be deemed that his lump sum price for the tender includes all work as required by the tender drawings and specification and no subsequent claim for any additional item will be entertained.

ITEM 1

AED -

DESCRIPTION UNIT QUANTITY

TOTAL ( 8.2 - MECHANICAL INSTALLATION )

AMOUNTS/NO RATE

PAGE: 15/18

Page 18: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 16 BOQ

Mechanical Engineering Installations (cont.)

FIRE FIGHTING INSTALLATIONS

(NOTE: ALL FIRE FIGHTING WORKS ONLEY MODIFICATION OF SPRONKLERS LOCATION AS PER APPROVED DRAWING BY CIVIL DEFENSE)

A

Provide and install the complete fire fighting installation strictly in accordance with the specification and as indicated on drawings including all builders work as, but not limited to complete the system the following for :

ITEM 1

B

Galvenized seamless steel Pipes and fittings for wet riser system ( hose reel ) and LV screwed and flanged joints including all fittings, supports and fixings for new location as per drawings: (if required)

ITEM 1

C Dia. 25mm , 32 mm LS 1D Dia. 50mm, 40mm, LS 1E Dia. 65mm LS 1

Frecheck the existing fire hose reel cabinets and make full service

G allow for paint, labeling and identification.

H 2kg CO2 portable extinguisher for new location as per drawing.

NOS 8

I 4kg Dry chemical portable extinguisher for for the kitchen.

NOS 8

J

Galvenized seamless steel Pipes and fittings for sprinkler system screwed and flanged joints including all fittings, supports and fixings for new location as per drawings: (if required)

LS 1

K

allow for new sprinkler head pendent recessed and upright as required and as per approved shopdrawing LS 1

Lallow for ZCV, flow switch and drain connection for sprinkler system. LS 1

Mhand over fire fighting work to local civil defense authority ITEM 1

Nwork shop drawing and approval from authority / as built drawing ITEM 1

Sundries

A

Test the whole of the fire fighting installation at completion in the presence of the Engineer, repeat test as may be required and leave in perfect order and to the satisfaction of the engineer and Local Authority.

ITEM 1

BProvide for all painting and identification to the installation.

ITEM 1

CAllow for builder's work including all sleeves, fire resistant sealant etc. ITEM 1

DAllow for submittal, samples, shop drawings, inspecting, as built drawings etc. Approved from Dubi civil Defence. ITEM 1

EAllow for the maintenance and protection of all fire fighting systems. ITEM 1

AED -

S/NO DESCRIPTION UNIT

TOTAL ( 8.2 - MECHANICAL INSTALLATION )

AMOUNTQUANTITY RATE

PAGE: 16/18

Page 19: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 17 BOQ

Mechanical Engineering Installations (cont.)

FIRE FIGHTING INSTALLATIONS (CONT)

Additional Items

A

The tenderer is to detail below any additional items with quantities and rates not previously included to complete the build up of the lump sum tender price for this section of the works. Should the tenderer fail to insert any items here, it will be deemed that his lump sum price for the tender includes all work as required by the tender drawings and specification and no subsequent claim for any additional item will be entertained.

ITEM 1

DRAINAGE INSTALLATIONS

ASupply and install Soil, waste and vent pipes and fittings of UPVC including all bends, junctions, accessories supports, holder bats and the like

B Dia. 50mm (2") ITEM 1C Dia. 80mm (3") ITEM 1D Dia. 110mm (4") ITEM 1

E Allow for all access doors, clean out rodding eyes and the like ITEM 1

FAllow for Floor traps as described and specified including pipeline connection to riser, casting into concrete slabs. NOS 3

G supply and install floor trap cover and floor clean out as per specified and drawing. ITEM 5

H allow for bottle trap for the sanitary fixtures as per specified ITEM 2

Sundries

A Allow for testing entire drainage system to the Engineer's approval ITEM 1

B Allow for submittals, samples, shop drawings, inspecting, as built drawings, etc. ITEM 1

C Allow for builder's work including sleeves, fire resistant sealant etc. ITEM 1

D Allow for maintenance of the complete drainage installation as specified ITEM 1

Additional Items

A

The tenderer is to detail below any additional items with quantities and rates not previously included to complete the build up of the lump sum tender price for this section of the works. Should the tenderer fail to insert any items here, it will be deemed that his lump sum price for the tender includes all work as required by the tender drawings and specification and no subsequent claim for any additional item will be entertained.

ITEM 1

AEDTOTAL (8.2 - MECHANICAL INSTALLATION )

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

PAGE: 17/18

Page 20: 2) 48$17,7,(6 - bankofbarodauae.ae · w p õ ky ô d w tkz dz/ > tkz< 7kh frqwudfwru vkrxog frqgvlghu lq klv hvwl pdwh wkh uhtxluhg txdqwlw\ dffruglqj wr survshfw

Page 18 BOQ

9 PROVISIONAL SUM9.1 Queue Management System ITEM 1

9.2Free-standing digital ePoster kiosk with a sleek, slim design ITEM 1

AED -

S/NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

TOTAL ( 9 - PROVISIONAL SUM )

PAGE: 18/18