working group 6 — biosphere modelling for ... documents...•interaction with geosaf, nsdf and...
TRANSCRIPT
MODARIA II: WORKING GROUP 6 BIOSPHERE MODELLING FOR LONG-TERM SAFETY
ASSESSMENTS OF RADIOACTIVE WASTE DISPOSAL FACILITIES
IAEA review and enhancement of Biomass methodology
Cartoon of the KBS-3 system at Forsmark, Sweden
This week:
• 20+ participants• Maintained the overall methodology format
• Improved human exposure groups• Incorporated guidance on biota assessment
• Reviewed technical material that support the report appendices• Update on long term climate• Arid environments• Defining area of interest• Guidance on mathematical modelling
• Linked the methodology to the overall safety case
WORKING GROUP 6
No!
Next steps:
• Review of interim report• By representatives from regulators and implementors• By people new to the field
• Write appendices• On PEG questionaire and lessons learned• Uncertainties• Examples drawn from a range of different contexts
• Interaction with GEOSAF, NSDF and others
• Plan interaction with• WG1, WG6 methods applicable to shorter timescales• WG3, Consistent with chapter on biota methodology• WG4, process understanding linked to data needs• WG5, Spatial scales on biota populations
• Draft 2.0 by May 2019
• Finalise the report by October 2019.
Interim meeting 2019 in Munich, week starting 13 or 20 May
The biosphere, an integral part of the entire system
Thank you!