y k sehgal transmission development-india
DESCRIPTION
Indian Transmission networkTRANSCRIPT
Installed Capacity : 159,400 MW
Peak Power Demand : 118,000 MW
Peak availability : 103,000 MW
Present Power Scenario
• Infrastructure growth remains the overriding priority for IndiaPower Sector has a pivotal role to play
Present Supply Scenario
Generation MixThermal 102450 MW(64%) Central
State
Private
TOTAL 159400 MW 159400 MW
50992 MW (32%)
Hydro 36860 MW (23%) 79394 MW (50%)
Nuclear 4560 MW(3%) 29014 MW (18%)
RES 15530 MW(10%)
• Transmission network spread geographically over 3.3 million sq kms
• 765kV/400kV lines: 1,00,916 ckms
• 220kV lines: 1,28,000 ckms
• HVDC Bipole (±500kV) : 7,500 ckms
• National Grid – Inter-regional capacity: 20,800MW
Transmission Network - Present
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
1
2
The‘Electrical’Regions
• 400kV Backbone Trans. Network - about 60,500 ckm(220kV: 10,000 ckm)
• Overlaying 765kV AC and 500kV HVDC system - about 7,000 ckm
• Substations 400kV & above –131 nos. with 89,000 MVA
• 2 nos. HVDC Bipole (4000 MW) and 4 nos HVDC Back to Back System (3000 MW)
POWER MAP OF INDIA POWERGRID Transmission Network - Present
World’s 3rd largest Transmission Network
KOTA
MALANPUR
AURAIYA
AGRA
NR
GORAKHPUR
BALIA
SAHUPURI
MW500
SALAKATIBIHARSHARIFF
SASARAM
PATNA
MUZAFFARPUR
MALDA
BIRPARA
BONGAIGAON
NER
UJJAIN
KOLHAPUR
PONDA
SR
CHANDRAPUR
BELGAUMNAGJHARI
GWALIOR
WR
1000
U.SILERU
MW
KORBAVINDHYACHAL
RAIPUR
BALIMELA
ERBUDHIPADAR
1000
TALCHERROURKELA
DEHRI
GAZUWAKA
MW
KANKAROLI
ZERDA
SIPAT RANCHI
Inter-regional capacity : 20,800MW
National Grid - Present
Inter-regional capacity : >32,000 MW
National Grid – A Continuing Process
National Grid – By 2012
36874
2860026783
14400 15043
57000
0
10000
20000
30000
40000
50000
60000
Central Sector State Sector Private Sector
XI Plan
XII Plan
Change in Generation Profile
Total
36874 (47%) 26783(34%) 15043(19%) 78700
28600 (28%) 14400(15%) 57000 (57%) 100000
XI
XII
Unevenly dispersed energy resources
Hydro in NER & NR
Coal in ER
Integration of energy resources through high capacity National Grid - a must
NR
WR
SR
ERNER
Ennore
KudankulamKayamkulam
Partabpur
Talcher/Ib Valley
Vindhyachal
Korba
LEGEND
Coal
Hydro
Lignite
Coastal
Nuclear
VizagSimhadri
Kaiga
Tarapur
Mangalore
Krishnapatnam
RAPP
SIKKIM
MYA
NMM
AR
CHICKEN NECK
Cuddalore
SRI LANKACOLOMBO
NEPALBHUTAN
DESHBANGLA
South Madras
Pipavav
Generation Load-Centre
Kolkata
Bhubaneswar
PatnaLucknow
Delhi
Mumbai
Chennai
Bangalore
Bhopal
Guwahati
Jammu
Ludhiana
Jaipur
Gandhinagar
Indore
Raipur
Thiruvananthapuram
Kozhikode
Hyderabad
Energy Resource Map
Jharkhand –6500 MW
NER –5000 MW
Orissa –23,000 MW
T.N.–10,000 MW
Generation Profile of IPPs
AP–24,000 MW
Chhattisgarh.–58,000 MW
Open Access in Transmission
Generation de-license
Power purchase through Tariff-based competitive bidding
Destination of power transfer not firmed-up when generation project is envisaged
New Regime of Power Sector
Change in generation profileQuantity
Location of the generation project
Scarce Right of Way
Complex dynamism due to high technologyReactive Power Management
Control of power flow
Implementation in time
Shortage of skilled manpower
Need of New Initiatives in Transmission
Cluster of Demand areas
Cluster of Generation
pockets
High Capacity Corridors
Need to be developed in Phases depending upon progress of generation projects
Creation of high Capacity Transmission Corridor
Minimum cost per MW transfer
Optimal Transmission losses
Minimization of Right of Way
Protection of flora & fauna
Strengthening of National Grid
Challenges in Transmission Development
Technology
High Voltage line
Increase the capacity of trans. corridor through HSIL/re-conductoring with HTLS /Upgradation
Utilisation of transmission lines upto full thermal
capacity – Series capacitors, SVC, FACTS
Optimization of Tower design – tall tower, multi-ckt. tower
GIS substation
EHVAC : 400kV 765kV 1200kVHVDC : ±500kV ±800kV
Technology being Adopted
1977 1990 2000 2012 2016
Voltage (kV)
Year
220kV400kV
500kVHVDC
765kV800kVHVDC
Increase in Transmission voltage
Complexities with high voltage AC system• Reactive Power Management• Availability of switchgear• Corona Loss• Sustainability of grid during contingencies
Voltage Upgradation1200kV
Development Plan
NEYVELI
RAICHUR
RAMAGUNDAM
VIJAYAWADA
CHANDRAPUR
KORADI
KORBAKORBA(W)
VINDHYACHAL
SATPURA
RIHAND
ANPARA OBRA
RENGALI
FARAKKA
KAHAL-
TALCHER
MUNIRABAD
N'SAGAR
URI
MAITHON
MADRAS
TEHRI
DHAULIGANGA
CHAMERA
N.JHAKRI
AURAIYA
KAIGA
MADURAI
UDUMALPET TRICHY
SALEM
BANGALORE
CUDDAPAH
GOOTY
HYDERABAD GAZUWAKA
ASOJ
DHULEBHILAI
ITARSI
JAIPUR
KANPUR LUCKNOW
JEYPORE
J
JEERAT
DURGAPUR
NORTH TRICHUR
KISHENPUR
WAGOORA
MOGA
BHIWANI
BIHAR-
KHAMMAM
BAREILLY
HISSAR
NALLAGARH
PANIPAT
MALERKOTLA
DEHGAM
INDRAVATI
DADRI
JAMSHEDPUR
LEGEND
BALLABGARH
BAWANA
MURADNAGAR
MANDAULAMEERUT
BASSI(RSEB)
PANKI
JALANDHAR
IIIII
GANDHAR
STPS
DULHASTIPAMPORE
SALALI&II
JAMMUSARNA HAMIRPUR
SIUL
PONG
RAPP-B
ANTA
DAUSA
CHITTORGARH
UDAIPUR
KOLAR
BAHOOR
KAYAMKULAM
PALLOM
EDAMON
KOLASIBAGARTALA
AGARTALA GPP
MALDA
KUMARGHAT
BADARPUR IMPHAL
JIRIBAMAIZWAL
ZEMABAWK
HAFLONG
LOKTAK
KAMENG
RAMMAM
SILIGURI
PURNEA KHLIEHRIAT
CHUKHA
BONGAIGAON BIRPARA
DALKHOLA
SAMAGURI
BALIPARATEZPUR
KOPILI DIMAPUR
DOYANGMARIANI
ITANAGAR
KHANDONG
MISA
RANGANADI
GOHPUR
ZIRO
DEOMALIKATHALGUR
KAKRAPAR
BHARUCH
KAWAS
NAVSARIVALTHAN
NAGDA
VAPI
HOSUR
SHARIF
MERAMUNDALI
BARIPADA
STPS
KOLAGHAT
ALLAHABAD
SINGRAULI
LUDHIANA PATIALA
KAITHAL
BUDHI-PADAR
NELLORE
KURNOOLNARENDRA
KOLHAPUR
MAPUSA
TRIVANDRUM
BHIWADI
SATNA
UNNAO
GORAKHPUR(PG)
MUZAFARPUR
TALAB H U T A N
SEONI
FATEHBAD
MAINPURI
SIPAT
KHANDWA
RAJGARH
SSAROVAR
BOISARTARAPUR
DAVANGERE HIRIYUR
GAON
SUBHASGRAM
AMRITSAR
BHATAPARA
WARANGAL
ALAMANTHI
MALEKOTTAYUR
PONDICHERRY
PUGALUR
MYSORE
KOZIKODE
DELHI
KUDANKULAM
TIRUNELVELI
MUVATTAPUZHA
BARHPATNAMAU
(PG)
(UP)
(UP)
KOTA RAPP-C&DKANKROLI
PARBATI
KOLDAM
PALLATANAGBPP
RANCHI
AKOLA
URI-II
-II
BAHDURGARH
JODHPUR
KISHENGANGA
ARASUR
MAHBOOB NAGAR
SOLAPUR(PG)
PARLI(N)PUNE
LONIKHAND
KALWA
B'SPUR
DAMOH
KARAMSADLIMBDI
RANCHODPURAZERDA
KARAD
SOLAPUR
BHILWARA
MERTA
ALISTONG
WAMPOH
-III
GANGTOK
MELLI
TALGUPPA
HASSAN
KARAIKUDI
VEMAGIRI
PARLI
RAJKOT
NAVI MUMBAI
KHADOLI
SHUJALPUR
KHARADPADA
MAGARWADA
AMARGARH
CHANDAKA
TEESTA-V
RANGIT
NKSTPP
FATEHPUR
BISHWANATH
LOWERSUBANSIRI
BHINMAL
GURGAON
RAMPUR
SILCHARMAITHON RBSASAN
MUNDRA
JETPURAMRELI
MUMBAI LOC
BHADRAWATI
BYRNIHAT
SONIPAT
K'WANGTOO
BACHCHAU
GAYA
TUTICORIN JV
KRISHNAPATANAM UMPP
NORTH CHENNAI JV
SIKAR
RATANGARH
BASPA
PANCHKULA POOLING STN
JATTI KALAN
LUCKNOW
BAREILLY
DASUYA
MAHRANIBAGHGNOIDA
KODERMA
BOKARO
MEJIA
FROM SIKKIMMELLI
BEHRAMPUR
PUNE
A'BAD
NEEMRANAMANESAR
DEHRADUNBAGPAT
GAJWEL
TILAIYYA
ROORKEE
SAHARANPURROORKEE
KASHIPUR
SASARAM
VARANASI
WR POOL
ANGUL
PADGHEAURANGABAD
RAIPURRAIGARH
WARDHA
INDORE
GWALIOR
BINA
JABALPUR POOL
JABALPUR DHARAMJAYGARH
JHARSUGUDA
CHAMPA
KISHANGANJ
AGRA
Transmission Corridor for Chhattisgarh IPP's (Corridor - V)
BHOPAL
JAIPUR
JHARKHANDPOOL
CHARIALIALIPURDUAR
PUNATSANGCHU-I
Transmission Corridor for Orissa IPP's (Corridor - I)Transmission Corridor for Jharkhand IPP's (Corridor - II)
Transmission Corridor for Tuticorin IPP's (Corridor - VII)
Transmission Corridor for Sikkim IPP's (Corridor - III)
NABINAGAR
EAST COAST
KRISHNAPATANAM IPP
BANGALORE
BANG_NEW
CHEYYUR UMPP
Transmission Corridor for Krishnapatnam IPP's (Corridor - VI)
TIRUVALAM
CUDDALORE
KURUKSHETRA
VADODRA
BALIA
B'SAHAR
ORAI
Transmission Corridor for Chhattisgarh & MP IPP's (Corridor - IV
PIRANA
Transmission Corridor for Srikakulam IPP's (Corridor - VIII)Transmission Corridor for Southern Region IPP's (Corridor - IX)
High Capacity Transmission Corridor
Planned to enhance the National Grid capacity progressively to about -
National Grid – A Continuing Process
2080032000
75000
0
20000
40000
60000
80000
Present By 2011-12 By 2016-17
Strengthening National Grid
Road Map for Indian Power System
• 400kV Transmission System – Present Backbone
• 765kV Transmission system – 2700 ckm under operation, about 7000 ckm under different stages of execution
• 765kV transmission lines are mostly double circuit
• HVDC system - ±800kV 6000MW NER- Agra under execution
• 1200kV AC Transmission System – under development : expected operation by 2016-17
Road Map for Transmission
Plan Target
POWERGRID 11th Plan Target
Item 11th Plan Target
Achieved So far(Mar’10)
Balance
Transmission line 400kV & above (Ckm)
35500
45
56000
Investment (USD billion)
12 5.6(2.3)
6.4
18400(5515)
17100
No.of EHV substations(400kV & above)
27(7)
18
MVA capacity 30080(10290)
25920
(*) Achieved in 2009-10
POWERGRID Transmission Augmentation Plan(Next 7-8 years)
Item Estimated Addition Programmein 12th Plan (2102-16)
Transmission line 400kV/765kV & above (Ckm)
80,000 – 90,000
No.of EHV substations (400kV & above)
90-100
MVA capacity 150,000 – 170,000
• Estimated Investment : About USD 22 billion
Transmission Lines : 80,000 – 90,000 Ckt.kms
+ 500kV/800kV HVDC: 5,000 – 6,000 ckt km
765 kV AC : 30,000 – 35,000 ckt km
400kV AC : 45000 – 50,000 ckt. km
New Substations – 90 - 100 Nos.
765/400kV : 35 – 40 Nos.
400/220/132kV : 55 - 60 Nos.
1200/765/400kV : 1 – 2 Nos.
Transformation Capacity (MVA)- 1,50,000 – 1,70,000 MVA765/400kV : 80,000 – 90,000 MVA
400/220/132kV : 70,000 – 80,000 MVA
Series Compensation : 22 nos. on 400kV lines
POWERGRID Physical Target(Next 7-8years)
Interconnection with Neighbouring Countries
INTERCONNECTION OF INDIA WITH BANGLADESH
India & Bangladesh InterconnectionIndia & Bangladesh Interconnection• Asynchronous Interconnection between the two
countries agreed in a meeting between Indian Delegation and BPDB & PGCB officials, Bangladesh on November 24, 2009 at Dhaka.
• Scope of Interconnection :– Establishment of 400kV Sw. Stn. at
Baharampur(India) by LILO of Farakka-Jeerat400kV S/c line
– Baharampur(India) –Ishurdi/Bheramara(Bangladesh) 400kV D/c line.
– Installation of HVDC back-to-back station (400/230 kV) at Ishurdi/ Bheramara(Bangladesh).
• The target date of commissioning is July, 2012.
Interconnection between India & Bangladesh GridsInterconnection between India & Bangladesh Grids
• Purpose :–Exchange of Power between
India and Bangladesh
• Interconnection :– Baharampur(India)-
Bheramara(Bangladesh) 400kV D/c line
–500MW HVDC B/b stn at Bheramara(Bangladesh)
• Type of connection :–Asynchronous(HVDC)
• Transfer Capacity :– 500MW (upgradable to
1000MW)
GOALPARA33.2 MVA
KHULNADOMJUR
LILUAH
HOWRAH(WB)
JOKA
BUDGEBUDGE
SOUTHERN
BARIPADA
HALDIATAMLUK
FALTA
KOLAGHAT
KRG'PUR(D)
ULUBERIA
KOLAGHAT(D) HWH(D)
HM
LEGEND
BHOLAGALLAMARI
LAKSHMIKANTOPUR
SUBHASGRAMBASIRHATSONARPUR
KASBA
MANGLA13.3 MVA
SOUTH
SATKHIRA
BHANDARIA13.3 MVA
26.6 MVABAGERHAT
KAWKHALI
PATUAKHALI40 MVA
BARISAL82 MVA
230/220kVEXISTING
132kV
FUTUREBANDARBAN
20 MVACOX'S BAZAR
RAUJAN
JULDAHSHAHMIRPUR
126 MVA
Bay of Bengal
HALISHAHAR167 MVA
BURHANUDDIN
63 MVA
82 MVA
HATHAZARI
BAROAULIA
KULSISIKALBAHA
80 MVA
41 MVADOHAZARI
CHANDROGHONA26.6 MVAMADANHAT
82 MVA
KAPTAI
LUNGSEN
TENGA
NBU
LDTEESTA
RAIGANJ
GANGARAMPUR
DALKHOLA(WBSEB)
CH. NAWABGANJ40 MVA
SAGARDIGHI
RAGHUNATHGANJ
DEBAGRAM
KRNAGAR
RANAGHAT
TITAGARH
DPL
ARAMBAG
ARAMBAGBURDWAN
RISHRA
BELMURI
KHANYANBTPS
DURGAPUR
NAGARBIDHAN
MANKAR
BOLPUR
SATGACHIA
KATWA
DHULIAN
RAMPURHAT
BAKRESHWARSAITHIA
GOKARNA
FARRAKA
KHEJURIA
PURNEA
KAHALGAONMALDA
SAMSI
DALKHOLA
KATIHAR
PURNEA(BSEB)(WBSEB)DALKHOLA
LEBONG
RAMMAM
JOYDEVPUR
GHORASAL
ASHUGANJ
MEGHNAGHATMAGURA
40 MVA
KHULNA CENTRAL192 MVA
NOAPARABONGAON
JEERAT
ASHOKNAGAR
DHRMPR
BARASAT
KALYANI JESSORE80 MVA
CHUADANGA
JHENAIDA40 MVA
BOTTAIL82 MVA
MADARIPUR26.6 MVA
GOPALGANJCHANDPUR
40 MVA
AMINBAZAR
FARIDPUR40 MVA
MANIKGANJ41 MVA
HASNABAD
MIRPUR
KALYANPUR
TONGI
ULLON
BASUNDHARA
BOGRA82 MVA
40 MVA
SHAHJAD
SIRAJGANJ
PUR40 MVA
BHERAMARA16.6 MVA
ISHURDIBEHRAMPUR
BEHRAMPUR
53 MVARAJSHAHI
82 MVAPABNA
NATORE40MVA
NIAMATPUR NAOGAON82 MVA
BOGRASOUTH
SRIPUR(MODHUPUR)
TANGAIL82 MVA
BAGHABARIKABIRPUR82 MVA
68 MVA
JAMALPUR82 MVA
82 MVAMYMENSINGH
JIRIBAMKOLASIB100 MVA KHOWAI
TRIPURA
CHOWMOHANI82 MVA
COMILLA
82 MVASOUTH
FENI40 MVA
40 MVA
COMILLANORTH
AGARTALAHARIPURSIDDHIRGANJ
RAMPURAGPP
AGARTALA
AMBASSA
W.PHAILENG
RANGAMATI
KHAGRACHARI
LUNGLEI
MARPARA
SERCHIP
(ZEMABAWK)
MIZORAMAIZWAL
AIZWAL
EASTKANCHANBARI
KISHORGANJ
20 MVASHAHJIBAZAR
50 MVA
B. BARIA
B BARIA
40 MVA
KAMALPUR
SREEMONGAL40 MVA
NETROKONA40 MVA
SYLHET
DULLABCHERA
KAILASHAHAR
KUMARGHAT
DHARMNAGAR
BADARPUR
PANCHGRAM
FENCHUGANJ33 MVA
SYLHET40 MVA
JIRIBAM
PILAPOOL
BONGAIGAON
ASSAM
BORNAGAR
40 MVALALMONIRHAT
PALASHBARI
JOYPURHAT
BALURGHAT 40 MVA
82 MVASAIDPUR
33.4 MVA
BOROPUKURIA
PURBASADIPUR
(2x41+1x20) MVATHAKURGAON
RANGPUR82 MVA
TURA
ALIPURDUAR
SILIGURI
MOINAGURI
PANCHAGARH
BIRPARA
MELLI
BIRPARA(WB)
GOSAIGAON
DHALIGAON
AGIA
SALAKATI
SINGIGAON
CHUKHA
GUWAHATI
NEHU
KYRDEMKULAIUMIAM-4
MEGHALAYANANGAL
BIBRA
40 MVACHATTAK
CHERRAPUNJI
SHILLONG
LONGPI
UMTRU
UMIAM
CHANDRAPUR
KHLIEHRIAT
KHLIEHRIAT
KHANDONG
HAFLONG
KOPILI
BYRNIHAT
JAGIROAD
UMRANGSO
NECHIPHU
RANGIA
AMINGAON
ROWTA TEJPUR
SAMAGURI
MARIANI
BALIPARA GOHPUR
POWER MAP OF BANGLADESH AND INDIA
GANGTOKRANJIT
TEESTA-VTALA
LHAO
KAMENGKHUPI
SURYAMANINAGAR
SILCHAR
400kV at 132kV
PALLATANA
AZARA
BOGRASOUTH
BHERAMARA
NAOGAON
NIAMATPUR
FARRAKA
SUBHASGRAM
KATWA
GOKARNA
JEERATKHULNA(SOUTH)
BOTTAIL
BAHARAMPUR
CH. NAWABGANJ
RAGHUNATHGANJ
KA
HA
LGA
ON
SAGARDIGHI
RAJSHAHI
BAHARAMPURISHURDI
NATORE
KHEJURIA
FARIDPUR
BAGHABARIGHORASAL
MA
DH
OP
UR
SHAHJADPABNA PUR
SIRAJGANJ
BOGRA
INTERCONNECTION BETWEEN INDIA AND BANGLADESH GRIDS
400 kV230 kV132 kV
THE PROJECTLEGEND
BAKRESHWAR
KOLAGHAT
INDIA400kV D/c
(400 KV)
BANGLADESH
MALDA
DHULIAN
DURGAPUR
ExistingUnder Constr. / Future
JAYPURHAT BARAPUKURIA
INTERCONNECTION OF INDIA WITH SRI LANKA
• Installed Capacity : 2411 MW
(Hydro – 50%, Thermal-46% )
• Maximum Demand : 1922MW
• Demand Growth : 8 %
• Hydro potential : 2000 MW, out of which 1000 MW already harnessed
EMBILIPITIYA
MATARA
GALLE
DENIYAYA
SAMANALAWEWA
BALANGODA
MATUGAMA
PANADURA
RANTEMBE
RANDENIGALA
VICTORIA
INGINIYAGALA
AMPARA
BOWATENNA
UKUWELA
KIRIBATHKUMBURA
KOTMALE
WIMALASURENDRABADULLA
N'ELIYA
MADAMPE
BOLAWATTA
THULHIRIYA
KURUNEGALA
VEYANGODA
BIYAGAMA
ORUWALA
KOLONNAWA
KOTUGODA
RATMALANA PANNIPITIYA
TRINCOMALEE
ANURADHAPURA
PUTTALAM HABARANA
RATMALANA
PANNIPITIYA
ORUWALA
BIYAGAMA
FORT
KOLLUPITIYA
KELANITISSA
KOLONNAWA
S'KANDA
132kV : Underground Cable132kV Line
220kV Line
POLPITIYA
NEWLAXAPANA
CANYON
KELANIYA
KOTUGODA
SAPUGASKANDA
KELANITISSA
KHD
KOSGAMA
VAVUNIA
POLONNARUWA
HAMBANTOTA
LAKDANAWI
LAXAPANA
SITHAWAKA
220/132 kV Sub Station 132kV GS Hydro Power Station Thermal Power Station
NEW ANURADHAPURA
Sri Lanka Transmission System
BARGE PS
CHUNNAKAM
KILINOCHCHI
VALACHCHANAI
132kV Line (not in operation)
Sri LankaSri Lanka : Present Power Scenario: Present Power Scenario
POWER MAP OF INDIA & SRILANKA
AP1
RENIGUNTA
KARWAR
KUDRE
HASSAN
DAVANGERE
TAIL RACE
SHARAVATHI
SIRSI KAIGA
KEMAR
MANGALORE
VARAHI
SHIMOGA
MUKH
TALAGUPPA
BANGALORE
C.DURGA
TIPTURHONALI
KA3
KA2
ANANTAPUR
HIRIYUR
KOLAR
AP3
TN3
HINDUPUR
AP4
CHITTOOR
TN1
NARENDRA
HAVERI
A'WADI
KADRA
KALINADI
PONDATO
KODASALLI
HUBLI KURNOOL
GOOTY
RAICHUR
MUNIRABAD
MUDDANURKRISHNAPATANAM
TN6. VILLUPURAM
KE1. PALAKKADKE2. KANIYAMPETAH
TN2. VINNAMANGALAM
TN4. KRISHNAGIRITN3. HOSUR
TN5. TV MALAI
TN1. THIRUVALEM
TN8. PERAMBULURTN7. SINGARAPET
SRIPERUMBUDUR
SULURPET
NELLORE
ALAMANTHI
ENNORE
KADAPERI
N MADRAS
VIJAYAWADA
NEYVELI EXTN.
PUDUKOTTAI
PARAMAKUDI
VILLUPURAM
KARAIKUDI
NEYVELI
BRAHMAPURAM
KOZHIKODE
KALAMASSERI
IDUKKI
PALLOM
KAYAMKULAM
EDAMON
TRIVANDRUM
NORTH TRICHUR
KANNUR
L PERIYAR
KASARAKODE
SATHURSABARGIRI
TIRUNELVELI
ZIRCONUM
TUTICORIN
UDUMELPET
TIRUPPUR
THENI
METTUR
MUV'ZHA
THUDIYALURKE1
KE2
PYKARA
KUNDAH
TN10
TN11
TN12
ARASUR
MYSORE
TK HALLI
H HALLI
TN7
TCGODU
PUGALUR
SALEM
MADURAI
INGUR
TN9
TRICHY
TN8
TN5
ATHUR
TN4 TN2
ARANI
TN12. GC PALAYAM
TN10. KADAMPARAITN9. SAMAYAPURAM
TN11. SEMPATTY
LEGEND
ACHARAPAKKAM
PONDICHERRY
BAHOUR
CUDDALORE
P P NALLURMYLADUTHURAI
THANJAVUR
VILLIANNOR
THIRUVARUR
KALPAKKAMSP KOIL
KUDANKULAMNAGARCOIL
400kV lines
132kV lines
MALEKOTTAIYUR
KILINOCHCHI
ANURADHAPURA
KURUNEGALA
KOSGAMA
SITHAWAKA
POLPITIYA
DENIYAYA
S APUGAS-
PANNIPITIYA
ORUWALA
BIYAGAMA
VEYANGODA
THULHIR IYA
PUTTALAM
MATUGAMA
GALLE
KOTUGODABOLAWATTA
KOLONNAWA
RATMALANA
PANADURA
KELANITISSA
MADAMPE
CHUNNAKAM
VALACHCHANAI
SAMANALAWEWA
EMBILIPITIYA
MATARA HAMBANTOTA
POLONNARUWA
BOWATENNA
UKUWELA
VICTORIA
RANDENIGALA
N'ELIYA
BALANGODA
KIRIBATHKUMBU RA
WIMALASURENDRA
KOTMALE
NEW
CANYON
LAXAPANA
HABARANA
RANTEMBEBADULLA
INGIN IYAGALA
AMPARA
TRINCOMALEE
VAVUNIA
NEW ANURADHAPURA
RAICHUR
RAICHUR
N'SAGAR N'SAGAR
FROM TALCHER
-KANDA
LAXAPANA
220kV lines
HVDC BIPOLE
UNDER GROUNDCABLE
AP1. MYDUKURAP2. NANDYALAP3. YERRAGUNTLAAP4. KALIKIRIKA1. HIRIYURKA2. GOWRIBIDANOORKA3. DB PUR
India India –– Sri Lanka Sri Lanka interconnectioninterconnection
• Madurai –Anuradhapura HVDC Bipole Line with :
1x500MW HVDC Terminal (Stage-I) 2x500 MW HVDC Terminal (Stage-II)
Quantum of Power Quantum of Power Exchange : 1000 MWExchange : 1000 MW
Proposed InterconnectionProposed Interconnection
India : Interconnection with Sri LankaIndia : Interconnection with Sri Lanka
185 Kms
50 Kms
150 Kms
Proposed Route for Interconnection
Madurai
Rameshwaram
Anuradhapura
Talaimannar
FILTER
TRANSFORMER VALVES
SM REACTOR
OVERHEAD OVERHEADCABLE
Proposed HVDC Interconnection Proposed HVDC Interconnection –– Initial StageInitial Stage
METALIC METALIC RETURN CABLERETURN CABLE
FILTER
FILTER
TRANSFORMER VALVES
SM REACTOR
OVERHEAD OVERHEADCABLE
Proposed HVDC InterconnectionProposed HVDC Interconnection
METALIC METALIC RETURN CABLERETURN CABLE
OVERHEAD OVERHEADCABLE
FILTER
FILTER
FILTER
INTERCONNECTION OF INDIA WITH BHUTAN
• For import of power from Chukha HEP (4x84 MW)
– Chukha – Birpara 220kV 3 ckts
• For import of power from Kurichu HEP (4x15 MW)
– Kuruchu - Geylegphug(Bhutan) – Salakati(NER) 132 kV S/c
• For import of power from Tala HEP (6x170 MW = 1020 MW)
– Tala – Siliguri 400kV 2x D/c line
India India -- Bhutan : Existing InterconnectionsBhutan : Existing Interconnections
• Hydro Potential in Bhutan : About 21000 MW
• About 11,000MW identified to be implemented in future– Punatsangchu –I : 1200 MW– Punatsangchu –II : 1000 MW– Mangdechu : 720 MW– Sankosh : 4000 MW– Chamkhar Chu -I : 670 MW– Kurigongre : 1800 MW– Amochu : 620 MW– Kholongchu : 486 MW– Wangchu : 900 MW– Bunakha : 180 MW
• Major portion of power from the future generation projects in Bhutan is envisaged to be imported into Indian grid.
• The 1st of the future projects to be commissioned in Bhutan is Punatsangchu-I (1200 MW) in 2014-15.
India India -- Bhutan : Future PotentialBhutan : Future Potential
India India –– Bhutan InterconnectionBhutan Interconnection
INTERCONNECTION OF INDIA WITH NEPAL
India - Nepal : Present Interconnection
Power Scenario in NepalInstalled Capacity : 607MW (Hydro – 91%)Demand : 600 MW
Over 16 links at 132/33/11 kVAbout 50 MW of power being exchangedNet export to Nepal (about 10% of demand of Nepal met from India)
Supply of 70MU/annum from Tanakpur (India) to Nepal
India – Nepal : Future• A 400 kV inter-connection (initially op. at 220kV level)
between Muzaffarpur(India) and Dhalkebar(Nepal) planned
• The scheme is to be developed by a private developer (IL&FS) in participation with POWERGRID
• For its implementation, two separate JV companies, one for Indian portion (ILFS, PTC, POWERGRID) and other for Nepalese portion (ILFS, PTC, NEA) are proposed
• Two separate DPRs for Indian and Nepalese portion have been prepared by POWERGRID and submitted to IL&FS in Feb-09 & March-09 respectively
• Formation of Joint Venture is under progress
India India –– Nepal : FutureNepal : Future
• Hydro Potential of Nepal : about 80,000 MW
• Large potential projects being considered for development and export of power to India
– Karnali - 10,800 MW
– Pancheshwar HEP - 6,500 MW
– Sapta Koshi - 3,300 MW
– Arun HEP - 1,000 MW
– West Seti HEP - 750 MW
– Arun HEP - 685 MW
– U. Marsyangdi – 2 - 600 MW