Pimpri - Chinchwad Municipal Corporation, Pimpri BRTS PROJECTSShrikanth Savane, Pimpri – Chinchwad Municipal Corporation
![Page 2: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/2.jpg)
WELCOME
Pimpri Chinchwad Municipal Corporation, Pimpri
BRTS PROJECTS
15th APRIL 2013
![Page 3: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/3.jpg)
Would Like to Share About Pimpri Chinchwad City
Institutional Set Up & Key Responsibilities
BRTS Projects
Progress / Achievements / Work completed
Bus Station
ITMS
.
![Page 4: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/4.jpg)
About Pimpri Chinchwad City
![Page 5: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/5.jpg)
Located towards North of Pune Area of 181 sq.km Population: 1.8 million (approx) PCMC received “BEST CITY “ award
0n 13th Dec.2012 From GOI for its best performance in JnNURM
• Area under Green Cover: 27%
• Annual Budget (2013-2014): Rs. 1800 Cr.
• Credit Rating: AA+ (SO) by CRISIL Ratings (S&P)
Pimpri Chinchwad at a Glance
![Page 6: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/6.jpg)
Vibrant city in the state of Maharashtra, India
Strong industrial base Small & medium industrial units of about 6,000 Large industrial units of about 50 Auto and ancillary industrial Hub
![Page 7: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/7.jpg)
Presence of International IT Firms
![Page 8: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/8.jpg)
Social and recreational facilities Strong Social Infrastructure with Municipal
Hospitals and Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.
Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.
![Page 9: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/9.jpg)
Population growth The city has a population of about 1.8 millions growing annually at
over 6% p.a. (national average 2.1%) Growth is fuelled by prospects of economic activity, good quality
of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai
Population Growth
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1951 1961 1971 1981 1991 2001
Year
Popu
latio
n
PopulationGrowth ofPCMC
![Page 10: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/10.jpg)
Institutional Set-upKey Responsibilities
![Page 11: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/11.jpg)
Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the year 1982
The body constitutes of Elected wing headed by – Mayor Administrative wing headed by – Municipal Commissioner
We manage about 181 sq.kms of area through our 4 Ward offices We have over 40 departments with a workforce of about 7500
employees
Institutional set up
![Page 12: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/12.jpg)
Institutional set up We are fully e-governed Corporation We received International Organization of
Standard (ISO) Certification (ISO 9001:2008) for Quality Management System.
![Page 13: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/13.jpg)
Responsible for Area planning Infrastructure planning, implementation and operation &
maintenance of services in the areas of Water Supply, Sewerage and Sanitation, Solid Waste Management, Roads and Transportation, Street lighting, Health and recreational facilities, Education (134 primary and 18 secondary schools) Preservation of natural heritage (river conservation), Development of housing facility for urban poor/ slums.
![Page 14: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/14.jpg)
Vision
To make Pimpri Chinchwad, a city of and for the next generation
Economically vibrant, attracting top business houses
And meet the requirements of all its citizens
A city to Live, Spend and Entertain
![Page 15: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/15.jpg)
BRTS PROJECTS
![Page 16: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/16.jpg)
BRTS PROJECTS IN PCMC AREA
AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40
KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20
NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80
PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74
Total BRTS Corridor Length = 44.575 Km.
First Intersection
Second Intersection
![Page 17: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/17.jpg)
DESCRIPTION OF REVISIONS INTIALSA B C
REV DATE
NTSSCALE:
R1/R2 22-12-2006
TYPICAL CROSS SECTION
61 m BRTS CROSS SECTION
![Page 18: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/18.jpg)
45 M BRTS CROSS SECTIONREVISED TYPICAL CROSS SECTION FOR 45.0M
300
REVISED TYPICAL CROSS SECTION WITH BUS STOP
300
CLIENTPROJECTDRAWING TITLE
SCALE-:1:100
DATEREV.
DATE : -09/12/2011DRG. NO:-CVKCPL/PCMC/ANNUITY/KALEWADI/CROSS-SECTION/45.00m/04
STATUS
C.V.KAND CONSULTANTSPRIVATE LIMITED
CONSTRUCTUION OF BRTS CORRIDORKALEWADI TO DEHU-ALANDI ROAD
(PACKAGE-II)FROM CH:-1+600 TO 3+000
410
8.
11icaM
kiTbaQda janaihtaya
mahanagarpailaka
REVISED TYPICAL CROSS SECTION & PLANFOR 45.00 m WIDE ROAD
PIMPRI CHINCHWAD MUNICIPAL CORPORATION15/07/2011R1
R2 08/12/2011R3 22/12/2011
SHEET 1 OF 1
![Page 19: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/19.jpg)
Corridor No 1 2 3 4
BRT CORRIDOR
Pune-Mumbai Highway Aundh Ravet Road Nashik Phata To
WakadKalewadi Phata to
Dehu Alandi
Length in KM. 12.00 14.50 8.00 10.275
Expected Project Cost
on completion Rs. In. Cr.
254.59 305.00 227.00 241.00
Expenditure as on 31St March 2013. Rs. In.
Cr.
254.59 229.65 180.82 86.50
Expected Completion
Date Dec 2013 Dec 2013 Dec 2013 Oct. 2014
BRTS Project Status
![Page 20: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/20.jpg)
BRTS Project statusCorridor No 1 2 3 4
BRT CORRIDOR Pune-Mumbai Highway Aundh Ravet Road Nashik Phata To Wakad Kalewadi Phata to Dehu Alandi
Present Status
Work is completed 16 BRT bus
stations are under construction on PPP basis.
Remaining 20 BRT bus stations will be completed by Dec-13.
Out of 16 BRT bus stations 12 bus stations completed & remaining 4 are in progress.
Unless all bus stations (16+20) completed BRT service cannot be started, so far all bus station will be completed by Dec. 13.
Length 14.50 Km- length 10.5 km completed.
4.00 km work is in Progress. Defence land is transferred in the month of Aug.12.
20 bus stations are planned & execution will be completed by Dec 13.
Work is in Progress. 83% of flyover work is
completed and total completion is expected by Oct. 13.
Road work is in Progress. Defence land is transferred in the month of Aug.12.
75% of road work is completed other than WP in High Court/District Court against land acquisition. (600m length of road out of 7.90 km).
15 bus stations are planned & execution will be completed by Dec 13.
Work is in Progress.
28% of flyover work is completed and stipulated date of completion is Oct. 13 and extension of time requested is 31st Aug 2014.
Road work is in Progress.
WP in High Court against land acquisition. Rehabilitation & Resettlement of 184 PAP’s is in process (1.6 km out of 10.275).
19 bus stations are planned & execution will be completed by Oct 14.
![Page 21: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/21.jpg)
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – IV WORK COMPLETED
SECTION – III WORK COMPLETED
![Page 22: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/22.jpg)
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – VI WORK COMPLETED
SECTION – V WORK COMPLETED
![Page 23: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/23.jpg)
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – I & II WORK IN PROGRESS
SECTION – VII WORK COMPLETED
![Page 24: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/24.jpg)
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)
NASHIK PHATA JUNCTION - 2nd Tier
NASHIK PHATA JUNCTION - 1st Tier
![Page 25: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/25.jpg)
BRTS SUTP PROJECT STATUS BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)
ROAD WORK IN PROGRESS
![Page 26: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/26.jpg)
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)
EMPIRE ESTATE PORTION
SEGEMENT CASTING YARD
![Page 27: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/27.jpg)
BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)
ROAD WORK IN PROGRESS
![Page 28: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/28.jpg)
BUS STATION
![Page 29: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/29.jpg)
Conceptual Layout
BRTS STATIONS -51.0 X 3.0 M SIZE FOR ONE SIDE DOCKING
![Page 30: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/30.jpg)
Conceptual Layout
BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING
![Page 31: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/31.jpg)
BRT BUS STOP DESIGN
![Page 32: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/32.jpg)
The Intelligent Transit Management System (ITMS) shall comprise of the following distinctive applications.
• Automated Fare Collection System• GPS based Fleet Monitoring System• Vehicle Scheduling & Dispatch System• Passenger Information System• Financial Management System / Central Clearing House System• Depot Management System & Bus Terminal Management System• Incident Management System / Call centre Management System• Business Intelligent System• Enterprise Management System
The estimated cost is Rs.19.07 Cr. for both hardware & software part of ITMS. The total O & M cost for 6 years on annuity basis is worked out as Rs. 30.65 Cr.
ITMS
![Page 33: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/33.jpg)
Technical Studies
Procurement of Consultant for Monitoring & Evaluation of BTRS services on all 4 corridors in PCMC area
— IBI Group, Canada has been appointed on 1st March 2013. Access plan to BRT corridor by Pedestrian & NMT– Proposal from MVA Asia consultancy is in process of acceptance. Parking policy & Management -- Proposal from UMTC consultancy is in process of acceptance. Promotion & Out reach Program – Proposal from IBI Group Canada consultancy is in process of
acceptance. Consultancy for O & D survey of corridor No. 3&4 – Aakar Abhinav,Mumbai has been appointed on 1st March 2013. Consultancy for Safety Audit of Pune –Mumbai Road. Proposal from IIT Mumbai (Powai) is in process of acceptance.
![Page 34: 003shrikanthsavane 130424025649-phpapp02 (1)](https://reader036.vdocuments.us/reader036/viewer/2022081605/58a154f31a28abbe3c8b5ba7/html5/thumbnails/34.jpg)
Thank you!