working group 6 — biosphere modelling for ... documents...•interaction with geosaf, nsdf and...

7
MODARIA II: WORKING GROUP 6 BIOSPHERE MODELLING FOR LONG-TERM SAFETY ASSESSMENTS OF RADIOACTIVE WASTE DISPOSAL FACILITIES IAEA review and enhancement of Biomass methodology Cartoon of the KBS-3 system at Forsmark, Sweden

Upload: others

Post on 06-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

MODARIA II: WORKING GROUP 6 BIOSPHERE MODELLING FOR LONG-TERM SAFETY

ASSESSMENTS OF RADIOACTIVE WASTE DISPOSAL FACILITIES

IAEA review and enhancement of Biomass methodology

Cartoon of the KBS-3 system at Forsmark, Sweden

Page 2: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

This week:

• 20+ participants• Maintained the overall methodology format

• Improved human exposure groups• Incorporated guidance on biota assessment

• Reviewed technical material that support the report appendices• Update on long term climate• Arid environments• Defining area of interest• Guidance on mathematical modelling

• Linked the methodology to the overall safety case

Page 3: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

WORKING GROUP 6

Page 4: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

No!

Page 5: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

Next steps:

• Review of interim report• By representatives from regulators and implementors• By people new to the field

• Write appendices• On PEG questionaire and lessons learned• Uncertainties• Examples drawn from a range of different contexts

• Interaction with GEOSAF, NSDF and others

• Plan interaction with• WG1, WG6 methods applicable to shorter timescales• WG3, Consistent with chapter on biota methodology• WG4, process understanding linked to data needs• WG5, Spatial scales on biota populations

• Draft 2.0 by May 2019

• Finalise the report by October 2019.

Page 6: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

Interim meeting 2019 in Munich, week starting 13 or 20 May

Page 7: WORKING GROUP 6 — BIOSPHERE MODELLING FOR ... Documents...•Interaction with GEOSAF, NSDF and others •Plan interaction with •WG1, WG6 methods applicable to shorter timescales

The biosphere, an integral part of the entire system

Thank you!