ODISHA POWER TRANSMISSION CORPORATION LIMITED CONSTRUCTION OF 400  KV SUBSTATION AT LAPANGA WITH  ASSOCIATED LILO LINES( LILO OF IB-MERAMANDALI BOTH CIRCUIT) VOL-IIA SCOPE OF WORKS NOTICE INVITING TENDER-NIT NO. 58/2011-12 BID DOCUMENT NO. :  SR. G.M-CPC- TENDER-400KV-LAPANGA 68/2011-12   NIT NO. 58/2011-12 (PACKAGE- 68-01/2011_ LAPANGA 400 KV )   SCOPE DETAILS  -VOL-IIA     1/2

Upload: sunil-singh

Post on 22-Nov-2015

21 views

Category:

Documents


5 download

TRANSCRIPT

  • ODISHAPOWERTRANSMISSIONCORPORATIONLIMITED

    CONSTRUCTIONOF

    400KVSUBSTATIONATLAPANGAWITHASSOCIATEDLILOLINES(LILOOF IBMERAMANDALIBOTHCIRCUIT)

    VOLIIA

    SCOPEOFWORKS

    NOTICEINVITINGTENDERNITNO.58/201112BIDDOCUMENTNO.:SR.G.MCPCTENDER400KVLAPANGA68/201112

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA1/2

  • IMPORTANTNOTE

    THEBIDDERSAREADVISEDTOVISITTHESITEBEFOREQUOTINGTHEBID.THEYSHALLASCERTAINALLTHE DATAFORTURNKEYCOMPLETION OF THE SUBSTATION AND ASSOCIATEDTRANSMISSIONLINESSUCHAS;

    1. SOILBEARINGCAPABILITY.

    2. BENCHINGANDFILLINGFORSITELEVELLING.

    3. TYPEOFSTRUCTURESFORBOTHLINE&SUBSTATION.

    4. QUANTITYOFMATERIALS/STRUCTURES/EQUIPMENT.

    5. TYPEOFFOUNDATIONSFOR LINETOWERS&SUBSTATIONEQUIPMENT/STRUCTURES.

    6. THELENGTHOFTHEBOUNDARYWALL,FENCINGANDROADS.

    7. ANYOTHERDATAREQUIREDFORDESIGNINGTHELINE& SUBSTATION.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA2/2

  • 1.0)GENERALThe Employer (M/S ODISHA POWER TRANSMISSION CORPOTATION

    LIMITED.)is strengthening their Transmission and Distribution systems by way ofconstructing 2X315MVA, 400/220KVSubstationat Lapangawith construction ofassociated LILO lines ( LILO of IBMeramandali Both circuit) on turnkey basis atLAPANGA inthestateofODISHAasoutlinedinthedetailedscopeofwork.TheworksaretobecarriedoutonTurnkeyBasistillfinalcommissioningofsubstation&associatedtransmissionline,itstesting,commissioningandhandingoverthesametotheowner.

    OPTCL is implementingaprojectnamedGridStrengthening forODISHA.Thefollowingtransmissionsystemisenvisagedunderthisproject.(a)LILOOFIBMeramandaliline6.0Km.(appox) (b)Establishmentofnew400/220KV,2X315MVAS/S atLapanga in theStateofODISHA

    SCOPE:SubStation:Thescopeofthisspecificationcoversthefollowing:

    Constructionoffollowing400KVBaysatLapangaandinstallationofequipments(includingallcivilworks).

    (i) 400KVbay08Nosfeederbays.(ii) 400KVbay2NosforICT(iii) 220KVbay2NosforICT220KVSide.

    Thedetailedscopeofworkisbroughtoutinsubsequentclausesofthissection.(I)ElectricalWork:

    Design,engineering,manufacture,testing,supplyonFORdestinationsitebasisincludingtransportationandinsurance,storage,erection,testingandcommissioningoffollowing(420KV&245KV)equipment/itemsatLAPANGAcompleteinallrespect:

    (a)420KV&245KVcircuitbreakers,isolators,currenttransformers,capacitor voltagetransformers,surgeArrestorsandotherequipment.(b)2Nos33/.415KV,1000KVAAuxiliary transformeralongwithassociated equipment.(c)Completesubstationautomationincludinghardwareandsoftwarealongwithassociated equipment and kiosks for following bays (bays as defined in technical specification, sec. S/S automation). Adequate training to OPTCL officialsarerequiredtobeorganisedforfamiliarisationoftheSAS.400KV10nos.(presentscope)&infuture4Nosfeederbaywillbeadded.220KV2nos.(presentscope).

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA1/36

  • *Theexistingongoing220/132KVsystemhasbeenprovidedwithSCADAprovisioncompatible to IEC 61850. Hence the proposed Substation automation shouldaccommodate the present system. Details of the SLDof the existing substation isenclosedunderTSIIfordesignofthesubstationautomationsystem(SCADA).(d)Completerelayandprotectionsystem.(e)Fireprotectionsystem.(HighPressurewatersprayMulsifire&Hydrantsystemalsotobeconsidered)*Designandperformancerequirementsofthefollowingtypesoffireprotectionsystems;

    (i) HydrantSystem(ii) HighVelocityWater(H.V.W)SpraySystem.(iii) FireDetectionandalarmSystem.(iv) PortableFireExtinguishers.(v) Wheel/TrolleymountedFireExtinguishers

    (f)LTSwitchgear(AC&DCdistributionboards).(g)DGSets.(250KVA,SilentGenereator)(h)BatteriesandBatterychargers.(i)1.1KVgradepower&controlcablealongwithcompleteaccessories.(j)Latticetypestructures(galvanized)for420KV/220KVsidecolumnandbeam&Pipetypestructure(galvanised)for420KV/220KVequipmentsupportstructureshallbeprovidedasperOPTCLrequirement,exceptCBsupportstructure,whichshallbeasperCBmanufacturer'sdesign.(k)Buspostinsulators,insulatorsstrings(160KN,Antifogtype)andhardware,clamps&connectors,conductors,aluminumtubes,Busbarandearthing materials.Baymarshalingboxes,spacers,cablesupporting angles/channels,cabletraysandcovers,junctionboxburiedcabletrenchesetc.(j)Earthmat.(LayingintheearthG.IFlat 75X12mm&RaiserfromtheearthmattodifferentequipmentandStructureG.IFlat75X10mm)(k) Complete lightingand illuminationof theswitchyard,Roads,DGbuilding, FireFighting&Pumphouseshall beprovidedby thecontractor asperdrawings/BOQenclosed by the purchaser. The lighting fixtures for switch yard lighting shall bemounted on Gantry structures. G.I tubular Lighting poles to be provided by thecontractor.(l) Controlandrelaypanel(BayPanel)arerequiredtobeinstalledintheswitcyardinAirConditionedKioskaspertechnicalspecunderE21Control&protectionpanel,SASandAirConditionedKiosk.(m)Oneno.ofbaymarshallingkioskshallbeprovidedforeachbay(excludingtiebreakerbayincaseofoneandhalfbreakerscheme).Inadditiontotherequirementsspecifiedelsewhere in thespecification, thebaymarshallingkioskshallhave two

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA2/36

  • distinct compartments for the followingpurpose:To receive two incoming415V,3phase,63Amps.ACsupplywithautochangeoverandMCBunits.DetailsoftheBMKareasperTechnicalspecification.(II)CivilWorks: The scope of work shall include but shall not be limited to the

    following:Design,Engineeringandcivilworksfor:a) Soilinvestigationfordesignpurposeduringtender.b) Foundationof2X315MVAAutoTransformers(ICT)andReactor(2X50

    MVAR,400KV)alongwith rail cum road track, jackingpadsandpylonsupports,fireresistantwalls.

    c) Foundationforlatticeandpipestructuresandequipments.d) Foundation for lightingpoles, baymarshallingboxes, baycontrol units,

    panelsandcontrolcubiclesofequipment.e) Cabletrenchesalongwithcoversandsumppits.f) Cabletrenchcrossingswithroads,railtracks,culvertsetc.g) Roads&Railtracksinsidesubstation.Allroadsinsideswitchyardfencing,

    thequantityforwhichistobeestimatedbythebidder,shallbewithblacktopping.AllremainingroadsfromS/Smaingateandapproachroadshallbeconcrete roads.Quantities for concrete roadsareasgiven in thepriceschedule.ReferTechnicalspecificationforsectionCivilworksofTechnicalspecification.

    h) Metalspreadingandantiweedtreatmentofswitchyardarea.i) StormWaterDrainagesystemintheS/S.j) PermanentwatersupplytowatertankprovidedforFireFightingsystem,

    Firefightingpumphousebuilding,bayskioskandfirefightingsystem.k) Substationfencingandgate.l) Buildingforfirefightingpumphouse(asperPurchasersupplieddrawing).m) Foundationfor2Nos33/.415KV,1000KVAauxiliarytransformer.n) Rainwaterharvestingsystem.

    (III)Beforeproceedingwiththeconstructionworkofthenewsubstationandexisting substations.Thecontractorshallfullyfamiliarizehimselfwiththesiteconditionsandgeneralarrangementsandschemeetc.Thoughthepurchasershallendeavortoprovidetheinformation,itshallnotbebindingforthepurchasertoprovidethesame. The bidders are advised to visit the substation sites and acquaint themselveswith thetopography, infrastructureandalsothedesignphilosophy beforeparticipatinginthetender.Thebiddershallbefullyresponsibleforprovidingallequipment,materials,systemandservicesspecifiedorotherwisewhichare requiredtocompletetheconstructionandsuccessfulcommissioningoperationand

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA3/36

  • maintenanceofthe substationinallrespects.Allmaterialsrequiredforthecivil (cement,sandand steel etc) and construction/installation works shall be suppliedbythecontractor.Thecompletedesign(unlessspecifiedotherwiseinspecificationelsewhere)anddetailedengineeringshallbedonebythecontractorbasedonthedetailscopeofworkas indicated.Refer thedrawingsas includedunder theTSII fordesign purpose.

    (a)Anyotheritemsnotspecificallymentionedinthespecificationbutwhicharerequiredforsupply,erection,testingandcommissioningandsatisfactoryoperationofthesubstationaredeemedtobeincludedinthescopeofthespecificationunlessspecificallyexcluded.(b)The contractor shall also be responsible for the overall coordination withinternal/externalagencies,projectmanagement,trainingofpurchaser'smanpower,loading, unloading, handling, moving to final destination for successful erection,testingandcommissioningofthesubstation/switchyard.(c)Baywidthfor400KVshallbe27mtrs.(minimum)andfor220KVshall be18mtrs.(minimum)subjecttomaintainingrequiredstatutoryclearance.Theshortcircuitforces(with63KAShortCktCurrent),applicablefor supportstructuresshallbecalculatedby the contractor. Designof substation and its associatedauxiliariessystemsincludespreparationofsinglelinediagramsandelectricallayouts,erectionkeydiagrams,electricalandphysicalclearancediagrams,designcalculationsforEarthmat,DirectstrokeLightingProtection(DSLP)BusBarandSpacers,controland protection schematics, wiring and termination schedules, civil designs (asapplicable) and drawings, design of the fire fighting system , outdoor& indoorlighting/illumination and other relevant drawings and documents required forengineeringofallfacilitieswithinthefencingtobeprovidedunderthiscontractarecoveredunderthescopeofthecontractor.

    (IV)PHYSICALANDOTHERPARAMETERS:Locationofthesubstation:Thelocationofsubstationisindicatedbelow:Sl.No. NameoftheSubstation. Name of

    theState.DistrictHeadQtr

    NearestRailwayStation.

    1. 400KV/220KVGridSubStationatLapangainthedistrictofODISHA.

    ODISHA Sambalpur Jharsuguda

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA4/36

  • (V)Meteorologicaldata:ThemeteorologicaldataofthesubstationsisenclosedunderTSII.However,for designpurposes,ambienttemperatureshouldbeconsideredas50deg.Cand relativehumidityas100%.Atmosphereatallsubstationsisheavilyindustrially pollutedzone.(VI)SoilData:ThebiddershallberesponsibleforcarryingouttherequiredtestsatsiteandshouldfullysatisfyhimselfaboutthenatureofsoilexpectedtobeencounteredpriortothesubmissionofBid.AnyvariationofsoildataduringdetailedengineeringorconstructionstageshallnotconstituteavalidreasoninaffectingthetermsandconditionsoftheBid.(VII)SCHEDULEOFQUANTITIES.The requirement of various items/equipments and civil works are indicated in BidProposal Sheet schedules (BPSVol. 1Bof the bidding documents as Shedule2A,2B,2C&3).

    Allequipment/itemsandcivilworksforwhichbillofquantityhasbeenindicatedinBPS(BidProposalSheetSchedulesVol1B)shallbepayableonunitratebasis.Duringactualexecution,anyvariationinsuchquantitiesshallbepaidbasedontheunitrateundereachitemincorporatedinNotificationofaward.

    Wherethequantitiesofitems/worksarenotindicatedbutindicatedasLOT/LS,thebidderisrequiredtoestimatethequantityrequiredforentireexecutionandcompletionofworksandincorporatetheirpriceinrespectiveBidpriceschedule(BPSVol1B)oftheBidding documents. For erection hardware items, bidders shall estimate the totalrequirementoftheworksandindicateLOTwiselumpsumprice.Anymaterial/worksfortheLOTnotspecificallymentionedinthedescriptioninBPSasmayberequiredshallbedeemedtobeincludedintheLOTitself.

    Besides the mandatory spares ,which are mentioned in the in the bid priceschedules(BPSVo.1BSchedule3oftheBiddingdocuments),optionalsparesrequiredmaybeseparatelyquotedbytheBidder.ThiswillnotbeconsideredforBidEvaluation.Thepurchaserreservetherighttopurchasethethesameoptionalspares.

    The bidder is clarified that no mandatory spares shall be used during thecommissioningoftheequipment.Anysparesrequiredforcommissioningpurposeshallbearrangedbythecontractor.Theunutilizedsparesifanybroughtforcommissioningpurposeshallbetakenbythecontractor.(VIII)BASICREFERENCEDRAWINGS:

    400/220KV LAPANGA S/S will be a extended substtaion of the ongoing220/132/33KVSubstationatLapanga.Forthe400KVvoltagelevel,breakerandhalfswitchingschemewith type layoutarrangementshallbeused.For220KVVoltagelevel,doublemainandtransferbusschemelayoutarrangementshallbeused.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA5/36

  • Single line diagram, structural layout drawings of proposed S/s(indicative only) isenclosedwiththebiddocumentsforreference,whichcanberefereedduringdetailedengineeringbythebidder. The reference drawings for earthing and others, which form a part of thespecifications, are given in Tech SpecVolII. The bidder shall maintain the overalldimensionsof the substations, buildings, phase to earth clearance, phase to phaseclearanceandsectionalclearance,clearancesbetweenbuses,busheightsbutmayalterthelocationsofequipmenttoobtainthestatutoryelectricalclearancesrequiredforthesubstation.

    The enclosed drawings(indicative) in the TSVOLII give the basic scheme,structurallayoutofsubstation,substationbuildings,associatedservicesetc.Incaseofanydiscrepancybetweenthedrawingsandtextofspecification,therequirementsoftextshall prevail in general. However, the Bidder is advised to get these clarified fromPURCHASER.(IX)Theauxiliarytransformersofrating1000KVAshallbeusedtofeedthesubstationauxiliaries.The1000KVA,33/0.415KVauxiliarytransformer shallbeconnectedto33KV system of the substation. This auxiliary transformers should not be used forconstructionpurpose.Thedetailedschemeisshowninthesinglelinediagram.(X)SPECIALTOOLSANDTACKLES:

    Thebiddershall includeinhisproposalthedeploymentofallspecialtoolsandtackles required for erection, testing, commissioningandmaintenanceof equipment.However,alistofallsuchdevicesshouldbeindicatedintherelevantscheduleprovidedintheBPS.InadditiontothisthecontractorshallalsofurnishalistofspecialtoolsandtacklesforthevariousequipmentinamannertoberefereedbythePURCHASEduringtheoperationoftheseequipment.(XI)FACILITIESTOBEPROVIDEDBYTHEBIDDER:(a)Biddershallmakearrangementfortheauxiliarypowersuppliesforconstructionpurpose.ThecostoftheuseofthepowershallbebornebytheBidder. (b)Biddershallmakeavailableconstructionwatersupply forconstructionofsubstation.Allnecessaryarrangementsforwatersupplyathisowncost,

    AndpurchasershallinnocaseberesponsibleforanydelayinworksbecauseofnonavailabilityorinadequateavailabilityofElectricalPower&water.(XII)SPECIFICREQUIREMENT:

    Thebiddershallberesponsibleforsafetyofhumanandequipmentduringtheworking.ItwillbetheresponsibilityofthecontractortocoordinateandobtainElectricalInspector's clearance before commissioning, any addition items, modification due toobservationofsuchstatutoryauthoritiesshallbeprovidedbythecontractatnoextracosttothepurchaser.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA6/36

  • (XIII)Thetechnicalspecificationshallbefollowedforthefollowings.

    a)FinalizationofthesubstationstructurallayoutinconsultationwithOPTCL.b) Execution of all civil works as per schedule for erection of all substationequipment, structuresand foundationof transformers, roads,culverts, rainwaterharvestingarrangements,constructionofearthmat,cabletrench,drainagesystem,Fencingetc.c) Erection, testing, commissioning of all equipment and handing over of thesubstation bays complete in all respect as per approved scheme and to thesatisfactionoftheEmployerincludingstatutoryinspection.d)Themakesoftheequipment/components/materialsshallbefromOPTCLapprovevendor list indicated in this tender and to beapprovedby theemployer beforeplacementoftheorderonthevendor/manufacturer.e)Thecontractor(s)shallarrangepowersupplyforconstructionoftheproject.Theexpenditure for such arrangement till completion of the project shall be to thecontractor(s)account.f)Thecontractor(s)shallarrangecleanwaterforconstructionandcuringtothecivilworks.Theexpenditureforsucharrangementtillcompletionoftheprojectshallbetothecontractor(s)account.g) The work as mentioned in the price schedule shall be considered for theevaluationofthebid.h) Thecontractor shall arrange for security of all thematerials includingownersupplymaterials(handedovertohim)thatarerequiredforsuccessfulcompletionoftheprojecttillfinalhandingoveroftheentireworktoOPTCL.i) Contractor has to obtain Project License in respect of the projects from theSecretary, Electrical Licensing Board of ODISHA at his own cost, prior tocommencementofworks.j) The contractor shall supply one official copy of each Standard listed in theappropriateschedule.

    Thecontractorshallbefullyresponsibleforprovidingallequipment,material,systemsandserviceswhicharerequiredtocompletetheconstructionandsuccessfulcommissioning of the works in all respects. The Contractor shall also refer to theTechnicalSpecification(Vol.II),forproperunderstandingoftheworksinvolvedinrespectofeachsubstation.

    ThescopeofworkonTurnkeybasisincludesdesign,engineering,manufacture,type testing, (factory testing) supply on FOR destination site basis, transportation,handling,storageatsite,erection,sitetesting,commissioningcompleteinallrespectsandmaintenanceofplantandequipmentuntilhandingoverofworksinaccordancewith

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA7/36

  • ConditionsofContractandthestipulationsundervariouschaptersofthisspecificationatthepricesstatedinthePriceScheduleforthefollowing.2.0)BRIEFSCOPEOFWORK:PACKAGE6801/2011.i) Supplyofequipmentandmaterialsexcludingpowertransformers/ICT/Reactor.ii) Detaileddesignoftheproposedsubstation,bayextensionworkand400KVDC

    Transmissionline.iii) Providingengineeringdataanddrawings,asperspecifiedformat,foremployers

    review,approvalandrecords.iv) Complete Manufacturing including Type, Acceptance & Routine testing, as

    specified.v) Packingandtransportation fromthemanufacturersworks to thesite including

    transitinsurance&customsclearance/portclearance(ifrequired),porthandling,forimportedgoodsandfurtherloading(ifapplicable)Asdeliveredatsitebasis

    vi) Receipt, Unloading, Storage, Insurance and Preservation of Sub station &TransmissionLinematerial&accessoriesatsite.

    vii) Constructionof2x315MVA400/220KVS/SatLapanga&Associated400KVDCTransmission Line (LILO) on Turnkey Basis. LILO of both circuit IBMeramandalilineto400KVsubstationatLapanga,LineLength6.0Kmsappox,onTurnkeybasisintheStateofODISHA(includingallcivilworks).

    vii) Construction of 400 KV Double Circuit LILO (LILO of both circuit IBMeramandalilineto400KVsubstationofLapanga.LengthoflineApproximateLinelengthis6.0Kms.* OPGWcable tobeusedfor communicationpurpose. Accordingly thecontractor to consider the equipment andmaterials tobeused for thesame.(1)Supplyof towerstructuralmaterials,conductor ,insulatoretc includingCivilworksforthetransmissionline.(2)TransmissionLineroutesurveyofentirestretch,SettlementofallissuesrelatedtorightofWayandconstructionofline(includingallcivilworks).(3)TestingandcommissioningofSubstation,TransmissionLine&associatedsystem.(4)HandingoverofthecompletedsystemtotheOwner.(5)SatisfactoryconclusionoftheContract.(6)InstallationofPLCC/Communicationindoorequipment(ownersupplyitem)atboththeendofthesubstation.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA8/36

  • Theaforesaidscopeofworkisonlyindicative.Thedetailedscopeisdescribedinthe Bidding Documents, which are available for inspection & sale, at the addressmentionedatpara18.0,asperdetailsschedulegivenbelow:

    2.1.Substation2.1.1.ElectricalThescopeincludesbutisnotlimitedtoi)Supplyerection,testing&commissioningofthefollowingequipments:

    I. Circuitbreakers

    II. Isolators

    III. Currenttransformers.

    IV. Voltagetransformers(capacitiveandinductive)

    V. CT,CVT,IVTconsoleboxeswithaluminiumalloyhavingminimumthreemm thickness.

    VI. Alloutdoorkiosks/boxes,shallbeGIsheetofminimum2mmthickness with aluminiumalloycanopy(rainhood)of3mmthickness.

    VII. Surgearresters

    VIII. Postinsulators

    IX. Protection, control, and metering systemswith Substation automation (SCADA).

    X. Insulatorstringswithhardware

    XI. Busbar,circuitconductorandallconductoraccessories.

    XII. Powerandcontrolcables,cablingaccessories,cabletraysetc.Propersealingofthecableentry(control&Power)atControlRoombuilding,topreventwaterenteringfromswitchyard/outsidetoCRBuilding,preventingentryofratsandreptiles,Fireproofetc.

    XIII. AC/DCsystemsincludingalldistributionboards,batteryandchargersystems,auxiliarytransformers.

    XIV. Airconditioningplantandsystemsforcontrolroom.(ifrequired)

    XV. Firefightingsystemsandequipment.(Mulsifier&HydrantSystemalsotobeconsidered)

    *Designandperformancerequirementsofthe

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA9/36

  • followingtypesoffireprotectionsystems;

    a.HydrantSystemb.HighVelocityWater(H.V.W)SpraySystemc.FireDetectionandalarmSystemd.PortableFireExtinguisherse. Wheel/TrolleymountedFireExtinguishers

    XVI. Steel structures for switchyard gantries and portals (lattice type); and equipment(pipeorlatticetype)includingthoseforlightningprotection.

    XVII. Earthingsystemandearthingconductors.

    XVIII. Testingandmaintenanceequipment.

    XIX. Lightingofsubstationareaandsubstationbuildings.Illuminationandemergencylightingsystematdifferentlocations.

    1. Controlandrelaypanelsasproposed.(BayModuletobeinstalledinthe switchyardinAirConditionedKioskasperTS)

    XX. PresentEventloggerpanelprovidedfor220/132/33KVSubstationcanbeconsideredfor400KVsystemalso.NecessarymodulestobearrangedtomatchwiththeexistingpanelforEventlogger.

    XXI. ACandDCdistributionboardsasperrequirementandasproposed.

    XXII. Busbarprotectionscheme(forproposed400KVsystemandnecessarybaymodule&othersystemtobeprovidedtomatchwiththeexistingoneforthe220kVbayextensionfor220KVsideoftheICT).

    XXIII. DisturbancerecorderwithTimesynchronization.(GPS)

    XXIV. SubstationlevelPC/LaptopprovisionforRelayconfigurationwiththeir software.

    XXV. Anyotheritemsrequiredforcompletionoftheprojectarealsointhescopeofthiscontractinordertocompletethesubstationinallrespect.

    XXVI. Supplyofallclamps,connectorsandhardwarerequiredforcommissioningofthesubstation.Thequantityandratingoftheconnectorsandclampsaredependentonthelayoutandrequirementofthesubstation.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA10/36

  • XXVII. Supplyandputtingofsubstationilluminationsystem.AllthelightfittingsshallbeLEDtype&thesefittingsshallbemountedonswitchyardportalstructuressuchascolumns&beams.Noseparatelightingmastisrequired.Entiresubstationlightingsystemintheswitchyard&colonyshallbede signedusingundergroundcablesonly.Nooverheadconductorsarepermittedforthispurpose.Forstreetlightingoneoutdoor lightingkioskwithtwoincomersof200Aratingswitchfuseunits(SFU)&withsixfeedersof32AratingfittedwithMCBshallbeconsidered.Similartypeofoutdoorkioskshallbeconsideredforcolonypowersupplywith200ASFU&tenoutgoing feederof 32A rating fittedwith MCB shall beconsidered

    XXVIII. OPGWlinkbetweenthetwolinksasproposedtheindoorequipmentlikeFOTE(FibreOpticTerminalEquipment)aretobesuppliedandtobeerectedandtestedbythecontractor.

    ii)Supplyofthefollowingequipmentsalso:

    .1 MandatorysparesforsubstationequipmentbeingsuppliedunderthiscontractasperBidproposalSheet(BPS)schedule3.

    .2 Maintenance&testingequipmentetcasperthelistprovidedinrelevantchapteroftechnicalspecifications.

    2.1.2.Civilworks

    Thedesign,engineering,supplyofallmaterialsincludingcementandsteel,consumables,asperspecificationandapproveddrawingsforcivilworksofthesubstationincludingbutnotlimitedtothefollowing:

    1. Designing, fabrication, galvanizing and erection of structures on respectivefoundationsdetailedinspecificationforcivilworks.Supplyofallstructuralmaterials(columns&beams,hardware&fastenersetc)asperrequirement.Thecontractorshall preferably adopt OPTCLdesignedstandard structures for use in varioussubstation,thedetailsofwhicharegivenatClauseno12ofthischapter.

    2. Soiltestingforsoilresistivityandsoilbearingcapacitybeforedesigning.

    3. Sitedevelopmentincludingleveling,filling&compactingofthesubstationareatothedesiredheight.

    4. Wherever pile foundations(if required after soil investigation) are required forControl room building, switch yard tower columns, Equipment foundation andtransmission line towersetc., theseare tobeconstructedasper theguideline

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA11/36

  • indicated in the specification elsewhere. The type of pile foundations can beascertainedonlyaftersoilinvestigationandapprovalofthesamebyOPTCL.

    5. ConstructionofsubstationretainingwallwithbrickmasonryandfencingbyGIheavydutygoatmeshfencingaspersiterequirement.

    6. ConstructionofboundarywallalongthepropertylineofthesubstationwithMaingate,securityshedandtwonos.switchyardgatesinthesubstation.Provisionsofasecurityshednearthemaingate.ThestructureshallbeRCCframedstructure.Thereshallbeprovisionofelectricalilluminationfacilities.

    7. Fencingofswitchyardareaandotherareaslikestationtransformerarea.

    8. There shall be provision of plantations of fruit bearing plants and water tapprovisionforwateringtheplantsinthesubstations.

    9. Construction of all foundations for columns, all switchgear such as circuitbreakers,isolators,CTs,CVTsandothersubstationequipmentsuchaslinetraps,postinsulator,etc.

    10.Constructionof foundationof ICT /Reactor/Power transformer/AutoTransformerincludingsupplyandputtingofrailfromtheservicebaytothetransformerplinth,allfoundations of columns, equipment structures. Separate foundations for themarshalingboxesoftheisolatorsaretobeconsidered.

    11.Antitermitetreatmentofswitchyardandcolonybuildings.

    12.Switchyardbuildingssuchascontrol room,DGset roomand.Thereshall beprovisionofawatercoolerincludingwaterpurifierinsidethecontrolroombuilding.Provisionofsplit typeairconditionersinsidethecontrolroom&PLCCroomofControlRoombuildingandconferencearea.

    13.Thereshallbeprovisionofstoreshed,oneRampwithwinchforliftingthematerialsandloweringthematerialsupto5MTandopenyardplatformtostorethematerialsliketransformerbushing,CT,CVTandotherequipment.

    14.Supplyandspreadingofuniform20mmnominalsizeHGmetalof160mmthickinsidetheswitchyardareaoftheSubStations.Thespreadingwillbedoneaboveafinishedlevelofswitchyardlandbyplaincementconcreteofthickness75mm(ratio 1:4:8). Anti weed treatment of the switch yard area to be madeas perprevailingpracticebeforespreadingofPCC.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA12/36

  • 15.Constructionofdrainagesystemof thesubstationsand thenewlyconstructedquarters&floodwaterdischargesystems.Miscellaneousworkslikemanholessoakpits,RCCtrench,fencing,etc.intheswitchyard.

    16.Constructionofrainwaterharvestingarrangementsinthesubstation.

    17.Constructionofcabletrencheswithtrays&covers&sumppitwithpump,asperrequirement.

    18.Construction of approach road to the new substation as per requirement.Constructionofperipheryroadsinsidethefencing.Theroadsinsidetheswitchyard&attheperipheryshallbeof3.75mtr.wide&theroadinsideswitchyardshallbeofconcreteroadaspertechnicalspecification.Theotherroadsmainandapproachroadshallbe7mtrswideandshallbebitumengrading.TheroadinfrontoftheICT/PowerTransformer/AutoTransformerconnectingtothemainroadshallbeof7mtrswideconcreteroad.

    19. Designingandproviding the earth matandearthingof the substation lightingprotection,equipmentearthingetc.Earthmatshallbedesignedusing75X12mmGIflat&theearthraiserfromtheearthmattotheequipment&allstructuresshallbe 75X10mm GIFlat.For lighteningprotection individualspikenot less than2.5mtrsshallbeprovidedoneachcolumnoftheswitchyard.Watertapprovisionshallbeprovidedforpouringwaterintotheearthpitsconstructedinside&aroundtheperipheryfencetheswitchyard.Theearthingshallbeextendedbeyond2mtrsfromthefencingandthefencingearthingarealsotobetakencare.

    20.A water tank for the fire fighting system to be designed ,considering therequirementofwaterformeetingtheworstconditionsandtobeprovidedwithitsconnectionfromaborewell,whichistobeprovidedneartothewatertank.

    21.A250KVADGsettobeprovidedneartheexistingcontrolroombuildingtomeettherequirementduringemergencycondition.TheD.GshallbeofsilenttypeandcanbeplacedinaDGroom.

    22.Civicamenitiesforthetownshipincludingdrainageandseweragesystems.

    23.Allothermaterials,whichthecontractorfeelstoberequiredforcompletionofthesubstation.

    24.Plantationoffruitbearingandflowerbearingplantsandgardensinandaroundthesubstation.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA13/36

  • 25. ModularMultidiameter flexibleCablesealingsystemconsistingof frames,blocksandaccessoriestobeinstalledwherevertheelectrical/control/communicationcablesoverground enteror leavefromcontrolroombuilding.CablesealingtobedonewithMultidiametertypeflexiblemodularbasedsealingblocksofdifferentsizes(size20:4mmto14.5mm,size30:10mmto25mm,size40:21.5mmto34.5mm,size60:28mmto54mm,size90:48mmto71mm,size120:67.5mmto99mmoranyconvenientsize)tobeprovidedforsimple,easyandquicktoassemble&reassemble.somespareblocksontheframetobeprovidedwithusableMultidiameterblockswithcenterplug,sothatthesespareblockscanbeusedforexpansioninfutureforwiderangeofcables,solidblocksshouldnotbeusedonframe.Cablesealingsystemshouldhavebeentypetestedforfire/water/smoketightnessandsuppliershallhavelocalpresencebywayoffullinfrastructurehavingservicesupport,trainingsupportandstockssupportandalsohavenecessarysalessupport for anychange / extension in future. Frames&stayplatematerial shouldbegalvanized steel and for compression single piece wedgewith galvanized steel boltsshouldbeused.

    2.2.Transmissionlines.

    i)Survey&ROWissues

    1. DetailedlineSurveyworksasperspecification.

    2. Thecontractorshallhavetosolvetheentirerightofwayproblemathisowncost.Contractorshallalsoresolvetheissuesrelatedtothetreecuttinginthetransmissionlineandsubstationathisowncost.HoweverthedetailsofROWissueshavebeenindicatedinSpecialConditionofContract(SCC)Vol.1A.

    ii) Design & Manufacturing (as applicable), supply, storage, erection, testing &commissioningoffollowingmaterials

    1. GalvanizedStructural materials of towersas per requirement. OPTCLadoptedstandardtowersshallpreferablybeusedforthetransmissionline,thedetailsofwhichisgivenatClauseno.13inthischapter.

    2. Insulators,hardwares.

    3. ACSRMooseconductors,GIearthwire/OPGWwirewithaccessoriesetcandtheirstringing.In400KVDClineTwinACSRMooseconductortobeadopted.OPGWwiretobeusedfortheproposedline.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA14/36

  • 4. Antifog type Disc insulators are required to be supplied and erected inTransmissionline.

    5. Commissioningoftransmissionlines.

    6. Anyotheritemsrequiredarealsointhescopeofthiscontractinordertocompletetheproposedtransmissionlinesinallrespect.

    3.ElectricalSystemDataof400/220/132/33

    1. NominalSystemVoltage(KV) 400/220/132/33

    2. HighestSystemVoltage(kV) 420/245/145/36

    3. SystemNeutralEarthing. Effectivelyearthed

    4.BasicInsulationLevel(kVP)

    i) Bus 1425/1050/650/170

    ii) EquipmentotherthanTransformer 1425/1050/650/170

    iii) Transformer 1425/1050/650/170

    5. PowerFrequencywithstandvoltage(KVrms) 630/460/275/80

    6. SystemfaultlevelKA 63/40/40/25

    7. Creepagedistanceforinsulators(mm) 10500/6125/3625/900

    8.Min.recommendedclearanceinair(mm)asperCBIP

    i) Phasetophase 4200/2400/1300/530

    ii) Phasetoearth 3500/2160/1300/480

    iii) Sectionalclearance 6500/5000/4000/4000

    9. Min.groundclearance(asperIERules) 8000/5500/5000/4000

    10.Busconfigurationfor400/220/132/33kV

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA15/36

  • SelectionofACSRconductorshallbeChosenfromMoose,Zebraandpantherasperrequirementanddecisionofemployer.AluminiumtubularPipefor400KVBusandequipmenttoequipmentconnectionfor400&220KVside.

    11.Phasetophasedistance:

    i) Alongthebay(mm) 7000/4500/3000/1500

    ii) Strungbus(mm) 7000/4500/3000/1500

    12.Referencedesigntemperature 50Deg.Centigrade.

    Detailedtechnicalparticularsofdifferentequipmenthavebeenspecifiedintherespectivespecificationsinthesubsequentsection.Ifanytechnicalparticularsaremissed from this volume the samemaypleasebe referred from relevant IS:specificationforbiddingpurpose.

    4.Designwork

    TheBiddershallfurnishdetaileddesignofthesubstation&transmissionlines.Thedesignworkshallincludebutnotlimitedtotechnicalcalculations,preparationofdrawings and bill of materials and specifying equipment not specified in thespecificationbutnecessaryforthecompletionofthesubstation &transmissionlinesontheturnkeybasis.Thetechnicalcalculationdesigndrawings,etc.shallbesubmittedtotheEmployerforapproval.HoweverthelayoutdrawingfurnishedbyOPTCLshallbetakenasaguideline.

    5.Standards

    Allmaterialsandequipmentsshallgenerallycomplyinallrespectswiththelatestedition of the relevant Indian Standards. International ElectroTechnicalCommission(IEC)oranyother internationallyacceptedStandardequivalentorbetter than relevant Indian Standard. Equipment complying with all otherauthoritativestandardssuchasBritish,ASA,VDE,etc.willalsobeconsideredifperformanceequivalentorsuperiortoIndianStandardisensured.

    In the event of supply of equipment confirming to any International orinternationally recognized Standard other than the Standard listed in the

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA16/36

  • Specification. The salient features of comparison shall be brought out andfurnishedalongwiththebid.

    IncaseofadoptinganystandardotherthanthatISorIEC,acompletesetofadoptedstandardshallbesuppliedbythebidder.However it isdesirableandpreferred that the equipment offered shall comply with one consistent set ofstandardunlessotherthanexceptionalcases.

    TheequipmentshallalsocomplywiththelatestrevisionofIndianElectricityActandIndianElectricityRulesandanyotherElectricalStatutoryProvision,RulesandRegulations.

    6.ReferenceDrawings

    Drawings showing indicating scope of work are enclosed. Drawings arecomplementarytospecificationsandshallbereferredtoforbetterunderstandingaswellasforestimationofquantitiesandbillofmaterialsforarisingatlumpsumbidpriceonturnkeybasis.

    Thebiddershallsubmitwiththetender,planofthesubstationshowingbroadlythescopeofworkincorporatedaspertechnicalspecification.Allthedrawingsshallbesubmitted in quadruplicate, enumerated in conformity with relevant clausestipulatedintheTechnicalSection.

    Thesedrawingsshallshowproposedlayoutplanwithsection.Drawingsshowingoverall dimension,clearanceetc. required for assemblinganddismantlingandspacerequirementsofalltheapparatusaretobesuppliedtoenabletheEmployertoexaminethedesignandlayoutattheinstallation.

    7.PackingandMarking

    Thebiddershallincludeandprovideforsecurelyprotectingandpackingtheplantsoastoavoiddamageintransitunderproperconditionandshallberesponsibleforalllossordamagecausedbyanydefectinpacking.

    Largeandheavy itemssuchas 220kV, 132 kVand33KVequipment andstructuralsteelshallbepackedandshippedasperstandardinternationalpractice.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA17/36

  • Container/Cartoons,boxes,trunksandotherpackagesshallbestrongandsturdyinconstructiontowithstandOceanshipping,loadingandunloading,transportonroughroads,andstorageintropicalareaandhaulingandhandlingduringerectionetc.Boxesandpackagesshallalsobeprotectedbysuitablepackingwiththehelpofwoodenplanks/MSframeorgalvanizedsteelstrips.Alayerofwaterproofmaterialshallbeprovidedinsidethecartoon/boxes/packagestoprotecttheequipmentfromwaterseepageandtoavoidrust.Thefollowinginformationshallbemarkedonthecontainer/boxes/packagesetc.

    a. Contractors/manufacturersname,projecttitleandcontractreference.

    b. Plant/accessoryidentificationNo.andtitle.

    c. Net/grossweight.

    d. Employersnamewithotherdispatchparticularssuchasdestination.

    Theemployershall takenoresponsibilityforanydamagedonetotheplantonroutetothesiteofworkorplaceofdeliverywhicheverisapplicable.

    8.Tests

    i)Unlessotherwisespecifiedinrespectivesection,allequipmentshallbesubjectedroutine,acceptancetestascoveredandspecifiedinanystandardinpresenceoftheauthorized representativeof theemployer. If theequipment/materials is not typetestedduringlastfiveyearsonthedateofBidOpening,thesamehastobetypetestedagainbeforeusingofmaterialsinthisproposedproject.

    ii)Biddershallsubmittypetestreportfromarecognizedlaboratoryalongwiththebid.

    iii)Atleast15daysadvancenoticeshallbegivenbythecontractortotheemployerforwitnessthetests.

    9.CompliancetoIErule1956

    i)TheconstructionagencyshallpossesasafetymanualdulyapprovedbycompetentauthorityintheGovt.ofhisStateGoverningthesafetyinworkbythepersonnelandstaff.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA18/36

  • ii) The agency shall possess valid contractors license issued by the ElectricalLicensingBoardofODISHA(ELBO)failingwhichhewillnotbeallowedtostartthework.

    iii) Supervisors of works shall posses appropriate valid supervisory certificate ofcompetencyissuedELBO,ODISHA.

    iv)At least50%ofelectricalworkmenemployed in theprojectshallpossesvalidworkmenpermitbyELBO.

    10. TheContractor has to followsubmissionof drawings, data,documentaspertheformatgivenbelow.

    Sl.No. Description WithBids

    PostOrder FinalDocumentForReview

    ForRecords

    Transparency

    Prints(Photostat)

    Electronic

    1. Switchyard single linediagrami

    2. Switchyardlayout,plan, section &placement ofvariousequipment

    3. Switchyardearthingand lightning protectioncalculations.

    4. Battery,batterycharger,DCDBsizingcalculations.

    5. Switchyard lightingcalculations

    6. Switchyardearthingandlightninglayout.

    7. Switchyardlightinglayout.

    8. Switchyard,controlroomequipmentandcablelayout.

    9. Switchyardclampsandconnectordetails.

    10. Relay,meteringandcontrol panel block logicdiagram.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA19/36

  • Sl.No. Description WithBids

    PostOrder FinalDocumentForReview

    ForRecords

    Transparency

    Prints(Photostat)

    Electronic

    11. Control panel schematicdrawings.

    12. Logicforcastlekeyinterlockbetweenbreakerandisolator.

    13. Relay,metering&ControlpanelandACDB,DCDBGAdrawings.

    14. SwitchyardequipmentGAdrawingsandcontrolschematics.

    15. Cableschedule.16. Interconnection

    diagrams.17. Relaysetting

    calculationsandCoordinationdrawings.

    18. SLDsofACDBandDCDB.

    19. Soakpitandwasteoilpitlayoutandsizingcalculation.

    20. Structuraldesigncalculationssuperstructures.

    21. Civildrawingsforfoundationandcabletrenches.

    22. Structuralfabricationdrawingsofequipmentsgantriesetc.

    23. Filledinequipmentdatasheetsasperenclosedformat.

    24. Completeliterature,leafletsforallequipments.

    25. Operational/maintenancemanual.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA20/36

  • Sl.No. Description WithBids

    PostOrder FinalDocumentForReview

    ForRecords

    Transparency

    Prints(Photostat)

    Electronic

    26. Deviationschedulew.r.t.a)Specificationb)Document/attachments.

    27. Listofsparepartsforeachmajorequipment.

    28. Listofspecialtoolsandtackles.

    29. Listofsubvendors.30. QAplanofvendor31. Installationoperating

    andmaintenanceinstruction.

    32. InspectionPlanandTestingProcedure.

    33. TestRecords.34. Listofcommissioning/

    maintenancespares.

    35. DataBook/Manuala)InstallationManualb)Operating/Maintenance.c)Catalogues/Brochures.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA21/36

  • 11.Minimumclearanceforsubstationdesignshallbeasperdetailsgiveninthetablebelow.Highestsystemvoltage(kV)

    Insulationlevel(kVP)

    SwitchingImpulseVoltage(KVP)

    SectionalClearance(mm)

    Minimumclearance GroundClearance(mm)

    Betweenphase&ground

    Betweenphases

    36KV 170 4000 480 530 4000145KV 650 4000 1300 1300 5000245KV 1050 5000 2160 2400 5500420KV 1425 1050 6500 3500 4200 8000

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA22/36

  • 12.OPTCLadoptedstandardswitchyardstructure:Thebiddersmayadopt their own type testeddesign for switchyard structureswithapprovalfromOPTCL.HoweverthestandardswitchyardstructuresadoptedinOPTCLswitchyardssystemindifferentvoltagelevelsaregivenbelow.A 400KVSIDE:

    1COLUMN:4TA,4TB,4TC,4TDTYPE,HEIGHT29(AdditionalPeak5Mtrs)MTRS,WEIGHT10MT

    2 BEAM:4GA,4GBTYPE,LENGTH27MTRS,WEIGHT4MTB 220KVSIDE:1. COLUMN:P1STYPE,HEIGHT21.5MTRS,WEIGHT4.464MT2. BEAM:Q1TYPE,LENGTH18MTRS,WEIGHT1.473MTC 132KVSIDE:1. COLUMN:T1STYPE,HEIGHT15MTRS,WEIGHT1.193MT

    2. COLUMN:T4STYPE,HEIGHT11MTRS,WEIGHT0.924MT

    3. BEAM:G1TYPE,LENGTH10.4MTRS,WEIGHT0.613MT

    4. BEAM:G2TYPE,LENGTH14.9875MTRS,WEIGHT0.906MT

    5. BEAM:G1XTYPE,LENGTH10.4MTRS,WEIGHT1.370MT

    6. BEAM:G1,2TYPE,LENGTH10.4MTRS,WEIGHT1.25MTD 33KVSIDE:

    1. COLUMN:T8STYPE,HEIGHT10.5MTRS,WEIGHT0.777MT

    2. COLUMN:T9STYPE,HEIGHT7.5MTRS,WEIGHT0.592MT

    3. BEAM:G4TYPE,LENGTH5.5MTRS,WEIGHT0.306MT

    4. BEAM:G4XTYPE,LENGTH5.5MTRS,WEIGHT0.306MT5. BEAM:G6TYPE,LENGTHMTRS,WEIGHT7.25MT

    ETHEBAYWIDTHOFDIFFERENTVOLTAGELEVELAREASBELOW

    1. 400KVSYSTEMSHALLBE27MTRS.2. 220KVSYSTEMSHALLBE18MTRS3. 132KVSYSTEMSHALLBE10.4/13.1MTRS.4. 33KVSYSTEMSHALLBE5.5MTRS

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA23/36

  • 13.OPTCLadoptedstandardTowerstructurefortransmissionline:The contractor may adopt their own type tested design for transmission linestructures/towers with approval from OPTCL. However the standard towerstructuresadoptedinOPTCLfordifferentvoltagelevelsaregivenbelow.

    A. 132KVTransmissionline.(Height29Mtrs)(MSGalvanised)

    (i) PAtype:Unitweight:3.430MT.

    (ii) +3mtrs:Unitweight:0.537MT.

    (iii) +6mtrs:Unitweight:1.349MT.

    (iv) PBtype:Unitweight:4.973MT.

    (v) +3mtrs:Unitweight:1.018MT.

    (vi) +6mtrs:Unitweight:2.104MT.

    (vii) PCtype:Unitweight:6.214MT.

    (viii) +3mtrs:Unitweight:1.119MT.

    (ix) +6mtrs:Unitweight:2.342MT.

    (x) TemplatesforPAUnitweight:0.665MT

    (xi) TemplatesforPBUnitweight:0.602MT

    (xii) TemplatesforPCUnitweight:1.904MT

    B. 220KVTransmissionline.(Height35.5Mtrs)(MSGalvanised)

    (i) OAtype:Unitweight:4.351MT.

    (ii) +3mtrs:Unitweight:0.727MT.

    (iii) +6mtrs:Unitweight:1.448MT.

    (iv) OBtype:Unitweight:7.574MT.

    (v) +3mtrs:Unitweight:1.305MT.

    (vi) +6mtrs:Unitweight:2.242MT.

    (vii) OCtype:Unitweight:9.839MT.

    (viii) +3mtrs:Unitweight:1.436MT.

    (ix) +6mtrs:Unitweight:2.599MT.

    (x) +15mtrs:Unitweight:6.670MT

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA24/36

  • (xi) UR:Unitweight:13.585MT.

    (xii) UR+3mtrstype:Unitweight:17.316MT.

    (xiii) UR+6mtrstype:Unitweight:4.249MT.

    (xiv) TemplatesforOAUnitweight:0.597MT

    (xv) TemplatesforOBUnitweight:0.815MT

    (xvi) TemplatesforOCUnitweight:1.172MT

    (xvii) TemplatesforURUnitweight:1.509MT

    C.400KVTransmissionlineTower.(Height46Mtrs)(HTSteelinLegSection,CrossArm&MainBracingandotherSectionMS)

    (I)DA(Normal)Type:(0to2deg):7.54869MT

    DA(+3Mtrextn):+1.93856MT

    DA(+6MtrExtn):+2.74532MT

    DA(+9MtrExtn):+4.62562MT

    (ii)DBType:(2to15deg):13.96342MT

    DB(+3Mtrextn):+2.44864MT

    DB(+6MtrExtn):+4.82572MT

    DB(+9MtrExtn):+9.34636MT

    (iii)DCType:(15to30deg):15.78074MT

    DC(+3Mtrextn):+2.90732MT

    DC(+6MtrExtn):+5.4436MT

    DC(+9MtrExtn):+9.94816MT

    (iv)DDType:(30to60deg):22.29494MT.

    DD(+3Mtrextn):+4.11758MT

    DD(+6MtrExtn):+5.25294MT

    DD(+9MtrExtn):+7.2021MT

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA25/36

  • D.No.ofBolts&NutsusedineachoftheTower

    TypeofTower Normal +3mtrs +6mtrs +9mtrsPA 1602 142 276PB 1097 273 542PC 1654 313 592OA 1147 180 228OB 1299 236 372OC 1877 254 402UR 2283 357 588DA 1980 524 722 1214DB 3668 656 1284 2464DC 4140 786 1442 2608DD 5844 1080 1388 1912

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA26/36

  • 14.ApprovedMakeOf Equipment&MaterialstobeusedintheSubstationandTransmissionlines.Thefollowingmakeoftheequipments&materialsshallbesuppliedasperapprovedvendorlist.

    VENDORLISTFORSUBSTATIONANDLINEWORKSOFOPTCL

    SlNo DescriptionofEquipmentormaterial NameoftheVendor

    1 BREAKER

    1.1 400KVSpringSpring,SF6,3150A,50KA

    Siemens/ABB/CGL/AREVA/BHEL

    1.2 220KVSpringSpring,SF6,3150A,40KA

    Siemens/ABB/CGL/AREVA

    1.3 132KVSpringSpring,SF6,3150A,40KA

    Siemens/ABB/CGL/AREVA

    1.4 33KVSpringVacuum,1600A,25KA Siemens/ABB/CGL/AREVA/BHEL

    2 CT

    2.1 400KV&220KV(Dead/LiveTank) AREVA/ABB/CGL/BHEL/SIEMENS

    2.2 132KV,Dead/LiveTank AREVA/ABB/CGL/BHEL/Vishal/Transfield/IndianTransformer/Victrans/VijayaElectricals

    2.3 33KV,Dead/LiveTank AREVA/ABB/CGL/Pragati/Vishal/Transfield/IndianTransformer/Victrans/VijayaElectricals

    3 CVT

    400KV,220KV&132KV AREVA/ABB/CGL/BHEL/SIEMENS

    4 PT/IVT

    4.1 400KV&220KV AREVA/ABB/CGL/BHEL/SIEMENS

    4.2 132KV&33KV AREVA/ABB/CGL/BHEL/IndianTransformers/VijayaElectricals/Victrans

    5 SURGEARRESTOR

    400KV,220KV,132KV&33KV CGL/OBLUM/AREVA/LAMCO/ELPROInternational

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA27/36

  • 6 CRPANEL

    400KV,220KV,132KV&33KV ABB/SIEMENS/AREVA/OtherManufacturersusingRelaysofSIEMENS/AREVA/ABB/SEL/GE

    7 ISOLATORS(I)400KV ABB/SIEMENS/SWITHGEAR&STRUCTURALS/GRPOWER/AREVA/CGL

    (II)220KV,132KV&33KV ABB/SIEMENS/SWITHGEAR&STRUCTURALS/GRPOWER/AREVA/CGL,M/sJ.DElectricalsLtd,Howrah.

    8 HARDWAREFITTINGS

    8.1 400KV RASTRIYAUDHYOG/ERITECH/IAC/EMI,KrsnaTransmissionHardwareMfgPvtLtd.IndustrialSpareProducts.

    8.2 220KV,132KV&33KV RASTRIYAUDHYOG/ERITECH/IAC/EMI/ELECTROTECHANDTRANSTECH,KrsnaTransmissionHardwareMfgPvtLtd.JaincoTransmissionLtd,A.K.PowerIndustriesPvtLtd,IndustrialSpareProducts.

    9 CONDUCTOR APAR,GPIL,ERITECH,STERLITE,VIJAYA/LUMINO/CABCON/TIRUPATI

    10 EARTHWIRE BHARATWIREROPES/UICWIRES/USHAMARTIN/GKWIRE,M/SBEDMUTHAINDUSTRIESLTD.

    11 DISCINSULATORS/SOLIDCOREPOSTINSULATORS

    BHEL/WS/MODERNINSULATOR/ADITYABIRLAINSULATORS/SRAVANA,M/sInsulators&Electricalscompany,Mandeep,M.P.

    12 LONGRODINSULATOR MODERNINSULATORS

    13 TOWER&STRUCTURESFORLINEANDSUBSTATIONANDFOUNDATIONBOLT(SAIL/TATA/RINLSTEELTOBEUSED)

    KEC/RPG/Jyoti/L&T/EMC/Kalpataru/NEXO/UTKALGALVANIZER/IVRCLINFRASTRUCTURES&PROJECTSLTD,NAGPUR/UNIQUESTRUCTURES&TOWERSLTDBHILAI/TECHNOENGINEERING&COLTDNEWDELHI/UNISTARGALVANISERS&FABRICATORS(P)LTDJAMSEDPUR/NEWMODERNTECHNOMECHPVT.LTDBARIPADA/GLOBALGALVANISER,

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA28/36

  • Khurdha/AGARWALSTEELSTRUCTURES(INDIA)PVTLTD,HYDERABAD,Hyderabad/SriAshutosEngineering,Raipur/AsterPvtLimited,Hyderabad/ShreemElectricalsPvtLimited,Bangalore.

    14 PVCINSULATEDPOWERANDCONTRALCABLES

    NICCO/GLOSTER/CCI/KEI/CRYSTAL/POLYCAB/GPIL/FINOLEX/Universal,M/sHavellsIndiaLtd,M/sKECInternationalLtd.

    15 HFCOAXIALCABLES ALPHACOMMUNICATION,DELHI/DELTONCables,NewDelhi

    16 STATIONTRANSFORMER(BEESTANDARD)

    AREVA/ALFA/TESLA/OTPL

    17 FIREFIGHTINGEQUIPMENT MINIMAX/CEASEFIRE,M/sKanadiaFyrFyterPvtLtd.

    18 LIGHTINGFIXTURES PHILPS/CGL/BAJAJ/HAVELS,M/sAvanisolutionsPvtLtd.OthermakeLEDLIGHTINGASPERBEESTANDARD

    19 CEMENTOPCGRADE43 ACC/ULTRATECH/KONARK/LAFARGE

    20 STEEL SAIL/TATA/RINL&steelsofothermaketobeapprovedbyOPTCLas&whenrequired.

    21 GIPIPE TATA/JINDAL

    22 AIRCONDITIONER HITACHI/CARRIER/BLUESTAR/VOLTAS/LG

    23 PVCWIRES L&T/FINOLEX/ANCHOR/KDK/HAVELLS

    24 SWITCHES ANCHOR/ABB/CONA/INDOASIAN/HAVELS

    25 MCB L&T/ABB/SIEMENS/MDS/HAVELLS/INDOASIAN

    26 ACB/MCCB L&T/SIEMENS/MERLINGERIN

    27 ACDB/DCDB/BMK/CONSOLEBOX MAKTELSYSTEM(Vadodara)/SARVANA(Chenai)/Technocrat(Cuttack),M/sUnitedEngineersPvtLtd.

    28 CLAMPSANDCONNECTORS ElectromechTranstech/Rastraudyog/Tyco/IAC/AswiniKumar&Co.,Cuttack

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA29/36

  • 29 GIBOLTS&NUTS NEXO/GKW/ASP

    30 BATTERY&BATTERYCHARGER EXIDEforBattery&CALDYNEforBatteryCharger.

    31 WAVETRAP AREVA,ABB,BPL

    32 Meters,Transducers,Indicator. M/sSecureMetersPvtLtd

    33 AuxillaryRelays. M/sEausun&ReyorleeLtd.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA30/36

  • 15.PortableFireExtinguisher: (ANNEXUREI)

    Portablefireextinguishersofthefollowingtypesshallbesuppliedtoeach

    substation.

    SlNo

    DescriptionofItems

    Unit capacity QuantityRequiredAt each132/33 kVS/S

    At each220/132/33kV S/S &400/220 KVS/S

    At each220/33kVS/S

    1 FoamType Nos 9ltrs 2 4 42 Dry chemical

    PowderType(Trolleymounted)

    Nos 22.5Kgs 2 4 2

    3 Dry PowderType

    Nos 5Kgs 2 4 2

    4 Carbondioxide(CO2

    Nos 9Kgs 5 10 5

    5 CarbonDioxide(CO2)

    Nos 4.5Kgs 5 10 5

    6 Carbondioxide(CO2)Trolleymounted

    Nos 22.5Kgs 2 4 2

    7 Fire bucketwith (a setcomprises ofsixnosBucketin each stand&onestand)

    Set 3 5 3

    The quantities are indicative. Bidders are advised to design as per therequirement.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA31/36

  • 16.Maintenance&TestingEquipment:(ANNEXUREII)Maintenance&testingequipmentshallbesupplied&installedforeachsubstationasperthelistgivenbelow.Sl.No

    DescriptionofItems Unit QuantityRequiredAteach132/33KVS/S

    Ateach220/132/33KVS/S&400/220KVS/S.

    Ateach220/33KVS/S

    1. 160 kv transformer oil breakdownvoltagetestset

    Nos 1 1 1

    2. Insulationresistancetester(megger) Nos 1 1 13. Oilsamplingbottle Nos 4 4 44. SF6gasleakdetector Nos 1 1 15. LCD,digitalmultimeter Nos 2 2 26. Analogue Multimeter(features same as

    digitalmultimeter)Nos 1 2 1

    7. LCD,clamponmeter Nos 2 2 28. Digitalearthtester Nos 1 1 1

    9. Discharge rod as per standard forcarryingouttheswitchyardmaintenancework

    Nos 6 6 6

    10. Rubberglovesofoperationof isolatorsandearthswitch

    Pairs 2 2 2

    11. Relaytoolskit Sets 1 1 112. Portableemergencylight Nos 4 4 413. Latest version desktop PC of reputed

    make withall itsaccessoriesincludingCPU,Monitor,UPSandhavingalllatestloadedsoftwareandalsoitsbackupinshapeof CDandseparatependrive .Suitable for loading of software asrecommended by the relaymanufacturer. It includessupplyofoneno portable laser printer of reputedmake.MakeofPCandprinter:HP/DELL

    Set 1 1 1

    **Themultimeters(bothdigitalandanalogue),clamponmeters,earthtestershallofMotwanemake.PriorapprovalsofOPTCLforallthetestingequipmentsaretobetaken.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA32/36

  • 17.OtherToolsandPlants(T&Ps)Requirement: (ANNEXUREIII)FollowingT&Psofreputedmakeshallbesupplied&installedateachsubstation.SlNo

    DescriptionofItems unit QuantityRequired

    Ateach132/33KVS/S

    Ateach220/132/33KVS/S&400/220KVS/S.

    Ateach220/33KVS/S

    1 SetofDspanner(6mm42mm) Set 1 1 12 SetofRingspanner(6mm

    42mm)Set 1 1 1

    3 Socketwrenchwithsockets,handles,andotherattachment(6mm42mm)

    Set 1 1 1

    4 Insulatedcuttingplier Nos 2 2 25 Insulatednoseplier Nos 2 2 26 Monkeyplier Nos 1 1 17 Circlipplier Nos 1 1 18 Pipewrench

    a)12inch1nob)18inch1no

    Set1 1 1

    9 Slywrencha)12inch2nosb)18inch1no

    Set1 1 1

    Insulatedhandlescrewdriversofdifferentsizesasperrequireda)12inchplainhead2nosb)8inchplainhead2nosc)12inchstarhead1nod)smallsize6inchplainandstarhead2eache)Completesetofdifferentheadinonebox/set1set

    Set 1 1 1

    11 LNkeyssetofdifferentsizesinonebox/set

    Set 1 1 1

    12 M.SFiles(12inchand6inchsizes)Roundfilesandflatfilesoneeachofdifferentsizes)

    set 1 1 1

    13 Hammarwithhandlea)1lb2nosb)1/2lb2nosc)2lb1no

    Set 1 1 1

    14 Crowbara)5ft2nosb)3ft2nos

    set 1 1 1

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA33/36

  • SlNo

    DescriptionofItems unit QuantityRequired

    Ateach132/33KVS/S

    Ateach220/132/33KVS/S&400/220KVS/S.

    Ateach220/33KVS/S

    15 Steelscale(12inch) Nos 2 2 216 Steeltape

    a)5mtrs2nosb)30mtrs1no

    Set 1 1 1

    17 Oilcane Nos 2 2 218 Spiritlevel(8inch) No 2 2 219 Plumbheadwithstringand

    attachmentNo 1 1 1

    20 Maintenancesafetybeltwithallattachmentandhelmets(completeoneset)

    Set 3 4 3

    21 Handdrillmachinewithdifferentbitsandkey.(Wolfmake)

    No 1 1 1

    22 Vacuumcleanerhavinghotblowerprovisionwithallattachments(EurekaForbesmake)

    No 1 1 1

    23 230250VAC,80W,450mmsweep,1400rpmstand(rugged)FANMake:Almonard,CGL

    No 2 4 2

    **T&PsshallbeofTaparia/Geodremake.ThehanddrillandvacuumcleanershallbewolfandEurekaForbesmake.

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA34/36

  • 18.OfficeFurniture:(ANNEXUREIV)Officefurnitureshallbesupplied&installedateachsubstationasperthelistgivenbelow.AllthefurnitureshallbeofGodrejmake.Beforesupplyofthefurnituretothesubstation,approvalfromOPTCLisrequired.Detailsofthescopeofsupplyareasindicatedbelow.

    SlNo DescriptionofItems unit QuantityRequiredAteach132/33KVS/S

    Ateach220/132/33KVS/S&400/220KVS/S.

    Ateach220/33KVS/S

    1 5ftX3ftexecutivetablewithdrawerbothsides

    Nos 5 6 5

    2 3ftX2&1/2ftTablewithonesidedrawer

    Nos 7 8 7

    3 Computertablesuitablekeepingmonitor,CPU,UPSandprinterwithtwonosrevolvingarmchairsuitableforcomputeruse.

    Set 1 1 1

    4 Executiverevolving,adjustable(height)chairswitharm

    Nos 5 6 5

    5 CushionfixedStypesteelchairswitharm

    Nos 18 24 18

    6 6ftX3ftconferencetable Nos 1 1 17 Cushionarmsteelchairsfor

    conferencetablepurposeNos 6 8 6

    8 6ftheightsteelalmirah(onlywithselves)forkeepingrecordsandothervaluableitems

    Nos 4 6 4

    9 6ftheightsteelalmirahwithglassdoorsforlibrarypurpose

    Nos 2 2 2

    10 6ftheight(havingminimum6lockersfacility)steelcupboardwithlockingarrangement

    Nos 2 2 2

    11 4ftsteelrack(minimumthreeselves)forkeepingthefilesandotheritems

    Nos 8 10 8

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA35/36

  • 19.PORTABLEALUMINIUMLADDEREXTENDABLETYPEOF3m+3mTOBEUSEDFORMAINTENANCEOFEQUIPMENTINSIDESWITCHYARD.HeavydutyTwofoldwithslidingfeaturealuminiumladdertobeusedforthemaintenanceworkequipmentintheswitchyard(400KV,220KV,132KV&33KV:Breaker,CT,CVT,Isolatorsetc)&alsostreetlightingmaintenance.Eachfoldwillbeofminimumheightof3Mtrsandshouldhavebetterlockingarrangementbetweeneachfoldsforbetterrigidity.

    20.PEDESTALMOUNTEDWHEELFITTEDDERRICKFORLIFTING/LOWERINGOFMATERIALSUPTO1.5TONCAPACITY.

    HeavydutyPedestalmountedwheelfittedderrickforlifting/loweringofmaterialsupto1.5toncapacitytobeusedforthemaintenanceworkequipmentintheswitchyard(400KV,220KV,132KV&33KV:Breaker,CT,CVT,Isolatorsetc)&alsoothermaintenanceworks.Theheightofthederrickwillbesuitableforloweringofthetoppoleofthecircuitbreakerupto400KVandotherequipmentsupto400KV.

    ENDOFVOLUMEIIA(SCOPEOFWORK)

    NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA36/36

    16. Maintenance & Testing Equipment: (ANNEXURE-II)