Christmas tree tops are pinned down to trap silt on the inner side in flood like conditions. The silt helps form a secondary bank

Bank Erosion Works

Page 3: Water Ways Presentation

The trapped silt is then planted up with Willow twigs, which root and help stop any further erosion

Page 4: Water Ways Presentation
Page 5: Water Ways Presentation

Willow Weaving

Willow weaving is a very successful and effective way of bank protection

Page 6: Water Ways Presentation

AFTER

Page 7: Water Ways Presentation
Page 8: Water Ways Presentation

Ten foot lengths of Willow are hand weaved around timber posts and then back filled with top soil.

Page 9: Water Ways Presentation

BEFORE

Page 10: Water Ways Presentation

AFTER 4 MONTHS

Page 11: Water Ways Presentation
Page 12: Water Ways Presentation

Willow weaving is normally carried out in the winter months when the willow is dormant.

Page 13: Water Ways Presentation

Normal height of weaving is two feet. Fagots are also used to protect bank erosion.

A Fagot is a bundle of Willow which is pinned to the bank of the river.

Page 14: Water Ways Presentation

A plan is first drawn up which shows the new proposed ramp and gradient.

Also included, is the positioning of all boulders to be used.

Construction of a Rock Ramp

Page 15: Water Ways Presentation

Bridge sills and weirs, can, in low water, become impartial barriers to migrating fish and invertebrates. A rock ramp is a very successful way of overcoming this problem.

Page 16: Water Ways Presentation

The site is first marked out and key boulders are put in place.

Page 17: Water Ways Presentation

This particular bridge sill needs a ramp of 28 meters in length, which will have a rise of 10 millimetres every 3 meters.

Page 18: Water Ways Presentation

Around 400 tonnes of rock from boulders to small gravels were used to construct this ramp.

Page 19: Water Ways Presentation

Boulders are also placed to manipulate the flow of water, which in turn creates kinetic energy, that can be channelled to help migrating fish.

Page 20: Water Ways Presentation

A view of the new rock ramp in a migratory flow.

Page 21: Water Ways Presentation

This rock ramp allows passage of spawning fish in any average daily flow. It takes out any overexertion of spawning fish, that would normally have to overcome a bridge sill in

low water. Problems caused by a bridge sill in low water are: loss of eggs due to fish hitting off the concrete, broken skin, which can lead to disease and stress, which in turn

effects reproduction and even mortality.

Page 22: Water Ways Presentation

Bridge sill before Rock Ramp

Page 23: Water Ways Presentation

Bridge sill after Rock Ramp

Page 24: Water Ways Presentation
Page 25: Water Ways Presentation

First after careful planning the site is marked out

Construction of Fish Pass

Page 26: Water Ways Presentation

Holes are drilled into bedrock, steel bars are then erected to support a concrete wall which will be built to create a deep holding pool.

Page 27: Water Ways Presentation

The concrete is mixed on site by hand, then shuttered, to form the pool holding wall.

Page 28: Water Ways Presentation

The concrete is allowed set for three weeks.

Page 29: Water Ways Presentation

The old mass concrete weir is marked out and lines are then cut out with a diamond blade Con Saw.

Page 30: Water Ways Presentation

A large rock breaker is then brought in to dismantle the reinforced concrete weir.

Page 31: Water Ways Presentation

A lot of steel bars were used in building this old weir, so it took a long time to dismantle.

Page 32: Water Ways Presentation

The old weir was built around 1960, no salmon would have been able to spawn above this spot since then.

Page 33: Water Ways Presentation

(Before Fish Pass)

Old concrete weir which is impassable for spawning fish.

Page 34: Water Ways Presentation

(After Fish Pass)

Now both Trout and Salmon can easily pass the weir to populate miles of suitable spawning grounds.

Page 35: Water Ways Presentation
Page 36: Water Ways Presentation

Before

An area of Glenmorgan Stream which is neglected due to an overgrowth of vegetation and is virtually dammed up.

Page 37: Water Ways Presentation

After

The streams now flow evenly and undammed, this allows spawning fish to access miles of suitable habitat thus increasing the numbers of returning fish.

Page 38: Water Ways Presentation
Page 39: Water Ways Presentation

Deflectors

Deflectors are formed by encasing small rocks in a wooden shaped triangle. This creates a pool-like effect.

Page 40: Water Ways Presentation

Bank Erosion Work

Christmas Trees are pruned along side eroded banks to gather silt, which will create a secondary bank which will be planted up with Willow slips.

Page 41: Water Ways Presentation

River Anner (Before)

Stretches of this famous river are so overgrown that no direct sunlight can reach in to the river bed. This has a devastating effect on the food chain, reducing fish

stocks to alarming levels.

Page 42: Water Ways Presentation

River Anner (After)

By pruning back the bank, vegetation plants such as Ranunculus will return, invertebrates feed on it and fish feed on the invertebrates, thus the natural

food chain returns.

Page 43: Water Ways Presentation
Page 44: Water Ways Presentation

Glenary Stream

To prevent bank erosion, Willow twigs were planted.

They are pruned twice each year to form a Sally Hedge.

Page 45: Water Ways Presentation

The Sally Hedge is very successful as no further erosion has occurred since planting (before this process the farm owner had to move his fencing post 3 feet each year

because of erosion).

Page 46: Water Ways Presentation

Instream Habitat Training

All participants enrol in a training course which covers the make up and basics of good instream habitat maintenance.

Page 47: Water Ways Presentation

Instream Habitat Training.

This course is FETAC accredited and covers subjects like the food chain, photosynthesis, reproduction, migratory habits and the subject of fish and invertebrates

and their movements

Page 48: Water Ways Presentation

Proposed Project for 2009To create a rock ramp fish pass on the river Nire

Page 49: Water Ways Presentation

Proposed Project for 2009To create a rock ramp fish pass on the river Nire