your partner for energy efficient, cost effective …
TRANSCRIPT
www.wilsonpowersolutions.co.uk
YOUR PARTNER FOR ENERGY EFFICIENT, COST EFFECTIVE AND RELIABLE
POWER DISTRIBUTION SOLUTIONS
www.wilsonpowersolutions.co.uk
YOUR PARTNER FOR ENERGY EFFICIENT, COST EFFECTIVE AND RELIABLE
POWER DISTRIBUTION SOLUTIONS
2
CONTENTS
Distribution Transformers ...................................................4-5
Voltage Management .......................................................12-13
Power Transformers ..............................................................6-7
Site Services ...............................................................................14
Switchgear & Cabinets ............................................................ 8
Wilson Power Rental ..............................................................15
Re-engineered Equipment ...................................................... 9
Chargetec Battery Trip Units .........................................16-17
Wilson e2 Armorphous Transformers ........................10-11
About Wilson Power Solutions .................................... 18-19
3
www.wilsonpowersolutions.co.uk
HERE TO SUPPORT YOU A PARTNER TO RELY ON
Our dedicated customer service, product innovation, engineering excellence and strong sense of social and
environmental responsibility, have helped to make us a valued and trusted power solutions partner for some of
the UK’s biggest companies.
THE BEST SOLUTION FOR YOUR POWER NEEDS
Recognising the importance of integrity and reliability, we strive to maximise our heritage and years of experience. This allows us to offer a unique service based on expert technical knowledge and superior product performance.
WARRANTYWe offer industry leading 24 months warranty across our transformer range including power transformers and special transformers. Battery chargers and switchgear come with 12 months warranty. Equipment from other manufacturers is covered by their respective guarantees.
24 MONTHS GUARANTEE
OUR VISIONTo be a family company with a conscience providing innovative, sustainable energy infrastructure solutions.
We believe in building lasting partnerships with our workforce, our customers, our suppliers and our communities; both locally and internationally. We care about your business and always strive to deliver the highest standards of product performance and customer service, becoming a power solutions partner you can truly rely on.
Registered
UVDB
4
DISTRIBUTION TRANSFORMERS
QUALITY STANDARDS COMPLIANCECommitted to continuous improvement, we are
following global material, technology and application developments closely, ensuring that our transformers
are designed to comply with and satisfy the high demands of modern distribution networks.
All of our transformers are manufactured in accordance with internationally recognized standards
(BS, IEC and ANSI) and comply with the EU Eco Design Directive for transformers (where applicable).
I have worked with Wilson Power Solutions on a number of
projects.
I’ve always found them helpful and particularly value their
flexibility with regards to custom requirements.
HV Regional Manager, SSE Enterprise Contracting
24 MONTH GUARANTEEOur Wilson e1 CRGO transformers come with an industry leading 24 month guarantee from dispatch.
Transformers are manufactured in accordance with internationally recognised standards for electrical transformers (BS, IEC and ANSI). Extended warranty times can be provided where required.
24 MONTH
GUARANTEE
YOUR BENEFITS:• Modern technology
• Short lead times
• Proven quality and reliability
• Long life cycle with low maintenance
• Guaranteed buy-back for end-of life plant
FULLY COMPLIANT
WITH NEW ECO DESIGN
DIRECTIVE2015 SPECS
Wilson e1 - Cost effective eco design compliant distribution transformers. The perfect choice for budget sensitive projects.
We design, manufacture and supply a comprehensive range of cold rolled grain oriented (CRGO), double wound distribution transformers that can be supplied both liquid filled (Oil or Midel) or dry type (Cast Resin).
5
Oil or Midel immersed distribution transformers Conventional free-breathing, hermetically sealed or with conservator
Dry type or cast resin distribution transformers IP 00 core and coils or enclosure with IP protection
Manufacturing standards ANSI, BS, IEC or custom specification
Rated Power 315 kVA up to 4 MVA
Primary Voltages typically 3.3, 6.6, 11, 11/6.6 dual, 33 kV
Secondary Voltages typically 280, 340, 400, 415, 433, 480, 690 V or custom specification
Phases Single and three phase transformers
Tappings 2 x 2.5% (plus and minus) offload tapchanger (other ranges or on load tapchangers on request)
Voltage regulation Via offload tapchanger (onload tapchanger with AVR relay on request)
Rated frequency 50 or 60 Hz
Vector groups Dyn11 or any other vector group as per IEC 60076
Temperature rise 60/65C or custom specification
Cooling type ONAN (oil natural air natural) or other types of cooling such as ONAF, KNAN, KNAF etc on request
Radiators Corrugated or bolt on panel radiator tanks
HV & LV terminals Air cable box type or open bushings on request
Installations Indoor and/or outdoor
Sound level As per ENATS 35
DISTRIB UTION TRANSFORMERS TECHNIC AL CHARACTERIST ICS
TYPICAL APPLICATIONS:
• Step down distribution transformers
• Step up generation transformers
• Wind farm transformers
• Solar PV farm transformers
• Motor starting transformers
• 6 Pulse and 12 Pulse rectifier transformers
• Earthing transformers
• Isolation transformers
• Korndörfer autotransformer starter
TYPICAL ACCESSORIES:
• Oil temperature indicator (OTI)
• Winding temperature indicator (WTI)
• Magnetic oil level gauge (MOG)
• Forced fan cooling
• Marshalling box
• Pressure relief device (PRD)
• AVR relay and control panel
• Bi-directional rollers
• Radiator valves
• Dehydrating breather
www.wilsonpowersolutions.co.uk
6
POWER TRANSFORMERSWe design, manufacture and supply cold rolled grain oriented steel (CRGO), double wound power transformers up to 200 MVA. Our power transformers are available both liquid filled
(typically Oil or Midel) or dry type (Cast Resin).
SUPPORT AND COMPLIANCEWe support all power transformer projects with a dedicated account manager and expert design
engineers to deliver a solution that best suits your needs. We follow a continuous improvement policy
and ensure that our power transformers comply with the highest standards of modern power systems.
All of our transformers are manufactured in accordance with internationally recognized standards
(BS, IEC and ANSI) and comply with the EU Eco Design Directive for transformers (where applicable).
24 MONTH GUARANTEEOur power transformers come with an industry leading 24 month guarantee from dispatch.
Transformers are manufactured in accordance with internationally recognised standards for electrical transformers (BS, IEC and ANSI). Extended warranty times can be provided where required.
24 MONTH
GUARANTEE
YOUR BENEFITS:• Short lead times
• Dedicated account manager
• Modern technology
• Proven quality and reliability
• Engineering support
• Custom specifications
I wanted to develop a relationship, something that
was more than “How do you buy transformers -
I can do that with Wilson’s.
Managing Director,
ESM Power Ltd
7
Oil or Midel immersed power transformers Conventional free-breathing, hermetically sealed or with conservator
Manufacturing standards ANSI, BS, IEC or custom specification
Rated Power 3 MVA up to 200 MVA
Primary Voltages typically 11, 22, 33, 66, 90, 132, 220 kV or custom specification
Secondary Voltages typically 3.3, 6.6, 11, 33, 66, 132 kV or custom specification
Phases Single and three phase transformers
Tappings On-load or off-load tap changers
Voltage regulation Via onload tapchanger (with AVR relay as standard)
Rated frequency 50 or 60 Hz
Vector groups Dyn11 or any other vector group as per IEC 60076
Temperature rise 60/65C or custom specification
Cooling type ONAN (oil natural air natural) or other types of cooling such as KNAN (max 33kV) on request
Radiators Tank mounted cooling radiator panels, separate cooling banks or heat exchangers
HV & LV terminals Air cable box type (33kV max) or open bushings
Installations Indoor or Outdoor
Sound level As per ENATS 35 or NEMA TR1
POWER TRANSFORMERS TECHNIC AL CHARACTERIST ICS
TYPICAL APPLICATIONS:
• Step down distribution transformers
• Step up generation transformers
• Wind farm transformers
• Solar PV farm transformers
• Motor starting transformers
• 6 Pulse and 12 Pulse rectifier transformers
• Earthing transformers
• Isolation transformers
• Korndörfer autotransformer starter
TYPICAL ACCESSORIES:
• Oil temperature indicator (OTI)
• Winding temperature indicator (WTI)
• Magnetic oil level gauge (MOG)
• Forced fan cooling
• Marshalling box
• Pressure relief device (PRD)
• AVR relay and control panel
• Radiator valves
• Dehydrating breather
www.wilsonpowersolutions.co.uk
8
LV CABINETSOn the low voltage side of a transformer, Wilson Power Solutions supplies a range of close coupled LV circuit breaker cabinets up to 4000 Amps and in line fuse cabinets up to 1600 Amp.
FEATURES & BENEFITS:• Removable front panels for ease of installation on site
• Top or bottom cable entry
• Metering
• Protection relays (such as G59)
• Restricted or unrestricted Earth Fault
• Surge Protection
All of our cabinets are secure, feature a weatherproof housing and are designed to provide long and reliable product life.
MV SWITCHGEARTo complement our transformer supply, Wilson Power Solutions stocks a wide range of new MV switchgear that can be close coupled or free standing. We regularly supply switchgear equipment of the following manufacturers:
I would like to commend your company on
the quality of workmanship and prompt
delivery to site. All alterations carried out
were of a very high standard and all aspects
related to the installation went very well.
Company Director,
R&B Switchgear Services Ltd
• Schneider (Ringmaster Range) RN2c, CN2, SN6, CE2, CE6, SE6
• Lucy (Sabre)
• Eaton (Xiria)
EX WORKS AVAILABILITY
• Schneider (Ringmaster Range) of equipment both extensible and non-extensible types.
Other manufacturers available on request.
SWITCHGEAR & CABINETS
9
RE-ENGINEERED EQUIPMENTA cost effective, reliable alternative - skillfully re-engineered power
and distribution transformers and switchgear
With over 69 years of heritage in re-engineering, we promise to make full use of existing resources, to reduce the amount of industrial waste wherever possible and to provide you with a responsible solution to your power needs.
OUR TRANSFORMER RE-ENGINEERING PROCESS ENCOMPASSES THE FOLLOWING STAGES:
• Detanking
• Core inspection and core stoving
• Full tank overhaul and replacement of all seals and gaskets
• New cable box and bushings where required
• Tap switch assessment
• Oil replacement
• Re-assembly and painting
• Testing and despatch to BSEN60076
RE-ENGINEERED MV/LV SWITCHGEAR• Large range of UK manufactured
equipment from diverse manufacturers including:
• Reyrolle, GEC, Ottermill, Schneider, Merlin Gerin, Yorkshire Switchgear, Brush, Long & Crawford, Ellison, Alstom, ABB, MEM, Dorman Smith, Allenwest, Wallacetown, Whipp & Bourne, W. Lucy
• 24 month complimentary warranty
RE-ENGINEERED POWER TRANSFORMERS:• Up to 60MVA
• Primary voltages typically 11kV, 33kV, and 132kV
• Step up or down
• OLTC
• ONAN/ONAF
• 24 month complimentary warranty
RE-ENGINEERED DISTRIBUTION TRANSFORMERS:• 100kVA up to 3000kVA oil immersed
ONAN, midel filled KNAN and dry type cast resin
• Primary voltages typically 3.3kV, 6.6kV, 11kV and 33kV
• Dual ratio transformers
• Step up or step down
• 24 month complimentary warranty
24 MONTH GUARANTEEOur Re-engineered distribution and power transformers and MV/LV switchgear come with a 24 month guarantee from dispatch.
24 MONTH
GUARANTEE
10
AMORPHOUS SUPER LOW LOSS TRANSFORMERS
Our Wilson e2 amorphous range is the industry leading super low loss transformer product.Providing lowest combined transformer losses, total cost of
ownership considerations are almost always favourable generating
impressive life time energy savings that will typically start adding to
your organisations bottom line within three to four years.
PERFORMANCE – UNRIVALLED RELIABILITY Pioneering amorphous technology, the Wilson e2 has been the first super low loss transformer in the UK – launched in 2009 it has helped organisations across a wide range of sectors reduce energy
costs and lower emissions.
The Wilson e2 provides two areas of savings:
GUARANTEED SAVINGS THROUGH REDUCED TRANSFORMER LOSSES
Our Wilson e2 transformer combines amorphous core material with
low current density conductors to provide lowest combined transformer
losses. Based on an average 25-year transformer lifespan, a 1000kVA
Wilson e2 transformer achieves typically £35,000 (15,000 kWh/pa @
£0.095) through loss savings alone when compared with a modern, eco
design compliant CRGO transformer.
Savings from replacing an existing older transformer with the e2 will be
significantly higher and typically cut energy bills by £3,500 per year.
SUBSTANTIAL POTENTIAL SAVINGS THROUGH VOLTAGE MANAGEMENT
The Wilson e2 is designed to deliver a reduced secondary voltage (415V
instead of 433V). In addition the units feature an extended tapping range
as standard thus allowing you to reduce site voltage at source without
the need for additional dedicated voltage management equipment.
1
2
THE UK’S MOST ENERGY
EFFICIENT DISTRIBUTION TRANSFORMER
MEETS & EXCEEDS STRICT
2021 EU ECO DESIGN SPECIFICATIONS
TODAY.
FAVORABLE TOTAL COST OF OWNERSHIP:
GET PAYBACK IN 4 YEARS OR LESS!
11
CUTTING TRANSFORMER LOSSES FURTHERTwo types of energy losses are inherent in the running of distribution transformers:
Core losses are continually present from the day the unit is energised, that is 24h a day, 365 days of the year.
Wilson e2 transformers combine amorphous metal cores with low current density conductors. The result: The UK’s most energy efficient transformer with lowest combined transformer losses providing you with guaranteed, easily quantifiable energy savings for your organisation.
1 LOAD LOSSES THAT VARY DEPENDING ON TRANSFORMER LOADING
2 NO- LOAD LOSSES THAT OCCUR IN THE TRANSFORMER CORE
WHAT ARE AMORPHOUS CORE TRANSFORMERS (AMT’S)?
The cores of conventional transformers consist of stacks of laminations that are made from silicon steel with an almost uniform
crystalline structure (CRGO). In transformers with amorphous cores, a ribbon of steel is wound forming the core.
The big benefit of amorphous transformers is that amorphous steel has lower hysteresis losses. Simply put, this means that less energy
is wasted in magnetising and demagnetising during each cycle of the supply current, which results in significantly reduced core losses.
COMPARISON OF PROPERTIES
Properties Unit Amorphous metalCRGO Steel
Density (g/cm3) 7.15 7.65
Specific resistance 130.00 45.00
Saturation flux density (Tesla) 1.56 2.03
Typical core loss (at 50 Hz, 1.4 Tesla)
Watt/kg 0.20 0.90
Thickness mm 0.025 0.27
Space factor 0.86 0.97
Brittleness Higher Lower
Available formRibbon/foil (standard sizes
-142.2mm,172.2 mm & 213.4 mm)Sheet/Roll
Annealing temperature
°C 360 810
Annealingatmosphere
Inert gas Inert Gas
Special annealing requirement Magnetic field annealing -
We’re happy to recommend
the Wilson e2 transformer as
part of an integrated approach
to energy savings.
Tesco Technical Standards Manager
Amorphous metals are made of alloys
that have no atomic order. They are made
by rapid cooling of molten metals that
prevents crystallisation and leaves a vitrified
structure in the form of thin strips. The lack
of systematic structure has given them the
additional name metallic glasses.
Infrared photography illustrates significantly lower temperature in an amorphous metal core (right) compared with a traditional silicon steel core (left).
WHAT ARE AMORPHOUS METALS?
CRGO CRYSTALLINE CORE e2 AMORPHOUS CORE
12
VOLTAGE MANAGEMENT THROUGH MV SUPPLY THE MOST COST EFFECTIVE AND LEAST INVASIVE SOLUTION
DEDICATED VOLTAGE OPTIMISATION UNIT
HV METERING
LV PANEL
LOAD1
LOAD3
LOAD2
LOAD4
VO UNIT
AWILSON e2 TRANSFORMER
11KV / 415V
HV METERING
LV PANEL
LOAD1
LOAD3
LOAD2
LOAD4
SITE VOLTAGE 220V
B
• High capital cost
• Additional system losses
• Increased plant footprint
• Additional cabling
• Additional maintenance
• Virtually maintenance free
• No additional equipment
• No added transmission losses
• No risk of system disturbance
• Cost effective 2in1 solution
Most sites with MV supply are operating a distribution
transformer that is designed to provide a nominal phase
voltage of 240V. Where sites can benefit from reducing
supply voltage, replacing existing transformers with a with
a Wilson e2 /Wilson e2+ transformer is often the most cost
effective solution. Why?
Replacing the supply transformer does not require any
additional equipment to be installed. This eliminates the
risk of system disturbance, avoids additional transmission
losses, minimises the total plant footprint and is virtually
maintenance free (see diagrams opposite).
HV voltage Tap setting LV voltage
11,000V 7.5% (1) 384V
11,000V 5% (2) 394V
11,000V 2.5% (3) 405V
11,000V 0 (4) 415V
11,000V -2.5% (5) 425V
11,000V -5% (6) 436V
GUIDELINE VALUES FOR NO LOAD VOLTAGE
VOLTAGE MANAGEMENT
Depending on your supply voltage and the voltage dependent
loads at site you can achieve reductions of up to 12% in
electricity consumption. In addition, equipment life can be
prolonged as a result of improved operating conditions.
In order to assess the savings potential of your site your incoming supply needs to be monitored and your load profile analysed.
THE FIXED TAP SOLUTION
The Wilson e2 is designed to provide a
lower nominal voltage and comes with an
extended tapping range allowing you to
adjust site voltage without the need for
costly additional equipment.
Many sites in the UK are supplied by a higher than optimal voltage that is responsible for significant energy losses in voltage dependent equipment.
Voltage Management is an energy saving technique that reduces these unnecessary losses
by improving voltage to site. The Wilson e2 transformer comes with in-built voltage
management capabilities that allow for easy adjustment to LV site voltage without the need
of costly additional equipment.
Depending on site supply voltage and your site’s load profile, managing voltage through a supply transformer can reduce energy consumption by up to 12% with customers typically achieving savings of 3-8%.
REDUCE UNNECESSARY
ENERGY WASTAGE CUT
ELECTRICITY BILLS
24 MONTH
GUARANTEE
13
The Wilson e2+ is a super low loss amorphous transformer with a 17 position on-load tap changer that dynamically adjusts LV side voltage allowing you to maximize energy
savings whilst safeguarding security of supply through buck and boost technology
Typical applications include sites
where supply voltage fluctuates
significantly (this can be irregular peaks
and troughs as well as distinct day
and night patterns), where a constant
output voltage is required (for example
operating highly sensitive equipment)
or to increase your sites’ resilience in
view of increasingly dirty supply from
the grid.
DYNAMIC STABILISATION
GUARANTEED OUTPUT VOLTAGE
www.wilsonpowersolutions.co.uk
The Wilson e2+ is saving the store 285,000 kWh per year through loss savings and
voltage management. Providing a cost-effective and space saving alternative to
dedicated Voltage Management systems.
BENEFITS OF DYNAMIC SUPPLY VOLTAGE REGULATION:
Maximises energy savings from voltage dependent loads
Provides controlled operating conditions
“Buck and boost” to safeguard against voltage spikes and drops
Enables small scale renewable integration
ADVANTAGES OF TRANSFORMERS WITH ON LOAD TAP CHANGER [OLTC] OVER “HYBRID” UNITS:
• One solid piece of engineering• Proven and reliable technology• Compact design• Reduced plant footprint• Less residual heat
WHY CHOOSE AN ON LOAD TAP CHANGER (OLTC) OVER THYRISTOR PRODUCTS?
• No excessive heat
• Less maintenance • Proven reliability • Smaller plant
footprint
REGULATED SUPPLY
VOLTAGE
BUCK & BOOST
TECHNOLOGY
Maximising energy savings - Increasing site resilience.
TECHNICAL SPECIFICATION
255
250
245
240
235
230
225
220
215
VO
LTS
LOGGING PERIOD
Savings with Wilson VO
THE DYNAMICALLY REGULATED SOLUTION
IMPROVE YOUR INFRASTRUCTUREFOR ENERGY EFFICIENCY AND RESILIENCE
14
I would like to thank you for your valued help resolving the two
recent problems regarding transformer leak and replacement
switchgear. Please thank your site staff for the professional
way they carried out the work on site yesterday.
UK Power Networks Services
Regional electricity companies along with small and large industrial customers often require
us to attend site and add metering, upgrade protection, or change current transformers.
Due to our comprehensive stock of re-engineered equipment we can modify panels using
the original manufacturers’ components, as well as supply and fit new ASTA certified parts.
PROTECTION SERVICES:• HV & LV Protection & grading studies
• Protection systems setting & commissioning
UPGRADES:• Compound to air busbar chambers &
cable boxes for dry type terminations
• Metering upgrades - analogue to electronic digital
• Protection/metering current transformers
• Protection relay upgrades - Areva Micom, Areva K-series, ABB, Argus, Schneider, Sepam, GE
• New inter tripping relays
• Translay
• Relay
• Restricted Earth Fault
• Voltage transformers
SAFETY & TRAINING: • Extensively trained HV
switching engineers
• CITB safety passports carried by all on site staff
APPROVED BY MAJOR INDUSTRIAL USERS AND
NATIONAL UTILITY COMPANIES
SITE SERVICESWe have extensive experience of carrying out on site modifications to low and medium voltage equipment. Membership of the Electricity Association (EA) allows us to lift SOPs
(suspension of operating practice) from your existing equipment.
15
WILSON POWER RENTALS: YOUR PARTNER FOR TEMPORARY POWER EQUIPMENT NEEDSTypical applications include:
• Generator load bank testing We have a vast range of electrical
transformers that can be used on
MV supplies where the voltage
is required to be dropped to a
suitable level to feed the load bank.
E.g. step down transformer
2500kVA 11000/415v ONAN
Dyn11.
• Temporary power installations In conjunction with a generator
where the voltage has to be
stepped up to grid voltages such as
11kv or 33kv to feed the local area
where power has been lost.
E.g. step up transformer 2500kVA
415v /11000 volts ONAN YNyn0
• In house test facilities - Direct on line starters up to
13.8kV for pump and motor testing
- Voltage transformer
- Metering current transformers
• Plant failure Call Wilson Hire for a quick
and secure solution in case of
emergency plant failure.
WILSON POWER RENTALSWilson Power Rentals offers an ideal solution to customers who need to supplement their own equipment
resources or who may require equipment to cope with an emergency.
OUR IMMEDIATELY AVAILABLE EQUIPMENT INCLUDES:
• Step up transformers
• LV transformers
• LV auto transformer starters
• Inverters and soft starts
• Direct on line starters up to 11kV
• 2500 kVA Multi-tapped transformers
• 3500 kVA Multi-tapped transformers
• Step down transformers
• Containerised substations
• Transformer rectifiers
• Voltage regulating transformers
You can take reassurance from the fact that Wilson Power Rentals can always support you with a
comprehensive hire fleet of power distribution equipment for testing and plant failure applications.
www.wilsonpowersolutions.co.uk
Wilson Power Solutions are always quick to respond, their
hire equipment is well maintained and I would not hesitate
to recommend them!
16
BATTERY CHARGERS AND BATTERY MONITORING
We design and manufacture a comprehensive range of industrial battery chargers and battery monitoring systems at our Leeds factory.
OUR CHARGETEC RANGES
Economy - C200 rangeThe C200 range provides basic back-up battery trip supply
with small standing load capabilities (4A) and 2.5Ah
battery backup.
Intermediate - C300 rangeThe C300 range provides a constant voltage charger with a
range of alarms and a standing load capability of between
4A and 10A. It comes with 8Ah batteries and a Low Voltage
Battery Disconnect to protect the batteries from Deep
Discharge as standard.
Advanced - C400 rangeThe C400 range provides a constant voltage charger with
a wide range of alarms. This range is suitable for larger
battery and /or standing load capabilities. This is typically
between 24-26Ah batteries with 5-14A standing load and
a Low Voltage Battery Disconnect to protect the batteries
from Deep Discharge as standard. Dual output for high
current closing coils is provided.
Bespoke - C500 rangeThe C500 range offers highly customised solutions to suit
your specifications.
12 MONTH GUARANTEEOur Chargetec battery chargers and battery monitoring solutions come with an industry leading 12 month guarantee from dispatch.
12 MONTH
GUARANTEE
Our Chargetec units are compact, smart and available in 24
Volts, 30 Volts, 48 Volots (50V) and 108 Volts (100V) DC
and can be tailored to individual needs. Optional monitoring
equipment includes high voltage and low voltage alarms,
earth leakage alarms, battery impedance, mains failure, low
voltage disconnect and general battery alarm monitors.
17
www.wilsonpowersolutions.co.uk
OUR FULL CHARGETEC RANGE
NEXT DAY DELIVERYALL STANDARD UNITS ARE AVAILABLE EX STOCK
VOLTAGE RANGE: 24, 30, 48 & 108V DC
CURRENT RANGE: 2A to 14 AMPS
BATTERIES: Valve Regulated Low Maintenance Sealed Lead Acid (10 year design life @ 20 deg C)
SPECIFICATION: Input Voltage: 230V AC, 50HzCharger Type: Constant VoltageDistribution: MCB
CUBICLE INFORMATION Dimensions: Size 1 – 500H x 400W x 210D (mm) Size 2 – 500H x 800W x 500D (mm) Protection: Internal: IP2X External: IP42 Colour: RAL 7032 Epoxy Powder Coated
The C500 range covers bespoke products that are manufactured to your own specific requirements.
UNIT REF. VOLTS OUTPUT AMPS Ah BATTERY TYPE CUBICLE TYPE CUBICLE WEIGHT (Kg)
C200-24-2.5 24 4A 3
Cyclon E-Type 1
20
C200-30-2.5 30 4A 3 20
C300-24-8 24 10A 8 21
C300-30-8 30 10A 8 25
C300 50 8 48 1.5A 8 27
C400-24-24 24 14A 24 NPL24-12
2
35
C400-30-26 30 10A 26 SBS 31 35
C400-50-24 48 4.1A 24 NPL24-12 40
C400-110-8 110 8.5A 8 Cyclon E-Type 45
C400-110-24 110 8A 24 NPL24-12 160
FEATURES & BENEFITS
• Voltmeter
• Ammeter (C400 units only).
• Mains/charger on indication.
• Manual Load Test Function.
• Common Alarm (Charger Fail, Low Volts,) (C300 & C400 units)
• Low Voltage Battery Disconnect to protect batteries from Deep Discharge (C300 & C400 Units)
18
SMALL ENOUGH TO CARE, LARGE ENOUGH TO DELIVER
Today, Wilson Power Solutions is managed by the third generation of the Wilson family
who like to maintain more traditional ways of doing business. Dedicated to helping customers find the best power distribution
solution for their individual needs, we are passionate about our expert knowledge and committed to giving advice with our
customers’ best interests at heart.
We treasure our heritage and know that our hard-earned reputation for service excellence and superior product performance has
grown out of 68 years of experience in the power engineering sector.
Wilson Power Solutions is based on a unique customer and professional approach that has grown out of years in the industry.
Richard Wilson
started the company
rewiring cars and
providing general
electrical contracting
Richard Wilson buy and
sell electric motors and
starting equipment
Dennis and Colin
Wilson, sons of Richard
Wilson, joined the
business. They expanded
the pump business into
ministry contracts as
well as the oil industry
and were now doing
some international
work, extending the
product profile to
flameproof motors and
equipment
The 3 day week and the
sale of generators create
a cash injection
A change of name: the
company becomes Richard
Wilson (Dencol) Ltd
Bought and
sold the first
transformer
and medium
voltage
switchgear
Extension of a
transformer hire
fleet to cope with
overseas demand
Move to Westland
Works, Westland
Square, Leeds
Simon Wilson
joined the business
Larger motors
and starting
equipment up to
2500kW provided
to oil refineries and
general industries
Dencol Engineering Ltd
was formed
Richard Wilson
provide
reconditioned pumps
to the oil industry.
The company
acquires two small
properties and a
storage facility in
Stanningley, Pudsey
1946 1950’S 1967 1973/4 1976 1978 1980’S 1985 1989LATE 1950’S AND EARLY 1960’S
We believe in building lasting partnerships with our people, our customers, suppliers and our communities, both locally and internationally.
19
Started
manufacturing own
range of battery
tripping units
Employ overseas
companies to
manufacture
distribution
transformers
Power and
Distribution
Transformers Ltd
Sold the
first power
transformer at
12/25MVA to
Aggreko in
Sri Lanka
Erika Wilson
joined the
business
Manufactured
a 30/40MVA
at 90kV/15kV
transformer in 13
weeks for a company
in Chad. Manufactured
4 reactors as the main
power input to a
Russian oil field
Started
manufacturing
low voltage ACB
and pillar feeder
cabinets
Designed and
manufactured 6 X
30/40MVA, 132/33kV
power transformers to
NEPA Nigeria
Manufactured
containerised
switchgear
packages to Iraq
Opened design and
tendering office
in India
Design and
manufacture of 3 x
50MVA, 132kV/33kV
power transformers
for Solar PV farms in
Norfolk and Cornwall
The Wilson e2 super
low loss amorphous
metal transformer is
launched
Leading supermarket
chains install
the Wilson e2
transformer, utilities
start testing the
technology
Wilson Power
Solutions Ltd
is launched
The Wilson e2+
is launched
1991 1993/4 1996 1997/8 2003 2004/5 2006 2008/9 2011 2014
OUR VALUES
H-O-N-E-S-T-Y
HELPFUL We aim to exceed customer expectations
OPTIMISTIC We turn problems into solutions
NURTURING We attract, develop and retain talented people
EXPERT We offer advice and educate freely
SOCIALLY We care about our RESPONSIBLE environment and
community
TRUSTWORTHY We deliver on our promises
YORKSHIRE We are proud of our heritage
WE’RE POWERED BY SOLAR PVWe take a responsible interest in the environmental impact of our business
activities. Our Leeds manufacturing site is powered by a dedicated 65 kW
Solar PV system designed to generate enough electricity to make us
self-sufficient. Who says the sun doesn’t shine “up north”?
Wilson Power Solutions Limited, Westland Works, Westland Square, Leeds LS11 5SS UK
Tel: +44 (0)113 271 7588 Fax: +44 (0)113 277 5124 Email: [email protected]
WE ARE PROUD TO PROVIDE EFFICIENT POWER SOLUTIONS FOR:
www.wilsonpowersolutions.co.uk© Wilson Power Solutions Limited,
September 2015